GB_SEG C2-H_CD-107XX2_Jan312023_F.pdf
PDF 529 KB Posted
- Solicitation number
- W912DS22B0022
About this file
This document summarizes an invitation for bid for construction services. The U.S. Army Corps of Engineers, New York District is seeking bids for Segment C2 and H Contract 2 of the Green Brook Flood Risk Management Project located in Middlesex Borough, New Jersey. The scope of work includes construction of Segment C2 along Bound Brook, which includes two pump stations, 1,700 feet of earthen levee, 100 feet of floodwall and one road closure gate. Segment H along Bound Brook includes 3,600 feet of earthen levee tied to a railroad embankment, 576 feet of floodwall and one road closure gate. The total project value is estimated between $25-100 million. The period of performance is 730 calendar days from notice to proceed. Bids are due electronically and must be submitted by the contracting officer's point of contact. The contract will be set aside for HUBZone small businesses and have a NAICS code of 237990.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40'
SCALE:1"= 20'
0 20'
N
CAP LANE
BLOCK 245
LOT 13
BLOCK 244
LOT 13
BLOCK 244
LOT 14
BLOCK 244
LOT 15
BLOCK 250
LOT 1
BLOCK 247
LOT 9
BLOCK 247
LOT 17
BLOCK 247
LOT 1
Pool Wall
A V
E N
U E
S O
U T
H L
IN
C O
L N
X X X X X X X X X
INV(C)=35.03
MID
DLE
SEX
COUNTY
BOROUGH
OF
MID
DLE
SEX
Curb
C u r b
C
G C
G
C
G
C
G C
G
C
G
C
G
Curb
G
S
S
G
G
W
W
W
W
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
IS
S
U E D
A T
E
W P
-X
D D -M
O N -Y
Y Y
Y
A N
S I
D
N E
W Y
O R
K
N E
W Y
O R
K
N E
W Y
O R
K D
IS
T R
IC
T
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
SHEET OF 493
B O
R O
O F M
ID
D
L E
S E
X A
N D G
R E
E N B
R O
O K T
W P
N J
S E
G M
E N
T C
H C
O N
T R
A C
T N
O
S U
B -B
A S
IN
O
F T
H E R
A R
IT
A N R
IV
E R
G R
E E
N B
R O
O K F
L O
O D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T
CONTRACT NO. 2 - AMENDMENT NO. 5 - DECEMBER 2022
J A
C O
B S
34+00 35+00 36+00
4+224+22
X
X
X
X
X
RIGHT-OF-WAY
PROPOSED
WORKING LIMITS
CONTRACTOR
BOROUGH RIGHT-OF-WAY
RIGHT-OF-WAY
PROPOSED
BOROUGH RIGHT-OF-WAY
CONTRACTOR WORKING LIMITS
RIGHT-OF-WAY
PROPOSEDFLOODWALL STA. 35+27.31
C S. LINCOLN AVEL
C SEGMENT C2 FLOODWALLL
BOUND BROOK
(NOTE 7)
EXISTING FLOODWALL
(NOTE 7)
EXISTING FLOODWALL
C SWALE DL
BOUND BROOK BANK
TO FOLLOW THE TOP OF
CONTRACTOR WORKING LIMITS
(NOTE 4)
KEY
SEE NOTE 4
EXISTING STORM SEWER
S
SEE NOTE 6
FENCE REMOVAL
SEE NOTE 4
EXISTING SANITARY SEWER
TREES TO BE REMOVED
AND REPLACEMENT
PAVEMENT REMOVAL
PAVEMENT REMOVAL
SIDEWALK REMOVAL
MILL AND OVERLAY
MILL AN OVERLAY SECTION
UIP CURB AND GUTTER THROUGH
SIDEWALK (NOTE 8)
REMOVE AND REPLACE
PAVEMENT (NOTE 8)
REMOVE AND REPLACE
REMOVE RIPRAP
AS-BUILT DRAWINGS) (NOTE 7)
OPTIC CONDUIT (PER
RELOCATED VERIZON FIBER
CURB AND GUTTER (NOTE 8)
REMOVE AND REPLACE
FIBER LINE (NOTE 7)
MCI/VERIZON
(NOTE 11)
(NOTE 11)
(NOTE 11)
CLEARING AND GRUBBING ACTIVITIES.
ABOVE THE GROUND. CONTRACTOR SHALL CLEAR THIS DEBRIS AS PART OF
ALL TREES AND SHRUBS WITHIN THIS AREA HAVE BEEN CUT OFF TO 1 FOOT11.
SEE CIVIL DRAWINGS FOR DETAILS.10.
SURVEY ON AREA PRIO TO COMENCING DEMOLITION OF ROADWAY
SEE SPECIFICATION SECTION 02 41 00 CONCERNING PERFORMING TOPOGRAPHIC9.
SEE SHEET C-507 FOR LIMITS.
COORDINATE CLOSURE AND DETOUR WITH CONTRACTING OFFICER.8.
DO NOT DISTURB7.
POST FOOTINGS.
FENCE REMOVAL SHALL INCLUDE REMOVAL OF FENCE POSTS AND6.
VERIZON AND CONTRACTING OFFICER ON FINAL LOCATION.
AND 29+75 TO OUTSIDE USACE RIGHT OF WAY. COORDINATE WITH
CABLE AND BOTH 8" DIAMETER CONDUITS BETWEEN STA. 11+75
LOCATE CONDUITS BEFORE EXCAVATING. RELOCATE FIBER OPTIC
FIBER OPTIC CABLE IS CONTAINED IN ONE OF TWO PIPE CONDUITS.5.
SHEETS C-101 THROUGH C-110.
NEW PIPES, MANHOLES AND DRAINAGE STRUCTURES. REFER TO
LIMITS OF THE REMOVAL ARE DETERMINED BY THE LOCATION OF THE
SHOWN IN THE KEY BELOW, ARE TO BE REMOVED AND BACKFILLED.
MANHOLES OR OTHER STRUCTURES MARKED ON THE PLAN, AS
EXISTING SANITARY SEWERS, STORM SEWERS AND ASSOCIATED4.
THE GOVERNMENT.
REPLACE AS DIRECTED BY THE USACE AT NO COST TO
OF THE CONTRACTOR. THE CONTRACTOR SHALL REPAIR OR
ROADWAYS (THAT ARE TO REMAIN IN PLACE) IS THE RESPONSIBILITY
ANY DAMAGE TO EXISTING OR SURROUNDING CURBS, SIDEWALKS OR3.
ALL TREES WITHIN CONTRACTOR WORKING LIMITS TO BE REMOVED. 2.
ITEM TO BE REMOVED.1.
NOTES:
%PRODUCTION DATA 4%%PRODUCTION DATA 3%%PRODUCTION DATA 2%
%PRODUCTION DATA 1%
S T
A T
O S
T A
C S
F R
E D
D O
C L S
G S
T A
U D
E R
CD-107
D E
M O
L
IT
IO
N P
L A
N S
H E
E T
S E
G M
E N
T C
G B S
E G C
-H
C
D -1
X X .d g n
-J
A N -2
MATCH LINE STA. 207+00 SHEET CD-154
MATCH LINE STA. 38+00 SHEET CD-108
M A
T C
H L
IN
E S
T A S
H E
E T C
D -1
150OPTION 2 CONTRACT
BASE CONTRACT AND
SHEET IS IN THE
WORK ON THIS
A
M E
N D
M E
N T N
O
-2
G M
S
GB_SEG C2-H_CD-107XX2
File details come from the government source that posted it. Updated .