18_A4_Supplemental Price Breakdown - Fillable.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- RELAY GROUND STATION - SOUTH (RGS-S) ANTENNA
- Solicitation number
- W9128F26RA012
About this file
This document is a Supplemental Price Breakdown pricing template for a Design-Build project at Shriever Space Force Base. The template provides a detailed line-item breakdown across 26 MasterFormat divisions, with spaces for unit costs, markups, and total pricing. While most line items are currently blank, the Heating, Ventilating, and Air Conditioning (Division 23) section shows a $100.00 entry. The template includes provisions for Prime Contractor markups such as General & Administrative (G&A), Field Office Overhead (FOOH), Profit, and Preparation & Performance Bond (P&PB) percentages, with a calculation requirement that the total with markups must match the total basic amount. This template appears to be associated with the Relay Ground Station South (RGS-S) Antenna project for the U.S. Army Corps of Engineers, which involves constructing facilities and infrastructure to support Space Force operations, including concrete pads, antenna foundations, radomes, utilities, generators, and associated site infrastructure.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SUPPLEMENTAL PRICE BREAKDOWN OF PRICING SCHEDULE TEMPLATE |
| TOTAL WITH MARKUPS AMOUNT TO EQUAL TOTAL BASIC AMOUNT |
| DIVISION | MASTERFORMAT DESCRIPTION | UNIT | AMOUNT |
| 01 | GENERAL REQUIREMENT (minus item 0101) | LS | $______________ |
| 0101 | 01 33 29 SUSTAINABILITY DOCUMENTATION | LS | $______________ |
| 02 | EXISTING CONDITIONS | LS | $______________ |
| 03 | CONCRETE | LS | $______________ |
| 04 | MASONRY | LS | $______________ |
| 05 | METALS | LS | $______________ |
| 06 | WOOD, PLASTICS, AND COMPOSITES | LS | $______________ |
| 07 | THERMAL AND MOISTURE PROTECTION | LS | $______________ |
| 08 | OPENINGS | LS | $______________ |
| 09 | FINISHES | LS | $______________ |
| 10 | SPECIALTIES | LS | $______________ |
| 11 | EQUIPMENT | LS | $______________ |
| 12 | FURNISHINGS | LS | $______________ |
| 13 | SPECIAL CONSTRUCTION | LS | $______________ |
| 14 | CONVEYING EQUIPMENT | LS | $______________ |
| 21 | FIRE SUPPRESSION | LS | $______________ |
| 22 | PLUMBING | LS | $______________ |
| 23 | HEATING, VENTILLATING, AND AIR CONDITIONING | LS | $100.00 |
| 25 | INTEGRATED AUTOMATION | LS | $______________ |
| 26 | ELECTRICAL | LS | $______________ |
| 27 | COMMUNICATIONS | LS | $______________ |
| 28/ | ELECTRONIC SAFETY AND SECURITY | LS | $______________ |
| 31 | EARTHWORK | LS | $______________ |
| 32 | EXTERIOR IMPROVEMENTS | LS | $______________ |
| 33 | UTILITIES | LS | $______________ |
| 34 | TRANSPORTATION | LS | $______________ |
Total Price Breakdown Amount $100.00
Prime Contractor Markups:
| --G&A | ______% | $______________ |
| --FOOH | ______% | $______________ |
| --PROFIT | ______% | $______________ |
| --P&PB | ______% | $______________ |
TOTAL WITH MARKUPS ERROR:#VALUE!
| * All items must be entered in dollars. |
| * "TOTAL WITH MARKUPS" from this Price Breakdown must match the "TOTAL BASIC AMOUNT". |
File details come from the government source that posted it. Updated .