W912DR18R0055_-_Attachment__I_-_OU7_Optimization_Memo.pdf
PDF 1 MB Posted
- Attached to
- Enviromental AE Services/W912DRDR18R0055 Federal contract opportunity
- Solicitation number
- W912DR-18-S-0009
About this file
Attachment I
View the file
Other files for this federal contract opportunity
Show all 50
Enviromental AE Services/W912DRDR18R0055 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
!A!A
!A
!A!A
!A
!A!A!A!A
!A!A!A
!A
!A
!A
!A
!A
!A
!A
!A !A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A !A
!A
@A
@A
@A
@A
@A@A@A@A
@A@A@A@A@A
@A@A@A@A@A
@A@A@A@A@A
@A@A
@A@A@A@A
@A
@A
@A
@A @A
@A
@A
@A
@A
@A
@A
@A
@A @A
@A
@A
@A
@A
@A
@A
@A @A
@A
@A
@A @A
@A
@A
@A
@A
@A
@A
@A @A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A @A@A
@A @A@A
@A
@A
@A
@A
@A
@A @A@A
@A
@A
@A
@A
@A @A
@A
@A@A
@A@A
@A@A
@A@A
@A@A @A
@A
@A
@A @A
@A @A @A
@A@A
@A @A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
!A!A
!A
!A!A
!A
!A!A!A!A
!A!A!A
!A !A
!A
!A
!A
!A
!A
!A
!A
!A !A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A !A
!A
@A
@A
@A
@A
@A@A@A@A
@A@A@A@A@A
@A@A@A@A@A
@A@A@A@A@A
@A@A
@A@A@A@A
@A
@A
@A
@A @A
@A
@A
@A
@A
@A
@A
@A
@A @A
@A
@A
@A
@A
@A
@A
@A @A
@A
@A
@A @A
@A
@A
@A
@A
@A
@A
@A @A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A @A@A
@A @A@A
A
@A
@A
@A
@A
@A @A@A
@A
@A
@A
@A
@A @A
@A
@A@A
@A@A
@A@A
@A@A
@A@A @A
@A
@A
@A @A
@A @A @A
@A@A
@A @A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
DMW-33B
PIT 1
PIT 2
PIT 3FORMER ABOVE GROUND
FUEL STORAGE TANK
SECONDARY CONTAINMENT BERM
CMT18
CMT20
CMT21
CMT22
CMT24
CMT24
CMT25
DMW22E
MWFTA13
MWFTA17
MWFTA21
MWFTA28B
MWFTA29B
MWFTA2A
MWFTA30B
MWFTA31B
MW102
CMT18
CMT20
CMT22
CMT24
DMW29B
MWFTA14
MWFTA15
MWFTA16
MWFTA18
MWFTA19
MWFTA20
MWFTA4
MWFTA8
MW100
MW101
MW103
MW99
PWFTA2
AEHADG10
AEHADG11
AEHADG8
AEHADG9
CMT18
CMT20
CMT21
CMT22
CMT24
CMT25
DMW13A
DMW19A
DMW20A
DMW21A
DMW22A
DMW25A
DMW26A
DMW27A
DMW29A
DMW33A
DMW35A
EBF05S
MWFOS2
MWFOS3
MWFOS4
MWFTA1
MWFTA10
MWFTA11
MWFTA12
MWFTA22
MWFTA23
MWFTA24
MWFTA25
MWFTA26
MWFTA27
MWFTA27A
MWFTA3
MWFTA5
MWFTA6
MWFTA7
MWFTA9
MWPAH1
MW108
MW109
MW116
MW117
MW118
MW119
MW120
MW121
MW122
MW123 MW124
MW125
MW127 MW128
MW138
MW139 MW140
MW141
MW142
MW143
MW144
MW145
MW146
MW147
MW148
MW149
MW150
MW36
MW40
MW41
MW42
MW43
MW44
MW46
MW47
MW48
MW50
MW51
MW52
MW53
MW54
MW55
MW56
MW57
MW59
MW60
MW61
MW62
MW64
MW65
MW68 MW69
MW71 MW72
MW74 MW75 MW76
MW77
MW78
MW79 MW80
MW81
MW82
MW83MW84
MW85
MW86
MW87
MW88
MW89
MW90
MW91
MW92
MW93
MW94
MW95
MW96
MW97
MW98
P1BWA58
P1BWA66
P1BWA67
P1BWB63
P1BWB70
P1BWB73
P2BWA45
P2BWB49
PZ1
PZ2
PZ3
PZ4
PZ5
PZ6
PZ7
PZ8
PZ9
PWFTA1
CMT23
INJ128
INJ129
INJ130
INJ131
INJ132 INJ133
INJ134
INJ135
INJ136
INJ137
INJ104
INJ105
INJ106
INJ107
INJ151
INJ152
INJ153
INJ154
INJ155
INJ156
INJ157
INJ158
INJ159
INJ160
INJ161
INJ162
INJ163
INJ164
INJ165
INJ166
INJ167
INJ168
INJ169
INJ170
INJ171
INJ-202
INJ-200
INJ-201 INJ-203
INJ-204
INJ-205
INJ-206
INJ-207
INJ-208
INJ-209
INJ-211
INJ-213
INJ-212
INJ-210
Bldg. 112Bldg. 74
Warehouse 4
Bldg. 24
OS-2
OS-1
Bldg. 94Bldg. 96
Bldg. 193
Area 1
Area 5
Area4
Area 3
Area 2
G Rd
Q Rd
P Rd
O Rd
Defense General
M Rd
KIN
GSL
AN
D CREE
K
11788500
11788500
11789000
11789000
11789500
11789500
Data Sources: AECOM, GIS Data;
ESRI, ArcGIS Online, Aerial Imagery Coordinate System: VA State Plane, South Datum: NAD 83 Units: Feet
0 100 200
Feet
Legend U.S. Government Property
OU-7
Biowall Location Fire Training Area Pit Location
! SVE/DPE Pilot Test Well (1995) DDC Pilot Test Area (1999)
!. DDC Well (1999) EVO Injection Area (January 2016) In-situ Bioremediation Area
Monitoring Wells @? Lower WBU Injection Well @? Upper WBU Injection Well !A Bedrock Monitoring Well !A Saprolite Monitoring Well @A Lower WBU Monitoring Well
Monitoring Well, WBU Unknown &, Lower WBU Piezometer &, Piezometer, WBU Unknown
TCE Plumes (LWBU) (Spring 2016) 5 µg/L 50 µg/L 500 µg/L 5000 µg/L
Bedrock Well ID Saprolite Well ID Lower WBU Well/PZ ID Unknown WBU Well/PZ ID Upper WBU Well ID Groundwater Elevation
MW102
MW100
MW124
CMT23
Defense Supply Center Richmond Richmond, VA
³ Figure 1 OU7 Remedial Technologies and Pilot Tests
95.01
OU-7 SVE/DPE Pilot Test (1995) The test was conducted in August and September 1995. Based on the results, the DPE technology was recommended for consideration as part of an overall remediation plan.
Density Driven Convection (DDC) Pilot Test (1999) A pilot system consisting of one DDC well, nine nested piezometers and an above ground pressurized air supply system were used to test the effectiveness of DDC in reducing concentrations of COCs in groundwater and to evaluate the feasibility of using DDC as a full scale remedial technology. The system was operated from December 17, 1998 to January 18, 1999.
In this technology, air injected at the bottom of the DDC well, rises in a series of slugs creating the flow of water through the DDC well, and ultimately leading to a circulation of water within the aquifer surrounding the well. Dissolved volatile compounds would be stripped off the groundwater as the water flows through the well and the oxygenated groundwater circulated through the aquifer would stimulate bioremediation within the contaminated aquifer.
Results of the test suggested that DDC would be a feasible remedial option for the site. It showed that DDC can reduce dissolved VOC concentrations at least 19 feet away in 26 days of operation.
OU-4 Time Critical Removal Action (2004) 987 cubic yards of soil were excavated in order to remove contaminant mass from the vadose zone at OU4.
OU-7 Enhanced In-situ Biodegradation Treatability Tests (2007 & 2009) They were implemented in the Pits 1 and 2 areas of OU7 Lower WBU. These tests consisted of placement of two PRBs or treatment walls (biowalls) containing organic mulch and sand downgradient of FTA Pit 1 and FTA Pit 2 source areas.
A separate in-situ bioremediation treatability test was conducted in the FTA Pit 3 area in April 2009. Approximately 2,125 gallons of ~ 6 percent (volume/volume) EVO was injected in an area of elevated chlorinated solvent concentration in the OU7 Lower WBU.
OU-7 MNA, LTM
(2012 - present) ROD for OU7 was signed in 2012. The final remedy for OU7 consisted of in-situ bioremediation consisting of EVO injections in source areas and downgradient high concentration areas, MNA and Long Term Monitoring and Institutional Controls.
OU7 In-Situ Bioremediation and ICs (2013 - present) As part of the final remedy, in-situ bioremediation that included injections of EVO was initiated in 2013 to treat CVOCs in the lower WBU at the source area and downgradient plumes. Institutional controls were also established to prevent exposure to OU-7 groundwater.
INJ128
1 inch = 75 feet
Proposed Wells ") Proposed Injection Well - 2017 Network Expansion (by ACE) ") Proposed Injection Well - Remedy Optimization
File details come from the government source that posted it.