RTA_30_As-Built_Contract_2_Part-2.pdf
PDF 20 MB Posted
- Attached to
- Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
- Solicitation number
- W912DS26RA032
About this file
This file is an As-Built Contract document for the Port Monmouth Phase II flood risk management project, specifically Part 2 of Contract 2 under the RTA 30% design package. The document pertains to the Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project, solicitation number W912DS26RA032, issued by the Department of the Army Corps of Engineers Engineering District New York in partnership with the New Jersey Department of Environmental Protection (NJDEP) as the non-Federal sponsor.
The project encompasses comprehensive flood risk management components including a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. These features are designed to reduce storm damages to low-lying residential and commercial structures in the Port Monmouth area from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. The RTA 30% design package was segmented and uploaded separately due to SAM size limitations, with this document serving as the as-built contract record for Part 2 of the second contract within the overall project delivery structure.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .