About this file

This is a solicitation for the Segment C2 and H Contract 2 portion of the Green Brook Flood Risk Management Project located in Middlesex Borough, New Jersey. The project involves construction of Segment C2 along Bound Brook, including two pump stations, 1,700 feet of earthen levee, 100 feet of floodwall, and one road closure gate. Segment H along Bound Brook includes 3,600 feet of earthen levee tied into a railroad embankment, 576 feet of floodwall, and one road closure gate. The estimated value is between $25-100 million. The period of performance is 730 calendar days from notice to proceed. The NAICS code is 237990. Proposals must be submitted electronically by the date specified in the solicitation, which will be posted on SAM.gov. The point of contact is Monica Chahary, Contract Specialist for the U.S. Army Corps of Engineers New York District.

View the file

Other files

File Type Posted
Bid Abstract - W912DS22B0022 - 01 Mar 2023.pdf PDF
Bid Abstract - W912DS22B0022- 28 Feb 2023.pdf PDF
Bid Abstract - W912DS22B0022.pdf PDF
W912DS22B0022-Amendment 0008.pdf PDF
W912DS22B0022-0007.pdf PDF
Contract 1 - As- Built Reference Drawings.pdf PDF
GB_SEG C2-H_CD-153XX2_Jan312023_F.pdf PDF
GB_SEG C2-H_CD-107XX2_Jan312023_F.pdf PDF
GB_SEG C2-H_CD-154XX2_Jan312023_F.pdf PDF
GB - Amend 7 - Specs - 2-3-2023.pdf PDF
M-701 Green Brook C2H Amendment 0006 - Dec 2022.pdf PDF
GB C2 H 00 90 02 SESC Certification.pdf PDF
Amendment 0006 - Spec 35 22 25.pdf PDF
W912DS22B0022-Amendment 0006.pdf PDF
Bid_Abstract-W912DS18C0021.pdf PDF
GB C2-H Contract 1 Amd 5 Drawings.pdf PDF
Green Brook Flood Risk Management Project - Segments C2 H Contract 2 - Amendment 5 - Specifications - 12-21-2022.pdf PDF
W912DS22B0022-Amendment 0005.pdf PDF
Green Brook Segments C2 H Contract 2 - Amendment 4 - Drawings.pdf PDF
Green Brook Flood Risk Management Project - Segments C2 H Contract 2 - Amendment 4 - Specifications - 11-17-2022.pdf PDF
W912DS22B0022 - Amendment 0004.pdf PDF
W912DS22B0022-Amendment 0003.pdf PDF
W912DS22B0022-Amendment 0002.pdf PDF
Site Visit Sign-In 21 September 2022.pdf PDF
EXHIBIT A.pdf PDF
EXHIBIT B.pdf PDF
W912DS22B0022-Amendment 0001.pdf PDF
01 22 00.00 10 - 9-13-2022.pdf PDF
4 - Structural (S) Series.pdf PDF
2 - Geotechnical (B) Series.pdf PDF
3 - Civil - (C - CD - CG - EC - CT - L - V - X) Series.pdf PDF
W912DS22B0022 - Solicitation.pdf PDF
8 - Reference Drawings.pdf PDF
6 - Pump Stations - (D - DI - S) Series.pdf PDF
5 - Control Building - (A - FA - M - P - E - SF) Series.pdf PDF
7 - Drainage Structures (S) Series.pdf PDF
100 Green Brook Flood Risk Management Project - Segments C2 H Contract 2 - Specifications - 8-15-2022.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

NOT TO SCALE

NOT TO SCALE

LOCATION PLAN

N

FLOOD RISK MANAGEMENT PROJECT

GREEN BROOK

GREEN BROOK SUB-BASIN OF THE RARITAN RIVER

BOROUGH OF MIDDLESEX AND GREEN BROOK TOWNSHIP, NEW JERSEY

THIS PROJECT

D

A T

E

X X

X

F

IL

E

C O

V E

R S

H E

E T

G-101

S .E .M

SEGMENT C2 AND H CONTRACT NO. 2

SEGMENT C2

SEGMENT H

100% SUBMITTAL - JUNE 2022

N

D E

L A

W A

R E el a w e a r v e

Lon g I sla nd

Sou nd

Cape

Cod

Bay

Nantucket Sound

Montauk Point

Lon g I sla nd

N E W Y O R K MASSACHUSETTS

CONNECTICUT

P E

N N

S Y

L V

A N I

A

D

R i r

JERSEY

NEW

I S

L A

N D

R H

O D

E

Blo ck

Isl and

So und

H u d s o n

R i v e r

GREEN BROOK

BOUND BROOK RD.

MIDDLESEX

BORO OF

D A

Y T

O N

V

E

M O

U N

T

IN

E

BOUND BROOK

LINCOLN BLVD.

S

L

IN

C O

L N

E

RR

CAP LN.

VOORHEES AVE.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

W P

-X

D D -M

O N -Y

Y Y

Y

A N

S I

D

N E

W Y

O R

K

N E

W Y

O R

K

N E

W Y

O R

K D

IS

T R

IC

T

U S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

SHEET OF 493

B O

R O

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

S E

G M

E N

T C

H C

O N

T R

A C

T N

O

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

CONTRACT NO. 2 - 100% SUBMITTAL - JUNE 2022

J A

C O

B S

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

W P

-X

D D -M

O N -Y

Y Y

Y

A N

S I

D

N E

W Y

O R

K

N E

W Y

O R

K

N E

W Y

O R

K D

IS

T R

IC

T

U S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

SHEET OF 493

B O

R O

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

S E

G M

E N

T C

H C

O N

T R

A C

T N

O

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

CONTRACT NO. 2 - 100% SUBMITTAL - JUNE 2022

J A

C O

B S

-J

U N -2

X X

X

G B S

E G C

-H

G

X X

X .d g

G-102

IN

D

E X O

F D

R A

W

IN

G S

S H

E E

T

GENERAL

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

GEOTECHNICAL

BORING NOTES AND LEGEND

G-101

G-102

G-103

B-101

B-102

B-103

B-104

B-105

COVER SHEET

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

B-106

INDEX OF DRAWINGS - SHEET 2

INDEX OF DRAWINGS - SHEET 1

B-109

B-107

B-108

B-110

B-111

B-112

B-113

B-114

B-115

B-116

B-117

B-118

B-119

B-120

B-121

B-122

B-123

B-151

B-152

B-153

B-154

B-155

B-156

B-157

B-158

B-159

B-160

B-161

B-162

B-163

B-164

B-165

B-166

B-167

B-168

BORING LOGS - SEGMENT C2 SHEET 1

BORING LOGS - SEGMENT C2 SHEET 2

BORING LOGS - SEGMENT C2 SHEET 3

BORING LOGS - SEGMENT C2 SHEET 4

BORING LOGS - SEGMENT C2 SHEET 5

BORING LOGS - SEGMENT C2 SHEET 6

BORING LOGS - SEGMENT C2 SHEET 7

BORING LOGS - SEGMENT C2 SHEET 8

BORING LOGS - SEGMENT C2 SHEET 9

BORING LOGS - SEGMENT C2 SHEET 10

BORING LOGS - SEGMENT C2 SHEET 11

BORING LOGS - SEGMENT C2 SHEET 12

BORING LOGS - SEGMENT C2 SHEET 13

BORING LOGS - SEGMENT C2 SHEET 14

BORING LOGS - SEGMENT C2 SHEET 15

BORING LOGS - SEGMENT C2 SHEET 16

BORING LOGS - SEGMENT C2 SHEET 17

BORING LOGS - SEGMENT C2 SHEET 18

BORING LOGS - SEGMENT C2 SHEET 19

BORING LOGS - SEGMENT C2 SHEET 20

BORING LOGS - SEGMENT H SHEET 1

BORING LOGS - SEGMENT H SHEET 2

BORING LOGS - SEGMENT H SHEET 3

BORING LOGS - SEGMENT H SHEET 4

BORING LOGS - SEGMENT H SHEET 5

BORING LOGS - SEGMENT H SHEET 6

BORING LOGS - SEGMENT H SHEET 7

BORING LOGS - SEGMENT H SHEET 8

BORING LOGS - SEGMENT H SHEET 9

BORING LOGS - SEGMENT H SHEET 10

BORING LOGS - SEGMENT H SHEET 11

BORING LOGS - SEGMENT H SHEET 12

BORING LOGS - SEGMENT H SHEET 13

BORING LOGS - SEGMENT H SHEET 14

BORING LOGS - SEGMENT H SHEET 15

BORING LOGS - SEGMENT H SHEET 16

BORING LOGS - SEGMENT H SHEET 17

BORING LOGS - SEGMENT H SHEET 18

CIVIL

G-104

G-105INDEX OF DRAWINGS - SHEET 4

INDEX OF DRAWINGS - SHEET 3

INDEX OF DRAWINGS - SHEET 5 G-106

INDEX OF DRAWINGS - SHEET 6 G-107

INDEX OF DRAWINGS - SEGMENTS C2 AND H

C-000

C-001

C-100

C-101

C-102

C-103

C-104

C-105

C-106

C-107

C-108

C-150A

C-150B

C-151

C-152

C-153

C-154

C-155

C-156

C-157

C-158

C-159

C-201

C-202

C-203

C-204

C-205

C-206

C-207

C-208

C-209

C-210

C-211

C-251

C-252

C-253

C-254

C-255

C-256

C-257

C-258

C-259

C-260

C-261

C-262

C-263

SEGMENT C2 KEY MAP

SEGMENT H KEY MAP

SEGMENT C2 ALIGNMENT SHEET

SEGMENT H PROFILE SHEET - ACCESS ROAD 3

S .G .K

C-109

SEGMENT C2 PROFILE SHEET - STA. 12+22 TO STA. 17+00

SEGMENT C2 PROFILE SHEET - STA. 17+00 TO STA. 22+00

SEGMENT C2 PROFILE SHEET - STA. 22+00 TO STA. 27+00

SEGMENT C2 PROFILE SHEET - STA. 27+00 TO STA. 32+00

SEGMENT C2 PROFILE SHEET - ACCESS ROAD 1 (BDR 2)

SEGMENT C2 PROFILE SHEET - ACCESS ROAD 2 (BDR 3)

SEGMENT C2 STORM SEWER PROFILE SHEET - CULVERT PROFILES

SEGMENT C2 STORM SEWER PROFILE SHEET - CULVERT PROFILES

SEGMENT C2 STORM SEWER PROFILE SHEET - CULVERT PROFILES

SEGMENT C2 SANITARY SEWER PROFILE SHEET - BDR2 SANITARY SEWER PROFILE

SEGMENT H PROFILE SHEET 1 - STA. 50+00 TO STA. 54+00

SEGMENT H PROFILE SHEET 2 - STA. 54+00 TO STA. 59+00

SEGMENT H PROFILE SHEET 3 - STA. 59+00 TO STA. 64+00

SEGMENT H PROFILE SHEET 4 - STA. 64+00 TO STA. 69+00

SEGMENT H PROFILE SHEET 5 - STA. 69+00 TO STA. 74+00

SEGMENT H PROFILE SHEET 6 - STA. 74+00 TO STA. 79+00

SEGMENT H PROFILE SHEET 7 - STA. 79+00 TO STA. 84+00

SEGMENT H PROFILE SHEET 8 - STA. 84+00 TO STA. 89+00

SEGMENT H PROFILE SHEET 9 - STA. 89+00 TO STA. 90+23.85

SEGMENT H STORM SEWER PROFILE SHEET - CULVERTS H1, H2 AND H3

SEGMENT H STORM SEWER PROFILE SHEET - CULVERTS H4 AND H5

SEGMENT H STORM SEWER PROFILE SHEET - CULVERTS H6 AND H9

ROADWAY PROFILE - SOUTH LINCOLN AVENUE

M

M

BORING LOCATION PLAN

BORING LOCATION PLAN

SEGMENT C2 GENERAL PLAN SHEET 1 - STA. 12+22 TO STA. 17+00

SEGMENT C2 GENERAL PLAN SHEET 2 - STA. 17+00 TO STA. 22+00

SEGMENT C2 GENERAL PLAN SHEET 3

SEGMENT C2 GENERAL PLAN SHEET 4 - STA. 22+00 TO STA. 26+50

SEGMENT C2 GENERAL PLAN SHEET 5 - STA. 26+50 TO STA. 31+00

SEGMENT C2 GENERAL PLAN SHEET 6 - STA. 31+00 TO STA. 33+50

SEGMENT C2 GENERAL PLAN SHEET 7 - STA. 33+50 TO STA. 38+00

SEGMENT C2 GENERAL PLAN SHEET 8 - STA. 38+00 TO STA. 42+75

SEGMENT C2 GENERAL PLAN SHEET 9 - STA. 42+75 TO STA. 47+00

SEGMENT H GENERAL PLAN SHEET 1 - STA. 50+00 TO STA. 53+75

SEGMENT H GENERAL PLAN SHEET 2 - STA. 53+75 TO STA. 59+25

SEGMENT H GENERAL PLAN SHEET 3 - STA. 59+25 TO STA. 64+50

SEGMENT H GENERAL PLAN SHEET 4 - STA. 64+50 TO STA. 69+00

SEGMENT H GENERAL PLAN SHEET 5 - STA. 69+00 TO STA. 73+25

SEGMENT H GENERAL PLAN SHEET 6 - STA. 73+25 TO STA. 78+00

SEGMENT H GENERAL PLAN SHEET 7 - STA. 78+00 TO STA. 82+75

SEGMENT H GENERAL PLAN SHEET 9 - STA. 86+75 TO STA. 90+23.85

SEGMENT H GENERAL PLAN SHEET 8 - STA. 82+75 TO STA. 86+75

SEGMENT H ALIGNMENT SHEET 1

SEGMENT H ALIGNMENT SHEET 2

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

W P

-X

D D -M

O N -Y

Y Y

Y

A N

S I

D

N E

W Y

O R

K

N E

W Y

O R

K

N E

W Y

O R

K D

IS

T R

IC

T

U S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

SHEET OF 493

B O

R O

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

S E

G M

E N

T C

H C

O N

T R

A C

T N

O

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

CONTRACT NO. 2 - 100% SUBMITTAL - JUNE 2022

J A

C O

B S

-J

U N -2

X X

X

G B S

E G C

-H

G

X X

X .d

G-103

IN

D

E X O

F D

R A

W

IN

G S

S H

E E

T

S .G .K

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

INDEX OF DRAWINGS - SEGMENTS C2 AND H

C-301

C-302

C-303

C-304

C-305

C-306

C-307

C-308

C-309

C-310

C-311

C-312

C-353

C-354

C-551

CD-101

CD-102

CD-103

CD-104

CD-105

CD-106

CD-107

CG-501

C-355

C-356

C-357

C-358

C-359

C-552

C-501

C-502

C-503

C-504

C-505

C-506

C-507

C-508

C-509

C-510

C-511

CD-108

CD-151

CD-152

CD-153

CD-154

CD-155

CD-156

CD-157

CD-158

CD-159

SEGMENT C2 GRADING PLAN SHEET 3 -

CG-101

CG-102

CG-103

CG-104

CG-105

CG-106

CG-107

CG-108

CG-151

CG-152

CG-153

CG-154

CG-155

CG-156

CG-157

CG-158

CG-159

EROSION CONTROL

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 3

EC-101

EC-102

EC-103

EC-104

EC-105

EC-106

EC-107

EC-108

EC-109

EC-152

EC-153

EC-154

EC-155

EC-156

EC-157

EC-158

EC-159

CIVIL (CONT'D) CIVIL (CONT'D)

CG-109

CG-502

CG-503

CG-551

CD-109

C-351

C-352

C-363

C-364

C-365

C-366

C-367

C-368

C-369

C-361

C-362

C-360

C-370

C-371

C-372

C-373

SEGMENT C2 CROSS SECTION SHEET - STA. 10+00 TO STA. 12+50

SEGMENT C2 CROSS SECTION SHEET - STA. 13+00 TO STA. 15+50

SEGMENT C2 CROSS SECTION SHEET - STA. 16+00 TO STA. 18+50

SEGMENT C2 CROSS SECTION SHEET - STA. 19+00 TO STA. 21+50

SEGMENT C2 CROSS SECTION SHEET - STA. 22+00 TO STA. 24+50

SEGMENT C2 CROSS SECTION SHEET - STA. 25+00 TO STA. 27+50

SEGMENT C2 CROSS SECTION SHEET - STA. 28+00 TO STA. 30+50

SEGMENT C2 CROSS SECTION SHEET - STA. 34+00 TO STA. 36+50

SEGMENT C2 CROSS SECTION SHEET - STA. 37+00 TO STA. 39+50

SEGMENT C2 CROSS SECTION SHEET - STA. 40+00 TO STA. 42+50

SEGMENT C2 CROSS SECTION SHEET - STA. 43+00 TO STA. 45+00

SEGMENT C2 PUMP STATION BDR2 SITE DETAIL

SEGMENT C2 BDR2 OUTLET DETAIL

SEGMENT C2 PUMP STATION BDR3 SITE DETAIL

ROADWAY PLAN - SOUTH LINCOLN AVE.

UTILITY DETAILS - SHEET 1 OF 2

UTILITY DETAILS - SHEET 2 OF 2

SEGMENT C2 CONSTRUCTION DETAILS - SHEET 1

SEGMENT C2 CONSTRUCTION DETAILS - SHEET 2

SEGMENT C2 CONSTRUCTION DETAILS - SHEET 3

SEGMENT C2 DEMOLITION PLAN SHEET 1 - STA. 12+22 TO STA. 17+00

SEGMENT C2 DEMOLITION PLAN SHEET 2 - STA. 17+00 TO STA. 22+00

SEGMENT C2 DEMOLITION PLAN SHEET 3

SEGMENT C2 DEMOLITION PLAN SHEET 4 - STA. 22+00 TO STA. 26+50

SEGMENT C2 DEMOLITION PLAN SHEET 5 - STA. 26+50 TO STA. 31+00

SEGMENT C2 DEMOLITION PLAN SHEET 6 - STA. 31+00 TO STA. 33+50

SEGMENT C2 DEMOLITION PLAN SHEET 7 - STA. 33+50 TO STA. 38+00

SEGMENT C2 DEMOLITION PLAN SHEET 8 - STA. 38+00 TO STA. 42+75

SEGMENT C2 DEMOLITION PLAN SHEET 9 - STA. 42+75 TO STA. 47+00

SEGMENT C2 GRADING PLAN SHEET 1 - STA. 12+22 TO STA. 17+00

SEGMENT C2 GRADING PLAN SHEET 2 - STA. 17+00 TO STA. 22+00

SEGMENT C2 GRADING PLAN SHEET 4 - STA. 22+00 TO STA. 26+50

SEGMENT C2 GRADING PLAN SHEET 5 - STA. 26+50 TO STA. 31+00

SEGMENT C2 GRADING PLAN SHEET 6 - STA. 31+00 TO STA. 33+50

SEGMENT C2 GRADING PLAN SHEET 7 - STA. 33+50 TO STA. 38+00

SEGMENT C2 GRADING PLAN SHEET 8 - STA. 38+00 TO STA. 42+75

SEGMENT C2 GRADING PLAN SHEET 9 - STA. 42+75 TO STA. 47+00

SEGMENT C2 PUMP STATION BDR2 CUT OUTLET - GRADING DETAIL

SEGMENT C2 PUMP STATION BDR3 - GRADING DETAIL

SEGMENT H CROSS SECTION SHEET - STA. 50+00 TO STA. 52+50

SEGMENT H CROSS SECTION SHEET - STA. 53+00 TO STA. 55+50

SEGMENT H CROSS SECTION SHEET - STA. 56+00 TO STA. 57+00

SEGMENT H CROSS SECTION SHEET - STA. 57+50 TO STA. 58+50

SEGMENT H CROSS SECTION SHEET - STA. 59+00 TO STA. 60+00

SEGMENT H CROSS SECTION SHEET - STA. 60+50 TO STA. 61+50

SEGMENT H CROSS SECTION SHEET - STA. 62+00 TO STA. 62+50

SEGMENT H CROSS SECTION SHEET - STA. 62+71 TO STA. 63+50

SEGMENT H CROSS SECTION SHEET - STA. 64+00 TO STA. 65+00

SEGMENT H CROSS SECTION SHEET - STA. 67+00 TO STA. 68+42

SEGMENT H CROSS SECTION SHEET - STA. 65+50 TO STA. 66+50

SEGMENT H CROSS SECTION SHEET - STA. 68+50 TO STA. 71+00

SEGMENT H CROSS SECTION SHEET - STA. 74+50 TO STA. 75+50

SEGMENT H CROSS SECTION SHEET - STA. 71+50 TO STA. 74+00

SEGMENT H CROSS SECTION SHEET - STA. 76+00 TO STA. 77+00

SEGMENT H CROSS SECTION SHEET - STA. 77+50 TO STA. 78+50

SEGMENT H CROSS SECTION SHEET - STA. 79+00 TO STA. 80+00

SEGMENT H CROSS SECTION SHEET - STA. 80+50 TO STA. 83+00

SEGMENT H CROSS SECTION SHEET - STA. 83+50 TO STA. 86+00

SEGMENT H CROSS SECTION SHEET - STA. 86+50 TO STA. 89+00

SEGMENT H DEMOLITION PLAN SHEET 1 - STA. 50+00 TO STA. 53+75

SEGMENT H DEMOLITION PLAN SHEET 2 - STA. 53+75 TO STA. 59+25

SEGMENT H DEMOLITION PLAN SHEET 3 - STA. 59+25 TO STA. 64+50

SEGMENT H DEMOLITION PLAN SHEET 4 - STA. 64+50 TO STA. 69+00

SEGMENT H DEMOLITION PLAN SHEET 5 - STA. 69+00 TO STA. 73+25

SEGMENT H DEMOLITION PLAN SHEET 6 - STA. 73+25 TO STA. 78+00

SEGMENT H DEMOLITION PLAN SHEET 7 - STA. 78+00 TO STA. 82+75

SEGMENT H DEMOLITION PLAN SHEET 8 - STA. 82+75 TO STA. 86+75

SEGMENT H DEMOLITION PLAN SHEET 9 - STA. 86+75 TO STA. 90+23.85

SEGMENT H GRADING PLAN SHEET 1 -STA. 50+00 TO STA. 53+75

SEGMENT H GRADING PLAN SHEET 2 - STA. 53+75 TO STA. 59+25

SEGMENT H GRADING PLAN SHEET 3 - STA. 59+25 TO STA. 64+50

SEGMENT H GRADING PLAN SHEET 4 - STA. 64+50 TO STA. 69+00

SEGMENT H GRADING PLAN SHEET 5 - STA. 69+00 TO STA. 73+25

SEGMENT H GRADING PLAN SHEET 6 - STA. 73+25 TO STA. 78+00

SEGMENT H GRADING PLAN SHEET 7 - STA. 78+00 TO STA. 82+75

SEGMENT H GRADING PLAN SHEET 8 - STA. 82+75 TO STA. 86+75

SEGMENT H GRADING PLAN SHEET 9 - STA. 86+75 TO STA. 90+23.85

SEGMENT H CULVERT H6 (BDL2) OUTLET - GRADING DETAIL SHEET

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 1 - STA. 12+22 TO STA. 17+00

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 2 - STA. 17+00 TO STA. 22+00

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 4 - STA. 22+00 TO STA. 26+50

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 5 - STA. 26+50 TO STA. 31+00

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 6 - STA. 31+00 TO STA. 33+50

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 7 - STA. 33+50 TO STA. 38+00

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 8 - STA. 38+00 TO STA. 42+75

SEGMENT C2 EROSION AND SEDIMENT CONTROL PLAN 9 - STA. 42+75 TO STA. 47+00

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 1 - STA. 50+00 TO STA. 53+75

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 2 - STA. 53+75 TO STA. 59+25

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 3 - STA. 59+25 TO STA. 64+50

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 4 - STA. 64+50 TO STA. 69+00

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 5 - STA. 69+00 TO STA. 73+25

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 6 - STA. 73+25 TO STA. 78+00

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 7 - STA. 78+00 TO STA. 82+75

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 8 - STA. 82+75 TO STA. 86+75

SEGMENT H EROSION AND SEDIMENT CONTROL PLAN 9 - STA. 86+75 TO STA. 90+23.85

SEGMENT H CULVERT H2 (BDL1) CULVERT OUTLET DETAIL

EC-151

SEGMENT C2 PUMP STATION BDR-2 - GRADING DETAIL

SEGMENT C2 - LEVEE TYPICAL SECTIONS

SEGMENT H - LEVEE TYPICAL SECTIONS

SEGMENT H - LEVEE TYPICAL SECTIONS AT PONDING AREA

SEGMENT H CROSS SECTION SHEET - STA. 89+50 TO STA. 90+23.85

SEGMENT H CULVERT H6 (BDL2) OUTLET DETAIL SHEET

UTILITY RELOCATION PLAN - SOUTH LINCOLN AVE.

TYPICAL SECTIONS - SOUTH LINCOLN AVE. AND ACCESS ROADS

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

W P

-X

D D -M

O N -Y

Y Y

Y

A N

S I

D

N E

W Y

O R

K

N E

W Y

O R

K

N E

W Y

O R

K D

IS

T R

IC

T

U S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

SHEET OF 493

B O

R O

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

S E

G M

E N

T C

H C

O N

T R

A C

T N

O

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

CONTRACT NO. 2 - 100% SUBMITTAL - JUNE 2022

J A

C O

B S

-J

U N -2

X X

X

G B S

E G C

-H

G

X X

X .d

G-104

D

E X O

F D

R A

W

IN

G S

S H

E E

T

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

EC-501

EC-502

EC-503

EC-504

EC-505

EC-506

EC-507

EC-508

EC-509

EC-510

EC-511

EC-512

EC-513

EC-514

EC-515

EC-516

EC-517

EC-518

EC-519

MAINTENANCE OF TRAFFIC

CT-101

CT-102

CT-103

CT-104

SURVEY

V-101

V-102

V-103

V-104

V-105

V-106

V-107

V-108

V-151

V-152

V-153

V-154

V-155

V-156

V-157

V-158

V-159

INDEX OF DRAWINGS - SEGMENTS C2 AND H

LANDSCAPE

SEGMENT C2 LANDSCAPE PLAN SHEET 2 - STA. 17+00 TO STA. 22+00

SEGMENT C2 LANDSCAPE PLAN SHEET 4 - STA. 22+00 TO STA. 26+50

SEGMENT C2 LANDSCAPE PLAN SHEET 5 - STA. 26+50 TO STA. 31+00

SEGMENT C2 LANDSCAPE PLAN SHEET 6 - STA. 31+00 TO STA. 33+50

SEGMENT C2 LANDSCAPE PLAN SHEET 7 - STA. 33+50 TO STA. 38+00

SEGMENT C2 LANDSCAPE PLAN SHEET 8 - STA. 38+00 TO STA. 42+75

SEGMENT C2 LANDSCAPE PLAN SHEET 9 - STA. 42+75 TO STA. 47+00

L-101

L-102

L-103

L-104

L-105

L-106

L-107

L-108

L-109

L-151

L-152

L-153

L-154

L-155

L-156

L-157

L-158

L-159

L-501

RIGHT OF WAY

X-101

X-102

X-103

X-104

X-105

X-106

X-107

X-108

X-151

X-152

X-153

X-154

X-155

X-156

X-157

X-158

X-159

SEGMENT H PROPOSED ROW PLAN SHEET 1 - STA. 50+00 TO STA. 53+75

SEGMENT H PROPOSED ROW PLAN SHEET 2 - STA. 53+75 TO STA. 59+25

SEGMENT H PROPOSED ROW PLAN SHEET 4 - STA. 64+50 TO STA. 69+00

SEGMENT H PROPOSED ROW PLAN SHEET 5 - STA. 69+00 TO STA. 73+25

SEGMENT H PROPOSED ROW PLAN SHEET 6 - STA. 73+25 TO STA. 78+00

SEGMENT H PROPOSED ROW PLAN SHEET 7 - STA. 78+00 TO STA. 82+75

SEGMENT H PROPOSED ROW PLAN SHEET 8 - STA. 82+75 TO STA. 86+75

EROSION CONTROL (CONT'D)

S .G .K

X-109

V-109

L-502

SEGMENT H LANDSCAPE PLAN SHEET 1 - STA. 50+00 TO STA. 53+75

SEGMENT H LANDSCAPE PLAN SHEET 2 - STA. 53+75 TO STA. 59+25

SEGMENT H LANDSCAPE PLAN SHEET 3 - STA. 59+25 TO STA. 64+50

SEGMENT H LANDSCAPE PLAN SHEET 4 - STA. 64+50 TO STA. 69+00

SEGMENT H LANDSCAPE PLAN SHEET 5 - STA. 69+00 TO STA. 73+25

SEGMENT H LANDSCAPE PLAN SHEET 6 - STA. 73+25 TO STA. 78+00

SEGMENT H LANDSCAPE PLAN SHEET 7 - STA. 78+00 TO STA. 82+75

SEGMENT H LANDSCAPE PLAN SHEET 8 - STA. 82+75 TO STA. 86+75

SEGMENT H LANDSCAPE PLAN SHEET 9 - STA. 86+75 TO STA. 90+23.85

SEGMENT H EXISTING SURVEY PLAN SHEET 1

SEGMENT H EXISTING SURVEY PLAN SHEET 2

SEGMENT H EXISTING SURVEY PLAN SHEET 3

SEGMENT H EXISTING SURVEY PLAN SHEET 4

SEGMENT H EXISTING SURVEY PLAN SHEET 5

SEGMENT H EXISTING SURVEY PLAN SHEET 6

SEGMENT H EXISTING SURVEY PLAN SHEET 7

SEGMENT H EXISTING SURVEY PLAN SHEET 8

SEGMENT H EXISTING SURVEY PLAN SHEET 9

SEGMENT H PROPOSED ROW PLAN SHEET 3 - STA. 59+25 TO STA. 64+50

SEGMENT H PROPOSED ROW PLAN SHEET 9 - STA. 86+75 TO STA. 90+23.85

SEGMENT C2 LANDSCAPE PLAN SHEET 1 - STA. 12+22 TO STA. 17+00

LANDSCAPING DETAILS AND PLANTING SCHEDULE

SEGMENT C2 PROPOSED ROW PLAN SHEET 1 - STA. 12+20 TO STA. 17+00

SEGMENT C2 PROPOSED ROW PLAN SHEET 2 - STA. 17+00 TO STA. 22+00

SEGMENT C2 PROPOSED ROW PLAN SHEET 4 - STA. 22+00 TO STA. 26+50

SEGMENT C2 PROPOSED ROW PLAN SHEET 5 - STA. 26+50 TO STA. 31+00

SEGMENT C2 PROPOSED ROW PLAN SHEET 6 - STA. 31+00 TO STA. 33+50

SEGMENT C2 PROPOSED ROW PLAN SHEET 7 - STA. 33+50 TO STA. 38+00

SEGMENT C2 PROPOSED ROW PLAN SHEET 8 - STA. 38+00 TO STA. 42+75

SEGMENT C2 PROPOSED ROW PLAN SHEET 9 - STA. 42+75 TO STA. 47+00

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL NOTES - SHEET 1

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL NOTES - SHEET 2 EC-522

EC-521

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 20 EC-520

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 1

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 2

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 3

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 4

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 5

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 6

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 7

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 8

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 9

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 10

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 11

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 12

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 13

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 14

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 15

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 16

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 17

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 18

SEGMENT C2 & H EROSION AND SEDIMENT CONTROL DETAIL - SHEET 19

SOUTH LINCOLN AVE DETOUR PLAN - 1

SOUTH LINCOLN AVE DETOUR PLAN - 2

SOUTH LINCOLN AVE DETOUR PLAN - 3

SOUTH LINCOLN AVE DETOUR PLAN - 4

FLOODWALL SEGMENTS C2 AND H PEDESTRIAN DETOUR CT-105

SOUTH LINCOLN AVE DETOUR PLAN - 6 SIGN TABLE CT-106

SEGMENT C2 LANDSCAPE PLAN SHEET 3 -

SEGMENT C2 EXISTING SURVEY PLAN SHEET 1 - STA. 12+22 TO STA. 17+00

SEGMENT C2 EXISTING SURVEY PLAN SHEET 2 - STA. 17+00 TO STA. 22+00

SEGMENT C2 EXISTING SURVEY PLAN SHEET 4 - STA. 22+00 TO STA. 26+50

SEGMENT C2 EXISTING SURVEY PLAN SHEET 5 - STA. 26+50 TO STA. 31+00

SEGMENT C2 EXISTING SURVEY PLAN SHEET 6 - STA. 31+00 TO STA. 33+50

SEGMENT C2 EXISTING SURVEY PLAN SHEET 7 - STA. 33+50 TO STA. 38+00

SEGMENT C2 EXISTING SURVEY PLAN SHEET 8 - STA. 38+00 TO STA. 42+75

SEGMENT C2 EXISTING SURVEY PLAN SHEET 9 - STA. 42+75 TO STA. 47+00

SEGMENT C2 EXISTING SURVEY PLAN SHEET 3 -

SEGMENT C2 PROPOSED ROW PLAN SHEET 3 -

LANDSCAPING NOTES AND SEED MIX TABLES

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

W P

-X

D D -M

O N -Y

Y Y

Y

A N

S I

D

N E

W Y

O R

K

N E

W Y

O R

K

N E

W Y

O R

K D

IS

T R

IC

T

U S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

SHEET OF 493

B O

R O

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

S E

G M

E N

T C

H C

O N

T R

A C

T N

O

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

CONTRACT NO. 2 - 100% SUBMITTAL - JUNE 2022

J A

C O

B S

-J

U N -2

X X

X

G B S

E G C

-H

G

X X

X .d

G-105

D

E X O

F D

R A

W

IN

G S

S H

E E

T

S .G .K

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

STRUCTURAL STRUCTURAL (CONT.)

INDEX OF DRAWINGS - SEGMENTS C2 AND H

FLOODWALL SEGMENTS C2 AND H - STRUCTURAL GENERAL NOTES

FLOODWALL SEGMENTS C2 AND H - GENERAL SITE PLAN

FLOOD GATES - GIRDER PLANS

FLOOD GATES - SECTIONS AND DETAILS

FLOOD GATES - SECTIONS AND DETAILS

S-101

S-102

S-103

S-104

S-151

S-152

S-153

S-301

S-302

S-303

S-304

S-305

S-356

S-357

S-358

S-359

S-351

S-352

S-353

S-354

S-355

S-401

S-402

S-403

S-404

S-405

S-406

S-451

S-452

S-453

S-454

S-455

S-456

S-457

S-458

S-459

S-460

S-461

S-501

S-502

S-503

S-504

S-505

S-506

S-507

S-508

S-509

S-510

S-511

S-512

S-812

S-811

S-810

S-809

S-808

S-807

S-806

S-805

S-804

S-803

S-802

S-801

S-154

FLOOD GATE C2 - ELEVATION

FLOOD GATE H - ELEVATION

FLOOD GATE C2 - GATE CLOSING SEQUENCE

FLOOD GATE C2 - GATE OPENING SEQUENCE

FLOOD GATE H - GATE CLOSING SEQUENCE

FLOOD GATE H - GATE OPENING SEQUENCE S-513

FLOOD GATES - CASTER MOUNTING DETAILS

CONTROL BUILDING - ARCHITECTURAL

A-001

A-111

A-101

A-201

A-301

A-501

A-531

A-601

A-603

A-604

A-100

GENERAL NOTES

LIFE SAFETY PLANS

FLOOR PLANS

EXTERIOR ELEVATIONS

BUILDING SECTIONS

EXTERIOR WALL SECTIONS AND DETAILS

EXTERIOR DETAILS

ROOM FINISH SCHEDULE, PARTITION TYPES, INTERIOR ELEVATIONS

M-001

M-501

M-301

M-701

M-101

CONTROL BUILDING - MECHANICAL

P-001

P-101

P-501

GENERAL NOTES, LEGENDS AND SYMBOLS

FLOOR PLAN

SCHEDULES AND DETAILS

CONTROL BUILDING - PLUMBING

CONTROL BUILDING - ELECTRICAL

E-101

E-102

E-103

E-104

E-105

E-106

E-107

E-108

E-109

E-110

E-111

E-112

ROOF PLAN AND REFLECTED CEILING PLAN

DOOR SCHEDULE TYPES AND DETAILS

DOOR DETAILS, LOUVER TYPES AND DETAIL

PUMP STATION BDR2 CONTROL BLDG. & PUMP STATION LIGHTING PLAN & FIXTURE SCHEDULE

PUMP STATION BDR2 & BDR3 ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS

PUMP STATION BDR2 CONTROL BLDG. & PUMP STATION POWER PLAN

PUMP STATION BDR2 CONTROL BLDG & PUMP STATION ELECTRICAL SITE PLAN

PUMP STATION BDR2 CONTROL PANEL ARCH. FRONT LAYOUT

PUMP STATION BDR2 ONE-LINE DIAGRAM

PUMP STATION BDR2 CONDUIT SCHEDULE

PUMP STATION BDR2 MAIN PUMP, SUMP PUMP, & LIGHTING CONTROL PANEL WIRING DIAGRAMS

PUMP STATION BDR2 SEQUENCE OF OPERATION

P-901

CONTROL DIAGRAMS

DETAILS

SECTIONS AND SCHEDULES

FLOOR PLAN

GENERAL NOTES, LEGENDS, AND ABBREVIATIONS

PUMP STATION BDR2 GENERATOR START AND DAMPER SCHEMATICS

PUMP STATION BDR2 TYPICAL SLUICE GATE WIRING DIAGRAM

M

M

FLOODWALL WALL H PLAN AND PROFILE - SHEET 1

FLOODWALL WALL H PLAN AND PROFILE - SHEET 2

FLOODWALL WALL H PLAN AND PROFILE - SHEET 3

FLOODWALL WALL H PLAN AND PROFILE - SHEET 4

FLOODWALL MONOLITH SECTIONS - FLOODWALL MONOLITHS C2-14 AND C2-15

FLOODWALL MONOLITH SECTIONS - MONOLITHS H-13 AND H-14

FLOODWALL MONOLITH SECTIONS - GATE C2 TRACK SUPPORT DETAILS

FLOODWALL MONOLITH SECTIONS - GATE H TRACK SUPPORT DETAILS

FLOODWALL MONOLITH SECTIONS - MONOLITHS C2-16 AND C2-17

FLOODWALL MONOLITH SECTIONS - MONOLITHS C2-16 AND C2-17

FLOODWALL MONOLITH SECTIONS - MONOLITHS C2-16 AND C2-17

FLOODWALL MONOLITH SECTIONS - MONOLITHS H-1 AND H-2

FLOODWALL MONOLITH SECTIONS - MONOLITHS H-3 THRU H-5

FLOODWALL MONOLITH SECTIONS - MONOLITHS H-6 THRU H-9

FLOODWALL MONOLITH SECTIONS - MONOLITHS H-10 AND H-11

FLOODWALL MONOLITH SECTIONS - MONOLITHS H-10 AND H-11

FLOODWALL MONOLITH SECTIONS - MONOLITHS H-10 AND H-11

FLOODWALL MONOLITH SECTIONS - MONOLITHS H-12 AND H-13

FLOODWALL MONOLITH SECTIONS - ELEVATION - MONOLITHS H-10 AND H-11

FLOODWALL MONOLITH SECTIONS - ELEVATION - MONOLITHS C2-16 AND C2-17

FLOODWALL MONOLITH PLANS - MONOLITHS C2-14 AND C2-15

FLOODWALL MONOLITH PLANS - MONOLITH C2-16

FLOODWALL MONOLITH PLANS - MONOLITH C2-17

FLOODWALL MONOLITH PLANS - MONOLITHS C2-14 THRU C2-17 - SHEET 1

FLOODWALL MONOLITH PLANS - MONOLITHS C2-14 THRU C2-17 - SHEET 2

FLOODWALL MONOLITH PLANS - MONOLITHS H-1 THRU H-3

FLOODWALL MONOLITH PLANS - MONOLITHS H-4 THRU H-7

FLOODWALL MONOLITH PLANS - MONOLITHS H-8 AND H-9

FLOODWALL MONOLITH PLANS - MONOLITH H-10

FLOODWALL MONOLITH PLANS - MONOLITH H-11

FLOODWALL MONOLITH PLANS - MONOLITH H-12

FLOODWALL MONOLITH PLANS - MONOLITH H-13

FLOODWALL MONOLITH PLANS - MONOLITHS H10 THRU H13 - SHEET 1

FLOODWALL MONOLITH PLANS - MONOLITHS H10 THRU H13 - SHEET 2

FLOODWALL MONOLITH PLANS - MONOLITH H-14

FLOOD GATES - SECTIONS AND DETAILS

UTILITY PENETRATION DETAILS THRU FLOODWALL CONCRETE AND FENCE DETAILS

UTILITY PENETRATION DETAILS THRU SHEET PILE

MICROPILE TENSION TEST DETAILS

MICROPILE COMPRESSION TEST DETAILS

MICROPILE SCHEDULE AND NOTES

TYPICAL MICROPILE DETAILS

TYPICAL SHEET PILE DETAILS - SHEET 2

TYPICAL SHEET PILE DETAILS - SHEET 1

FLOODWALL - SEGMENTS C2 AND H - ACCESS LADDER DETAILS

FLOODWALL ARCHITECTURAL TREATMENT DETAILS - SHEET 2

FLOODWALL ARCHITECTURAL TREATMENT DETAILS - SHEET 1

TYPICAL FLOODWALL DETAILS

A-602NOT USED

PUMP STATION BDR2 ROOF PLAN LIGHTNING PROTECTION & PANEL BOARD SCHEDULE

FLOODWALL WALL C2 PLAN AND PROFILE - SHEET 2

FLOODWALL WALL C2 PLAN AND PROFILE - SHEET 1

ISOMETRICS

FLOOD GATE C2 LAYOUT

FLOOD GATE H LAYOUT

FA-101

FA-501

CONTROL BUILDING - FIRE ALARM

FA-001

DETAILS

PLAN

GENERAL NOTES, ABBREV., AND SYMBOLS

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

W P

-X

D D -M

O N -Y

Y Y

Y

A N

S I

D

N E

W Y

O R

K

N E

W Y

O R

K

N E

W Y

O R

K D

IS

T R

IC

T

U S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

SHEET OF 493

B O

R O

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

S E

G M

E N

T C

H C

O N

T R

A C

T N

O

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

CONTRACT NO. 2 - 100% SUBMITTAL - JUNE 2022

J A

C O

B S

-J

U N -2

X X

X

G B S

E G C

-H

G

X X

X .d

G-106

D

E X O

F D

R A

W

IN

G S

S H

E E

T

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

INDEX OF DRAWINGS - SEGMENTS C2 AND H

E-203

E-151

E-152

E-153

E-154

E-155

E-156

E-157

E-158

E-159

E-160

E-161

E-162

E-163

E-201

E-202

E-204

CONTROL BUILDING - STRUCTURAL

PUMP STATION - PROCESS MECHANICAL

SF-001

SF-002

SF-101

SF-102

SF-201

D-103

D-102

D-101

D-104

D-105

D-106

GENERAL NOTES

TYPICAL DETAILS

D-151

D-152

D-153

PUMP STATION BDR-3 SECTION C

PUMP STATION BDR-3 SECTION B

PUMP STATION BDR-3 SECTION A D-154

D-155

D-156

PUMP STATION - P&ID

DI-101

DI-102

DI-103

DI-104

DI-105

CONTROL BUILDING - ELECTRICAL (CONT'D) PUMP STATION WET WELL - STRUCTURAL

S-601

S-602

S-603

S-604

S-605

S-606

S-607

S-608

S-609

S-610

S-611

S-612

S-613

S-614

S-615

S-616

S-617

S-618

S-619

S-620

S-621

S-622

S-651

S-652

S-653

S-654

S-655

S-656

S-657

S-658

S-659

S-660

S-661

S-662

S-663

S-664

S-665

S-666

PUMP STATION BDR-2 WET WELL - BOTTOM PLAN

PUMP STATION BDR-2 WET WELL - SECTION

PUMP STATION BDR-2 WET WELL - SECTION

PUMP STATION BDR-2 WET WELL - SECTION

PUMP STATION BDR-2 WET WELL - SECTION

PUMP STATION BDR-2 WET WELL - SECTION

PUMP STATION BDR-2 WET WELL - SECTIONS

PUMP STATION BDR-2 WET WELL - SECTIONS

PUMP STATION BDR-2 WET WELL - SECTIONS

PUMP STATION BDR-2 WET WELL - STAIR SECTIONS AND DETAILS

PUMP STATION BDR-2 WET WELL - STAIR SECTIONS AND DETAILS

PUMP STATION BDR-2 WET WELL - LADDER AND GUARDRAIL DETAILS

PUMP STATION BDR-2 WET WELL - SECURITY FENCE DETAILS

PUMP STATION BDR-2 WET WELL - RETAINING WALL SECTIONS

PUMP STATION BDR-3 WET WELL - BOTTOM PLAN

PUMP STATION BDR-3 WET WELL - SECTION

PUMP STATION BDR-3 WET WELL - SECTION

PUMP STATION BDR-3 WET WELL - SECTION

PUMP STATION BDR-3 WET WELL - SECTION

PUMP STATION BDR-3 WET WELL - SECTION

PUMP STATION BDR-3 WET WELL - SECTIONS

PUMP STATION BDR-3 WET WELL - SECTIONS

PUMP STATION BDR-3 WET WELL - ACCESS STAIR DETAILS

PUMP STATION BDR-3 WET WELL - ACCESS STAIR DETAILS

PUMP STATION BDR-3 WET WELL - LADDER AND GUARDRAIL DETAILS

PUMP STATION BDR-3 WET WELL - TRASH RACK DETAILS

PUMP STATION BDR-3 WET WELL - RETAINING WALL SECTIONS

S-667

S-668

S-669

S-670

S-671

S-672

S-673

PUMP STATION BDR-3 WET WELL - SECTIONS AND DETAILS

PUMP STATION BDR-3 WET WELL - SECTIONS AND DETAILS

S .G .K

DI-106

OVERALL SITE PLAN ELECTRICAL CONDUIT

CMU WALL REINFORCING ELEVATIONS

PUMP STATION BDR3 ROOF PLAN LIGHTNING PROTECTION & PANEL BOARD SCHEDULE

PUMP STATION BDR3 ONE-LINE DIAGRAM

PUMP STATION BDR3 CONDUIT SCHEDULE

PUMP STATION BDR3 MAIN PUMP, SUMP PUMP & LIGHTING CONTROL PANEL WIRING DIAGRAMS

PUMP STATION BDR3 SEQUENCE OF OPERATION

PUMP STATION BDR3 CONTROL BLDG. & PUMP STATION LIGHTING PLAN & FIXTURE SCHEDULE

PUMP STATION BDR3 CONTROL BLDG. & PUMP STATION POWER PLAN

PUMP STATION BDR3 CONTROL BLDG. & PUMP STATION ELECTRICAL SITE PLAN

PUMP STATION BDR3 GENERATOR START AND DAMPER SCHEMATICS

PUMP STATIONS BDR2 AND BDR3 ELECTRICAL DETAILS SHEET 1 OF 4

PUMP STATIONS BDR2 AND BDR3 ELECTRICAL DETAILS SHEET 2 OF 4

PUMP STATIONS BDR2 AND BDR3 ELECTRICAL DETAILS SHEET 3 OF 4

PUMP STATIONS BDR2 AND BDR3 ELECTRICAL DETAILS SHEET 4 OF 4

PUMP STATION BDR-2 BOTTOM PLAN

FOUNDATION PLAN - SECTIONS & DETAILS

ROOF FRAMING PLAN - SECTIONS & DETAILS

PUMP STATION BDR-2 MID LEVEL PLAN

PUMP STATION BDR-2 TOP LEVEL PLAN

DRAINAGE STRUCTURES H2 AND H6

PUMP STATION BDR2 AND BDR3 BACKUP GENERATORS

PUMP STATION BDR-3

PUMP STATION BDR-2

SYMBOLS AND DESIGNATIONS SHEET 2 OF 2

SYMBOLS AND DESIGNATIONS SHEET 1 OF 2

E-164DRAINAGE STRUCTURES H2 AND H6 CONDUIT ROUTING

FLOOD GATES C2 AND H LAYOUT CONDUIT ROUTING

PUMP STATION BDR-2 SECTION A

PUMP STATION BDR-2 SECTION B

PUMP STATION BDR-2 SECTION C

PUMP STATION BDR-3 BOTTOM PLAN

PUMP STATION BDR-3 MID LEVEL PLAN

PUMP STATION BDR-3 TOP LEVEL PLAN

PUMP STATION BDR3 CONTROL PANEL ARCH. & FRONT LAYOUT

PUMP STATION BDR3 TYPICAL SLUICE GATE WIRING DIAGRAM

PUMP STATION BDR-2 WET WELL - MID LEVEL FLOOR SLAB REINFORCING PLAN

PUMP STATION BDR-2 WET WELL - SECTIONS AND DETAILS

PUMP STATION BDR-2 WET WELL - SECTIONS AND DETAILS

PUMP STATION BDR-2 WET WELL - SECTIONS AND DETAILS

PUMP STATION BDR-2 WET WELL - MID LEVEL PLAN - EL. 41.15'

PUMP STATION BDR-2 WET WELL - TOP LEVEL PLAN - EL. 54.25'

PUMP STATION BDR-3 WET WELL - MID LEVEL PLAN - EL. 44.65'

PUMP STATION BDR-3 WET WELL - TOP LEVEL PLAN - EL. 55.25'

PUMP STATION BDR-3 WET WELL - MID LEVEL FLOOR SLAB REINFORCING PLAN

PUMP STATION BDR-3 WET WELL - CONCRETE STAIR DETAILS

PUMP STATION BDR-3 WET WELL - SECURITY FENCE DETAILS

PUMP STATION BDR-3 WET WELL - SECTIONS AND DETAILS

PUMP STATION BDR-3 WET WELL - SECTIONS AND DETAILS

PUMP STATION BDR-2 WET WELL - TRASH RACK SECTIONS AND DETAILS

PUMP STATION BDR-2 WET WELL - BOTTOM REINFORCING PLAN

PUMP STATION BDR-3 WET WELL - BOTTOM REINFORCING PLAN

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

IS

S

U E D

A T

E

W P

-X

D D -M

O N -Y

Y Y

Y

A N

S I

D

N E

W Y

O R

K

N E

W Y

O R

K

N E

W Y

O R

K D

IS

T R

IC

T

U S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

SHEET OF 493

B O

R O

O F M

ID

D

L E

S E

X A

N D G

R E

E N B

R O

O K T

W P

N J

S E

G M

E N

T C

H C

O N

T R

A C

T N

O

S U

B -B

A S

IN

O

F T

H E R

A R

IT

A N R

IV

E R

G R

E E

N B

R O

O K F

L O

O D R

IS

K M

A N

A G

E M

E N

T P

R O J E

C T

CONTRACT NO. 2 - 100% SUBMITTAL - JUNE 2022

J A

C O

B S

-J

U N -2

X X

X

G B S

E G C

-H

G

X X

X .d

G-107

D

E X O

F D

R A

W

IN

G S

S H

E E

T

S .G .K

INDEX OF DRAWINGS - SEGMENTS C2 AND H

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

NO.

REFERENCE

SHEET

TITLE

NO.

SHEET

DRAINAGE STRUCTURES

CD-159-1

CD-159-2

CD-159-4

CD-159-6

CD-159-7

CD-612-4

CD-612-5

REFERENCE DRAWINGS

CD-602-2

MANHOLES CD-602-8

PRECAST MANHOLES CD-602-9

CD-602-4

CD-602-3

INLET GENERAL DETAILS CD-602-1

CD-606-1

CD-606-3

CD-606-4

TRAFFIC CONTROL DEVICES

TRAFFIC CONTROL DEVICES

CONSTRUCTION BARRIER CURB (ALTERNATE A)

CONSTRUCTION SIGNS

CONSTRUCTION SIGNS

STEEL U-POST SIGN SUPPORTS

STEEL U-POST SIGN SUPPORTS

TRAFFIC CONTROL DETAILS TCD-1

VH601

S-701

S-702

S-703

S-704

S-705

S-706

DRAINAGE STRUCTURE H2 - PLAN

DRAINAGE STRUCTURE H2 - TOP PLAN, SECTIONS AND DETAILS

DRAINAGE STRUCTURE H2 - SECTIONS AND DETAILS

DRAINAGE STRUCTURE H2 - SECTIONS AND DETAILS

DRAINAGE STRUCTURE H2 - SECTIONS AND DETAILS

DRAINAGE STRUCTURE H2 - SECTIONS AND DETAILS

S-707

S-708

S-709

S-710

S-711

S-712

DRAINAGE STRUCTURE H6 - PLAN

DRAINAGE STRUCTURE H6 - TOP PLAN, SECTIONS AND DETAILS

DRAINAGE STRUCTURE H6 - SECTIONS AND DETAILS

DRAINAGE STRUCTURE H6 - SECTIONS AND DETAILS

DRAINAGE STRUCTURE H6 - SECTIONS AND DETAILS

DRAINAGE STRUCTURE H6 - SECTIONS AND DETAILS S-713

S-714

S-715

S-716

S-717

S-718CULVERT C2 - PLAN AND SECTIONS

HEADWALL C2-2 - SECTIONS AND DETAILS

CULVERT C3 - PLANS

CULVERT C3 - SECTIONS

CULVERT SECURITY GRATE - SECTIONS AND DETAILS

S-719

S-720

S-721

S-722

S-723

DRAINAGE STRUCTURE H6 - SECTIONS AND DETAILS

HEADWALL C5-2 - SECTIONS AND DETAILS

DRAINAGE STRUCTURE H2 - SECTIONS AND DETAILS

CULVERT C1 AND DRAINAGE CHAMBER C1-3 - PLAN

DRAINAGE CHAMBER C1-3 - PLAN AND SECTIONS

DRAINAGE CHAMBER C1-3 AND CULVERT C1 - SECTIONS

INLETS, TYPE B1, B2 & B, B1, & B2 MODIFIED

INLETS, TYPE E, E1, E2, & ES

HYDROLOGIC DATA - GREEN BROOK DOWNSTREAM OF BOUND BROOK

CONCRETE SIDEWALK (PUBLIC SIDEWALK CURB RAMP)

CONCRETE SIDEWALK (PUBLIC SIDEWALK CURB RAMP TABLES)

CONCRETE SIDEWALK (PUBLIC SIDEWALK CURB RAMP TABLES)

INLETS, TYPE A, B & C

GB_SEG C2-H_G101XX2_Jun272022_F
GB_SEG C2-H_G101XX2
GB_SEG C2-H_G102XXX_Jun272022_F
GB_SEG C2-H_G102XXX
GB_SEG C2-H_G103XXX_Jun272022_F
GB_SEG C2-H_G103XXX
GB_SEG C2-H_G104XXX_Jun272022_F
GB_SEG C2-H_G104XXX
GB_SEG C2-H_G105XXX_Jun272022_F
GB_SEG C2-H_G105XXX
GB_SEG C2-H_G106XXX_Jun272022_F
GB_SEG C2-H_G106XXX
GB_SEG C2-H_G107XXX_Jun272022_F
GB_SEG C2-H_G107XXX

File details come from the government source that posted it. Updated .