ATTACHMENT 3 - SPECIALIZED EXPERIENCE (AMD 002).pdf
PDF 80 KB Posted
- Solicitation number
- W912DS26RA028
About this file
This is a specialized experience form template for the ERCIP Well Field Expansion project at Fort Drum, NY. The form is designed to be completed by prime contractors or key subcontractors to demonstrate relevant project experience within the past seven years on similar-type and -scope projects.
The form requires contractors to provide comprehensive information about each past project, including the facility type, company name, project name and location, project owner, general scope of work, and the contractor's specific role (prime, joint venture, or subcontractor). Respondents must detail the construction cost, percentage of work self-performed, extent and types of work subcontracted out, construction dates (start and completion), and LEED certification level if applicable. Additionally, contractors must disclose their performance evaluation by the owner if known, indicate whether they experienced termination or assessed liquidated damages (with required explanations if applicable), and provide the owner's point of contact for reference verification along with current contact telephone numbers. The form requires one completed form per project example and is intended to establish the contractor's qualification and experience relevant to the well field expansion project.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ERCIP Well Field Expansion
Fort Drum, NY
ATTACHMENT 3 - SPECIALIZED EXPERIENCE
PRIME CONTRACTOR OR KEY SUBCONTRACTOR
Provide the following information to show examples of projects your company constructed within the last seven years indicating experience with projects of similar type and scope. Use one form per project.
Type of Facility Represented
Your Firm's Name:
Name of Project
Location of Project
Owner
General Scope of Construction Project
Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed:
Construction Cost
Did this project include LEED (Bronze, Silver, Gold or Platinum)
Percent of Work Self Performed
Extent and Type of Work You Subcontracted Out
Dates Construction: Began Completed
Your Performance Evaluation by Owner, if known
Were You Terminated or Assessed Liquidated Damages?
(If either is "Yes", attach an Explanation)
Owner's Point of Contact for Reference(Name and Company)
Current Telephone Number of Reference