2026.09.03_Site Visit_Sign in for Power Gen_Lakehurst.pdf

PDF 25 KB Posted

Attached to
Construction of the Power Generation with Microgrid at Joint Base McGuire-Dix-Lakehurst (JBMDL), New Hanover, NJ
Solicitation number
W912DS26BA032
Issued by

About this file

This document is a walkthrough sign-in sheet for a "Power Generation with Microgrid" solicitation dated September 3, 2026. The sheet captures attendance and contact information for 25 representatives from 23 companies who participated in the walkthrough event. Attendees represent a diverse range of organizations including electrical contractors (Imperial Electric, Wysocki Electric, Eastern Construction & Electric, Gks Electric/Tech Flow), engineering firms (Schweitzer Engineering Laboratories, APG, J. Fletcher Creamer & Son), equipment and service providers (Carbon Recall, PKF-Mark III, Richard Group, Schneider Electric, NACOM Companies, Ranco Construction, Benaka Inc, David Boland Inc, Dobco Inc), and specialized firms (Burrow Global JV LLC). Each entry includes the attendee's name, company affiliation, and email address, with one entry (Ebram Ibrahim from Dobco Inc) marked as "Added" to the roster.

The sign-in sheet serves as documentation of industry engagement for the Power Generation with Microgrid project, indicating pre-solicitation or pre-award activity to brief potential contractors on project requirements and scope. No specific pricing terms, response deadlines, award dates, or set-asides are detailed in this document.

View the file

Other files

File Type Posted
Bid Abstract Form Power Generation Microgrid Revised Final.pdf PDF
RFI log for posting 9.23.26.xlsx XLSX spreadsheet
RFI-08 - SPEC 09 90 00.pdf PDF
RFI-50 - ES103 - ENLARGED - ELECTRICAL SITE PLAN.pdf PDF
RFI-21 - SPEC 26 08 00.pdf PDF
RFI-49 - ES102 - ENLARGED - ELECTRICAL SITE PLAN.pdf PDF
RFI-22 - CS502 - SITE DETAILS - 2.pdf PDF
RFI-16 - SPEC 32 31 13.pdf PDF
AF Meter Data Management Plan 20250610.pdf PDF
RFI-47 - ES503 - ELECTRICAL SITE DETAILS.pdf PDF
RFI-11 - M-501 - MECHANICAL DETAILS.pdf PDF
RFI-02 - SPEC 26 37 13.pdf PDF
RFI-63 - SPEC 32 11 26.pdf PDF
RFI-74 - EP701 - PARTIAL ONE-LINE DIAGRAM A - NEW WORK.pdf PDF
RFI-90 - SPEC 26 31 00.pdf PDF
RFI-32 - M-702 - MECHANICAL CONTROLS ARCHITECTURE.pdf PDF
RFI-75 - SPEC 26 12 19.pdf PDF
RFI-17 - CS112 - SITE PLAN - AREA 2.pdf PDF
01 45 35 - Attachment - Schedule_of_Special_Inspections.pdf PDF
Solicitation Amendment W912DS26BA0320001 SF 30.pdf.pdf PDF
RFI-62 - SPEC 31 00 00.pdf PDF
2026.09.03_Site Visit_Sign in for Power Gen_Lakehurst.pdf PDF
Power Gen w. microgrid bidder walkthrough packet.pdf PDF
A.03.09 Drawings - 100%.pdf PDF
Solicitation - W912DS26BA032.pdf PDF
Power Generation with Microgrid - Specifications - RTA_rev1.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Name Company Email william eckman imperial electric eckman.william80@gmail.com Thomas wysocki wysocki electric tom@wysockielectric.com patrick wysocki wysocki electric patrick@wysockielectric.com Jon Vargas Schweitzer Engineering Laboratories jon_vargas@selinc.com Ryan Lukachek Schweitzer Engineering Laboratories ryan_lukachek@selinc.com Josh Elkins Carbon Recall Josh@carbonrecallchattanooga.com dan girard APG dan.girard@apg-epc.com Steve Shirey APG steve.shirey@apg-epc.com Lester Danley PKF-Mark III lbd@pkfm.com Andres Frias J. Fletcher Creamer & Son Jeffrey.Faiella@jfcson.us Jorge Contreras Richard Group jorge.contreras@richardgroup.com Peter Shull Schneider Electric peter.schull@sefederal.com Richard Sosdorf Eastern Construction & Electric rich@easternce.com Tom Silvera Eastern Construction & Electric rich@easternce.com Santhosh Rava Burrow Global JV LLC santhosh.rava@laccorp.com Anthony DiBattista NACOM Companies Anthonyd@nacomco.com John B NACOM Companies johnb@nacomco.com Larry Bisignano Ranco Construction ranco@rancoconstruction.com Amit Deshmukh Benaka Inc Benaka@benakainc.com Shawn Carr Gks electric/Tech flow Scarr@gkselectricinc.com Matthew Newley David Boland, Inc Matthew.newley@dboland.com Ebram Ibrahim Dobco Inc estimating@dobcogroup.com Added

Power Generation with Microgrid Walkthrough Sign in Sheet

03-SEP-2026

File details come from the government source that posted it. Updated .