REGISTER.pdf

PDF 102 KB Posted

Attached to
Construction of the ERCIP Wellfield Expansion at Fort Drum, NY
Solicitation number
W912DS26RA028
Issued by

About this file

This document is a Submittal Register form for the Fort Drum Wellfield Expansion project, serving as a tracking template for contractor submissions throughout the project lifecycle.

The register encompasses preconstruction submittals, design data, test reports, certificates, shop drawings, product data, manufacturer's instructions, operation and maintenance data, and closeout submittals. Key preconstruction submittals include salvage plans, contact personnel lists, explosive safety training certificates, project schedules, design quality control plans, sustainability checklists, accident prevention plans, quality control plans, site plans, traffic control plans, environmental protection plans, stormwater pollution prevention plans, and cybersecurity compliance statements. Design submittals include interim and final design documents with associated checklists and conferences. Construction phase submittals require special inspection reports, backflow preventer tests, monthly solid waste disposal reports, and employee training records. Closeout submittals include as-built drawings, record drawings, operation and maintenance manuals, equipment certifications, DD Form 1354, training validation documentation, and utility systems records. The register tracks submission dates, approval requirements, material deadlines, and routing to approving authorities. Classification codes (G, C, A, S) and review requirements (RO) indicate which items require government approval or third-party review. The form provides columns for contractor action dates, government forwarding dates, and approval authority receipt and return dates, enabling comprehensive project documentation management from preconstruction through final closeout.

View the file

Other files

File Type Posted
Solicitation Amendment W912DS26RA0280005 SF 30.pdf PDF
C-501_2026-08-07_AMD 5.pdf PDF
01 33 16.00 10.pdf PDF
Solicitation Amendment W912DS26RA0280004 SF 30.pdf PDF
01 78 00.pdf PDF
C-501_2026-08-03_AMD 4.pdf PDF
Solicitation Amendment W912DS26RA0280003 SF 30.pdf PDF
ATTACHMENT 2 - PAST PERFORMANCE QUESTIONNAIRE PPQ (AMD 002).pdf PDF
ATTACHMENT 3 - SPECIALIZED EXPERIENCE (AMD 002).pdf PDF
ATTACHMENT 5 - SAMPLE FIRM_UNEQUIVOCAL_LOC BETWEEN PRIME CONTRACTOR AND SUB (AMD 002).pdf PDF
ATTACHMENT 1 - PROPOSAL DATA SHEET (AMD 002).pdf PDF
REVISED 00 22 10 (AMD 002) (002).pdf PDF
ATTACHMENT 4 - SMALL BUSINESS PARTICIPATION PLAN (AMD 002).pdf PDF
W912DS26R0028 P00002.pdf PDF
Solicitation Amendment W912DS26RA0280001 SF 30.pdf PDF
Site Visit Sign In Sheet.pdf PDF
ATTACHMENT 3 - SPECIALIZED EXPERIENCE.pdf PDF
ATTACHMENT 1 - PROPOSAL DATA SHEET.pdf PDF
Solicitation - W912DS26RA028.pdf PDF
Ft. Drum Wells Field Final D-B RFP - Appendix A.pdf PDF
Ft. Drum Wells Field Final D-B RFP - Appendix B.pdf PDF
Well Field Bidder Walkthrough Packet Instructions.pdf PDF
ATTACHMENT 2 - PAST PERFORMANCE QUESTIONNAIRE PPQ.pdf PDF
Ft. Drum Wells Field Final D-B RFP - Appendix C - Volume 1.pdf PDF
Ft. Drum Wells Field Final D-B RFP - Appendix C - Volume 2.pdf PDF
JA 26-008 - Ft Drum Wellfield -Trane Supervisory Control and Data Acquisition1 May 2026_Redacted.pdf PDF
JA 26-009 - Ft Drum Wellfield - Data Switches- 27 May 2026 _Redacted.pdf PDF
ATTACHMENT 4 - SMALL BUSINESS PARTICIAPTION PLAN.pdf PDF
ATTACHMENT 5 - SAMPLE FIRM_UNEQUIVOCAL_LETTER OF COMMITMENT BETWEEN PRIME CONTRACTOR AND SUB.pdf PDF
Ft. Drum Wells Field Final D-B RFP - Appendix C - Volume 3.pdf PDF
Ft. Drum Wells Field Final D-B RFP.pdf PDF
Ft. Drum Wells Field Final D-B RFP - Appendix D.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 8 PAGES

Fort Drum Wellfield Expansion project

01 11 00 SD-01 Preconstruction Submittals

1.7 G ROSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1List of Contact Personnel

SD-07 Certificates

1.4.13Rs Explosive Safety Education

Training Certificate

01 30 00 SD-01 Preconstruction Submittals

1.3View Location Map

1.4Progress and Completion

Pictures

01 32 01.10 18 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 16.00 10 SD-01 Preconstruction Submittals

1.5.1 G RODesign Quality Control Plan

1.5.2.2Initial Design Conference

1.5.2.3Preconstruction Conference

3.4.1 G RODCM Procedures

3.7.4 G ROSubmittal Register

SD-05 Design Data

1.7.1 C RODesign and Code Checklists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 8 PAGES

01 33 16.00 10 2.4 C ROSustainable Design

3.2.1 R ROInterim Design Submittals

3.6.3Conference Documentation

3.7 R ROFinal Design Submittals

3.8 C RODesign Complete Documents

SD-11 Closeout Submittals

3.7.5 A RODD Form 1354

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 G ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G ROSustainability Action Plan

1.5.3.2 G ROPreliminary Sustainability

eNotebook

SD-05 Design Data

1.5.3.2 G ROInterim Design High Performance

and Sustainable Building Checklist

1.5.3.2 G ROInterim Design Sustainability

eNotebook

1.5.3.2 G ROFinal Design Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.3.2 GFinal High Performance and

Sustainable Building Checklist

1.5.3.2 G ROFinal Sustainability eNotebook

G ROAmended Final Sustainability eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 8 PAGES

01 35 26 SD-01 Preconstruction Submittals

1.8.1 G ROAccident Prevention Plan (APP)

Design

1.8.2 G ROAccident Prevention Plan (APP)

Construction

SD-06 Test Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

1.5 G ROMonthly Exposure Reports

SD-07 Certificates

1.9 G ROActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

1.13Hot Work Permit

1.14License Certificates

1.14.1 G ROPortable Gauge Operations

Planning Worksheet

1.14.1 G RORadiography Operation Planning

Work Sheet

1.12.4.2 G ROStandard Lift Plan

1.12.4.2 G ROCritical Lift Plan

01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

1.5.2.2 GAdditional Requirements For

Design Quality Control (DQC) Plan

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 8 PAGES

01 45 00 1.12.2Design Quality Control

1.5.2.2Discipline-Specific Checklists

SD-06 Test Reports

1.12.3Verification Statement

01 45 35 SD-06 Test Reports

3.1.1Special Inspection Daily Reports

3.1.2Special Inspection Daily Reports

3.1.1Special Inspection Biweekly

Reports

SD-07 Certificates

1.5 G ROSpecial Inspector

SD-11 Closeout Submittals

3.1.2 G ROInterim Report

3.1.2 G ROComprehensive Final Report

3.1.3 G ROFinal Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.3.1 G ROTraffic Control Plan

2.2.1 G ROHaul Road Plan

1.6.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

1.6.6 G ROContractor Temporary Network

Cybersecurity Compliance

Statements

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 8 PAGES

01 50 00 3.4Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.5.1Storage Material Inventory

1.6.1Preconstruction Survey

1.6.2Regulatory Notifications

1.6.4Environmental Manager

Qualifications

1.6.5Employee Training Records

1.7 G ROEnvironmental Protection Plan

1.7.9.1Dirt and Dust Control Plan

1.10Solid Waste Management Permit

3.2.1.1 G ROStormwater Pollution Prevention

Plan

3.2.1.2Stormwater Notice of Intent

G ROSpill Prevention Control And

Countermeasure (SPCC) Plan

SD-06 Test Reports

1.10.1 G ROMonthly Solid Waste Disposal

Report

3.2.1.3Inspection Reports

SD-07 Certificates

1.6.5 G ROEmployee Training Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 8 PAGES

01 57 19 1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

1.6.2 G RORegulatory Notifications

1.6.5 G ROAssembled Employee Training

Records

1.10 G ROSolid Waste Management Permit

3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

3.2.1.5As-Built Topographic Survey

3.7.1 G ROWaste Determination

Documentation

3.7.2.1 G ROProject Solid Waste Disposal

Documentation Report

3.7.2.1 G ROSales Documentation

3.7.2.1Contractor Certification

01 58 00 SD-02 Shop Drawings

1.3.1 G ROSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROConstruction Waste Management

Plan

SD-06 Test Reports

1.8.2Quarterly Reports

1.8.3Annual Report

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 8 PAGES

01 74 19 1.9 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.8.5Warranty Tags

1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

1.8.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

G RORecord Model

3.6As-Built Record of Equipment and Materials

1.8.1Warranted Equipment and

Materials

3.4 G ROFinal Approved Shop Drawings

3.5 G ROConstruction Contract

Specifications

2.2 G ROCertification of EPA Designated

Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 8 PAGES

01 78 00 2.3 G ROCertification Of USDA Designated

Items

3.9.1 G ROInterim DD FORM 1354

3.9.2List Of Installed Building

Equipment Items For DD Form

01 78 23 SD-10 Operation and Maintenance

Data

1.4 G ROFacility Data Workbook

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

3.2.1 G ROOperation And Maintenance

Manual, Progress Submittal

3.2.2 G ROOperation And Maintenance

Manual, Prefinal Submittal

3.2.3 G ROOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

3.1.5 G ROValidation of Training Completion

3.1.1 G ROTraining Plan

1.6.6.7 G RORecord Drawings And Utility

Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .