About this file

Attachment BG - Tech Memo

View the file

Other files for this federal contract opportunity

Other files attached to Enviromental AE Services/W912DRDR18R0055, newest first.
File Type Posted
W912DR18R0055_-_Amendment_0004_9-5-18.pdf PDF
W912DR18R0055_-_Attachment_BQ_-2017_OU6_and_OU7_Report_Draft_7-2018.pdf PDF
W912DR18R0055_-_Attachment_BR_-App_G2_Final_OU_&_VMP_Tech_Memo_-_Sept_2014-11-01-15.pdf PDF
W912DR18R0055_P00003_Solicitation_8-31-18.pdf PDF
W912DR18R0055_-_Attachment_AR_-_Bldg_65_SSDS_O_and_M.pdf.5ms0eat.partial PDF
W912DR18R0055_-_Attachment_BO_-Bldg_65_SSDS_O_and_M.pdf PDF
W912DR18R0055_-_Attachment_BH_-VAG830484_Discharge_Monitoring_Report_(DMR).pdf PDF
W912DR18R0055_-_Attachment_BE_-_Foma;_DSCR_Bldg_151_Vapor_Mitigation_1-22-18.pdf PDF
W912DR18R0055_-_Attachment_BB_-Draft_OU8_SSDS_Report_2017_REV1_clean.docx DOCX document
W912DR18R0055_-_Attachment_AW_-DRAFT_-_BDGR_OM_Manual_3.pdf PDF
W912DR18R0055_-_Attachment_AU_-_DRAFT_-_BDGR_OM_Manual_1.pdf PDF
W912DR18R0055_-_Attachment_BF_-FINAL_OU6_Bldg_151_SSDS_DesignREV1_6.12.18_combined.pdf.nhd3u0q.partial PDF
W912DR18R0055_-_Attachment_BP_-Complete_RFI_and_Gov't_responses_8-30-18.pdf PDF
W912DR18R0055_-_Attachment_AZ_-Draft_OU_8_Jul2016_Qtr_Monitoring_TM_092816.pdf PDF
W912DR18R0055_-_Attachment_BM_-2016_Proposed_OU8_Sampling_Program.pdf PDF
W912DR18R0055_-_Attachment_AT_-_DLA-Richmond_OU-8_S_Lobe_Long_Term_Pump_Test_Tech_Memo_2015-12-01_Draft.pdf PDF
W912DR18R0055_-_Attachment_BK_-2016_Proposed_OU6_Sampling_Program.pdf PDF
A_DR-R-0055_RFIs_8-13-18_GOVT_Response_Part_2__8-20-18.docx DOCX document
A_DR-R-0055_RFI_and_responses_Part_1_8-14-18.pdf PDF
W912DR18R0055_-_Attachment__I_-_OU7_Optimization_Memo.pdf PDF
W912DR18R0055_-_Attachment_Q_-_Site_visit_OU7_2.jpg JPG image
W912DR18R0055_-_Attachment_Y_-_DSCR_2017_OU_8_GWMR_Figures.pdf PDF
W912DR18R0055_-_Attachment_O_-_OU7_Post_Injection_Monioring_Data_Combined-April2018.xlsx XLSX spreadsheet
W912DR18R0055_-_Attachment_AF_-_Site_Visit_BDGR_5.jpg JPG image
W912DR18R0055_-_Attachment_K_-_J151147-2_UDS_Level_2_Report_Final_Report.pdf PDF
W912DR18R0055_-_Attachment_AO_-_DirectionsToDSCRVisitorCenterAndNorthGateV.pdf PDF
W912DR18R0055_-_Attachment_D_-_OU3_(OU6_visit)_LUC_Cap_and_Measurements_092016.pdf PDF
W912DR18R0055_-_Attachment_M_-J151733-1_UDS_Level_2_Report_Final_Report.pdf PDF
W912DR18R0055_-_Attachment_R_-_Site_visit_OU7_3.jpg JPG image
W912DR18R0055_-_Attachment_C_-_Draft_2017_OU6_OU7_GW_Report_Tables.pdf PDF
W912DR18R0055_-_Attachment_P_-_Site_visit_OU7_1.jpg JPG image
W912DR18R0055_-_Attachment_V_-_OU_8_ERD_RAWP_20180718.docx DOCX document
W912DR18R0055_-_Attachment_Z_-_DSCR_2017_OU_8_GWMR_Tables.pdf PDF
W912DR18R0055_-_Attachment_AP_(2)_8_9_18_site_visit_Sign_In_sheet_Pg.2.jpg JPG image
W912DR18R0055_-_Attachment_AB_-_Site_visit_BDGR_1.jpg JPG image
W912DR18R0055_-_Attachment_X_-_DRAFT_2017_OU8_GWMR_8.4.18.docx DOCX document
W912DR18R0055_-_Attachment_U_-_Non-DoD_Source__OU8_North_South_Lobe_Pump_Test_-_July_2018_Effluent.msg MSG file
W912Dr18R0055_-_Attachment_AP_(1)_1_8_9_18_site_visit_Sign_in_sheet_Pg.1.jpg JPG image
W912DR18R0055_-_Attachment_AM_-_June_2018_Planning_Meeting-Compressed.pptx PPTX presentation
W912DR18R0055_-_Attachment_AH_-_Site_visit_Northern_lobe_pump_test_1.jpg JPG image
W912DR18R0055_-_Attachment_H_-_Draft_2018_Annual_Vapor_Rpt_OU7_Bldg_72_7.24.18REV1_combined.pdf PDF
W912DR18R0055_-_Attachment_G_-_DRAFT_OU-7_Optimization_Memo_-_FINAL.docx DOCX document
W912DR18R0055_-_Attachment_E_-_OU-6_Optimization_Remedy_-_7-20-2018.pdf PDF
W912DR18R0055_-_Attachment_B_-Draft_2017_OU6_OU7_GW_Report_Figures.zip ZIP file
W912DR18R0055_-_Attachment_AQ_Past_Performance_Questionnaire_Template_rev__10-17-16.pdf PDF
W912DR18R0055_-_Attachment_S_-_Draft_OU8_SSDS_Report_2017_7.6.18-clean.docx DOCX document
W912DR18R0055_-_Attachment_AI_-_Site_visit_Northern_Lobe_pump_test_2.jpg JPG image
W912DR18R0055-0001_Solicitation_-_8-10-18.docx DOCX document
DR-18-S-0009_DirectionsToDSCRVisitorCenterAndNorthGateV_8-1-18.PDF PDF
Draft_DLA-Richmond_PWS_3_July_2018.docx DOCX document
Show all 50

Enviromental AE Services/W912DRDR18R0055 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL MEMORANDUM

EMERGING CONTAMINANT SAMPLING

OPERABLE UNITS 6, 7 AND 8

DEFENSE SUPPLY CENTER RICHMOND, VIRGINIA

Prepared For

Defense Logistics Agency

And

Defense Supply Center Richmond

November 2011

TECHNICAL MEMORANDUM

EMERGING CONTAMINANT SAMPLING – OPERABLE UNITS 6, 7 AND 8

DEFENSE SUPPLY CENTER RICHMOND, VIRGINIA

Introduction

This document describes field activities and results of groundwater sampling conducted for emerging contaminants at Operable Units (OUs) 6, 7 and 8 at the Defense Supply Center

Richmond, located near Richmond, Virginia. Defense Supply Center Richmond (the installation) is an approximately 650-acre installation located near Richmond, Virginia and is the

Defense Logistics Agency’s (DLA) aviation demand and supply chain manager. This document was prepared by DLA’s contractor AECOM Technical Services under the Air Force Center for

Engineering and the Environment (AFCEE) Contract Number FA8903-08-D-8770 (Task Order

83).

Background

OU 6 is located in the central portion of the installation and is designated as the groundwater impacted by OU 1 (the Open Storage Area [OSA]), OU 2 (Area 50 Landfill) and

OU 3 (the National Guard Area [NGA]). Final remedies have been implemented at OUs 1, 2 and

3 to address the unacceptable risk posed by soil contamination at these OUs. Past industrial activities in OUs, 1, 2, and 3 have resulted in releases of chemicals into the OU 6 groundwater.

The OSA (OU 1) is located in the west-central portion of the installation. The OSA began operation in 1942 as a storage area for bulk drummed chemicals, the recoupment of liquids from leaking drums, and the repair/replacement of damaged containers. From the late 1950s to the early 1970s, the Area 50 landfill (OU 2) was used as a disposal site for waste (including contaminated and outdated chemicals) and construction debris. The area was originally a ravine that was approximately 800 feet (north to south) by 200 feet (east to west), and 10 feet deep.

While the area was used as a landfill, material was placed in the original ravine and used areas were regraded and revegetated. The potentially hazardous materials disposed of in Area 50 may have included chemicals used in photographic development processes, organic solvents, pesticides and herbicides, acidic and alkaline chemicals, POL, and PCBs. The NGA (OU 3) is a

15-acre area to the east of Area 50 that is covered with buildings, concrete, asphalt paving, and gravel. Vehicle maintenance and support activities for approximately half of the Virginia Army

National Guard units were conducted here. Past activities included parts degreasing and vehicle washdown, using chlorinated organic solvents in some cases.

OU 7 is located in the southern portion of DSCR and designates the area of groundwater impacted by OU 4 (the Fire Training Area [FTA]). OU 13, designated as the Polycyclic

Aromatic Hydrocarbon (PAH) Area, also may have impacted OU 7. At the FTA, three separate, unlined pits were used for firefighting training purposes. Flammable liquid chemicals and petroleum products were dumped into the pits, ignited, and extinguished during the training.

Oils, solvents, pesticides, and herbicides may have been used for fuel at these pits. A time-critical removal action was undertaken during November 2004 to reduce, to the extent practicable, principal threat source material in OU 4 that could contribute to further degradation of OU 7 groundwater.

OU 8 is defined as the groundwater beneath and downgradient of the Acid Neutralization

Pits (ANPs), located in the northern portion of the installation. The ANPs are referred to as

OU 5.

In January 2011, the United States Environmental Protection Agency (USEPA) requested

DLA to perform groundwater sampling at OUs 6 and 7 to evaluate the presence of two emerging contaminants Perfluorooctanesulfonic Acid (PFOS) and Perfluorooctanoic Acid (PFOA). PFOS and PFOA have been detected at fire fighting area sites, landfills, and other Department of

Defense sites. For the installation, groundwater sampling was requested in the source area

(shallow) monitoring wells (OU 6 [landfill] and OU 7[fire fighting training areas]).

Field Activities and Results

In March 2011, groundwater sampling activities were conducted in the shallow (Upper

Water Bearing Unit [WBU] at OU 6 and Lower WBU at OU 7) source area monitoring wells.

The groundwater sampling activities were conducted using low-flow techniques in accordance with the installation Sampling and Analysis Plan (SAP). The groundwater samples were sent to

Columbia Analytical Services (a fixed laboratory) for PFOS and PFOA analyses. Field parameters such as pH, dissolved oxygen, oxidation-reduction potential (ORP) were also measured during the groundwater sampling event. Five monitoring wells at OU 6 and ten monitoring wells at OU 7 were sampled in March 2011. Figures 1 and 2 show the locations of these monitoring wells.

The analytical results were validated in accordance with the laboratories methodology and control limits, while the data qualifiers were applied in accordance with the installation

QAPP. Tables 1 and 2 present the results of the March 2011 sampling. The analytical results were compared to the USEPA provisional health advisory levels (0.2 µg/L for PFOS and 0.4 µg/L for PFOA). As seen from the tables, none of the groundwater analytical results from the

March 2011 sampling event showed PFOS and PFOA results above the provisional health advisory levels. These results were presented to Defense Supply Center Richmond planning team (DLA, USEPA and the Virginia Department of Environmental Quality [VDEQ]) in July

2011. The planning team recommended that one additional sampling round be conducted.

Additional monitoring wells at OU 6 and 7, including wells screened in the deeper WBU, were selected for sampling. In addition, source area wells at OU 8 were also selected for PFOS and

PFOA sampling.

In August 2011, twenty eight monitoring wells at OU 6 (including Upper and Lower

WBU wells), twenty seven monitoring wells at OU 7 (including Lower and Saprolite WBU wells) and five monitoring wells at OU 8 were sampled using low-flow techniques in accordance with the installation SAP. Figures 3 to 7 show the locations of these monitoring wells. The groundwater samples were sent to Test America, Inc., for analyses of PFOS and PFOA. Similar to the March 2011 sampling results, the August 2011 sampling results were validated in accordance with the laboratories methodology and control limits, while the data qualifiers were applied in accordance with the installation QAPP. Tables 3, 4 and 5 present the results of the

August 2011 sampling. The analytical results were compared to the USEPA provisional health advisory levels (0.2 µg/L for PFOS and 0.4 µg/L for PFOA). As seen from the tables, none of the OU 6 and OU 8 groundwater analytical results showed PFOS and PFOA results above the provisional health advisory levels. At OU 7, only well CMT-18-6 showed PFOS concentration

(0.275 µg/L) slightly above the USEPA provisional health advisory level of 0.2 µg/L. The remaining OU 7 wells showed PFOS and PFOA results below the provisional health advisory levels.

Recommendations

Based on the results of the March and August 2011 groundwater sampling events, it appears that PFOS and PFOA contamination at the groundwater OUs at the installation is not a significant issue. Therefore, additional groundwater sampling for PFOS and PFOA at OUs 6, 7 and 8 is not recommended.

Table 1: OU 6 PFOS and PFOA Results - March 2011

Field Sample ID:

Date Collected: Units Provisional

Health Levels

PFOS/PFOA

Perfluorooctylsulfonic Acid (PFOS) ug/L 0.2 0.0051 0.00048 0.0087 0.0031 0.0012 Perfluorooctanoic Acid (PFOA) ug/L 0.4 0.019 0.0011 0.0029 0.015 0.01

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

18.72 0 125 0 0

15.92 19.56 17.19

0.061 0.031 1.34 3.79

4.46 4.54 4.42 187 304 54 -66

5.58

0 0 0 0 0

9.9 15.25 0.214 5.79 -12

OU6-MW-59

03/18/2011

OU6-MW-60

03/18/2011

OU6-AEHA-28A

03/18/2011

OU6-MW-126

03/18/2011

OU6-MW-132

03/18/2011

Table 2: OU 7 PFOS and PFOA Results - March 2011

Date Collected: Units Provisional

Health Levels

PFOS/PFOA

Perfluorooctylsulfonic Acid (PFOS) ug/L 0.2 0.0081 0.0068 0.0047 0.0033 0.0034 0.0881 0.02 0.0053 Perfluorooctanoic Acid (PFOA) ug/L 0.4 0.0063 0.0095 0.002 0.0031 0.0037 0.091 0.017 0.0093

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU NA 0 5.1 6.2

NA 17.01 18.15 14.2

NA - not analyzed

NA 0.229 0.292 0.375

26.3 0

0.157 0.318

13.05 15.63

NA 0 0 0

NA 144 167 -10

NA 4.63 4.8 5.8

4.05 0 38 -77

6.71 6.64

OU7-MW-36

03/17/2011

OU7-AEHADG-11

03/17/2011

4.3 15.81 0.248

4.04 0.395 15.49

OU7-MW-41

03/17/2011

OU7-MW-46

03/17/2011

OU7-MW-46D

03/17/2011

OU7-MW-48

03/17/2011

OU7-MW-61

03/17/2011

OU7-MW-62

03/17/2011

Table 2: OU 7 PFOS and PFOA Results - March 2011

Date Collected: Units Provisional

Health Levels

PFOS/PFOA

Perfluorooctylsulfonic Acid (PFOS) ug/L 0.2 Perfluorooctanoic Acid (PFOA) ug/L 0.4

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

NA - not analyzed

0.0021 0.005 0.00068 0.00062

0.015 0.013 0.017 0.013

NA

53.6 17.7 0 NA

14.07 13.99 13.95 0.323

5.56

0 0 NA

136 147 NA

4.75 4.55 NA

0.299 0.137 NA

OU7-MW-96

03/17/2011

OU7-MW-98

03/17/2011

OU7-MWFOS-3

03/17/2011

OU7-MWFOS-3D

03/17/2011

Table 3: OU 6 PFOS and PFOA Results - August 2011

Well ID:

Date Collected:

Sample Type:

Units

Provisional Health Levels

PFOS/PFOA

Perfluorooctane Sulfonate (PFOS) ug/L 0.2 <0.029 U 0.187 <0.03 U <0.029 U <0.03 U <0.029 U <0.029 U <0.03 U <0.029 U <0.028 U Perfluorooctanoic acid (PFOA) ug/L 0.4 0.019 J 0.184 <0.02 U <0.02 U <0.02 U <0.019 U <0.02 U <0.02 U 0.018 J 0.023

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

0.08 0.231 0.87

OU6-AEHA-27A

8/23/2011 Normal

OU6-AEHA-27B

8/23/2011 Normal

OU6-AEHA-28A

8/23/2011 Normal

OU6-AEHA-28B

8/23/2011 Normal

OU6-AEHA-30B

8/23/2011 Normal

OU6-AEHA-31B

8/23/2011 Normal

OU6-AEHA-31B

8/23/2011 Duplicate

OU6-MW-52

8/23/2011 Normal

OU6-CMT-12-2

8/24/2011 Normal

OU6-CMT-12-2

08/24/2011 Duplicate

0 0 NA10.32

2.4 26.02

5.66

24.6 24.07

5.85

0 0 0 0 0 NA

0.1850.267 0.194 0.37

212 270 24 165 NA 360 171 NA

3.55 3.42 4.94 4.32 NA 2.25 4.66 NA

NA 0.528 NA

26.05 20.43 NA26.31 23.65 24.48 21.5 NA

84.1 27.2 47.7 NA 160 55 NA

NA - not analyzed

U - Undetected: The analyte was analyzed for, but not detected.

J - Estimated: The analyte was positively identified, the quantitation is an estimation due to discrepancies in meeting certain analyte-specific quality control criteria.

12.9

Date Collected:

Sample Type:

Units

Provisional Health Levels

PFOS/PFOA

Perfluorooctane Sulfonate (PFOS) ug/L 0.2 Perfluorooctanoic acid (PFOA) ug/L 0.4

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

NA - not analyzed

U - Undetected: The analyte was analyzed for, but not detected.

J - Estimated: The analyte was positively identified, the quantitation is an estimation due to discrepancies in meeting certain analyte-specific quality control criteria.

<0.03 U <0.029 U 0.029 J 0.032 <0.03 U <0.03 U <0.03 U <0.03 U 0.015 J <0.03 U <0.029 U <0.028 U <0.028 U

0.032 0.014 J <0.02 U <0.02 U <0.02 0.01 J <0.02 <0.02 U 0.028 <0.02 U <0.019 U 0.017 J 0.013 J

0.848 3.340.068 0.693 0.116 0.049 0.092 0.045 0.042 0.128 0.021 0.03

OU6-MW-125

8/23/2011 Normal

OU6-MW-125

8/23/2011 Duplicate

OU6-MW-126

8/23/2011 Normal

OU6-MW-130

8/23/2011 Normal

OU6-MW-131

8/23/2011 Normal

OU6-MW-132

8/23/2011 Normal

OU6-MW-150

8/24/2011 Normal

OU6-MW-160

8/24/2011 Normal

OU6-MW-166

8/24/2011 Normal

OU6-MW-59

8/24/2011 Normal

OU6-MW-60

8/24/2011 Normal

OU6-EBF-04D

8/24/2011 Normal

OU6-DMW-18A

8/23/2011 Normal

0 0 0 1.1 0 1.930 NA 0 0 1.68

164 122415 -11 17 NA 160 118

1.8 5.77 4.62 NA 4.28

104 13119 196 181

NA

5.31 4.55 5.433.71 6 4.22 4.35 5.19

27.1 20.04

1.5 NA 5 75.2

21.7825.31 27.42 22.2 20.43 21.4120.49 NA 20.87 23.5 25.46

47.2 134 0 25.8431 302 483 25.6 8.7

Date Collected:

Sample Type:

Units

Provisional Health Levels

PFOS/PFOA

Perfluorooctane Sulfonate (PFOS) ug/L 0.2 Perfluorooctanoic acid (PFOA) ug/L 0.4

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

NA - not analyzed

U - Undetected: The analyte was analyzed for, but not detected.

J - Estimated: The analyte was positively identified, the quantitation is an estimation due to discrepancies in meeting certain analyte-specific quality control criteria.

<0.028 U <0.029 U <0.029 U <0.03 U <0.03 U <0.03 U <0.029 U <0.019 U <0.019 U 0.035 <0.02 U 0.012 J <0.02 U <0.019 U

0.090.931 0.143 3.45 0.133

OU6-MW-94

8/24/2011 Normal

OU6-MW-62

8/24/2011 Normal

OU6-MW-63

8/24/2011 Normal

OU6-MW-69

8/24/2011 Normal

OU6-MW-82

8/23/2011 Normal

OU6-MW-83

8/23/2011 Normal

OU6-MW-87

8/23/2011 Normal

2.82 00 0 0 0 175 275 16740 79 188

4.44 4.45 4.37 4.125.43 5.67

0.089 0.05

24.56 29.65 23.82 26.05

5.55

120 47 16.1 9.5 25.39

84.1 29.5 0

24.76 19.82

Table 4: OU 7 PFOS and PFOA Results - August 2011

Date Collected:

Sample Type:

Units

Provisional Health Levels

PFOS/PFOA

Perfluorooctane Sulfonate (PFOS) ug/L 0.2 0.016 J <0.03 U <0.03 U 0.275 <0.03 U <0.03 U 0.02 J <0.029 U 0.04 0.169 Perfluorooctanoic acid (PFOA) ug/L 0.4 0.014 J 0.014 J <0.02 0.247 <0.02 U 0.023 <0.02 U <0.019 U 0.0098 J 0.183

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

OU7-AEHADG-10

8/24/2011 Normal

OU7-AEHADG-10

8/24/2011 Duplicate

OU7-AEHADG-11

8/24/2011 Normal

OU7-CMT-18-6

8/26/2011 Normal

OU7-DMW-29B

8/25/2011 Normal

OU7-INJ-106

8/26/2011 Normal

OU7-MW-101

8/26/2011 Normal

OU7-MW-102

8/25/2011 Normal

OU7-MW-116

8/25/2011 Normal

OU7-MW-118

8/25/2011 Normal

21.15 0.767 4.29

0NA 0

NA 419

NA 1.3

NA 0.342

NA

19.2 0.488 3.99

25.13

NA 0

NA

NA

NA

NA

NA

NA

6.76 221 82 329 54 37 4.02 0.156 18.07

0.04

5.7 0.287 23.76

37.6 >800 10.5 1.3

22.3 24.98 24.89

4.69 0 0

2.15 5.12 5.36

0.166 0.4 0.134

Blue highlighting indicates analyte detected above the provisional health levels

J - Estimated: The analyte was positively identified, the quantitation is an estimation due to discrepancies in meeting certain analyte-specific quality control criteria.

NA - not analyzed

U - Undetected: The analyte was analyzed for, but not detected.

Date Collected:

Sample Type:

Units

Provisional Health Levels

PFOS/PFOA

Perfluorooctane Sulfonate (PFOS) ug/L 0.2 Perfluorooctanoic acid (PFOA) ug/L 0.4

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

Blue highlighting indicates analyte detected above the provisional health levels

J - Estimated: The analyte was positively identified, the quantitation is an estimation due to discrepancies in meeting certain analyte-specific quality control criteria.

NA - not analyzed

U - Undetected: The analyte was analyzed for, but not detected.

0.047 0.028 J <0.031 U 0.045 0.021 J 0.016 J 0.035 0.044 0.014 J 0.021 J 0.026 J 0.035 <0.03 U

0.013 J <0.02 U 0.011 J <0.02 U 0.012 J <0.02 U 0.011 J 0.015 J 0.018 J 0.011 J <0.02 U <0.02 U 0.013 J

NA -25 126 249 114 120 239 397 -10

OU7-MW-42

8/25/2011 Normal

OU7-MW-46

8/26/2011 Normal

OU7-MW-48

8/26/2011 Normal

OU7-MW-61

8/24/2011 Normal

OU7-MW-62

8/24/2011 Normal

OU7-MW-72

8/24/2011 Normal

OU7-MW-74

8/25/2011 Normal

OU7-MW-83

8/25/2011 Normal

OU7-MW-89

8/25/2011 Normal

OU7-MW-120

8/25/2011 Normal

OU7-MW-36

8/26/2011 Normal

OU7-MW-41

8/26/2011 Normal

OU7-MW-119

8/25/2011 Normal

66108 247

3.88 0.36

0 0

23.86 25.45

0 NA 0 00 0 00.38 3.41 5.74 0 0

5.47 NA 5.82 4.315.82 4.2 6.073.1 4.12 3.69 3.85 2.47

0.3 NA 0.525 0.1950.449 0.42 0.1860.355 0.371 0.543 0.325 0.317

19.17 19.77 20.54 21.98 19.5423.95 26.6 NA 22.13 21.81 25.88

20 0 >800 0 0175 0 NA 0 0

Date Collected:

Sample Type:

Units

Provisional Health Levels

PFOS/PFOA

Perfluorooctane Sulfonate (PFOS) ug/L 0.2 Perfluorooctanoic acid (PFOA) ug/L 0.4

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

Blue highlighting indicates analyte detected above the provisional health levels

J - Estimated: The analyte was positively identified, the quantitation is an estimation due to discrepancies in meeting certain analyte-specific quality control criteria.

NA - not analyzed

U - Undetected: The analyte was analyzed for, but not detected.

0.02 J 0.023 J <0.03 U <0.03 U <0.03 U 0.042

0.014 J <0.02 U 0.012 J <0.02 U 0.011 J 0.01 J

OU7-MW-90

8/25/2011 Normal

OU7-MW-98

8/25/2011 Normal

OU7-MW-99

8/25/2011 Normal

OU7-MWF0S-3

8/25/2011 Normal

OU7-MWFTA-16

8/25/2011 Normal

8069 74 128 121

OU7-MW-89

8/25/2011 Duplicate

NA

NA

NA

NA

NA

NA

0 2.89 0.01 0

5.3 5.17 6.66 4.14

0.128 0.278 0.232 0.093

25.6625.61 27.55 27.81

22.24 6.17 10.76

8.54

17.3 106 186 0

Table 5: OU 8 PFOS and PFOA Results - August 2011

Date Collected:

Sample Type:

Units

Provisional Health Levels

PFOS/PFOA

Perfluorooctane Sulfonate (PFOS) ug/L 0.2 0.033 0.041 J <0.03 U 0.017 J <0.03 U <0.03 U Perfluorooctanoic acid (PFOA) ug/L 0.4 0.011 J 0.014 0.033 0.018 J <0.02 U 0.022

Field Parameters

Dissolved Oxygen mg/L Oxidation Reduction Potential mV pH pH units Conductivity mS/cm Temperature ° C Turbidity NTU

0 0

OU8-DMW-24A

8/26/2011 Normal

4.43 NA 0 4.9

OU8-DMW-24A

8/26/2011 Duplicate

OU8-DMW-30A

8/26/2011 Normal

OU8-DP-11

8/26/2011 Normal

OU8-MW-102

8/26/2011 Normal

OU8-MW-120

8/26/2011 Normal

349567 NA 416 738

0.056

2.64 NA 2.6 2.67 1.64 3.9

22.3318.63 NA 20.66 21.1

J - Estimated: The analyte was positively identified, the quantitation is an estimation due to discrepancies in meeting certain analyte-specific quality control criteria.

NA - not analyzed

U - Undetected: The analyte was analyzed for, but not detected.

24.89

0 NA 0 0 0

0.056 NA 0.125 0.126 0.053

<A

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A

<A

<A

<A

<A<A

<A

<A

<A

<A <A <A

<A

<A

<A

<A

<A

A A

<A

<A

<A <A

<A

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A <A<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A<A

<A

<A

<A

<A

<A<A

<A

<A<A<A

<A<A<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A <A

<A

<A

<A<A

<A

<A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A

<A

<A

A

A

A

A

A

A

A

A

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A<A

<A

<A

<A

<A

<A

<A

<A

!A !A !A !A

!A !A

<A

<A<A

<A

<A

<A

Inset 1

Inset 2

DMW12A

234 235

T-125

154155T-123

T-124

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

MW126MW131

MW132

MW59

MW60

OU 6

OU 1

OU 2

OU 3

OU 9

K

AREA ENLARGED

<A<A

<A

<A

<A !A

<A

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

A

!A

<A

AEHA28A

Inset 1

Inset 2

0 2512.5 Feet

0 3015 Feet

E:\DSCR\Figures\OU6\Figure_1_OU6_Upper_PFOS_PFOA_Sampling_Locs_March_2011.mxd

OU 6 Upper WBU Wells PFOS/PFOA Sampling

March 2011

DEFENSE SUPPLY

CENTER RICHMOND

RICHMOND, VIRGINIA

Figure

DATE

CHKD

DRAWN

PROJ. NO.

11/22/11

Manish Joshi

Crystal Hardin

60134990

0 250 500125 Feet

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<

A

A

A

A

A

A

A<A

A

A

A

A

A

A

A

A

A<

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<A

A<

A<

A

A<

A<

A

A

A

A

A<A

A

A<

A

A

A <

A

A

A

A

A

A

A

A

A

A

A

A

A<

A

A

A <

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<

A

A

A

A

A

!A!A !A!A

!A !A

!A !A

!A !A

A<

A

A

A <

A<A

A

A

A

A

Inset 1

Inset 2

AEHADG11MWFOS3 MW36

MW41

MW46 MW48

MW61

MW62

MW98

11274

Warehouse 4 24

OS-2

OS-1

OU 12

OU 4

OU 7

OU 13

E:\DSCR\Figures\OU7\Figure_2_OU7_Lower_PFOS_PFOA_Sampling_Locs_March_2011.mxd

0 150 30075 Feet

A

A

A

A <

A <

A <

A

A

A

A

A

A

A

A

MW96

MW98

0 5025 Feet

Inset 1

A

A

A

A

A

A<A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

0 5025 Feet

Inset 2

OU 7 Lower WBU Wells PFOS/PFOA Sampling

March 2011

DEFENSE SUPPLY

CENTER RICHMOND

RICHMOND, VIRGINIA

Figure

2DRAWN

PROJ. NO.

11/22/11

Manish Joshi

Crystal Hardin

60133594

DATE

CHKD

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A

<A

<A

<A

<A<A

<A

<A

<A

<A <A <A

<A

<A

<A

<A

<A

A A

<A

<A

<A <A

<A

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A <A<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A<A

<A

<A

<A

<A

<A<A

<A

<A<A<A

<A<A<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A <A

<A

<A

<A<A

<A

<A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A

<A

<A

A

A

A

A

A

A

A

A

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A<A

<A

<A

<A

<A

<A

<A

<A

!A !A !A !A

!A !A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

Inset 1

Inset 2

DMW12A

MW150

234 235

T-125

154155T-123

T-124

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

AEHA27A

DMW18A

CMT12-2

MW125

MW126

MW130

MW131MW132

MW52

MW59

MW60

MW62

MW63

MW69

MW82

MW83

MW87

OU 6

OU 1

OU 2

OU 3

OU 9

<A<A

<A

<A

<A !A

<A

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

A

!A

<A

AEHA28A

Inset 1

Inset 2

0 2512.5 Feet

0 3015 Feet

E:\DSCR\Figures\OU6\Figure_3_OU6_PFOS_PFOA_Sampling_Locs_August_2011.mxd

OU 6 Upper WBU Wells PFOS/PFOA Sampling

August 2011

DEFENSE SUPPLY

CENTER RICHMOND

RICHMOND, VIRGINIA

Figure

DATE

CHKD

DRAWN

PROJ. NO.

11/22/11

Manish Joshi

Crystal Hardin

60134990

0 250 500125

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A A

A

A

A

A

A

A

A

A

A

A < A

A

A

A

A

A

A

A

A

A

A

A

A

A <

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<A<A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

!A

A

A

A

A

A

A

A

A

T-125

T-123

T-124

Inset 1

DMW12B

234 235

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

Warehouse

OU 6OU 1 OU 2 OU 3

OU 9

AEHA27B

AEHA28B

AEHA30B

AEHA31B

MW94

MW160

MW166

A

A

A

A

A

!A

A

EBF04D

Inset 1

0 2512.5 Feet

E:\DSCR\Figures\OU6\Figure_4_OU6_Lower_PFOS_PFOA_Sampling_Locs_August_2011.mxd

0 250 500125 Feet

OU 6 Lower WBU Wells PFOS/PFOA Sampling

August 2011

DEFENSE SUPPLY

CENTER RICHMOND

RICHMOND, VIRGINIA

Figure

DATE

CHKD

DRAWN

PROJ. NO.

11/22/11

Manish Joshi

Crystal Hardin

60133594

Legend

DSCR Boundary

Operable Units

Lower WBU Well

No Name Creek

Buildings

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<

A

A

A

A

A

A

A<A

A

A

A

A

A

A

A

A

A<

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<A

A<

A<

A

A<

A<

A

A

A

A

A<A

A

A<

A

A

A <

A

A

A

A

A

A

A

A

A

A

A

A

A<

A

A

A <

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A<

A

A

A

A

A

!A!A !A!A

!A !A

!A !A

!A !A

A

A<

A

A

A

A

A

A

A<A

A

A

A

A

A

A

A

A

A

A

A

AInset 1

Inset 2

AEHADG10

AEHADG11MWFOS3

CMT18

MW36

MW41

MW42

MW46

MW48

MW61

MW62

MW72

MW74

MW83

MW89

MW90

MW98

MW118

MW116

MW119

MW120

11274

Warehouse 4 24

OS-2

OS-1

OU 12

OU 4

OU 7

E:\DSCR\Figures\OU7\Figure_5_OU7_Lower_PFOS_PFOA_Sampling_Locs_August_2011.mxd

0 150 30075 Feet

A

A

A

A <

A <

A <

A

A

A

A

A

A

A

A

INJ106

MW98

0 5025 Feet

Inset 1

A

A

A

A

A

A<A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

0 5025 Feet

Inset 2

OU 7 Lower WBU Wells PFOS/PFOA Sampling

August 2011

DEFENSE SUPPLY

CENTER RICHMOND

RICHMOND, VIRGINIA

Figure

5DRAWN

PROJ. NO.

11/22/11

Manish Joshi

Crystal Hardin

60133594

DATE

CHKD

A

A

A

A

A

A

A

A

A

A

A

A

A

A A

A

A

A

A

A

A

A

A A

A

A A

A

A

A

A

A

A

DMW29B

MWFTA16

MW101

MW102

MW99

AEHADG8

Warehouse 4

OS-2

OS-1

OU 12 OU 4

OU 7

E:\DSCR\Figures\OU7\Figure_6_OU7_Saprolite_PFOS_PFOA_Sampling_Lcs_August_2011.mxd

0 150 30075 Feet

OU 7 Saprolite WBU Wells PFOS/PFOA Sampling

August 2011

DEFENSE SUPPLY

CENTER RICHMOND

RICHMOND, VIRGINIA

Figure

DATE

CHKD

DRAWN

PROJ. NO.

11/22/11

Manish Joshi

Crystal Hardin

60134990

Legend

Installation Boundary

Operable Units

Kingsland Creek

Buildings

A Saprolite WBU Well

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A<A<A

<A

<A

<A <A <A <A

<A

<A

<A<A

<A

A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

A

<A<A<A

<A

<A

<A

<A<A<A<A<A

<A

<A<A<A

<A<A

<A

<A

<A <A

<A

<A

<A

<A

<A

<A<A

<A<A

<A<A

<A

<A <A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A<A

<A

<A

<A

<A

<A <A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

<A

!A!A!A!A!A !A !A!A!A

!A!A !A

!A <A

<A <A

<A

<A

Inset 1

MW102

MW120

DMW24A

OU 5

<A

<A<A

<A <A

<A

<A<A

<A<A

<A

!A!A!A!A!A

!A

!A

!A!A

!A!A

<A

<A

DMW30A

DP11

AREA ENLARGED

Inset 1

OU 8 Upper WBU Wells PFOS/PFOA Sampling

August 2011

DEFENSE SUPPLY

CENTER RICHMOND

RICHMOND, VIRGINIA

Figure

7DRAWN

PROJ. NO.

11/22/11

Manish Joshi

Crystal Hardin

60134990

DATE

CHKD

Legend

DSCR Boundary

Operable Units

Upper WBU Well

Buildings

A

<A

Lower WBU Well

K

0 17587.5 Feet

0 4522.5

E:\DSCR\Figures\OU8\Figure_7_OU8_Upper_PFOS_PFOA_Sampling_Locs_August_2011.mxd

File details come from the government source that posted it.