RFI-74 - EP701 - PARTIAL ONE-LINE DIAGRAM A - NEW WORK.pdf

PDF 538 KB Posted

Attached to
Construction of the Power Generation with Microgrid at Joint Base McGuire-Dix-Lakehurst (JBMDL), New Hanover, NJ
Solicitation number
W912DS26BA032
Issued by

About this file

This document is a Partial One-Line Diagram (Sheet EP701) for a power generation system with microgrid capabilities at Joint Base McGuire-Dix-Lakehurst, New Jersey. The diagram depicts electrical infrastructure rated at 480Y/277V, 3-phase, 4-wire, 60Hz with 4000A capacity and 65 KAIC at the main switchboard (MC-1).

The project involves integrating multiple power generation and storage components including: a 2300 kW/2500 kVA liquid-filled transformer (XFMR-1) stepping down from 34.5 kV primary service; two 500 kW/625 kVA natural gas generators (NG-1 and NG-2); three 500 kW/500 kWh battery energy storage systems (BESS-1, BESS-2, BESS-3); a microgrid controller; and associated electrical distribution with two 30 kVA step-down transformers (MPC-1 and MPC-2) for general receptacles and site lighting. The feeder schedule specifies wire sizes ranging from #4 to #600 with corresponding conduit sizes from 1 inch to 5 inches. Contractor responsibilities include field verification of existing utilities, coordination through the Contracting Officer and 87 CES, connection of a power meter to record baseline service data for 30 days prior to equipment submittals, provision of all termination lugs, compliance with NEC requirements for grounding and conduit fill, and ensuring 100 percent rated assemblies for circuit breakers 400A and larger. The document references solicitation W912DS19D0011 and was issued in September 2026 (Revision 01) by the U.S. Army Corps of Engineers, New York District.

View the file

Other files

File Type Posted
Bid Abstract Form Power Generation Microgrid Revised Final.pdf PDF
RFI-47 - ES503 - ELECTRICAL SITE DETAILS.pdf PDF
RFI-32 - M-702 - MECHANICAL CONTROLS ARCHITECTURE.pdf PDF
RFI-11 - M-501 - MECHANICAL DETAILS.pdf PDF
RFI-21 - SPEC 26 08 00.pdf PDF
RFI log for posting 9.23.26.xlsx XLSX spreadsheet
AF Meter Data Management Plan 20250610.pdf PDF
RFI-50 - ES103 - ENLARGED - ELECTRICAL SITE PLAN.pdf PDF
RFI-08 - SPEC 09 90 00.pdf PDF
RFI-22 - CS502 - SITE DETAILS - 2.pdf PDF
RFI-90 - SPEC 26 31 00.pdf PDF
RFI-16 - SPEC 32 31 13.pdf PDF
RFI-17 - CS112 - SITE PLAN - AREA 2.pdf PDF
RFI-62 - SPEC 31 00 00.pdf PDF
01 45 35 - Attachment - Schedule_of_Special_Inspections.pdf PDF
Solicitation Amendment W912DS26BA0320001 SF 30.pdf.pdf PDF
RFI-75 - SPEC 26 12 19.pdf PDF
RFI-49 - ES102 - ENLARGED - ELECTRICAL SITE PLAN.pdf PDF
RFI-02 - SPEC 26 37 13.pdf PDF
RFI-63 - SPEC 32 11 26.pdf PDF
2026.09.03_Site Visit_Sign in for Power Gen_Lakehurst.pdf PDF
2026.09.03_Site Visit_Sign in for Power Gen_Lakehurst.pdf PDF
Power Gen w. microgrid bidder walkthrough packet.pdf PDF
A.03.09 Drawings - 100%.pdf PDF
Power Generation with Microgrid - Specifications - RTA_rev1.pdf PDF
Solicitation - W912DS26BA032.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SWITCHBOARD, MC-1, 480Y/277V, 3P, 4W, 60HZ, 4000A, 65 KAIC

M F

M

G

G

1. FOR GENERAL NOTES, LEGENDS, ABBREVIATIONS, AND

PHASING NOTES, SEE DRAWINGS E-001 AND E-002.

2. PARTIAL ONE-LINE DIAGRAM DOES NOT CONTAIN EVERY

ELECTRICAL PIECE OF EQUIPMENT IN B678. PARTIAL ONE-

LINE DIAGRAM SHOWS EXISTING CONDITIONS THAT HAVE

BEEN PREPARED BASED ON FIELD SURVEY DATA AND

EXISTING DESIGN DRAWINGS. ADDITIONAL COMPONENTS

AND CONDITIONS THAT ARE NOT SHOWN ON THE

DRAWINGS MAY EXIST AND MAY REQUIRE CERTAIN

ADJUSTMENTS THAT ARE NOT NOTED ON THE DRAWINGS.

FIELD VERIFY THE LOCATIONS OF ALL EXISTING

ELECTRICAL UTILITIES AND EQUIPMENT SHOWN ON THE

DRAWINGS PRIOR TO BIDDING.

3. COORDINATE ALL ELECTRICAL WORK, INCLUDING ANY

OUTAGE REQUIREMENTS FOR CONNECTIONS TO EXISTING

SYSTEMS, THROUGH THE CONTRACTING OFFICER AND 87

CES. ISOLATE WORK FROM THE EXISTING 34.5 KV PRIMARY

SERVICE.

4. AS SOON AS PRACTICAL AFTER AWARD, CONTRACTOR

MUST CONNECT A POWER METER TO THE MAIN SERVICE AT

SWGR-1 AND RECORD THE POWER FOR AT LEAST 30 DAYS.

THIS DATA MUST BE SUBMITTED TO THE 87 CES AND COR

FOR REVIEW AT LEAST SIX WEEKS PRIOR TO ANY

EQUIPMENT SUBMITTALS.

5. PROVIDE ALL TERMINATION LUGS AS REQUIRED.

6. WIRE SIZES ARE MINIMUMS. CONTRACTOR MAY INCREASE

AS LONG AS CONDUIT SIZES ARE ALSO ADJUSTED TO

MAINTAIN NEC CONDUIT FILL REQUIREMENTS.

7. ALL NEUTRAL CONDUCTORS MUST MATCH THE SIZE OF THE

PHASE CONDUCTOR.

8. ALL EQUIPMENT GROUNDS MUST BE PER NEC ARTICLE 250.

9. UNLESS OTHERWISE NOTED, ALL CIRCUIT BREAKERS

RATED AT 400A AND LARGER MUST BE 100 PERCENT RATED

ASSEMBLIES.

XFMR-1

34.5KV

480Y/277V

2300KW/2500KVA

LIQUID FILLED

SW-1

38KV, 600A, 3 PHASE,

150kV BIL

(3) 50E FUSES

S

E T

S O

F

(4

/0

G

"C

3200AF

3200AT

LSIG

ERMS

EO

GF

1000AF

1000AT

LSIG

EO

3200AF

3200AT

LSIG

ERMS

500KW/

500KWH

BESS-1

(E) MH-A7MH

S

E T

S O

F

/0

G

"C

S

E T

S O

F (4

/0

G

"C

400AF

225AT

LSIG

100AF

100AT

SPD

500KW/

500KWH

BESS-2

500KW/

500KWH

BESS-3

S

E T

S O

F (4

/0

G

"C

S

E T

S O

F (4

/0

G

"C

S

E T

S O

F (4

/0

G

"C

S

E T

S O

F (4

/0

G

"C

SEE SHEET EP704

FOR PV SYSTEM

ONE-LINE DIAGRAM

1000AF

1000AT

LSIG

EO

800AF

500AT

LSIG

ST

1000AF

1000AT

LSIG

ST

1000AF

1000AT

LSIG

ST

1000AF

1000AT

LSIG

ST

2 2 2

DP-1

480Y/277V 3P, 4W

225A MCB

MPC-1

30KVA

480V:

208/120V

MPC-2

30KVA

480V:

208/120V

3 3

G

"C

G

-1

/2 "C

/0

G

"C

MICROGRID

CONTROLLER

DMDM DM DM DMDM

400AF

SPACE

500KW/

625KVA

480V

NATURAL GAS

GENERATOR

NG-1

S

E T

S O

F (4

/0

G

"C

500KW/

625KVA

480V

NATURAL GAS

GENERATOR

NG-2

REFER TO EP702

FOR CONTINUATION

EXISTING B678

SWITCHGEAR

4 4 4

/C

/0

,1 G

"C

1000AF

1000AT

1000AF

1000AT

100%

RATED

LOAD

BANK

1000AF

1000AT

1000AF

1000AT

100%

RATED

LOAD

BANK

/C

/0

,1 G

"C

GENERAL SHEET NOTES

SHEET KEYNOTES

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B U

R N

S A

N D

M c D

O N

N E

L L

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A L T

E R

N A

T E

I N

F O

F

IL

E N

A M

E

US Army Corps of Engineers ®

J O

IN

T

-B A

S E

M C

G U

IR

E

-D

IX

-L A

K E

H U

R S

T N

J P

O W

E R

G E

N E

R A

T

IO

N W

IT

H

M

IC

R O

G R

ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S N

E W

Y O

R K

D

IS

T R

IC

T

F

E D

E R

A L P

L A

Z A

R

M

-3

N E

W Y

O R

K N

Y

-0

S E

P T

R E

V

EP701

P A

R T

IA

L O

N E

-L

IN

E D

IA

G

R A

M A

N

E W

W O

R K

A B

A R

R O

N

J M

A Y

R A

N T

E P

U T

N A

M

C P

L U

M M

E R

W D

S D

NTSSCALE:

A1

PARTIAL ONE-LINE DIAGRAM A - NEW WORK

1. BID OPTION 1: TRIP RATING MUST BE 700AT.

2. PROVIDE ADDITIONAL 3" SCHEDULE 40 PVC CONDUIT FOR

COMMUNICATIONS.

3. PROVIDE COMBINATION PANELBOARD AND STEP DOWN

TRANSFORMER IN NEMA 3R RATED ENCLOSURE, MPC-1 &

MPC-2, TO SERVE GENERAL PURPOSE RECEPTACLES AND

SITE LIGHTING. SEE ES100 SERIES DRAWINGS FOR

EQUIPMENT LOCATION.

4. INTEGRAL MAIN CIRCUIT BREAKER FOR BATTERY ENERGY

STORAGE SYSTEM SIZED AND PROVIDED BY

MANUFACTURER.

5. IF BESS REQUIRES SEPARATE CIRCUIT FOR AUXILIARY

POWER, CONTRACTOR MUST PROVIDE THIS POWER FROM

PANEL DP-1 OR MPC-1 AS NEEDED. CONTRACTOR MUST

PROVIDE ALL NECESSARY MATERIAL AND EQUIPMENT FOR A

FULLY OPERATIONAL BESS.

SOURCE DESTINATION SETS WIRES CONDUIT

MH-A7 SW-1 1 3#1/0,1#4G 5"

SW-1 XFMR-1 1 5"

XFMR-1 MC-1 8 4#600,1#3/0G 4"

MC-1 SWGR-1

NG-1 3 4"

NG-2 3 4"

PV-2 2

BESS-1

BESS-2

BESS-3

DP-1 1 4#4/0,1#4G 3"

MC-1

MC-1

MC-1

MC-1

MC-1

MC-1

MC-1

8 4#600,1#3/0G 4"

4#500,1#1/0G

4#500,1#1/0G

4#600,1#1/0G

3 4"4#500,1#1/0G

3 4"4#500,1#1/0G

3 4"4#500,1#1/0G

4"

FEEDER SCHEDULE

R

T A

S U

B M

IT

T

A L

J U

L Y

R

E V

IS

ED

F O

R B

ID

D

ER

IN

Q U

IR

IE

S

S

EP

T

3#1/0,1#4G 1

File details come from the government source that posted it. Updated .