This solicitation package outlines requirements for a firm fixed price construction contract to repair Building 785 at the United States Military Academy in West Point, New York. The scope of work includes providing a certified Dental Clinic for the Defense Health Agency/Medical Command that meets specifications. Key requirements are the application of a 1/4 inch thick epoxy resin flooring system with chemical and abrasion resistance, low VOC emissions, and a 10-year warranty. The solicitation was issued by the U.S. Army Corps of Engineers New York District and responses are due by the date specified in the solicitation. The procurement is unrestricted with full and open competition.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR BUILDING 785, DENTAC 31800173.001
WEST POINT, NY
SECTION 09 67 23.14
CHEMICAL RESISTANT RESINOUS FLOORING
08/ 16, CHG 1: 08/ 18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C307 (2018) Standard Test Method for Tensile Strength of Chemical-Resistant Mortar, Grouts, and Monolithic Surfacings
ASTM C413 (2018) Standard Test Method for Absorption of Chemical-Resistant Mortars, Grouts, and Monolithic Surfacings and Polymer Concretes
ASTM C531 (2018) Standard Test Method for Linear Shrinkage and Coefficient of Thermal Expansion of Chemical-Resistant Mortars, Grouts, and Monolithic Surfacings, and Polymer Concretes
ASTM C579 (2018) Standard Test Methods for Compressive Strength of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes
ASTM C580 (2018) Standard Test Method for Flexural Strength and Modulus of Elasticity of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes
ASTM C722 (2018) Standard Specification for Chemical-Resistant Resin Monolithic Floor Surfacings
ASTM D1308 (2002; R 2013) Effect of Household Chemicals on Clear and Pigmented Organic Finishes
ASTM D4060 (2019) Abrasion Resistance of Organic Coatings by the Taber Abraser
ASTM D4263 (1983; R 2018) Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM E162 (2021) Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source
SECTION 09 67 23.14 Page 1
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
NATIONAL TERRAZZO AND MOSAIC ASSOCIATION (NTMA)
NTMA Info Guide (2017) Terrazzo Reference Guide
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1113 (2016) Architectural Coatings
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Flooring Systems; G, AE
SD-03 Product Data
Sealer and Resin; G, G, AE
Floor Surfacing; G, AE
Indoor Air Quality for Primer; G, AE
Indoor Air Quality for Top Coating; G, AE
Indoor Air Quality for Sealer And Resin; G, AE
Mixing; G, AE
SD-04 Samples
Flooring Systems; G, AE
SD-07 Certificates
Qualifications of Installer; G, AE
SD-08 Manufacturer's Instructions
Application; G, AE
SECTION 09 67 23.14 Page 2
SD-10 Operation and Maintenance Data
Flooring Systems; G, AE
1.3 QUALITY ASSURANCE
1.3.1 Qualifications of Installer
Perform installation by an applicator approved by the manufacturer of the floor surfacing materials. Furnish a written statement from the manufacturer detailing the Qualifications of Installer.
1.3.2 Shop Drawings
Submit drawings indicating the type and layout of the flooring system for approval.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver the materials to the project site in unopened bags and containers clearly labeled with the name of the manufacturer, type of material, batch number, and date of manufacture. Store materials, other than aggregates, away from fire, sparks, or smoking areas. Maintain the storage area between 50 and 90 degrees F.
1.5 ENVIRONMENTAL REQUIREMENTS
Maintain the ambient room and floor temperatures at 65 degrees F, or above, for a period extending from 48 hours before installation until one week after installation. Cure concrete for at least 28 days and keep it free of water for at least 7 days prior to receiving surfacing in accordance with ASTM D4263. Measure and insure moisture content of wood substrates between 8 and 10 percent prior to application.
PART 2 PRODUCTS
2.1 MATERIALS
Provide materials (except aggregate) used in the flooring from a single manufacturer. Furnish and install trowel applied type epoxy finish of 1/4 inch thickness with properties and chemical resistance conforming to the requirements specified in NTMA Info Guide . trowel applied 1/4 inch thick, epoxy, material conforming to ASTM C722 with Type A surfacings (chemical resistance and moderate to heavy traffic resistance) resin-based flooring. Meet the following material requirements:
2.1.1 Primer
Type recommended by the manufacturer to penetrate into the pores of the substrate and bond with the floor surfacing matrix to form a permanent monolithic bond between substrate and surfacing matrix. Primer products used on the interior of the building (defined as inside of the weatherproofing system) must meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1113 . Provide validation of indoor air quality for primer.
SECTION 09 67 23.14 Page 3
2.1.2 Aggregate
Provide silica sand, quartz, granite, or other suitable chemical resistant material having a Mohr's hardness of not less than 6.0 selected from manufacturer's standard aggregates aggregate.
2.1.3 Binder
Provide thermo-setting epoxy binder.
2.1.4 Fillers
If required, provide inert silica, quartz or other hard aggregate material fillers as recommended by the flooring manufacturer. Furnish fillers in the quantity necessary to impart the required color and physical characteristics. Provide a filler containing sufficient fines to obtain an even-textured, nonslip type of surface on the finished topping.
2.1.5 Top Coating
Furnish color coating of type recommended by the manufacturer. Floor top coating products used on the interior of the building (defined as inside of the weatherproofing system) must meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1113 . Provide validation of indoor air quality for top coating.
2.2 FLOORING SYSTEMS
Submit cured samples of each floor finish or color combination and Data Package 1 in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. The complete systems, after curing, must have the following properties when tested in accordance with the test methods listed for each property.
2.2.1 Chemical Resistance
ASTM D1308; no effect when exposed to the following reagents for 7 days:
Acetic Acid: 5 percent solution Ammonium Hydroxide: 10 percent solution Citric Acid: 5 percent solution Coffee Cola Syrup Isopropyl Alcohol Mineral Oil Sodium Hydroxide: 5 percent solution Tri-Sodium Phosphate: 5 percent solution Urea: 6.6 percent solution
2.2.2 Epoxy Matrix Floor Surfacing
2.2.2.1 Compressive Strength
ASTM C579; 10,000 psi minimum at 7 days.
2.2.2.2 Tensile Strength
ASTM C307; 1500 psi minimum at 7 days.
SECTION 09 67 23.14 Page 4
2.2.2.3 Flexural Modulus of Elasticity
ASTM C580; 500,000 psi minimum at 7 days.
2.2.2.4 Thermal Coefficient of Expansion
ASTM C531; 0.00004 inches per inch per degree F maximum.
2.2.2.5 Shrinkage
ASTM C531; 0.5 percent maximum.
2.2.2.6 Bond Strength
300 psi minimum with 100 percent concrete failure ( 2500 psi Compressive Strength Concrete).
2.2.2.7 Flame Spread Index
ASTM E162; 25 maximum.
2.2.2.8 Smoke Deposited
ASTM E162; 4 mg maximum.
2.2.2.9 Abrasion Resistance
ASTM D4060; 15 mg maximum weight loss.
2.2.2.10 Moisture Absorption
ASTM C413; 1.0 percent maximum.
2.2.2.11 Chemical Resistance
ASTM D1308; no effect when exposed to the following reagents for 7 days:
Acetic acid: 5 percent solution Ammonium Hydroxide: 10 percent solution Citric Acid: 5 percent solution Coffee Cola Syrup Isopropyl Alcohol Mineral Oil Sodium Hydroxide: 5 percent solution Tri-Sodium Phosphate: 5 percent solution Urea: 6.6 percent solution
2.3 SEALER AND RESIN
Provide a sealer product recommended by the industrial resin-based flooring manufacturer; when applied to the resin topping and dried, it must be nonslip and resistant to staining and suitable for the type application indicated. Floor resin and sealer products used on the interior of the building (defined as inside of the weatherproofing system) must meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1113 . Provide validation
SECTION 09 67 23.14 Page 5 for Indoor Air Quality for Sealer and Resin.
2.4 ANTIMICROBIAL
Treat industrial resin-based flooring to be resistant to fungi and bacteria.
2.5 COLOR
Provide color as indicated.
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Completely remove existing resilient flooring and adhesive by scraping.
Remove all dirt, dust, debris, and other loose particles by sweeping or vacuum cleaning. Protect adjacent surfaces not scheduled to receive the flooring by masking, or by other means, to maintain these surfaces free of the flooring material.
3.1.1 Concrete Surfaces
3.1.1.1 Mechanical Cleaning
Completely remove dirt, wax, paint, laitance, by grinding with a terrazzo machine, sanding with coarse open grid sandpaper, sand blasting, chipping, bush hammering, or wire brushing.
3.1.1.2 Steam Cleaning
Completely remove all animal fats, grease, oil, wax, using a high pressure steam cleaner equipped with a soap injection system. Scrape the surface to remove any build-up of debris. Then thoroughly saturate the surface with hot caustic solution. Allow the solution to remain on the floor for 15 to 20 minutes. Apply steam, with caustic, over the presoaked area until all contamination is removed. Leach the caustic residue from the surface using one or more applications of steam without caustic. Flush the floor with warm water.
3.1.1.3 Paint Stripping
Brush or spray on a paint stripping material that has been demonstrated to effectively remove the paint. Leave the stripping material on the surface until the paint has softened or blistered. Remove paint by scraping, brushing, or wiping. Rinse the surface in accordance with the stripping material manufacturer's recommendations. Avoid strippers containing toxic methylene chloride.
3.1.1.4 Air Drying
After cleaning, allow concrete surface to air dry thoroughly prior to application of surfacing. Blowers or oil free compressed air may be used. Do not use flame-drying methods. Prior to application of surfacing, test concrete surface for excessive moisture in at least two locations. Place rubber mats at each location with smooth side against concrete and place weight on top of mat to hold in position and ensure contact with concrete. Polyethylene with all edges taped may be used in lieu of mats. After 8 hours remove mat or sheeting and examine floor
SECTION 09 67 23.14 Page 6 surface for moisture accumulation. If tests indicate accumulation of moisture at either location, perform additional air drying until additional tests show no moisture accumulation.
3.1.2 Plywood
For new plywood substrates, provide exterior grade plywood with exterior grade glue nailed with annular ring or spiral nails. Sand the plywood to remove all latent contaminants. Sweep or vacuum surfaces to remove all sanding debris. Tape joints with 4 inch wide glass fiber reinforced tape.
3.1.3 Ceramic Tile
Remove all fats, oils, grease, or soap scum using a caustic solution of one pound of caustic soda to one gallon of water. Allow the solution to stand on the surface for at least one hour then scrub with steel brushes or steel wool. Mop up the caustic solution, neutralize it with a 10 percent muriatic acid solution, and thoroughly rinse the residue from the surface. Test glazed tile a deglazing agent as recommended by the flooring manufacturer and sanded or acid etched to roughen the surface sufficiently to obtain a good bond. Sweep or vacuum surfaces to remove all sanding debris. Use face shield, rubber gloves, and other safety equipment when using acids, alkalis, or solvents.
3.1.4 Substrate Cracks, Spalls, Joints, and Depressions
Fill all cracks, joints, spalls, and other depressions in the substrate with a latex underlayment, as recommended by the manufacturer compatible with the floor surfacing material.
3.2 MIXING
Proportion and mix the floor surfacing components in accordance with the manufacturer's instructions. Submit flooring manufacturer's descriptive data, mixing, proportioning, and installation instructions. Include maintenance literature for resinous flooring.
3.3 APPLICATION
Submit complete instructions for application of flooring system including any precautions or special handling instructions required to comply with OSHA 29 CFR 1910 -Subpart Z. Apply primer, floor surfacing, and seal coat in accordance with the manufacturer's recommendations and the following requirements.
3.3.1 Primer
Apply primer uniformly over the entire area to receive floor surfacing using clean rubber squeegees or clean steel trowels. Do not allow primer to collect in depressions. Allow primer to dry thoroughly before the next coat is applied. Reprime porous areas or areas where primer has dried.
3.3.2 Floor Surfacing
Apply mixed surfacing material to provide a finish floor surfacing not less than 1/4" inch thick. The entire surfacing in any one room or area must be placed in one continuous operation without use of cold joints or divider strips . All surfaces must be flush, true to plane and line, and level within 1/4 inch in 10 feet.
SECTION 09 67 23.14 Page 7
3.3.3 Seal Coat
Apply seal coat uniformly covering all surfaces after floor surfacing has cured and as recommended by the supplier.
3.4 PROTECTION
Allow surfacing to set for a minimum period of 48 hours before traffic is allowed on the floor. Protect finished flooring from traffic by covering with 30 pound building paper or other equally effective means until final acceptance of the project.
-- End of Section --
SECTION 09 67 23.14 Page 8