About this file

Attachment AJ -2018 Draft Management Action Plan 7-18-18 Rev 1

View the file

Other files

File Type Posted
W912DR18R0055_-_Amendment_0004_9-5-18.pdf PDF
W912DR18R0055_-_Attachment_BR_-App_G2_Final_OU_&_VMP_Tech_Memo_-_Sept_2014-11-01-15.pdf PDF
W912DR18R0055_-_Attachment_BS_-App_G1OU6_Summary_of_Subsurface_Soil_Gas_2010.pdf PDF
W912DR18R0055_-_Attachment_BQ_-2017_OU6_and_OU7_Report_Draft_7-2018.pdf PDF
W912DR18R0055_P00003_Solicitation_8-31-18.pdf PDF
W912DR18R0055_P00002_Solicitation_8-31-18.pdf PDF
W912DR18R0055_-_Attachment_BC_-DRAFT_2017_OU8_GWMR_8.4.18.pdf PDF
W912DR18R0055_-_Attachment_BA_-Draft_OU8_SSDS_Report_Tables_1-3.pdf PDF
W912DR18R0055_-_Attachment_BN_-2016-04_Draft_Comm_Inv_Plan_041216.pdf PDF
W912DR18R0055_-_Attachment_BL_-2016_Proposed_OU7_Sampling_Program.pdf PDF
W912DR18R0055_-_Attachment_AT_-_DLA-Richmond_OU-8_S_Lobe_Long_Term_Pump_Test_Tech_Memo_2015-12-01_Draft.pdf PDF
W912DR18R0055_-_Attachment_BJ_-VAG830484_tletter_2015.pdf PDF
W912DR18R0055_-_Attachment_BB_-Draft_OU8_SSDS_Report_2017_REV1_clean.docx DOCX document
W912DR18R0055_-_Attachment_BI_-VAG830484_GeneralPermit2013.pdf PDF
W912DR18R0055_-_Attachment_AS_-_Boring_Logs_PWS.pdf PDF
W912DR18R0055_-_Attachment_BM_-2016_Proposed_OU8_Sampling_Program.pdf PDF
W912DR18R0055_-_Attachment_AZ_-Draft_OU_8_Jul2016_Qtr_Monitoring_TM_092816.pdf PDF
W912DR18R0055_-_Attachment_BP_-Complete_RFI_and_Gov't_responses_8-30-18.pdf PDF
W912DR18R0055_-_Attachment_BE_-_Foma;_DSCR_Bldg_151_Vapor_Mitigation_1-22-18.pdf PDF
W912DR18R0055_-_Attachment_AW_-DRAFT_-_BDGR_OM_Manual_3.pdf PDF
W912DR18R0055_-_Attachment_BK_-2016_Proposed_OU6_Sampling_Program.pdf PDF
W912DR18R0055_-_Attachment_AY_-_OMM_Plan_Bldg_151_SSDS_May_2018.docx DOCX document
W912DR18R0055_-_Attachment_AX_-DRAFT_Bldg_151_SSDS_OMM_Manual_5.11.18_combined.pdf PDF
W912DR18R0055_-_Attachment_BF_-FINAL_OU6_Bldg_151_SSDS_DesignREV1_6.12.18_combined.pdf.nhd3u0q.partial PDF
W912DR18R0055_-_Attachment_AU_-_DRAFT_-_BDGR_OM_Manual_1.pdf PDF
W912DR18R0055_-_Attachment_BO_-Bldg_65_SSDS_O_and_M.pdf PDF
W912DR18R0055_-_Attachment_BG_-Tech_Memo_PFOS_PFOA_2_.pdf PDF
W912DR18R0055_-_Attachment_AR_-_Bldg_65_SSDS_O_and_M.pdf.5ms0eat.partial PDF
W912DR18R0055_-_Attachment_BH_-VAG830484_Discharge_Monitoring_Report_(DMR).pdf PDF
A_DR-R-0055_RFIs_8-13-18_GOVT_Response_Part_2__8-20-18.docx DOCX document
A_DR-R-0055_RFI_and_responses_Part_1_8-14-18.pdf PDF
W912DR18R0055_-_Attachment_L_-_J151255-2_UDS_Level_2_Report_Final_Report.pdf PDF
W912DR18R0055_-_Attachment_AH_-_Site_visit_Northern_lobe_pump_test_1.jpg JPG image
W912DR18R0055_-_Attachment_H_-_Draft_2018_Annual_Vapor_Rpt_OU7_Bldg_72_7.24.18REV1_combined.pdf PDF
W912DR18R0055_-_Attachment_Z_-_DSCR_2017_OU_8_GWMR_Tables.pdf PDF
W912DR18R0055_-_Attachment_R_-_Site_visit_OU7_3.jpg JPG image
W912DR18R0055_-_Attachment_AG_-_Site_visit_BDGR_6.JPG JPG image
W912DR18R0055_-_Attachment_AD_-_Site_visit_BDGR_3.jpg JPG image
W912DR18R0055_-_Attachment_J_-J151095-1_UDS_Level_2_Report_Final_Report.pdf PDF
W912DR18R0055_-_Attachment_AM_-_June_2018_Planning_Meeting-Compressed.pptx PPTX presentation
W912DR18R0055_-_Attachment_AP_(2)_8_9_18_site_visit_Sign_In_sheet_Pg.2.jpg JPG image
W912DR18R0055_-_Attachment_AE_-_Site_Visit_BDGR_4.jpg JPG image
W912DR18R0055_-_Attachment_N_-_OU7_biowalls.pptx PPTX presentation
W912DR18R0055_-_Attachment_AC_-_Site_visit_BDGR_2.jpg JPG image
W912DR18R0055_-_Attachment__F_-_20171117_DSCR_FINAL_WorkPlanOU7_Remedial_Optimization.pdf PDF
W912DR18R0055_-_Attachment_T_-_Figure_4-1_-_Proposed_Wells.pdf PDF
W912DR18R0055_-_Attachment_AN_-_Visit_Request_Form.pdf_-_Adobe_Acrobat_Pro.pdf PDF
W912DR18R0055_-_Attachment_X_-_DRAFT_2017_OU8_GWMR_8.4.18.docx DOCX document
W912DR18R0055_-_Attachment_P_-_Site_visit_OU7_1.jpg JPG image
W912DR18R0055_-_Attachment_G_-_DRAFT_OU-7_Optimization_Memo_-_FINAL.docx DOCX document
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMUNITY INVOLVEMENT

DRAFT

MANAGEMENT ACTION PLAN

FOR

DEFENSE SUPPLY CENTER RICHMOND

RICHMOND, VIRGINIA

Prepared For

Defense Logistics Agency

And

Defense Supply Center Richmond

July 2018

DRAFT

MANAGEMENT ACTION PLAN

FOR

DEFENSE SUPPLY CENTER RICHMOND

RICHMOND, VIRGINIA

Prepared for:

And

Prepared by:

Arcadis W912DR-13-D-0019, Delivery Order 0005

July 2018

PURPOSE

In an effort to coordinate planning information among Installation Restoration Program (IRP) managers, Department of Defense (DoD) Commands, the installation, executing agencies, and the public, this Management Action Plan (MAP) has been updated for (calendar year) 2018 for the Defense Supply Center Richmond. The purpose of the MAP is to outline the multi-year restoration program for the installation. The MAP defines the IRP requirements and proposes a comprehensive approach to conduct future investigations and remedial actions at each Operable Unit (OU) at the installation. The MAP is used to track requirements, progress towards cleanup objectives, and schedules. Under the current project schedule and projected funding, all OUs at the installation are expected to attain Remedy in Place (RIP) status by the end of FY 2021. This time frame will allow additional treatment of off-site areas at OUs 6 and 7, if needed, and to mitigate OU 8 plume off-site migration considering the complexities associated with the hydrogeologic regime at OU 8.

Defense Supply Center Richmond – Management Action Plan Contributors to the MAP – Page 4 REVIEWed by

ACRONYMS AND ABBREVIATIONS

ANPAcid Neutralization Pit
CAPCorrective Action Plan
CORContracting Officer Representative
CSMConceptual Site Model
CVOCChlorinated Volatile Organic Compound
DDDDichlorodiphenyldichloroethane
DDEDichlorodiphenyldichloroethylene
DDTDichlorodiphenyltrichloroethane
DESDLA Environmental & Safety Directorate
DGSCDefense General Supply Center
DLADefense Logistics Agency
DoDDepartment of Defense
DPEDual Phase Extraction
DSERTSDefense Site Environmental Restoration Tracking System
EBSEnvironmental Baseline Survey
EREnvironmental Restoration
ESDExplanation of Significant Differences
ESIExpanded Site Investigation
EVOemulsified vegetable oil
FFAFederal Facilities Agreement
FFSFocused Feasibility Study
FSFeasibility Study
FTAFire Training Area
FYFiscal Year
HHRAHuman Health Risk Assessment
IRAInterim Remedial Action
IRPInstallation Restoration Program
LTMLong Term Monitoring
LUCLand Use Control
MAPManagement Action Plan
MNAMonitored Natural Attenuation
NOVNotice of Violation
NGANational Guard Area
NPLNational Priorities List
OSAOpen Storage Area
OUOperable Unit
PAPreliminary Assessment
PAHPolycyclic Aromatic Hydrocarbon
PCBPolychlorinated Biphenyl
PCETetrachloroethene
PXPost Exchange
RARemedial Action
RA-CRemedial Action - Construction
RA-ORemedial Action – Operation
RABRestoration Advisory Board

ACRONYMS AND ABBREVIATIONS (contd)

RBCRisk Based Concentration
RCResponse Complete
RDRemedial Design
REMRemoval Action
RIRemedial Investigation
RIPRemedy in Place
RODRecord of Decision
RRSERelative Risk Site Evaluation
SCSite Closure
SISite Investigation
SLERAScreening Level Ecological Risk Assessment
SVESoil Vapor Extraction
SVOCSemivolatile Organic Compound
TCATrichloroethane
TCETrichloroethene
TRCTechnical Review Committee
TSTransitory Shelter
USACEUnited States Army Corps of Engineers
USAEHAUnited States Army Environmental Hygiene Agency
USEPAUnited States Environmental Protection Agency
USTUnderground Storage Tank
VDEQVirginia Department of Environmental Quality
VOCVolatile Organic Compound
WBUWater Bearing Unit

Defense Supply Center Richmond – Management Action Plan Acronyms and Abbreviations – Page 6 summary Placed on National Priorities List (NPL) - July 1987 32 DSERTS (Defense Site Environmental Restoration Tracking System) Sites

Defense Supply Center Richmond – Management Action Plan Summary – Page 7

ACTIVE DSERTS SITES -

OUs AND SITE TYPES:

14 active DSERTS sites (Environmental Restoration [ER] Eligible)
OU1 – Open Storage AreaOU 2 – Former Landfill
OU 5 – Acid Neutralization Pit (ANP) AreaOU 13 – Spill Area
Post Exchange (PX) – Gasoline Filling StationOUs 6, 7, 8 – Groundwater Sites

OUs 10, 11, 12 – Former Chemical Storage Buildings OU 9 – Interim Groundwater Treatment System OU 4 – Unlined chemical dumping area/fire training area OU 3 – Vehicle Maintenance Area 18 inactive DSERTS sites

CONSTITUENTS:
Chlorinated volatile organic compounds (CVOCs), petroleum hydrocarbons, polycyclic aromatic hydrocarbons (PAHs), pesticides, metals
AFFECTED MEDIA:
Groundwater, soil, and sediment
COMPLETED RECORD OF DECISION (ROD):
13 RODs completed at ER Eligible Sites (OUs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12

and 13)

COMPLETED IRA/REM/RA:
· Interim Remedial Action (IRA)

· Groundwater pump and treat system at OU 9

· Removal Action (REM)

· Soil excavation at OU 3

· Soil excavation at OU 4

· Soil excavation at OU 13

· Remedial Action (RA)

· Soil cover at OU 2

· Concrete cover and soil vapor extraction (SVE) at OU 5

· Vegetative covers at OU 10 and OU 11

· Asphalt cover at OU 12

· Low permeability soil backfill at OU 13

· Groundwater extraction and treatment for PX Gas Station

CURRENT DSERTS PHASES:
· Remedial Action (RA) ongoing at groundwater OUs 6, 7 and 8

· Long-term monitoring (LTM) for soil OUs 1, 2, 3, 4, 5, 10, 11, 12, 13 and the PX Gasoline Station. Note land use controls (LUCs) for soil OUs 4 and 5 are included under OUs 7 and 8, respectively.

PROJECTED DSERTS PHASES:
· RA expected at OU 8

· LTM for all OUs

FUNDING:
· Need funding for RA at groundwater OUs 6, 7, and 8
DURATION:
Year of IRP Inception: 1981 Estimated year of IRP Completion: 2046

Final Deletion from the NPL: 2043 (All OUs). Deletion of specific OUs is anticipated prior to 2043.

INSTALLATION INFORMATION

LOCALE

Defense Supply Center Richmond (the installation) is located approximately 8 miles south of the city of Richmond, Virginia, along Jefferson Davis Highway. The installation consists of over 600 acres, approximately 1 mile wide (east to west) and 2 miles long (north to south). The property is roughly L-shaped, and the southeastern section currently consists of primarily administrative, operations, maintenance, housing, daycare facilities, and recreational areas (see Figure 1). The remaining areas include warehouses, open storage, and light industrial facilities. The installation’s current workforce is over 2,000 employees. The area surrounding the installation is primarily residential and woodland with a lesser proportion of commercial/light industrial property.

COMMAND ORGANIZATION

Headquarters:Defense Logistics Agency (DLA) Headquarters, Installation Operations Richmond, Environmental Management Division
Installation:DLA Installation Support at Richmond

IRP EXECUTING AGENCY

· Investigation, Remedial Design and Remedial Action Phases Executing Agency: United States Army Corp of Engineers (Baltimore District)

REGULATORY PARTICIPATION

FEDERAL:U.S. Environmental Protection Agency (USEPA), Region 3
STATE:Virginia Department of Environmental Quality (VDEQ), Division of Waste Operations

REGULATORY STATUS

· NPL Installation – 1987

· Federal Facilities Agreement (FFA) – 1990

Defense Supply Center Richmond – Management Action Plan Installation Information and Description – Page 12

INSTALLATION DESCRIPTION

Defense Supply Center Richmond is the home to DLA Aviation which supports more than 1,340 weapon systems as the U.S. military's integrated material manager for more than 1.2 million national stock number items, industrial retail supply and depot-level repairable acquisitions. In addition, DLA Aviation manages supply, storage and distribution operations alongside its military customers at Robins Air Force Base, GA; Tinker Air Force Base, OK; Hill Air Force Base, UT; Marine Corps Air Station Cherry Point, NC; Naval Air Station North Island, CA; and Naval Air Station Jacksonville, FL. DLA Aviation also manages depot-level reparable procurement operations at Robins, Tinker and Hill Air Force Bases; Navy Inventory Control Point Philadelphia; and Redstone Army Arsenal in Huntsville, AL. The aviation supply chain has personnel at over a dozen stateside sites directly supporting the warfighters. DLA Aviation also operates the federal government's only industrial plant equipment facility at Navy Inventory Control Point, Mechanicsburg, PA.

The United States government purchased the land from private owners in 1941, and construction activities began in September of that year. The installation was activated as the Richmond Quartermaster Depot on 1 January 1942, after the United States government purchased the land from private land owners in 1941. In 1943, the installation became the Richmond Armed Service Forces Depot. The Quartermaster Branch Depot was established on-site in 1949, followed by the U.S. Army General Supply Center in 1958. DLA began overseeing operations in 1962, when the installation became known as the Defense General Supply Center (DGSC). In 1996, the installation was renamed the Defense Supply Center Richmond.

Past operations at the installation have encompassed a variety of industrial operations including the following: tent, refrigerator, and parachute repair; military vehicle and equipment overhauling; automotive engine repair and rebuilding; sanitary and industrial waste treatment and disposal; helmet refurbishing; gas cylinder refurbishing and replenishing; firefighter training; and hazardous chemical storage, recoupment, and shipping.

Current missions at the installation include the following:

· Managing, controlling, storing, and distributing general military, administrative, and other supplies worldwide for DLA

· Storing industrial chemicals with no recoupment activities involved as damaged containers, if any are shipped for disposal

· Refurbishing and refilling chemical gas cylinders

· Storing and supplying operational and maintenance parts for military aircraft

· Disposing of excess inventory

· Maintaining and storing military and government vehicles

· Storing and distributing maps to DoD installations and other government agencies worldwide

· Providing professional development and training opportunities for Government supply and inventory specialists

· Maintaining the U.S. Army’s National Technical Information System for hazardous substances

· DLA Distribution Mapping - responsible for inventory and worldwide physical distribution of all maps, charts and other geodetic material for DoD, storing 85,000 map items for its military customers worldwide

INSTALLATION DESCRIPTION

DSERTS Site Descriptions and Status

DSERTS NumberSite DescriptionActive
002Transitory Shelter (TS) 202 (OU 11)Yes
004Malathion Contamination (Part of OU 1)No
006Building 68 – Polychlorinated Biphenyl (PCB) Storage (OU 10)Yes
008Recoupment Area (Part of OU 1)No
009Area 50 Landfill (OU 2)Yes
010Dichlorodiphenyltrichloroethane (DDT) Storage (Warehouse 9)No
011Asbestos Storage (Warehouse 4)No
012Mercury Storage (Warehouse 9)No
013Pesticide Storage (Roads and Grounds)No
014Pesticide Storage and Mixing Facility (OU 12)Yes
015Rubble Disposal AreaNo
017Former Fire Training Pit Soils (OU 4)Yes
018Waste Oil Underground Storage Tank (UST) – Mechanical, Heating
and Electrical shop (CAP 2)No
019Waste Oil UST – Automotive ShopNo
020Aluminum Phosphide Ash Burial AreaNo
021Sludge from Sewage Treatment PlantNo
022PCB StorageNo
023Pistol RangeNo
024Paint Residue Area (Paint Shed)No
025Calcium Hypochlorite Fire – 1977No
026USTS-National Guard Area (Part of OU 3)No
027ANP Soils (OU 5)Yes
028Open Storage Area Soils (OU 1)Yes
029Parker Pond – Expanded Site Investigation (ESI) 2No
030Fuel Storage Area (Part of OU 4)No
031National Guard Area Soils (OU 3)Yes
032Former Fire Training Area (FTA) Groundwater (OU 7)Yes
033PX Gas Station (CAP 1)Yes
034Area 50 Groundwater (OUs 6 and 9)Yes
036ANP Groundwater (OU 8)Yes
037PAH Area (OU 13)Yes
038Tank Farm (CAP 3)No

Note: Numbers 001, 003, 005, 007, 016, and 035 were not used.

PROJECT TEAM

Defense Supply Center Richmond – Management Action Plan
Project Team – Page 13

PROJECT TEAM

ROLES AND RESPONSIBILITIES

· DLA – Lead agency for remedial actions at Defense Supply Center Richmond; resource advocate; policy development; provides consultative support; decision validation and approval.

· DLA Installation Support at Richmond – Directs the installation’s daily restoration program execution (ensure costs/performance/ schedule are on target).

· USACE Baltimore District Service Center – Provide contracts for contractors and review contractor performance.

· Program Manager

· Manages budget/schedule/quality of deliverables produced by contractors.

· Provides timely funds obligation and contract execution and oversees costs/performance/ schedule as the Program Manager.

· VDEQ – Supporting regulatory agency for remedial actions at the installation.

· USEPA – Lead regulatory agency for remedial actions at the installation.

· ARCADIS

· Performs on-time, cost-effective consulting services for restoration activities.

· Meets DLA’s completion strategy for technically defensible site restoration.

Defense Supply Center Richmond – Management Action Plan Project Team – Page 14

INSTALLATION ASSESSMENT

Past industrial operations at the installation have resulted in the use, storage, management, inadvertent release, and/or disposal of hazardous materials, such as chlorinated solvents, petroleum products, and wastewater treatment sludge. Past storage operations at the installation have led to the accidental release of these and other hazardous materials, such as PAHs, pesticides, petroleum hydrocarbons, PCBs, and metals.

An initial assessment was completed in August 1981 that indicated potential soil impacts at six OUs and possible groundwater impacts at three OUs. During 1982, the U.S. Army Environmental Hygiene Agency (USAEHA) investigated the hydrogeologic setting, identified two areas of significant groundwater impacts associated with the Area 50 landfill and the former FTA, and installed monitoring wells in the vicinity of the most impacted areas. Elevated groundwater concentrations of CVOCs such as trichloroethene (TCE), tetrachloroethene (PCE), and chlorobenzenes were detected and compared to VDEQ Groundwater Quality Standards. A third possible source of groundwater impacts was determined to be the National Guard Area (NGA). Subsequent investigations showed CVOC constituents in both the upper and lower water bearing units (WBUs) east of Area 50, extending to and beyond the eastern boundary of the installation.

Initial testing of residential water wells near the installation was performed between 1982 and 1984. In 1984, chloroform was detected, but the concentration was well below the USEPA limit for drinking water. Trace amounts of 1,1,1-trichloroethane (TCA) and 1,1-dichloroethane were also detected. Monitoring wells were installed off-installation to the east of NGA. Off-installation wells were analyzed, along with the associated NGA and Area 50 monitoring wells, during subsequent investigations of the hydrogeology and the extent of potential groundwater impacts between 1985 and 1987.

Based on the results of these investigations, the installation was officially placed on the NPL in 1987 with a Hazard Ranking System score of 33.85 due to CVOCs in on-site groundwater, potential off-site migration of CVOC-contaminated groundwater, and groundwater discharge into surface water. In 1990, USEPA, VDEQ, and DGSC (now Defense Supply Center Richmond) entered into an FFA to continue monitoring the installation and to develop and implement remedial action plans. Thirteen OUs were ultimately defined for the IRP.

An RI was initiated in 1986 to characterize the nature and extent of CVOCs in soil at four OUs:

· Open Storage Area (OSA) – OU 1

· Area 50 Landfill – OU 2

· NGA – OU 3

· Former FTA – OU 4 The acid neutralization pits (ANPs – OU 5) were investigated as a possible CVOC source area.

The groundwater plumes associated with soil impacts were considered separately from the soil OUs:

· OSA/Area 50/NGA groundwater – OU 6

· Former FTA groundwater – OU 7

· ANP groundwater – OU 8 An installation-wide pesticide monitoring study completed in 1986 by USAEHA identified three additional possible areas of concern:

· Former Building 68 – OU 10

· Former Building 202 – OU 11

· Former Building 112 – OU 12 These areas were identified due to the various pesticide residues (i.e., DDT, chlordane, heptachlor, arsenic) discovered in the surface soils and storm drain sediments. In 1992, an area of PAH impacts was encountered near the FTA, which was associated with a past fuel oil release from an aboveground storage tank. This area was designated as OU 13. An IRA for OU 6, consisting of a groundwater extraction, CVOC treatment, and discharge system, began operating in 1996. This area was designated as OU 9.

In 2000, the installation began integrating RIs and Focused Feasibility Studies (FFSs) for source and groundwater OUs. RI/FFSs were conducted as part of a comprehensive, installation-wide completion strategy recognizing the interdependence of soil and groundwater impacts. This strategy involves removing or treating continuing sources of impacts, controlling migration in the environment, and limiting exposure to impacts that pose unacceptable human health or ecological risk through institutional or engineered controls. Response decisions made under this completion strategy are results-focused, with clearly defined performance expectations. DLA strives to effectively and efficiently meet its response action obligations under the Comprehensive Environmental Response Compensation and Liability Act.

Implementation of this completion strategy required an update of the installation’s Conceptual Site Model (CSM). Completed in 2006, the CSM summarizes relevant information on the nature, extent, and migration of constituents in soil and groundwater; provides a framework for cleanup programs; and serves as a foundation for risk assessments. Data gaps for the updated CSM were addressed in a supplemental FS investigation between August 2003 and April 2004. HHBRAs for each OU were subsequently revised using updated risk assessment guidance and industrial land use scenarios.

Three creeks near the installation property (Kingsland Creek, No Name Creek, and an unnamed tributary of Falling Creek) were evaluated to determine the potential impact from past on-site activities. Between 2001 and 2004, a creek monitoring study determined there were no significant impacts on habitat quality for aquatic organisms in the monitored creeks. HHBRAs were also performed on the creeks, and unacceptable cancer risk was determined for residential recreational users (waders) in each creek. However, the estimated risk was driven by infrequently detected constituents in groundwater and conservative exposure scenarios. Therefore, no further action was recommended to protect human health from potential installation impacts to the creeks.

Since the completion of the CSM, considerable progress has been achieved at the installation’s DSERTS sites. Records of Decision have been completed for OUs 2 (2008), 6 (2013), 7 (2012), 8 (2007), 10 (2007), 11 (2007), 12 (2005) and 13 (2011) and remedial action completion status has been achieved for OUs 2, 10, 11, 12 and 13. In addition, the interim remedial action (OU 9) has been decommissioned. As part of the feasibility studies at OU 6 and 7, low-cost passive groundwater treatment treatability studies were implemented in 2007. An in situ bioremediation treatability study at OU 8 was implemented in 2010 prior to full-scale application in 2013 and 2014. Full scale application was completed at OU 7 in 2013 and at OU 6 in 2015, and pressurized and gravity fed EVO injections took place at OU 6 in July 2015. These studies have shown favorable results for the treatment of the groundwater contamination at these OUs. Remedial action activities are ongoing at OUs 6, 7, and 8. In 2015, direct-push technologies were utilized to investigate the north-eastern edge of the OU 8 plume extending towards Bensley Elementary School. DLA initiated a long term pump test along the northern lobe of the OU 8 plume in 2015 and a long term pump test well int the southern lobe of the OU 8 plume in 2016. A targeted groundwater extraction and recirculation system for OU 8 was implemented successfully in 2017 to enhance biodegradation of the dissolved-phase plume beneath portions of OU-5 and Bay F of Warehouse 65 which are source areas of the OU 8 plume. Twelve new injection wells were installed in October 2017 for OU 7 in the intermediate zone followed by USACE completing an ISB injection of Lactoil (or equivalent) a blended carbon donor consisting of 35% EVO and 35% sodium lactate into 31 injection wells (12 new and 19 existing wells) from November 2017 to January 2018. Additional remedial action activities are planned for August 2018 for OU 8.

As a result of the building 65 sub-slab-depressurization system effectiveness study, modification activities to enhance the systems impact were made to Bldg 65 SSDS in 2016 to address ROI issues of the system. Additional SSDS optimization activities were completed in June 2018 to address operational deficiencies.

LUCs have been implemented at OUs 1, 2, 3, 6, 7, 8, 10, 11, 12, 13 and the PX Gas Station. These LUCs are documented in the LUC RD (AECOM, 2015). Annual inspections are conducted to verify that the LUCs are being implemented as proposed. Any deficiencies noted during the annual inspections are rectified. LUCs for OUs 4 and 5 are incorporated in the OUs 7 and 8 LUCs, respectively.

All open DSERTS sites listed under the Defense Supply Center Richmond IRP are eligible for funding. Sites that pose the greatest risk to public health (based on the Relative Risk Site Evaluation [RRSE]) are generally given priority in funding allocations. The RRSE is a qualitative tool used to group sites into low, medium, and high-risk categories based on site information and the contaminant hazard factor, the migration pathway factor, and the receptor factor. These sites are organized in the Site Descriptions section of the MAP by their DSERTS identification number but are primarily described by their OU number (1-13) or common name (PX Gas Station). RRSEs are not required at DSERTS sites classified as RIP or Response Complete (RC).

Defense Supply Center Richmond – Management Action Plan Installation Assessment – Page 17

Aug 81
Installation Assessment Report
US Army Toxic and Hazardous Materials Agency
Mar 82
Geohydrologic Study No. 38-26-0164-82
US Army Environmental Hygiene Agency
Nov 82
Phase II, Geohydrologic Study No. 38-26-0164-83
US Army Environmental Hygiene Agency
Nov 83
Final Geohydrologic Study No. 38-26-0164-84
US Army Environmental Hygiene Agency
Jul 84
Phase I, Final Contamination Assessment Report, OU 2, OU 6
Dames & Moore
Sep 84
Groundwater Contamination Progress Report
US Geological Survey
Dec 84
On Post Quarterly Well Testing, Mar 94-Dec 94, OU 2, OU 6
US Geological Survey
Jan 85
Groundwater Contamination Progress Report, Oct 84-Dec 84, OU 6
US Geological Survey
Apr 85
Groundwater Contamination Progress Report, Jan 85-Mar 85, OU 6
US Geological Survey
Jun 85
Groundwater Contamination Progress Report, Apr 85-Jun 85, OU 6
US Geological Survey
Oct 85
Groundwater Contamination Progress Report, Jul 85-Sep 85, OU 6
US Geological Survey
Nov 85
Phase II, Final Contamination Assessment Report
Dames & Moore
Sep 86
Pesticide Monitoring Study, Evaluation of Pesticide Residue Associated with Pest Control Operations
US Army Environmental Hygiene Agency
Jan 87
Phase II, Groundwater Contamination Administrative Report
US Geological Survey
Oct 87
Soil Gas Survey Report, OU 5
Target Environmental Services
Oct 88
Phase II, Soil Gas Survey Report, OU 3
Target Environmental Services
Apr 89
RI, Final Report, OU 5, OU 8
Dames & Moore
May 89
RI, Report, OU 4, OU 7
Dames & Moore
Nov 89
Soil Gas Survey Report, OU 1
Target Environmental Services
Nov 90
FFA, Investigation and Response of Past and Present Environmental Impacts
Defense Logistics Agency, Virginia Department of Waste Management, DGSC-WI, EPA Region 3
Jul 91
Technical Memorandum Report, Interim Groundwater Sampling Results, United States Geological Survey Off-Post Wells, Rayon Park
CH2M Hill
Sep 91
Proposed Preliminary ARAR Report, OU 4
LAW Environmental, Inc.
Oct 91
FFS, Final Report, OU 1
LAW Environmental, Inc.
Oct 91
FFS, Final Report, OU 5
LAW Environmental, Inc.
Jan 92
Final Proposed Plan, OU 5
LAW Environmental, Inc.
Jan 92
Final Proposed Plan, OU 1
LAW Environmental, Inc.
Mar 92
ROD, OU 5
LAW Environmental, Inc.
Apr 92
ROD, Final, OU 1
LAW Environmental, Inc.
Dec 92
RD, Pilot Study for Vacuum Extraction System Work Plan, OU 5
Engineering-Science, Inc.
Apr 93
FFS, Draft Report, OU 6
LAW Environmental, Inc.
Apr 93
RD, 100% Design Submittal Report, OU 5 (Volume I & Volume 2)
Engineering-Science, Inc.
Sep 93
ROD, IRA, OU 9
LAW Environmental, Inc.
Feb 94
RI, Final Field Investigation Report, OU 7
Engineering-Science, Inc.
Jun 94
ESI, Final Report, OU 12
LAW Environmental, Inc.
Jun 94
ESI, Final Report, OU 11
LAW Environmental, Inc.
Jun 94
ESI, Final Report, OU 10
LAW Environmental, Inc.
Jun 94
ESI, Final Report, OU 4
LAW Environmental, Inc.
Jun 94
RI, Final Report Addendum, OU 6
LAW Environmental, Inc.
Feb 95
FFS, Final Report, OU 3
LAW Environmental, Inc.
May 95
Final Exploratory Trenching Characterization Report, OU 2
LAW Environmental, Inc.
Jul 95
Final Proposed Plan, OU 3
LAW Environmental, Inc.
Sep 95
Explanation of Significant Differences Report, OU 5
US Army Corps of Engineers - Huntsville Division
Sep 95
Explanation of Significant Differences Report, OU 9
LAW Environmental, Inc.
Oct 95
Quarterly Groundwater Sampling Report, Aug 95, PX Station
Parsons Engineering Science Inc.
Oct 95
ROD, Final, OU 3
LAW Environmental, Inc.
Nov 95
RI, Report, Addendum, OU 5
LAW Environmental, Inc.
Jan 96
RI, Final Report Addendum, OU 4, OU 7
LAW Environmental, Inc.
Jan 96
Quarterly Groundwater Sampling Report, Dec 95, PX Station
Parsons Engineering Science Inc.
Jan 96
Final Pilot Test Report, PX Station
LAW Engineering and Environmental Services, Inc.
Feb 96
Final Pilot Test Report, OU 5
LAW Environmental, Inc.
Apr 96
FFS, Final Report, OU 7
LAW Engineering and Environmental Services, Inc.
Apr 96
Quarterly Groundwater Sampling Report, Feb 96, PX Station
Parsons Engineering Science Inc.
Oct 96
Quarterly Groundwater Sampling Report, Intrinsic Remediation, Oct 96, PX Station
Parsons Engineering Science Inc.
Dec 96
RI, Final Supplemental Report, OU 4, OU 7
LAW Engineering and Environmental Services, Inc.
Jan 97
Final Pilot Test Report, OU 4, OU 7
LAW Engineering and Environmental Services, Inc.
Jan 97
Quarterly Groundwater Sampling Report, Intrinsic Remediation, Jan 97, PX Station
Parsons Engineering Science Inc.
Jan 97
Revised Final Corrective Action Plan, PX Station
Parsons Engineering Science Inc.
Apr 97
Quarterly Groundwater Sampling Report, Intrinsic Remediation, Apr 97, PX Station
Parsons Engineering Science Inc.
May 97
Revised Final Background Characterization Report
LAW Engineering and Environmental Services, Inc.
Jul 97
RI, Final Report, OU 11
LAW Engineering and Environmental Services, Inc.
Jul 97
RA, Summary Report, OU 3
Omega Environmental Services
Jul 97
Quarterly Groundwater Sampling Report, Jul 97, PX Station
Parsons Engineering Science Inc.
Aug 97
FFS, Final Report, OU 4
LAW Engineering and Environmental Services, Inc.
Aug 97
RA, Final Five-Year Review Report, OU 1
LAW Engineering and Environmental Services, Inc.
Oct 97
Quarterly Groundwater Sampling Report, Oct 97, PX Station
Parsons Engineering Science Inc.
Jan 98
RI, Final Report, OU 10
LAW Engineering and Environmental Services, Inc.
Jul 98
FFS, Final Report, OU 8
LAW Engineering and Environmental Services, Inc.
Feb 98
Quarterly Groundwater Sampling Report, Feb 98, PX Station
Parsons Engineering Science Inc.
Aug 98
Quarterly Groundwater Sampling Report, Aug 98, PX Station
Parsons Engineering Science Inc.
Sep 98
IRA, Final Action Memorandum Decision Document, OU 2
LAW Engineering and Environmental Services, Inc.
Oct 98
Report of Video Inspections of Storm Sewers, OU 2, OU 12
LAW Engineering and Environmental Services, Inc.
Nov 98
Final Treatability Study Report, OU 8
LAW Engineering and Environmental Services, Inc.
Feb 99
Final Proposed Plan, OU 4
LAW Engineering and Environmental Services, Inc.
Feb 99
Final Corrective Action Plan Annual Report, Intrinsic Remediation, PX Station
Parsons Engineering Science Inc.
Feb 99
Biannual Groundwater Sampling Report, Feb 99, PX Station
Parsons Engineering Science Inc.
May 99
FFS, Third Revised Final Report, OU 2
LAW Engineering and Environmental Services, Inc.
Jun 99
ROD, Final, OU 4
LAW Engineering and Environmental Services, Inc.
Jun 99
Final Groundwater Model Update Report, Bioplume II, PX Station
Parsons Engineering Science Inc.
Jul 99
RI, Revised Final Report, OU 13
LAW Engineering and Environmental Services, Inc.
Jul 99
Density Driven Convection Pilot Test Report, OU 7
Wasatch Environmental, Inc.
Sep 99
FS, Letter Report Addendum, OU 7
LAW Engineering and Environmental Services, Inc
Oct 99
Final Proposed Plan, OU 2
LAW Engineering and Environmental Services, Inc.
Jan 00
Revised Final Treatability Study Report, OU 8
LAW Engineering and Environmental Services, Inc.
Jan 00
FS, Final Report, OU 11
LAW Engineering and Environmental Services, Inc.
Mar 00
FS, Final Report, OU 10
LAW Engineering and Environmental Services, Inc.
Jun 00
FFS, Revised Final Report, OU 12
LAW Engineering and Environmental Services, Inc
Jun 00
RI, Second Revised Final Report, OU 12
LAW Engineering and Environmental Services, Inc.
Jun 00
Final Natural Attenuation Studies Report, OU 6
LAW Engineering and Environmental Services, Inc.
Dec 00
Final Pilot Test Report, OU 6
LAW Engineering and Environmental Services, Inc.
Nov 01
After Action Plan, Groundwater Pump and Treat System, OU 9
Horne Engineering Services, Inc.
Dec 01
Final Groundwater Summary Report, OU 11
LAW Engineering and Environmental Services, Inc.
Dec 01
Technical Memorandum Report, Quarterly Groundwater Sampling, Oct 01, OU 8
LAW Engineering and Environmental Services, Inc.
Jan 02
Technical Memorandum Report, First Quarterly Groundwater Sampling,

Oct 01, PX Station LAW Engineering and Environmental Services, Inc.

Jan 02
Data Summary Report, No Name Creek, Kingsland Creek
LAW Engineering and Environmental Services, Inc.
Jan 02
Basewide Environmental Baseline Survey Report
Rasco, Inc.
Feb 02
Final Quarterly Groundwater Sampling Plan, OU 6, OU 8, PX Station
LAW Engineering and Environmental Services, Inc.
Feb 02
Technical Memorandum Report, First Quarterly Groundwater Sampling, Sep 01-Oct 01, OU 6
LAW Engineering and Environmental Services, Inc.
Apr 02
Final Updated Residential Well Survey Report
LAW Engineering and Environmental Services, Inc.
Apr 02
Final Groundwater Summary Report, OU 10
LAW Engineering and Environmental Services, Inc.
Dec 02
Technical Memorandum Report, Quarterly Groundwater Sampling,

Mar 02-Apr 02, OU 6 MACTEC Engineering and Consulting, Inc. (f/k/a LAW Engineering and Environmental Services, Inc.)

Dec 02
Technical Memorandum Report, Creek Monitoring, Nov 01, Kingsland Creek, No Name Creek, Falling Creek Tributary
MACTEC Engineering and Consulting, Inc.
Dec 02
Technical Memorandum Report, Quarterly Groundwater Sampling,

Mar 02-Apr 02, OU 8 MACTEC Engineering and Consulting, Inc.

Jan 03
Technical Memorandum Report, Quarterly Groundwater Sampling,

Mar 02-Apr 02, OU 7 MACTEC Engineering and Consulting, Inc.

Jan 03
Summary of Findings Report, OU 6
MACTEC Engineering and Consulting, Inc.
Feb 03
Summary of Findings Report, OU 7
MACTEC Engineering and Consulting, Inc.
Mar 03
Technical Memorandum Report, Quarterly Groundwater Sampling, Jul 02, OU 6
MACTEC Engineering and Consulting, Inc.
Apr 03
Technical Memorandum Report, Quarterly Groundwater Sampling, Jul 02, OU 7
MACTEC Engineering and Consulting, Inc.
Apr 03
Technical Memorandum Report, Quarterly Groundwater Sampling, Jul 02, OU 8
MACTEC Engineering and Consulting, Inc.
Apr 03
Technical Memorandum Report, Quarterly Groundwater Sampling, Jul-Aug 02, PX Station
MACTEC Engineering and Consulting, Inc
Jul 03
Technical Memorandum Report, Creek Monitoring, Nov 02, Kingsland Creek, No Name Creek, Falling Creek Tributary
MACTEC Engineering and Consulting, Inc.
Jul 03
Final Consolidated Five-Year Review Report, OU 1, OU 3, OU 9
MACTEC Engineering and Consulting, Inc.
Aug 03
Annual Groundwater Report, Oct 02, OU 7
MACTEC Engineering and Consulting, Inc.
Nov 03
Environmental Investigation Report, Proposed Sanitary, Sewer Installation Rayon Park
EEE Consulting, Inc.
Jan 04
Annual Groundwater Sampling Report, Oct 01-Oct 02, OU 8
MACTEC Engineering and Consulting, Inc.
Jan 04
Supplemental FS, Final Work Plan (Volume I and Volume II)
MACTEC Engineering and Consulting, Inc.
Jan 04
Annual Groundwater Sampling Report, Oct 01-Oct 02, PX Station
MACTEC Engineering and Consulting, Inc.
Feb 04
Quarterly Groundwater Sampling Report, 03, OU 8
MACTEC Engineering and Consulting, Inc.
Feb 04
Quarterly Groundwater Sampling Report, 03, PX Station
MACTEC Engineering and Consulting, Inc.
Mar 04
Quarterly Groundwater Sampling Report, 03, OU 6
MACTEC Engineering and Consulting, Inc.
Mar 04
Quarterly Groundwater Sampling Report, 03, OU 7
MACTEC Engineering and Consulting, Inc.
Apr 04
Revised Final Letter Work Plan, Potential Source Material Investigation, Former Fire Training Pit Area, OU 4
MACTEC Engineering and Consulting, Inc.
Sep 04
Final Action Memorandum Report, Principal Threat Source Material Removal, OU 4
MACTEC Engineering and Consulting, Inc.
Oct 04
Final General SAP (Volume I, Volume II and Volume III)
MACTEC Engineering and Consulting, Inc.
Mar 05
Third Revised Final Focused Feasibility Study Report, OU 12
MACTEC Engineering and Consulting, Inc.
Mar 05
Proposed Plan, OU 12
MACTEC Engineering and Consulting, Inc.
July 05
Final Removal Action Completion Report, Principal Threat Source Material Removal, OU 4
MACTEC Engineering and Consulting, Inc.
Sep 05
ROD, Final, Rev. 1 OU 12
MACTEC Engineering and Consulting, Inc.
Dec 05
Final Work Plan Addendum for the Bi-Annual Groundwater Sampling
MACTEC Engineering and Consulting, Inc.
Dec 05
Final Results of Bi-Annual Groundwater Sampling – July 2005 OUs 6, 7, and 8 (Volume 1 and Volume 2)
MACTEC Engineering and Consulting, Inc.
Feb 06
Supplemental Feasibility Study Investigation Report

(Volume 1, Volume 2 Part 1 & Part 2, Volume 3 Part 1 & Part 2 and Volume 4) MACTEC Engineering and Consulting, Inc.

Apr 06
Environmental Land Use Control Implementation Plan
MACTEC Engineering and Consulting, Inc.
Apr 06
Human Health Baseline Risk Assessment Work Plan
MACTEC Engineering and Consulting, Inc.
May 06
Final Focused Feasibility Study Report, OU 8 (Part 1, Part 2 and Part 3)
MACTEC Engineering and Consulting, Inc.
May 06
Final Proposed Plan, OU 8
MACTEC
Jun 06
Human Health Baseline Risk Assessment of the Creeks

Adjacent to DSCR MACTEC Engineering and Consulting, Inc.

Jun 06
Final OU 12 Remedial Design
MACTEC Engineering and Consulting, Inc.
Jun 06
Groundwater Sampling Report, January 2006, PX Gasoline Station
Earth Tech, Inc.
Jul 06
OU 2 Technical Memorandum
MACTEC Engineering and Consulting, Inc.
Jul 06
Final Feasibility Study Addendum, OU 10
MACTEC Engineering and Consulting, Inc.
Jul 06
Final Feasibility Study Addendum, OU 11
MACTEC Engineering and Consulting, Inc.
Aug 06
Final Results of Bi-Annual Groundwater Sampling – January 2006
MACTEC Engineering and Consulting, Inc.
Aug 06
Final Conceptual Site Model Report
MACTEC Engineering and Consulting, Inc.
Sep 06
Results of Three-Year Creek Monitoring Program (2001-2004)

(Part 1 and Part 2) MACTEC Engineering and Consulting, Inc.

Sep 06
Final Remedial Action Work Plan, OU 12
Earth Tech, Inc.
Oct 06
Final Proposed Plan, OU 10
Earth Tech, Inc.
Oct 06
Final Proposed Plan, OU 11
Earth Tech, Inc.
Dec 06
Final Revised Human Health Baseline Risk Assessment, OU 1
Earth Tech, Inc.
Jan 07
Final Results of Bi-Annual Groundwater Sampling – July 2006
MACTEC Engineering and Consulting, Inc.
Feb 07
Final Technical Memorandum for Revised Remedy Selection, OU 2
MACTEC Engineering and Consulting, Inc.
Feb 07
Final Record of Decision, OU 8
Earth Tech, Inc.
Mar 07
Final Treatability Studies Work Plan, OU 6 and OU 7
Earth Tech, Inc.
May 07
Final Remedial Action Report, OU 12
Earth Tech, Inc.
Jun 07
Final Explanation of Significant Differences, OU 1
Earth Tech, Inc.
Jul 07
Final Operable Units 6/9 IRA Evaluation Report (Part 1 and Part 2)
Earth Tech, Inc.
Jul 07
Final Results of Bi-Annual Groundwater Sampling – January 2007
Earth Tech, Inc.
Jul 07
Final Record of Decision, OU 10
Earth Tech, Inc.
Jul 07
Final Record of Decision, OU 11
Earth Tech, Inc.
Sep 07
Groundwater Sampling Report, December 2006, PX Gasoline Station
Earth Tech, Inc.
Oct 07
Final Environmental Land Use Control Implementation Plan
Earth Tech, Inc.
Nov 07
Final Proposed Plan, OU 2
Earth Tech, Inc.
Nov 07
Final Protectiveness Determination Addendum, OU 3 (Part 1 and Part2)
Earth Tech, Inc.
Jan 08
Community Involvement Plan
Earth Tech, Inc.
Feb 08
Final Remedial Design/Remedial Action Work Plan, OU 10 and OU 11
Earth Tech, Inc.
Jul 08
Final July 2007 Groundwater Monitoring Report, PX Gasoline Station
Earth Tech, Inc.
Jul 08
Final Results of Bi-Annual Groundwater Sampling – July 2007

(Volume 1 and Volume 2) Earth Tech, Inc.

Aug 08
Final Five-Year Review Report for OUs 1, 3, 8, 9, 10, 11, and 12
Earth Tech, Inc.
Aug 08
Final Record of Decision, OU 2
Earth Tech, Inc.
Sep 08
Final Amendment to the ROD (OU 9)
Earth Tech, Inc.
Sep 08
Final Remedial Action Report for OU 10 and OU 11
Earth Tech, Inc.
Sep 08
Final Remedial Design/Remedial Action Work Plan, OU 8
Earth Tech, Inc.
Sep 08
Final Revised SLERA for Low Lying Wooded Area, OU 13
Earth Tech, Inc.
Sep 08
Final Decommissioning Plan for PX Treatment System
Earth Tech, Inc.
Sep 08
Final Decommissioning Plan for OU 9 Treatment System
Earth Tech, Inc.
Oct 08
Final Results of Bi-Annual Groundwater Sampling – January 2008
Earth Tech, Inc.
Nov 08
Final Environmental Land Use Control Implementation Plan
Earth Tech, Inc.
Nov 08
Groundwater Sampling Report, January 2008, PX Gasoline Station
Earth Tech, Inc.
Feb 09
Final Decommissioning Report for PX Treatment System
Earth Tech, Inc.
Jun09
Final Remedial Design Remedial Action Work Plan – OU 2
AECOM
Jun 09
Final Results of Annual Groundwater Sampling – January 2009
AECOM
Jun 09
Final 2009 LUCIP Inspection Report
AECOM
Sep 09
Final Revised Focused Feasibility Study – OU 13

(Part 1 and Part 2)

AECOM/MACTEC

Mar 10
Final Proposed Plan – OU 13
AECOM
Apr 10
Final Remedial Action Completion Report – OU 2
AECOM
Apr 10
Final Remedial Action Monitoring Report – OU 8
AECOM
Jun 10
Final 2010 LUCIP Inspection Report
AECOM
Jul 10
Final Revised FFS – OU 7

(Volume I, Volume II, Volume III)

AECOM

Sep 10
Final Results of Annual Monitoring – OUs 6, 7, and 12
AECOM
Jan 11
Final Proposed Plan – OU 7
AECOM
Jan 11
Final Technical Memorandum – Results of Oct 2010 Investigations at

PX Gas Station

AECOM

Feb 11
Final Letter Report for Soil and Groundwater Investigations at PX Gas Station
AECOM
Mar 11
Final Remedial Action Monitoring Report (Sept 09 Mar 10) – OU 8
AECOM
Aug 11
Final ESD for OU-8
AECOM
Aug 11
Final Environmental LUCIP – Revision 4
AECOM
Sep 11
Final Results of Annual Groundwater Monitoring – OUs 6, 7, and 12
AECOM
Sep 11
Final Revised FFS for OU 6

Part 1, Part 2 and Part 3

AECOM

Sep 11
Final Site Activities Report – Soil and Groundwater Investigations at

PX Gas Station

AECOM

Oct 11
Final ROD for OU 13
AECOM
Nov 11
Final Technical Memorandum – Emerging Contaminants Sampling

(PFOS and PFOA)

AECOM

Dec 11
Final Remedial Action Monitoring Report – OU 8 (Apr 2010 to Mar 2011)
AECOM
Mar 12
Final Management Action Plan
AECOM
Mar 12
Final Proposed Plan- OU6
AECOM
Apr 12
Final Results of Annual Monitoring at Operable Units 6 & 7- February 2012
AECOM
Apr 12
Final Remedial Action Monitoring Report (April 2011 to December 2011) For Operable Unit 8
AECOM
Apr 12
Final Quality Assurance Project Plan
AECOM
May 12
Record of Decision for Operable Unit 7 Fire Training Area Groundwater
AECOM
Jun 12
Technical Memorandum Groundwater Monitoring at OUs 6 and 7 – 2012
AECOM
Sept 12
Final Results of Groundwater Monitoring & Well Inspection/Repair at OU 6 & 7
AECOM
Aug 12
2012 LUCIP Inspection Report for Defense Supply Center Richmond, Virginia
AECOM
Dec 12
Technical Memorandum Off-Installation Groundwater Monitoring Results at Operable Unit 8
AECOM
Feb 13
Technical Memorandum, Groundwater Monitoring at OUs 6 and 7
AECOM
Feb 13
Final 2012 Monitoring Report for Operable Unit 8
AECOM
Feb 13
Technical Memorandum, Semi-Annual Groundwater Monitoring Results at

OU 8

AECOM

Apr 13
Technical Memorandum, Semi-Annual Groundwater Monitoring at OU 8 – April 2013
AECOM
May 13
Subsurface Vapor Intrusion Investigation, OU 6
AECOM
May 13
Final Remedial Design/Remedial Action Work Plan for OU 7
AECOM
May 13
Final Remedial Design/Remedial Action Work Plan Addendum for OU 8
AECOM
May 13
Final Remedial Design/Remedial Action Work Plan OU 13
AECOM
Jun 13
Final Management Action Plan
AECOM
Aug 13
Final Five-Year Review Report for OUs 1, 2, 3, 7, 8, 9, 10, 11, 12 &13
AECOM
Sept 13
Final Record of Decision for OU 6
AECOM
Sept 13
Final Results of Annual Monitoring for OUs 6 & 7-Feb/Mar 2013
AECOM
Oct 13
Technical Memorandum, Semi-Annual Groundwater Monitoring at OU 8 – Sept/Oct 2013
AECOM
Jan 14
Final 2013 Project Management Plan
AECOM
Jul 14
Final Technical Memorandum Work Plan, Groundwater and Surface Water Monitoring at OU 6, OU 7 and OU 8 and Soil Vapor Monitoring at OU 7
AECOM
Jul 14
Final Technical Memorandum Work Plan, Monitoring Well Installation at OU 8
AECOM
Jul 14
Final Technical Memorandum, Completion of Phase 1 of the Direct Push Groundwater Sampling and Injection Well Installation at OU 8
AECOM
Jul 14
Final Technical Memorandum, Synoptic Air/Groundwater Study Work Plan for Off-Site Residences and OU 8
AECOM
Aug 14
Final 2013 LUCIP Inspection Report
AECOM
Aug 14
Final 2013 Monitoring Report for OU 8
AECOM
Aug 14
Final OU13 Remedial Action Completion Report
AECOM
Aug 14
Final Quality Assurance Project Plan for Defense Supply Center Richmond
AECOM
Oct 14
Final Remedial Design/Remedial Action Work Plan for OU 6
AECOM
Oct 14
Final Buildings 65 & 66 Vapor Intrusion Human Health Risk Assessment
AECOM
Nov 14
Final Management Action Plan
AECOM
Nov 14
Revised Final Subsurface Vapor Intrusion Investigation for OU 8
AECOM
Nov 14
Final Technical Memorandum Work Plan, Direct-Push Investigation at OU 8
AECOM
Mar 15
Final Technical Memorandum Work Plan, Direct-Push Investigation at Bensley Elementary School, Eastern Edge of OU 8 and Warehouse 66
AECOM
May 15
Final Subslab Depressurization System Quarterly Monitoring Report for OU 8 – October 2014
AECOM
Jul 15
Final Subsurface Vapor Intrusion Investigation for the Motor Pool and Butler Buildings at the Dervishian Army Reserve Center
AECOM
Aug 15
Final Semi-Annual Groundwater Monitoring Results for OU 8 – March 2014
AECOM
Aug 15
Final Technical Memorandum Work Plan, Semi-Annual Groundwater Monitoring at OU 8
AECOM
Aug 15
Final Source Investigation and Assessment Technical Memorandum for OU 8
AECOM
Aug 15
Final Groundwater and Surface Water Monitoring Technical Memorandum Work Plan for OU 6, 7 & 8
AECOM
Aug 15
Final Revised Remedial Design/Remedial Action Work Plan for OU 6
AECOM
Oct 15
Final 2014 Land Use Control Inspection Report
AECOM
Oct 15
Final Quarterly Vapor Monitoring Technical Memorandum – September 2014
AECOM
Nov 15
Final Technical Memorandum - Synoptic Crawl Space, Soil Gas and Groundwater Study Results for Off-Site Residences Near OU 8
AECOM
Nov 15
Final Environmental Site-Wide Land Use Control Remedial Design
AECOM
Nov 15
Final 2015 Management Action Plan
AECOM
Nov 15
Final Results of Annual Monitoring at OU 6 & 7 – March 2014
AECOM
Nov 15
Final Human Health Risk Assessment for Subsurface Vapor Intrusion at Off-Installation Properties on Strathmore Road
AECOM
Nov 15
Final 2014 Groundwater Monitoring Report for OU 8
AECOM
Nov 15
Final Quarterly Vapor Monitoring Technical Memorandum for OU 7 – September 2014
AECOM
Dec 15
Final Technical Memorandum Remedial Design/Remedial Action Work Plan Addendum for OU 7
AECOM
Jan 16
Final Technical Memorandum, Building 65 Sub-Slab Depressurization System Effectiveness Study
AECOM
Feb 16
Final Subsurface Vapor Intrusion Investigation of Additional Off-Installation Properties on Strathmore Road Work Plan for OU 8
AECOM
Feb 16
Final Sub-Slab Depressurization System Quarterly Monitoring Report (Oct-Dec 2014) for OU 8, Building 65
AECOM
Feb 16
Technical Memorandum, RD/RA Work Plan Addendum, OU 6
AECOM
May 16
Sub-Slab Depressurization System Quarterly Monitoring Report (Jan-Mar 2015) for OU 8, Building 65
AECOM
May 16
Sub-Slab Depressurization System Quarterly Monitoring Report (Jul-Sep 2015) for OU 8, Building 65
AECOM
Jun 16
Technical Memorandum, Vapor Intrusion Monitoring Point Installation, OU 7, Building 72
Arcadis
Jun 16
Technical Memorandum, Fence Line Vapor Sampling, OU 8
Arcadis
Aug 16
Technical Memorandum, Direct Push Investigation (Dec 2014) for OU 8
Arcadis
Sep 16
Sub-Slab Depressurization System Quarterly Monitoring Report (Apr-Jun 2015) for OU 8, Building 65
AECOM
Nov 16
Technical memorandum, Quarterly Fence Line Monitoring (Jan 2016) for OU8
AECOM
Nov 16
Technical memorandum, Quarterly Fence Line Monitoring (Jul 2016) for OU8
AECOM
Feb 17
Land Use Control Inspection Report, 2015
AECOM
Feb 17
Land Use Control Inspection Report, 2016
AECOM
Feb 17
Land Use Control Inspection Report, 2016
AECOM
Jun 17
Technical Memorandum, Direct Push Investigation, Phase 2 (Mar 2015) for

OU 8

AECOM

Jun 17
Groundwater Monitoring Report (2015) for OU 8
AECOM

PREVIOUS STUDIES

Date Title Author

Defense Supply Center Richmond – Management Action Plan Previous Studies – Page 21

ER ELIGIBLE DSERTS SITES

Defense Supply Center Richmond – Management Action Plan ER Eligible DSERTS Sites – Page 32 Defense Supply CENTER RICHMOND – DSERTS Site 002 transitory shelter 202: ou 11

Defense Supply Center Richmond – Management Action Plan Site Descriptions – Page 45 Site Description Former Building 202, referred to as a Transitory Shelter (TS), was an open-front storage shed located along the western installation boundary). Formerly, the northern end of the shelter was used to store approximately 800 drums of DDT. In 1981, seepage from the drums was discovered. Soil from the floor was removed and backfilled with clean soil. The area was paved over, and a containment berm was constructed along the floor to contain future potential leakage. The drums were subsequently removed for off-site disposal in the early 1980s.

In 1986, soil samples were collected as part of a pesticide monitoring study. Analytical results indicated that the soil contained residues of DDT and its primary metabolites (dichlorodiphenyldichloroethane [DDD] and dichlorodiphenyldichloroethylene [DDE]). In 1992, an ESI revealed toluene, semivolatile organic compounds (SVOCs), metals, and pesticides in surface soil and sub-floor samples. As a result, the soil impacts were designated as OU 11.

Additional soil and storm drain sediment samples were collected in 1995. Soils were found to contain seven metals, DDT and its metabolites, and PCB-1254 above the USEPA Region 3 risk-based concentrations (RBCs) for residential exposure. Maximum concentrations were found in surface samples. Lead, DDD, and DDT concentrations exceeded residential soil RBCs in sediment samples, but there was not a complete receptor exposure pathway for impacted storm drain sediments. Groundwater collected in 2000 contained two metals and two volatile organic compounds (VOCs) at concentrations above the USEPA Region 3 tap water RBCs but below VDEQ groundwater quality standards. However, downgradient results were below upgradient groundwater concentrations.

An RI was submitted in 1997 and an FS in 2000. An FS Addendum was submitted in 2005 evaluating potential remedial alternatives for future industrial re-use of the site. The HHBRA was updated in 2006 for current and future on-site industrial workers and future construction workers. There was no unacceptable risk for any exposure scenario. The shed was demolished in October 2004, and the area was paved with asphaltic concrete in October 2005. The area is currently used for materials storage. A ROD for OU 11 was signed in 2007. Based on existing OU-specific data, the selected remedial alternative includes LUCs, maintenance of the existing cover system, and proper soil disposal and erosion control in case of future excavation. A vegetative cover was also recommended at OU 11. The RD and RA-C were completed in 2008, and the site has achieved RC.

Path Forward Annual LUCs and LTM of vegetative cover are ongoing and will continue at OU 11.

IRP STATUS

RRSE Rating:Low Risk
Constituents:Metals, SVOCs, pesticides
Affected Media:Soil, Storm Sewer Sediment
Completed IRP Phases:Preliminary Assessment (PA), Site Investigation (SI), RI, FS, RD, RA-C, RC
Current IRP Phase:LTM
Future Phases:LTM

Defense Supply CENTER RICHMOND – DSERTS Site 006 Building 68: OU 10

Site Description OU 10 is the former site of Building 68, a small (30foot x 30-foot) brick building surrounded by an asphalt and gravel lot. OU 10 is located in Zone 1 in the northern part of the installation. From 1954 to 1972, the area served as a pesticide storage and operations facility. Additionally, in 1972 the surrounding gravel lot was used to store electrical transformers. A spill of transformer oil containing PCBs occurred during 1980. Affected soil was excavated and removed from the site. The lot surrounding the former building is currently used for vehicle parking. Storm drains in the area discharge into the Falling Creek Tributary, just west of the installation.

Soil and storm drain sediment samples were collected during a pesticide monitoring study in 1986. A human health risk assessment (HHRA) was performed using a residential exposure scenario. Dieldrin was detected in surface soils above the USEPA Region 3 RBC for residential exposure and above background concentrations. No evidence of pesticide migration to groundwater was found.

An ESI was performed in 1992, which included collecting surface and subsurface soil samples. Toluene, 16 SVOCs, 6 pesticides, and 20 metals were detected. Arsenic, benzo(a)pyrene, and manganese concentrations resulted in unacceptable human health risk under residential exposures, and the soil impacts were designated OU 10.

An RI report was submitted in 1998. Groundwater, subsurface soil, and storm sewer sediment samples were collected during 1995.

This is the start of the file's text. The full file is on GovTribe.