This file is Fort Drum Regulation 420-7, an environmental regulation document issued by the Directorate of Public Works Environmental Division at Fort Drum, New York, effective 26 September 2024. The regulation establishes comprehensive environmental laws, restrictions, and procedures for all activities conducted on the Fort Drum military installation, applicable to military personnel, civilians, contractors, and all authorized parties operating on the installation.
The regulation addresses major environmental compliance areas including hazardous waste management (with mandatory use of the "You-Call, We-Haul" program for disposal), petroleum/oils/lubricants (POL) operations requiring secondary containment at 110% capacity, stormwater pollution prevention, drinking water protection with cross-connection controls, wastewater management with oil/water separator requirements, air quality compliance under NYSDEC Title V permits, storage tank management for above-ground and underground systems, spill prevention and reporting to emergency services, and field operations including tactical water purification systems with specific discharge limits. The regulation mandates Environmental Officer (EO) appointments at unit and facility levels (primary WO1/O1 or above; alternate E5 or above) with monthly inspections using Fort Drum Environmental Compliance Checklists, annual POL handling and stormwater best management practice training, and compliance assistance visits by DPW-Environmental personnel. Additional requirements include asbestos-containing material abatement prior to demolition, lead-containing paint management for pre-1980 structures, ozone-depleting substance (ODS) refrigerant handling by EPA-certified technicians, prohibition of cold cleaning degreasers with bioremediating parts washers only approved, bulk fueling operations limited to designated sites with exceptions requiring Records of Environmental Consideration (REC), and adherence to endangered species and bald eagle protection measures including aircraft altitude restrictions (1,500 feet AGL) and activity buffers (330 feet from active nests during breeding season). The regulation also establishes requirements for contractors performing work on Fort Drum, including submission of Environmental Protection Plans at least 15 business days prior to work commencement, hazardous waste disposal compliance, spill cleanup responsibility, and vehicle permitting for off-post material transport.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Colby Company Engineering
APPENDIX B
FORT DRUM INSTALLATION STANDARDS
Fort Drum Regulation 420-7
Facilities Engineering
Environmental Regulation
Directorate of Public Works Environmental Division Fort Drum, NY 26 September 2024
UNCLASSIFIED
SUMMARY of CHANGE
Environmental Regulation
This revision, dated 26 Sep 2024-
• Updates contact information for the Drinking Water Program throughout the regulation.
• Updates contact information for Forests (para. 3-3).
• Updates information about bald eagle requirements (para. 3-5).
• Updates HEMTT containment requirements to address issues with precipitation, spills, etc. (para. 3-16 & 3-17).
• Updates the cold cleaning degreasers/parts washer requirements to reflect changes made to 6 NYCRR Part 226 (para. 3-18).
• Updates requirements for any changes to the Fort Drum potable water system, Drinking
Water (para. 3-20).
• Updates requirements for expansions and modifications of the Fort Drum sewer system, Wastewater (para. 3-21).
• Updates prohibited equipment without approval, Air Quality/Title V Operating Permit
(para. 3-24).
• Updates approved Open Fire requirements (para. 3-26).
• Updates requirements for Bulk Fuel Dispensing Sites (para. 3-27).
• Updates ODS (Class I and Class II Refrigerants) as required by 40 CFR Part 82 and
Sections 608 and 609 of the Clean Air Act (para. 3-28).
• Updates Facilities Requiring an Environmental Officer (Appendix B).
• Updates the Fort Drum Environmental Compliance Checklist REV11 (Appendix D).
• Updates rank requirements for appointing Environmental Officers (para. 2-3).
• Updates additional duty responsibilities for Environmental Officer’s (para. 2-4).
• Updates chart for Facility’s Requiring an Environmental Officer (Appendix B).
• Updates responsibilities for new soldiers in-processing (para. 2-1).
• Updates Cultural Resources requirements for fill materials brought onto Fort Drum
(para. 3-6).
• Updates Installation Restoration Program (IRP) requirements (para. 3-31).
• Updates responsibilities of Contracting Officer Representative responsibilities (para. 2-
6).
• Updates contractor responsibilities performing work on Fort Drum (para. 2-5).
• Updates disposal requirements for sanitary wipes (para. 2-8 & 3-21).
• Updates outdoor vehicle washing and outdoor maintenance (para. 3-22).
• Updates purpose, intent, toxic metal, and particulates (para. 3-13).
• Updates Barbed, Ribbon, and Concertina Wire (C-2 Field Activities).
• Updates endangered/protected bat species (C-7 Fish and Wildlife).
• Updates tactical water purification requirements (C-2 Field Activities).
• Updates military training/post project requests for Record of Environmental
Consideration (C-9 REC).
• Adds Appendix F: Global Warming Potential Limits for Equipment Containing
Refrigerants (page 41).
Fort Drum Regulation 420–7 • 26 September 2024 i
Directorate of Public Works Environmental Division 26 September 2024
HQS US Army Garrison Fort Drum, NY
Facilities Engineering
Environmental Regulation
MATTHEW R. MYER
Colonel, IN Garrison Commander
History. This publication is a rapid action revision. The portions affected are listed in the summary of change.
Summary. This regulation sets forth environmental laws, restrictions, and procedures for activities on Fort Drum.
Applicability. This regulation applies to all personnel, military, and civilians, who engage in activities on Fort Drum.
Proponent. The proponent is the Directorate of Public Works, Environmental Division.
Suggested Improvements.
Users are invited to send comments and suggested improvements on DA Form
2028 (Recommended Changes to Publications and Blank Forms) to Environmental Division (DPW), 4205 Po Valley Road, AMIM-DRP-E, Fort Drum, NY 13602.
Distribution. This publication is available in electronic media and is available to all persons on Fort Drum.
Restrictions. There are no restrictions.
Contents (Listed by paragraph and page number)
Chapter 1 Introduction, page 1 Purpose • 1-1, page 1 References • 1-2, page 1 Explanation of Abbreviations and Terms • 1-3, page 1
Chapter 2 Responsibilities, page 1 Directorate of Public Works (DPW) • 2-1, page 1 Public Affairs Office (PAO) • 2-2, page 3 Commands, Directorates, and Support Activities • 2-3, page 3 Environmental Officers (EOs) • 2-4, page 3 Contractors • 2-5, page 4 Contract Officer Representative (COR)• 2-6, page 4 Army Field Support Battalion (AFSBN), Hazardous Material Control Center (HMCC)• 2-7, page 5 Everyone • 2-8, page 5
Chapter 3 Policies and Procedures, page 5 National Environmental Policy Act (NEPA) and Environmental Documentation • 3-1, page 5 EO Training • 3-2, page 6 Forests and Vegetation • 3-3, page 6 Wetlands and Streams • 3-4, page 6 Fish and Wildlife/Endangered Species • 3-5, page 6 ii
Cultural Resources • 3-6, page 8 HMCC • 3-7, page 9 Emergency Planning and Community Right to Know Act (EPCRA) • 3-8, page 9 Environmental Protection Plans (EPPs) • 3-9, page 9 Hazardous Waste (HW), HW Management/ “You-Call, We-Haul” • 3-10, page 10 Non-Hazardous Solid Waste (SW) and Recycling Management • 3-11, page 11 Non-Hazardous SW Collection and Storage • 3-12, page 12 Toxics • 3-13, page 12 Petroleum, Oils and Lubricants (POL)/POL Operations Contract • 3-14, page 13 Spill Prevention, Control, and Countermeasures Plan • 3-15, page 14 Secondary Containment • 3-16, page 14 Fueling Operations on and off the Cantonment Area • 3-17, page 15 Storage Tank Management • 3-18, page 15 POL Labeling • 3-19, page 16 Drinking Water • 3-20, page 16 Wastewater • 3-21, page 16 Stormwater • 3-22, page 17 Operational Noise • 3-23, page 18 Air Quality/Title V Air Operating Permit • 3-24, page 18 Parts Washers • 3-25, page 18 Open Fires • 3-26, page 19 Bulk Fuel Dispensing Sites • 3-27, page 19 Ozone Depleting Substances (ODS) • 3-28, page 19 Paint Booths • 3-29, page 20 Idling Prohibition for Heavy Duty Vehicles • 3-30, page 21 Installation Restoration Program (IRP) • 3-31, page 21 Pollution Prevention Program • 3-32, page 21 Net Zero • 3-33, page 22 Compliance Assistance Visits • 3-34, page 22
Appendix
a. References, page 24
b. Facility Designations, page 27
c. Guidelines for Field Operations, page 28
d. Environmental Inspection Checklist, page 35
e. Drinking Water Source Protection Measures Map, page 40
f. Global Warming Potential Limits for Equipment Containing Refrigerants, page 41
Glossary
Chapter 1 Introduction
1-1. Purpose This regulation sets forth laws, restrictions, and procedures related to environmental concerns on the Fort Drum military installation.
1-2. References Required and related publications and prescribed and referenced forms are listed in appendix A.
1-3. Explanation of Abbreviations and Terms Abbreviations and terms used in this regulation are explained in the glossary.
Chapter 2 Responsibilities
2-1. Directorate of Public Works (DPW)
a. The DPW will-
(1) Implement and maintain a Qualified Recycling Program (QRP) and appoint a QRP Manager IAW Army Regulation (AR) and Department of Defense (DOD) Instruction 4715.4.
(2) Track and report Solid Waste (SW) and recycle tonnage as required by ARs and New York State Environmental Conservation Law (NYSECL).
(3) Develop and maintain the installation Air Quality Program.
(a) Use air-monitoring data to identify, eliminate, or minimize emission of pollutants from all sources, particularly if they hinder compliance with applicable air quality standards.
(b) Maintain all stationary sources (heating units, furnaces, boilers, generators, and paint booths) to ensure compliance with applicable emission standards.
(c) Ensure that all new stationary sources and all major modifications to existing stationary sources are designed to meet or exceed applicable air quality standards.
(d) Implement emergency air pollution episode plans promulgated by state and local authorities.
(e) Prepare and submit all required reports to include air quality permits.
(f) Maintain liaison with air quality control agencies/authorities.
b. The DPW-Environmental Division will-
(1) Will provide a copy of the most current Spill Prevention, Control, and Countermeasure Plan (SPCCP) to all units and other agencies on Fort Drum.
(2) Perform the following Storage Tank Management functions:
(a) Evaluate the need for replacement or new tank systems using total life-cycle cost analysis. Ensure persons supervising tank installations are specifically trained and qualified in tank system installations and state certified if required.
(b) Ensure leak detection for regulated Aboveground Storage Tanks (ASTs)/Underground Storage Tanks (USTs) occurs either by retrofit or inventory control procedures.
(c) Ensure existing regulated ASTs/USTs have cathodic protection, catch basins, and overfill warning devices. Regulated ASTs/USTs and commercial permitted tanks (heating oil or other tanks greater than 50 gallons) will meet specific retrofit or closure requirements.
(d) Ensure that all future installations of any petroleum storage tank will be installed above ground. Underground petroleum transfer piping is authorized only for Army and Air Force Exchange Service (AAFES) fueling stations and the bulk storage dispensing stations including the OASIS hydrant system. Secondary containment will be provided for above and below ground piping for all AST and already existing UST petroleum systems.
(e) Ensure all existing ASTs/USTs have secondary containment and, for field erected tank systems, leak detection systems. Ensure new AST systems are constructed with cathodic protection on underground piping, secondary containment on underground piping and tanks, and overfill protection.
c. The DPW-Environmental Division Petroleum, Oils and Lubricants (POL) Program Manager will-
(1) Maintain a physical inventory of all tank systems.
(2) Perform testing of tank integrity.
(3) Ensure removal of all damaged, leaking, or improperly functioning regulated tank systems.
(4) Be the primary point of contact for any work involving an AST or UST installation, upgrade, or removal.
(5) Maintain permit records and permit applications for all regulated and commercial tanks.
d. The DPW-Environmental Division Air Quality Program Manager will-
(1) Use air-monitoring data to identify, eliminate, or minimize emission of pollutants from all sources, particularly if they hinder compliance with applicable air quality standards.
(2) Monitor all stationary sources (heating units, furnaces, boilers, generators, paint booths, and incinerators) to ensure compliance with applicable emission standards.
(3) Ensure that all new stationary sources and all major modifications to existing stationary sources are designed to meet or exceed applicable air quality standards.
(4) Implement emergency air pollution episode plans promulgated by state and local authorities.
(5) Prepare and submit all required reports to include air quality permits.
(6) Maintain liaison with air quality control agencies/authorities.
e. The DPW-QRP Manager will designate marketable recyclables for segregation and collection.
f. The DPW-Environmental Division Installation Restoration Program (IRP) Manager will coordinate with facility owners prior to investigation/remediation of newly discovered and existing IRP sites.
g. The DPW-Environmental Division Hazardous Waste (HW) Program Manager will-
(1) Be responsible for ensuring that all HW is correctly characterized
(2) Be responsible for ensuring that all HW is properly containerized, labeled, and shipped IAW applicable laws and regulations.
(3) Ensure that all persons handling HW are trained IAW Title 40 (40 CFR) (part 265.16(a) (2)).
(4) Ensure that satellite collection sites and less than 90-day sites are inspected weekly.
(5) Be responsible for signing all HW manifest and maintaining copies for at least three years.
(6) Generate delivery order request and process them through the Defense Logistics Agency Disposition Service (DLADS).
(7) Act as the Contract Officer Representative (COR) for the DLADS HW contract.
(8) Prepare and submit an annual HW report to the New York State Department of Environmental Conservation (NYSDEC) and Environmental Protection Agency (EPA).
(9) Maintain the “You-Call, We-Haul Program”.
(10) Be responsible for reviewing applicable contracts to ensure compliance with HW law and regulations.
h. The DPW-ENV SW Program Manager and DPW-O&M Roads and Grounds will-
(1) Be responsible for the collection, storage, marketing, and disposal of non-hazardous SW and recyclables on Fort Drum except for construction and demolition debris generated by military construction, renovation, and demolition projects and that which is generated by the
Privatization of Army Lodging, other entities operating on Fort Drum and Fort Drum Mountain Community Homes (FDMCH).
(2) Developing a waste and recycle pick-up schedule that suits the needs of Fort Drum activities and maintains acceptable sanitary standards at the lowest possible cost; procure and maintain waste and recycle collection, handling, and transport equipment capable of sustaining operations on Fort Drum.
(3) Operate and maintain a SW transfer station.
(4) Execute and review contractual agreements for the processing, marketing, and transportation of non-hazardous SW and recyclable materials.
(5) Develop, maintain, and implement an Integrated Solid Waste Management Plan (ISWMP). Provide oversight and inspections for covered operations.
i. The DPW-Pest Control will-
(1) Prepare and maintain a current Integrated Pest Management Plan (IPMP) that defines pest management requirements, resources, and responsibilities.
(2) Coordinate the IPMP with affected parties.
(3) Ensure personnel that apply or supervise the application of pesticides are appropriately trained and certified.
(4) Establish procedures to store, handle, dispose, apply, and manage pesticides that are consistent with federal, state, and local environmental law.
(5) Maintain and archive records and reports on all pesticide applications and operations made to all facilities and grounds.
(6) Conduct periodic program reviews to ensure regulatory compliance and correct deficiencies.
j. The DPW-ENV Environmental Officer (EO) Course Instructor will provide an in person 30-minute environmental compliance brief to all incoming soldiers at or during the installations in-processing procedure/briefing. This will include legal topics such as stormwater, solid waste, spills, and other topics of concern.
2-2. Public Affairs Office (PAO) The Fort Drum PAO will-
a. Manage, record, and archive noise complaints.
b. Act as the sole liaison between noise complainants and Fort Drum.
2-3. Commands, Directorates, and Support Activities
a. Each brigade, battalion, company, and separate detached units will appoint a primary and alternate Environmental Officer (EO) in writing to act as the unit POC for environmental concerns. Reference Appendix B for list of high-risk facilities that require an appointed and trained EOs. The primary EO should be WO1/O1 or above in rank and the alternate E5 or above. This includes all separate detachments, units, and detachments from other armed forces branches tenant to Fort Drum.
b. Each directorate and support activity and organization will appoint a primary and alternate EO at appropriate organizational levels in writing to act as the organizational POC for environmental concerns.
c. All military units and organizations, regardless of armed forces branch, participating in exercises and utilizing any of Fort Drum’s facilities, training areas or ranges will appoint an EO to act as the POC for environmental concerns.
2-4. Environmental Officer (EO) The EO will function as the unit commander and organizational supervisors “eyes and ears” for their environmental programs; ensuring compliance with environmental law and regulations, as well as serve as the POC for the Compliance Assistance Visits (CAVs) conducted by DPW- Environmental. Additional EO responsibilities include:
a. Advise unit commanders or organizational supervisors on matters related to the implementation of this policy.
b. Advise management in developing and implementing the environmental management and compliance program in the unit or organization.
c. Organize, plan, and implement an effective environmental management and compliance program at the unit or local level.
d. Develop and maintain Standard Operating Procedures (SOPs) for environmental management and compliance program elements.
e. Provide coordination with Fort Drum Environmental Division.
f. Publicize environmental management and compliance policies and procedures.
g. Primary EO is responsible for conducting formal monthly inspections using the latest inspection checklist (Fort Drum Environmental Compliance Checklist) and coordinating the periodic inspection of facilities for compliance with applicable environmental policy, law, and regulation.
h. Primary EO is responsible for providing/documenting training to the unit to include annual POL handling training, but not limited to annual spill response and stormwater BMP training. It is also the responsibility of the EO to maintain hard copies in a binder of all completed monthly inspections as well as all required annual training documentation to make them readily available for audits.
i. The alternate EO is responsible for performing daily checks to ensure environmental procedures and regulations are being followed.
j. Ensure that all environmental accidents or incidents are investigated and reported promptly IAW SOPs.
k. Advise unit commanders or organizational supervisors of any environmental or potential violation of environmental rules, regulations, policies, or directives.
l. Participate in annual EO refreshers conducted by DPW-Environmental.
m. Notify the CAV team on redeployment and deployments for close out of the facility.
n. Notify the DPW compliance instructor when he/she has undergone a permanent change of station or is no longer in his/her appointed EO capacity.
2-5. Contractors Contractors will-
a. Provide DPW-Environmental with an Environmental Protection Plan (EPP) that conforms to the standard set forth in the most current Unified Facilities Guide Specification.
b. Contractors (e.g., job ordering contract, repair rehabilitation and minor construction, U.S.
Army Corps of Engineers (USACE), Army Environmental Command, etc.) performing work on Fort Drum that generate or accumulate HW must comply with all federal, state, and local environmental laws and regulations, including the Fort Drum Hazardous Waste Management Plan (HWMP) and ISWMPs 6 NYCRR Part 360 guidance papers.
c. Be responsible for all costs associated with HW management and disposal including requirements to test unlabeled/unknown waste generated on job sites.
d. Be responsible for any spill clean-up and all costs associated with the clean-up of a spill.
e. Follow additional/specific requirements listed in para 3-29 for Ozone Depleting Substances (ODSs) pertaining to certification requirements.
f. Assure all vehicles that are used to haul material and or waste to any off-post location have appropriate 6 NYCRR Part 364 permitting for that material and number is clearly marked on vehicle.
2-6. Contracting Officer’s Representative (COR)
The COR will-
a. Be responsible for quality assessment/quality control actions of the EPPs within the COR’s authority as delegated by the contracting officer.
b. Follow additional/specific requirements listed in para 3-29 for ODS pertaining to certification requirements.
c. Be a liaison between DPW-Environmental and the contracting office for required reporting of Solid Waste and recycling as well as violations of federal, state, and local environmental law that occur in areas operated by contractors.
2-7. Army Field Support Battalion (AFSBN), Hazardous Material Control Center (HMCC) The HMCC will-
a. Notify DPW-Environmental when bulk (greater than 500 pounds) shipments of any extremely hazardous substance have been acquisitioned or issued.
b. Provide accurate information to DPW-Environmental regarding storage and issue of HM for completion of the installations annual Tier II report and Title V air reports.
2-8. Everyone
a. It is the responsibility of all active Army, Army National Guard, Army Reserve, members of other uniformed services, Civilian personnel, tenants, contractors, and all other authorized to conduct operations on Fort Drum.
b. It is a shared responsibility of the entire Fort Drum community (all individuals) to properly dispose of wipes in the trash and not to discard wipes into the sanitary sewer, which can result in lift station pump failure and sewage spills.
Chapter 3 Policies and Procedures
3-1. National Environmental Policy Act (NEPA) and Environmental Documentation
a. Environmental review and documentation are required for all federal actions (e.g., military training, new technology/equipment testing, construction projects), IAW the NEPA. This includes actions occurring on federal lands.
b. A request for review must be submitted to DPW-Environmental Division NEPA Coordinator by the proponent of the action. Requests are to be submitted through the automated system for both military training and post projects.
c. Information required to submit an action for review includes a project or exercise name, the date and duration, the proponent’s name, 8-digit location coordinates, and a detailed description of the action (to include a map of the area and/or Concept of Operations (CONOP)) to be used/disturbed.
d. Military training requests must be submitted 14 business days prior to occupying or preparing the field for training. Division and brigade level training missions will be submitted 30 business days prior to training. See the Environmental Guidelines Appendix in Fort Drum Regulation 350–4, Range Regulation, for specific field requirements.
e. Post project requests must be submitted a minimum of 14 business days prior to the start of the action. Review of actions that propose restoration, repair, maintenance, enhancement, construction, demolition, fielding, research and development, land management etc., are required to be coordinated with the NEPA office for environmental review as early in the development phase as possible (concept phase). Pending location, size and scope of potential impacts, project review, coordination and required documentation may take additional time to complete.
f. Approved missions/actions will receive a Record of Environmental Consideration (REC) form that is required to be retained with the proponent at the location of the activity. If the project or training mission is modified or changed, additional documentation must be submitted by the proponent to the NEPA Coordinator for review.
g. Actions not covered by a REC must be analyzed to determine if they could cause significant impacts to the human and natural environment. Based on the extent of the impact, an environmental assessment or an environmental impact statement may be required.
h. The POC for NEPA questions, military training requests, and post project requests is the DPW-Environmental Division NEPA Coordinator at (315) 771-6026.
3-2. EO Training
a. Commanders will appoint and ensure EOs receive required training to ensure environmental compliance actions take place, IAW AR 200–1, Environmental Protection and Enhancement.
b. Individuals who were appointed by their unit commanders or supervisors must bring a signed appointment letter to the instructor, which will denote who is appointed the primary and alternate EOs.
c. Environmental Officer’s training is offered twice per month, catered environmental training is available upon request.
d. The POC for EO training can be reached at (315) 772-6108.
3-3. Forests and Vegetation
a. All tree cutting, damage, and or/removal is prohibited, unless approved by the Fort Drum Forest Management, and Fish and Wildlife Management Programs. Standing trees are considered real property. Unauthorized removal of trees constitutes theft of government property.
b. Any forest product needed for training exercises must be authorized for use by the Fort Drum Forestry Program (REC required).
c. Harvesting or removing any downed woody material is allowed only upon purchase of a Fort Drum firewood permit. See Fort Drum Regulation 420-6, Forest Product Sales, for more information regarding the sale of firewood and other forest products.
d. Any unauthorized use or removal of forest products is subject to fines and penalties as outlined in Fort Drum Regulation 420-6.
e. The POC for Forests can be reached at (315) 772-3170/Other Vegetation at (315) 778- 6348.
3-4. Wetlands and Streams
a. The Wetlands Management Program is responsible for the analysis of projects and other activities regarding Federal and State Wetland and Waters of the United States (WOTUS) regulations. The Wetland Management Program in conjunction with the USACE, EPA, and NYSDEC determine the appropriate permit requirements for proposed activities.
b. Authorization is required for all activities resulting in dredging or the placement of fill materials in jurisdictional wetlands and other WOTUS. A review by the Wetlands Management Program is required for all proposed construction activities and maintenance of structures within and adjacent to wetlands and other WOTUS (REC required).
c. Training activities will be minimized in and around wetlands and WOTUS.
d. Water crossing or bridging operations are prohibited unless conducted at the approved locations. Other proposed locations must first be reviewed by the Wetlands Management Program to determine whether permits are required before any action occurs.
e. Vehicle washing is not allowed in or adjacent to streams and other open water bodies.
f. The POC for Wetlands and Streams can be reached at (315) 772-6238.
3-5. Fish and Wildlife/Endangered Species/Bald Eagles
a. It is illegal to pursue, shoot, hunt, kill, capture, trap or take protected fish and wildlife or engage in lesser acts that disturb or harass fish and wildlife or their dens/roosts/nests, etc., unless specifically authorized to do so. Feeding wildlife (with the exception of birds at bird feeders) is prohibited.
b. Protected fish and wildlife may be taken only during an open season or as permitted by federal and state laws and regulations. Hunting, fishing, trapping, and other recreational activities on Fort Drum are conducted IAW New York State laws; applicable federal laws;
Fort Drum Regulation 420-3, Hunting, Fishing, Trapping and Camping; and supplemental orders issued by the installation commander.
c. Disturbing, molesting, or removing the traps and/or trapped animals of licensed trappers or fish and wildlife management personnel is prohibited.
d. Beaver dams will not be disturbed, destroyed, or altered within a stream or wetland area without prior coordination with the Fort Drum Fish and Wildlife Management Office (315) 778- 6348. All beaver management is conducted under permits issued by the NYSDEC.
e. Natural vegetation (not including landscaped yards) will not be disturbed, destroyed, or altered without prior coordination with the Fort Drum Fish and Wildlife Management office. All vegetation management is conducted under the provisions of a Consultation with the U.S. Fish and Wildlife Service IAW the Endangered Species Act. In general, no trees greater than 3" in diameter at breast height may be cut from 15 April - 15 October to avoid any direct adverse effects to the federally endangered Indiana and northern long eared bats. Additionally, no vegetation (to include trees of any size, shrubs, grasses, etc.) may be cut from 15 April - 01 August, to minimize the incidental take of migratory birds IAW the Migratory Bird Treaty Act.
f. All bats found must be immediately reported to Fort Drum’s Fish and Wildlife Management Program (315) 778-6348 or (315) 212-6397. Do not attempt to handle any live bats, regardless of condition. If a live bat is found in a building, please contact (315) 772-2072 (Pest Control) or
(315) 778-6348 (Fort Drum Fish and Wildlife Management).
g. If bats of any species are discovered during building demolition, then all work must cease, and the Fort Drum Fish and Wildlife Management office must be contacted immediately.
h. No lethal control methods are permitted for bats unless there is a suspected human health risk for exposure to rabies or other disease. No adhesive traps used for rodents or insects will be placed in such a manner that they could capture bats, i.e., glue traps will not be placed in any crawl space or attic compartment within buildings or in areas where bats are known to occur.
i. All activities generating smoke (i.e., military training, firefighting training, prescribed fires, etc.) will be conducted IAW Fort Drum’s Endangered Species Act requirements and guidance and applicable regulations.
j. All conservation measures within Fort Drum’s Biological Assessment will be followed and all reasonable and prudent measures and terms and conditions with the U.S Fish and Wildlife Service’s Biological Opinion (or other Consultations) will be followed regarding the federally endangered Indiana and northern long eared bats. If there are questions about endangered species or to get a copy of Fort Drum’s Endangered Species Act Implementing Document, contact Fort Drum’s Fish and Wildlife Management Program.
k. Disturbing, molesting, or harassing bald eagles and bald eagle nesting locations is prohibited.
l. All aircraft (i.e., manned/unmanned/fixed wing/rotary wing) must avoid operation within
0.25 mile or greater of any active eagle nest during the breeding season (January 1 - September 30). NOTAM and broadcasts on the Range Information System/ WSAAF Automatic Terminal Information System identifying 0.25 mile lateral and 1500 AGL restrictions will be in place for all operators and will apply to all manned or unmanned aircraft.
m. No loud, intermittent activities (i.e., blasting/artillery/live fire) can occur within 0.25-mile buffer of any active eagle nest during the breeding season (January 1 - September). Therefore, operations incorporating gunnery/ live fire must not encroach within the 0.25 nest buffer, and aviation operations must also stay at or above 1500 AGL.
n. Dismounted maneuvers, other land or water based military training, and/or recreation (e.g., hunting, hiking, camping, kayaking, canoeing, fishing) is prohibited within 330 feet of any active eagle nest during the breeding season (January 1 - September 30). If any eagle or nest is encountered, individuals must quietly leave the area.
o. Timber harvesting, clear cutting, tree cutting, or removal or overstory trees is prohibited within 330 feet of any active eagle nest at any time of the year. Tree cutting, timber harvesting, or other similar management actions may be authorized outside of the 330-foot nest management buffer during the non-breeding season (i.e., October - December) in coordination with Fort Drum’s Fish and Wildlife Management Office.
p. The POC for Fish and Wildlife can be reached at (315) 212-6397, Endangered Species/Bald Eagles at (315) 778-6348.
3-6. Cultural Resources
a. Federal law mandates that all cultural resources eligible for listing on the National Register of Historic Places must be protected. Cultural resources include but are not limited to historic buildings and structures, cemeteries, and historic and prehistoric archaeological sites.
Many areas on Fort Drum containing national register eligible cultural resources are marked with “OFF LIMITS by Order of the Commander” signs and/or reflective Seibert Stakes and will be avoided.
b. On Fort Drum, some national register eligible properties have been made available as historic area training assets. These areas are marked by signs that say, “Historic Area, Training Permitted, No Digging.” These areas are for surface use only, and paint munitions are forbidden.
c. With the exception of intact projectile points found on the ground surface, federal law prohibits artifact/relic collecting anywhere on Fort Drum. Collectors of intact projectile points are encouraged to report the find to the Cultural Resources office.
d. Willful damage to an archaeological site on Fort Drum is a violation of the Archaeological Resources Protection Act and carries criminal penalties.
e. All proposed renovation/repairs to structures eligible for the National Registry must comply with the Secretary of Interior Standards and contracts will provide language mandating those standards.
f. Recreational metal detecting is prohibited on Fort Drum. Recreational metal detectorists are encouraged to contact the cultural resources program about the possibilities for working with the archaeological survey.
g. All excavations and any form of intentional ground disturbance on Fort Drum require environmental review and the appropriate permitting processes.
h. All federal undertakings on behalf of Fort Drum that have the potential to affect archaeological or historic properties require Cultural Resources review. Consultation under the National Historic Preservation Act might have to occur, whether or not the undertaking occurs within the installation boundary.
i. Any type of fill material being brought onto Fort Drum by a contractor must be from a New York State approved soil mine or gravel pit.
j. If accidental discovery of items that appear to be cultural remains (historic foundations, graves, historic or prehistoric artifacts, etc.) occurs during emplacement excavation or construction projects, all work will cease within a 30-meter radius of the find. Directorate of Plans, Training, Mobilization and Security (DPTMS), Range Division and DPW Cultural Resources will be contacted immediately.
k. The POC for Cultural Resources can be reached at (315) 772-4165.
3-7. HMCC
a. Hazardous Material (HM) is defined as any substance that presents a risk to human health or the environment. HW is HM that can no longer be used for its intended purpose.
b. All HM coming onto Fort Drum must be purchased through the HMCC. Purchasing of HM from off-post retailers is prohibited.
c. Government Purchase Card cardholders are not authorized to purchase HM. Mission Installation Contracting Command will track, report, and revoke any cards that are used to make unauthorized purchases of HM.
d. The HMCC will maintain an authorized use list that will outline what is required for units/contractors to accomplish their mission. Units will not “stockpile” products from the HMCC.
The HMCC will manage HM necessary to sustain the evolving 10th Mountain Division (LI) mission.
e. The HMCC will be the POC for all product shelf-life extension issues. Units/tenants are responsible for inventorying their products and notifying the HMCC when a material needs an extension. The type of material (Type I or Type II), previous extensions, and other characteristics are the determining factors on whether that material is subject to an extension.
f. HM must be managed in a way as to eliminate avoidable generation of HW.
g. Flammable lockers will not be stored outdoors, or in conditions that will potentially change the chemical composition of the materials being stored (freezing temperatures, extreme heat, etc.) and cause excess waste generation.
h. Units/tenants will not stockpile HM. All HM will be procured on a 10-day schedule though the HMCC to minimize the disposal of unused material due to an expired shelf life.
i. Units/tenants that have unwanted HM that is still serviceable must contact the HMCC to have it turned in through the HM disposition program for reissue analysis.
j. Fort Drum has a restricted use list that bans the use of chlorinated solvents. Possessing any product that contains any of the listed ingredients is a violation and is reported to the Garrison Commander (GC).
k. The POC for HMCC can be reached at (315) 772-4591.
3-8. Emergency Planning and Community Right to Know Act (EPCRA)
a. Under Title III of the Superfund Amendments and Reauthorization Act and federal implementation instructions for Executive Order 13423; Fort Drum must comply with the provisions set forth in sections 301 through 313 of the EPCRA.
b. IAW para. a, above, contractors conducting work on the installation are required to provide the following information to DPW-Environmental:
(1) An accurate and current Safety Data Sheet (SDS) for all HM brought on to the installation.
(2) Location and storage vessel information for those HMs.
(3) Information regarding the duration the HM will be on the installation.
c. Spills of any hazardous substance must be immediately called into the 911 operations center.
d. The POC for EPCRA requirements is the DPW-Environmental Division EPCRA Program Manager at (315) 772-0218.
3-9. Environmental Protection Plans (EPPs)
a. All EPPs will be staffed to DPW-Environmental at least 15 business days prior to start of work for review and approval.
b. An appointed onsite environmental manager will be the designated POC for all environmental concerns.
c. Any violation of the environmental requirements set forth in the EPP or violation of Federal, State, or local laws and regulations must be immediately reported to the COR and DPW-Environmental.
d. The POC for EPPs can be reached at (315) 772-5269.
3-10. Hazardous Waste (HW), HW Management/ “You-Call, We-Haul”
a. HW is defined as HM that is no longer able to be used for its intended purpose and either exhibits one or more of the following characteristics: ignitability, corrosivity, reactivity, toxicity, or contains a waste listed in the Code of Federal Regulations (CFR), Title 40 (40 CFR) (part 261.31-33(f)). It is Fort Drum’s intent to:
(1) Ensure compliance with all applicable HM and HW laws and regulations.
(2) Eliminate or minimize hazards to human health and damage to the natural environment.
(3) Save money by implementing waste management procedures which conserve resources.
(4) Protect public health and safety.
b. Proper HW management includes control of the use, storage, and disposal of hazardous/toxic waste. Hazardous and toxic materials include, but are not limited to:
(1) Pesticide, insecticide, and rodenticide.
(2) Herbicide and fungicide.
(3) Solvents.
(4) Photographic fixer, developer, and toner.
(5) Paint/thinners and paint-related material including aerosols.
(6) Miscellaneous materials including but not limited to laboratory, medical, chemotherapeutic, radioactive, nuclear, biological, and chemical material.
(7) Used/broken fluorescent lamps and mercury containing items.
(8) Sealants/adhesives.
(9) Batteries of all types.
(10) Acids.
(11) Corrosive cleaners.
(12) Lead dust.
(13) Asbestos.
(14) Poly chlorinated biphenyls ballasts.
c. If the Fort Drum DLADS cannot find a market for a HM, it is disposed as a HW. The cost of disposing HW is high, therefore, DPW-Environmental monitors disposal of all HW. All tenant command organizations and support activities must comply with Fort Drum’s HWMP and utilize Fort Drum’s EPA identification number for disposal.
(1) The HWMP outlines the required procedures for notifying the HW manager regarding the use, storage, and ultimate disposal of any HW.
(2) All HW must be disposed of within New York State Register and Official Compilation of Codes, Rules and Regulations of the State of New York, Title 6 (6 NYCRR) for timeliness and proper manifesting requirements. Fort Drum has an approved EPA identification number for the disposal of HW from the installation. This is the only EPA identification number that will be used for disposal of waste generated at Fort Drum.
(3) The HW manager or appointed representative must review and sign the waste profiles/waste analysis, Land Ban restriction forms (if applicable), all manifests, and Bill of Ladings for waste that is generated on Fort Drum prior to shipment off of the installation.
d. The HW manager must also be provided with the following:
(1) New York State Regulating Authority permit for each treatment, storage, disposal or recycling facility utilized.
(2) A letter stating, they are authorized to receive the waste stream from Fort Drum.
(3) Documentation that the transporter of HW is licensed and/or permitted to transport HW IAW NYSDEC and United States Department of Transportation (USDOT) regulations.
Documentation must also include a letter stating that they are authorized to transport the waste stream from Fort Drum and provide a copy of the NYSDEC/USDOT Transporter Operator Permit and driver’s license with hazmat endorsement.
e. It is the responsibility of all generators of HW on the installation to utilize the “You Call/We Haul” program as soon as the HM becomes a waste. Accumulation or stockpiling of any HW is strictly prohibited.
f. It is required to provide the HW technician an accurate copy of an SDS for all items collected.
g. Improper disposal of HW material, chemicals/substances (e.g., discarded in dumpsters, trash receptacles, etc.) is a violation.
h. Operation of a 90-day accumulation area outside of the 90-day accumulation building 11144 is strictly prohibited, unless approved by the HW manager.
i. Stockpiling of HW is strictly prohibited. Units/tenants must utilize the “You-Call, We-Haul” program.
j. The POC for HW issues is the DPW-Environmental, HW Manager at (315) 772-4156 and “You-Call, We-Haul” at (315) 772-6111.
3-11. Non-Hazardous Solid Waste (SW) and Recycling Management
a. This section establishes policy for operations and procedures for the efficient and economical management of non-hazardous SW and recyclable materials including source reduction, resource recovery, re-use, recycling, collection, transportation, storage, and disposal.
b. Non-hazardous SW management will be IAW the Resource Conservation and Recovery Act, the NEPA, Executive Order 13423, AR, IPM, NYSECLs, and regulation.
c. Regulated medical waste management will be IAW AR 40–5 and AR 40–61.
d. Fort Drum SW management facilities and assets will not be used for the collection, transportation, and disposal of wastes generated outside the boundaries of Fort Drum, including private homes, leased housing, or FDMCH, unless generated within the scope of Army actions.
e. SW dumping at unauthorized sites is prohibited. Individuals residing in off-post residences or conducting non-governmental activities are strictly prohibited from disposing SW into government owned and operated refuse containers. Individuals involved in unauthorized disposal will be ticketed, subject to fines and other penalties including additional administrative actions determined by the GC. Unauthorized disposal will include improper source segregation and disposal of recyclable materials resulting in co-mingling of recyclables with SW in Fort Drum’s waste stream.
f. Scavenging and picking through refuse in containers, dumpsters, or at the SW transfer station is prohibited. SW collection containers and dumpsters must remain closed and covered when not in use.
g. Recycling and source segregation of recyclable materials is mandatory at all commands, directorates, and tenant activities on Fort Drum.
h. Litter discipline will be strictly observed by units in the Fort Drum training areas. Litter discipline in training areas will be monitored by the Range Division of the DPTMS. Within the cantonment area, all units/activities must routinely police the area immediately surrounding their buildings and facilities.
i. All military construction, renovation, and demolition projects on Fort Drum will include performance requirements for the 60% diversion of SW from landfills.
j. Project specifications will include the submission of a contractor’s Construction and Demolition Waste Management Plan that conforms to the USACE Guide Specification.
k. Burning of SW on Fort Drum is prohibited.
l. Fort Drum has developed an ISWMP. The ISWMP provides specific guidance for source reduction, resource recovery, re-use, recycling, the QRP and SW management practices.
m. The POC for Non-Hazardous SW and Recycling Management can be reached at (315) 783-5810/ (315) 772-5944.
3-12. Non-Hazardous SW Collection and Storage
a. There are no federal or New York State permitted landfills on Fort Drum. All non-hazardous SW generated on Fort Drum will be disposed of at a federal or New York State permitted facility. All transporters of non-hazardous SW generated on Fort Drum will be permitted to do so by the appropriate federal or New York State agency.
b. The POC for Non-Hazardous SW Collection and Storage can be reached at
(315) 783-5810/ (315) 772-5944.
3-13. Toxics
a. Asbestos Containing Materials (ACM).
(1) Any ACM testing will be performed IAW the requirements prescribed in 40 CFR (part
763) and the Asbestos Hazard Emergency Response Act.
(2) Asbestos abatements will be performed IAW with all applicable sections of the New York State Department of Labor’s Industrial Code Rule 56, and all asbestos abatement work will be performed by a firm licensed in the State of New York. Asbestos abatement projects will require submission, review, and approval of work plans prior to the commencement of work.
(3) Demolition is defined as wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations. Renovations are defined as altering a facility or one or more facility components in any way, including the stripping or removal of ACM from a facility component.
(4) Demolitions and renovations will be performed IAW 40 CFR (part 61) and the EPA’s demolition practices under the Asbestos National Emission Standards for Hazardous Air Pollutants. Demolition and renovation work plans will be submitted for review and approval prior to the commencement of work.
(5) It is the purpose and intent of this part to reduce the risks to the public associated with exposure to asbestos and to conform to Federal requirements set forth in the Asbestos Hazard Emergency Response Act (AHERA), National Emission Standards for Hazardous Air Pollutants (NESHAP), and Occupational Safety and Health Administration (OSHA) Asbestos Standard for the Construction Industry. Therefore, all ACM (friable and nonfriable) shall be abated prior to demolition IAW New York State Department of Labor’s Industrial Code Rule 56, while adhering to all NESHAP requirements throughout the demolition process.
(6) Individuals involved in asbestos management in place, demolition, removal, and renovation must have the EPA Model Accreditation training IAW 40 CFR (part 763).
b. Lead Containing Paint (LCP).
(1) Lead dust and debris generated from renovation/demolition activities can adversely impact human health and the environment. Testing to determine the presence of LCP may be performed on commercial structures constructed prior to 1980 to determine the presence of
LCP.
(2) If testing is not performed, all structures constructed prior to 1980 will be assumed to contain LCP.
(3) All renovation/demolition activities associated with commercial structures known or presumed to contain LCP must be IAW the Occupational Safety and Health Administration Lead in Construction Rule (29 CFR, part 1926.62).
(4) All construction contracts must include the most current version of the Unified Facilities Guide Specification for Lead in Construction.
(5) Contract deliverables (lead compliance plan, lead waste management plan, etc.) must be submitted to the DPW-Environmental, Toxics’ Program Manager for review and approval prior to commencing work.
(6) Renovation or demolition of any housing areas, including Single Soldier Housing, must comply with the Toxic Substance Control Act (40 CFR, part 745) as amended by the Residential Lead Based Paint Hazard Reduction Act of 1992 (Public Law 102-550).
c. Toxic Metals and Particulates:
(1) All individuals involved in toxic metal and particulate management in place, demolition removal, and renovation shall perform all work IAW the Occupational Safety and Health Administration, Toxic and Hazardous Substance Standards (29 CFR 1910.1024-Beryllium (Be), 1910.1027-Cadmium (Cd), 1910.1026-Hexavalent Chromium (Cr6+), and 1910.1025-Lead (Pb)).
(2) All contractors shall submit and maintain a written exposure control plan required under OSHA 29 CFR 1910.1024-1027 to DPW Environmental, Toxics’ Program Manager for review and approval no less than 10 business days prior to the commencement of work.
(3) DPW Environmental, Toxics’ Program Manager can be reached at (315) 772-0218 or
(315) 955-5638.
3-14. Petroleum Oil Lubricant (POL)/POL Operations Contract
a. The POLs include all used oils, used antifreeze, Off-Specification fuels (Off-Spec), Fats, Oils and Greases (FOG) from dining facilities and debris from spill cleanup (e.g., rags, absorbents).
b. The following requirements will be met while managing POLs:
(1) All generated used oil products on Fort Drum will be stored in designated storage containers at each facility. Used and Off-Spec POLs will not be stored in plastic cups, coffee cans, water bottles, etc.
(2) Any 55-gallon petroleum storage drum must be documented in the Fort Drum SPCCP.
Any undocumented petroleum storage drum is a violation of 40 CFR (Part 112). All petroleum storage containers must be stored in designated storage locations for maintenance areas which are found in the Fort Drum SPCCP. Units/contractors must perform monthly inspections for all petroleum storage areas. Inspection checklists can be found in the SPCCP. Forward all inspection checklists to the DPW-Environmental Division POL Program Manager.
(3) Units/contractors must coordinate with the DPW-Environmental Division POL Program Manager to establish a new storage location.
(4) Used oils including motor oils (petroleum and synthetic), gear oil (SAE 80/90), and silicone brake fluid will be stored together in an AST/or 30-gallon drum.
(5) Absolutely no solvents will be mixed with any used oil product IAW 40 CFR (part 279.21).
(6) All Off-Spec fuel must be stored in an AST or a 30-gallon drum if the location does not have an AST. The mixing and storing of Off-Spec fuel, Jet Petroleum (JP-8), diesel, heating oil, and kerosene is authorized.
(7) All Off-Spec gasoline will be stored in a separate container and will not be mixed with other Off-Spec fuels.
(8) All Off-Spec Aviation Gas (AVGAS) will be stored in a separate container and will not be mixed with other Off-Spec fuels.
(9) Used antifreeze will be stored in an approved…