ATTACHMENT 3 - SPECIALIZED EXPERIENCE.pdf
PDF 65 KB Posted
- Solicitation number
- W912DS26RA028
About this file
This document is a specialized experience form template for the ERCIP Well Field Expansion project at Fort Drum, NY. It is designed for prime contractors or key subcontractors to submit examples of previously constructed projects demonstrating relevant experience with similar project types and scope within the last seven years. One form must be completed per project.
The form requires contractors to provide comprehensive project information including the facility type, firm name, project name, location, owner, general scope of construction, the contractor's role (prime, joint venture, or subcontractor), construction cost, percentage of work self-performed, extent and type of subcontracted work, construction dates (start and completion), and LEED certification level if applicable. Additionally, contractors must disclose their performance evaluation by the owner, any terminations or liquidated damages assessments (with required explanations if applicable), and provide the owner's point of contact for reference verification including current telephone number. This submission requirement establishes baseline qualifications and demonstrates the contractor's capability to execute similar construction work at Fort Drum.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ERCIP Well Field Expansion Fort Drum, NY
CUI
ATTACHMENT 3 - SPECIALIZED EXPERIENCE
PRIME CONTRACTOR OR KEY SUBCONTRACTOR
Provide the following information to show examples of projects your company constructed within the last seven years indicating experience with projects of similar type and scope. Use one form per project.
Type of Facility Represented
Your Firm's Name:
Name of Project
Location of Project
Owner
General Scope of Construction Project
Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed:
Construction Cost
Did this project include LEED (Bronze, Silver, Gold or Platinum)
Percent of Work Self Performed
Extent and Type of Work You Subcontracted Out
Dates Construction: Began Completed
Your Performance Evaluation by Owner, if known
Were You Terminated or Assessed Liquidated Damages?
(If either is "Yes", attach an Explanation)
Owner's Point of Contact for Reference(Name and Company)
Current Telephone Number of Reference
File details come from the government source that posted it. Updated .