15_A3_Specs and Drawings_Attachment.pdf
PDF 4 MB Posted
- Attached to
- RELAY GROUND STATION - SOUTH (RGS-S) ANTENNA
- Solicitation number
- W9128F26RA012
About this file
This file contains a specification section (01 81 00) for the Relay Ground Station-South (RGS-S) project at Schriever Space Force Base in Colorado, which provides comprehensive details about the project's scope, design, and construction requirements. The project is a Research, Development, Test, and Evaluation (RDT&E) funded effort to design and construct a facility capable of uplink and downlink communications with space vehicles, including Legacy SBIRS GEO, Next Generation GEO (NGG), and Next Generation Polar (NGP) space vehicles.
The facility will consist of four major components: Ground Terminal Equipment (GTE), Communications and Networking Equipment (CNE), Facilities and Infrastructure (F&I), and Command, Control, Communications, Computers, Intelligence/Information Technology (C4I/IT). Key infrastructure elements include three sets of GTE housed in environmentally-controlled radomes, CNE shelters, concrete pads, antenna pedestal foundations, site utilities, backup generators, fuel tanks, and pathways and cabling. The project has a signed $50M support agreement between USACE and Space Force, with the antenna system needing to be constructed and commissioned no later than September 2027. The base bid and bid options are structured around specific construction line items (CLINs) covering various aspects of the project's design and implementation.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Relay Ground Station -South (RGS-S) - Schriever SFB, CO SHCO00104
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 81 00
SUMMARY OF THE WORK
04/21
PART 1 GENERAL
1.1 REFERENCES
1.2 DESIGN AND CONSTRUCTION OBJECTIVES
1.3 PROJECT SCOPE
1.3.1 GTE/CNE Scope (Not in Contract, For Information Only)
1.3.2 NIWC C4I Scope (Not in Contract, For Information Only)
1.3.3 USACE RFP Scope
1.3.4 Facility Functions
1.3.5 Project Site
1.3.6 Base Bid and Bid Option
1.3.6.1 Base Bid
1.3.6.2 Bid Options
1.4 DESIGN AND CONSTRUCTION REQUIREMENTS
1.4.1 Changes to RFP Criteria Requirements
1.4.2 Codes and Criteria
1.4.3 Phasing of Work, Security, and Construction Staging
1.4.4 Sustainability
1.4.4.1 Criteria
1.4.4.2 Cybersecurity
1.4.5 Design and Construction Measurement Units
1.4.6 Personnel Qualifications and Experience
1.4.7 Design and Construction Deliverables
1.4.8 Operations and Maintenance Requirements
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 81 00 Page 1Am #0003
SECTION 01 81 00
SUMMARY OF THE WORK
04/21
PART 1 GENERAL
1.1 REFERENCES
The design publications listed below shall be used as sources of criteria for the design. Where a date is not specified, the most current edition of the code or standard in effect, including errata and addenda available at the RFP proposal submission deadline shall be used as criteria for the design. The criteria from these sources may be supplemented but not supplanted, by applicable criteria contained in nationally recognized codes and standards.
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 1-200-01 (2022; with Change 3, 2024) DoD Building Code
UFC 1-200-02 (2020; Change 2, 2022) High Performance and Sustainable Building Requirements
UFC 3-460-01 (16 Jul 2019, Chg. 3 - June 2023) Design: Petroleum Fuel Facilities
UFC 3-575-01 (2012; with Change 1, 2021) Lightning and Static Electricity Protection Systems
UFC 3-580-01 (2024) Telecommunications Interior Infrastructure Planning and Design
UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection Engineering for Facilities
UFC 4-010-06 (2023) Cybersecurity of Facility-Related Control Systems
UFC 4-021-02 (2013; with Change 1, 2019) Electronic Security Systems
DODM 5200.01 (2012; Change 3, 2020) DoD Information Security Program: Protection of Classified Information
MIL-STD-188-124B (1 Feb 92) Grounding, Bonding, and Shielding for Common Long Haul/Tactical Communication Systems Including Ground Based Communications-Electronics Facilities and Equipment
MIL-HDBK-419A (29 Dec 87) Grounding, Bonding, and Shielding for Electronic Equipments and Facilities
CSSAM TEMPEST/1-13 RED/BLACK Installation Guidance
SECTION 01 81 00 Page 2Am #0003
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2023; ERTA 7 2023; TIA 23-15) National Electrical Code
NFPA 780 (2023) Standard for the Installation of Lightning Protection Systems
American National Standards Institute (ANSI)
ANSI-C2 National Electrical Safety Code
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-568 Generic Telecommunications Cabling for Customer Premises
TIA-569 (2019e; Add 1 2022) Telecommunications Pathways and Spaces
U.S. AIR FORCE (USAF)
DAFI 31-101 Department of the Air Force Instruction 31-101, Integrated Defense (ID)
1.2 DESIGN AND CONSTRUCTION OBJECTIVES
Project has signed $50M support agreement between USACE and Space Force.
Requirements documents, including Design Document and RFP development for similar system are available. Antenna System, including support work by others, must be constructed and commissioned NLT Sept 2027.
1.3 PROJECT SCOPE
RGS-S is a Research, Development, Test, and Evaluation (RDT&E) appropriations funded project, which includes design, procurement, development, integration, and testing of advanced technology hardware and software systems capable of uplink and downlink communications with Legacy SBIRS GEO, Next Generation GEO (NGG), and Next Generation Polar (NGP) space vehicles. This RDT&E funded project will be a lights-out facility, located at Schriever Space Force Base in Colorado. Site improvements will be necessary to support system equipment.
Facilities and infrastructure will be designed, procured, installed, and commissioned by the contractor via the RDT&E funded contract.
The facilities and infrastructure will primarily consist of concrete pads, antenna pedestal foundations, site utilities, pathways and cabling, and two shelters, one for SFCOMM communications and one for SFELEC equipment.
Each shelter must be sized to accommodate the required equipment and the equipment manufacturer's required clearances. Shelter(s) are to be with a 3'x7' (minimum) door or larger (depending on the largest piece of equipment) to be placed in the shelter(s) and HVAC per 01 86 10.01 MECHANICAL REQUIREMENTS (HVAC) requirements. Walls shall be either metal or precast. Roof shall be sloped at a minimum of 1/2" per foot. Walls, floor, and roof must be identified in accordance with ASHRAE 90.1
SECTION 01 81 00 Page 3Am #0003 requirements. Shelter(s) are to be set on concrete pads, sized at least 6" larger than the shelter on all sides. Provide a concrete ramp to the finished floor elevation of the shelter(s) at a slope of not more than 1:12 to the door(s).
The facility will be comprised of four major components that are needed to provide connectivity between the space vehicles and end users. These components are:
1. Ground Terminal Equipment (GTE)
2. Communications and Networking Equipment (CNE)
3. Facilities and Infrastructure (F&I)
4. Command, Control, Communications, Computers, Intelligence/Information Technology (C4I/IT)
RGS-S will include three (3) sets of GTE housed in environmentally-controlled radomes.
CNE will provide the interface between GTE and external interfaces. CNE will primarily consist of routers, firewalls, computers, cryptos, and other associated networking equipment and will be housed in its own environmentally controlled CNE shelter. This equipment will provide communications services, cyber services, networking services, encryption, fault detection, local configuration, administrative functions, and timing.
F&I will support GTE and CNE, and C4I/IT. F&I will primarily consist of concrete pads, antenna pedestal foundations, radome ringwalls, site utilities, backup generators, fuel tanks, pathways and cabling, and SFCOMM and SFELEC shelters. RGS-S F&I must comply with [*Am-3]UFC 1-200-01 (DoD Building Code) and Appendix A - Site Preliminary Design Document (SPDD)[**Am-3].
C4I/IT will consist of communication network infrastructure from on-site entrance location, network equipment, telephony, and security and protection systems (e.g., ESS, FRCS, local transport).
1.3.1 GTE/CNE Scope (Not in Contract, For Information Only)
- Antennas
- Radomes and ECUs/blowers
- GTE shelter and ECU
- CNE shelter and ECU
- Lightning protection for radomes, GTE shelter, CNE shelter
- Smoke detectors within GTE/CNE/Antenna base
1.3.2 NIWC C4I Scope (Not in Contract, For Information Only)
- OSP from CNE shelter to Bldg 712
- OSP between Ringwalls, GTE shelter, CNE shelter, Communication shelter, Electrical shelter
- ISP within ringwalls
- ESS/ACS/IDS
- CCTV for entrances
1.3.3 USACE RFP Scope
- Ringwalls
- Antenna foundations
- Electrical shelter
- Communication shelter
SECTION 01 81 00 Page 4Am #0003
[*Am-3]UFC 1-200-01 (DoD Building Code) and Appendix A - Site Preliminary Design Document
(SPDD)[**Am-3]
- All concrete pads (GTE shelter, CNE shelter, Radome ECUs, Radome transformers)
- Antenna reflector assembly pads (may need 3 next to each radome)
- Site Electrical and water utilities
- Grounding and lightning protection, tie in for GTE/CNE/Radomes
- Fire alarm system
- Lighting system
- Backup generators/fuel (as a bid option)
- All conduit/pathways
- OSP from Communication shelter to Bldg 780
1.3.4 Facility Functions
The primary function of RGS-S is a Research, Development, Test, and Evaluation (RDT&E) site.
1.3.5 Project Site
The RGS-S site is located at Schriever SFB outside of Colorado Springs, CO. The site area was approved by the Schriever SFB Facility Board on 06 June 2023. The site is situated inside the restricted area, between the west RA fence line and building 712, south of Kepler Avenue. Access to this area would be via Kepler Road. Vicinity and location maps can be found in the drawings provided with this RFP.
1.3.6 Base Bid and Bid Option
1.3.6.1 Base Bid
The base bid includes the design and construction of the complete and usable facility as described in all sections of these specifications, appendices and drawings. [*Am-3]Per Specification Section 00 10 00 Solicitation, Contract Line Item Number (CLIN) Schedule:
a. 0001: Design to include AE services to complete CLINs 0002-0007
b. 0002: Entire work complete for Construction of the Relay Ground Station - South paving and sitework. Including but not limited to clearing, grubbing balance site, rough and final grading, surface drainage control, and paving access. [**Am-3]
1.3.6.2 Bid Options
Bid Options are summarized here. See discipline specific requirements sections and drawings for additional information.[*Am-3]Per Specification Section 00 10 00 Solicitation, Contract Line Item Number (CLIN) Schedule:
a. 0003: Entire work complete for construction of site communications and OSP communication lines. Including but not limited to Cabling, Trenching and duct back for OSP from Communication shelter to building.
b. 0004: Entire work complete for construction of electrical distribution, lighting, and control systems. Including but not limited to Electrical shelter, Site Electrical, water utilities, Trenching and duct back, grounding and lightning protection, tie in for GTE/CNE/Radomes Fire alarm system Lighting system.
c. 0005: Entire work complete for construction of Relay Ground Station -
SECTION 01 81 00 Page 5Am #0003
[*Am-3]Per Specification Section 00 10 00 Solicitation, Contract Line Item Number (CLIN) Schedule:
a. 0001: Design to include AE services to complete CLINs 0002-0007
b. 0002: Entire work complete for Construction of the Relay Ground Station - South paving and sitework. Including but not limited to clearing, grubbing balance site, rough and final grading, surface drainage control, and paving access. [**Am-3]
[*Am-3]Per Specification Section 00 10 00 Solicitation, Contract Line Item Number (CLIN) Schedule:
a. 0003: Entire work complete for construction of site communications and OSP communication lines. Including but not limited to Cabling, Trenching and duct back for OSP from Communication shelter to building.
b. 0004: Entire work complete for construction of electrical distribution, lighting, and control systems. Including but not limited to Electrical shelter, Site Electrical, water utilities, Trenching and duct back, grounding and lightning protection, tie in for GTE/CNE/Radomes Fire alarm system Lighting system.
c. 0005: Entire work complete for construction of Relay Ground Station -
South, scope not included in other CLINs. This is the Primary Construction Scope including but not limited to Ringwalls Antenna foundations, all concrete pads (GTE shelter, CNE shelter, Radome ECUs, Radome transformers, equipment, housekeeping pads act.), and Antenna reflector assembly pads.
d. 0006: Entire work complete for construction of generator and supporting systems. Including but not limited to Backup generators and all conduit/pathways.
e. 0007: Entire work complete for construction of site fueling and supporting systems. Including but not limited to Fueling systems and all conduit/pathways.[**Am-3}
1.4 DESIGN AND CONSTRUCTION REQUIREMENTS
1.4.1 Changes to RFP Criteria Requirements
This Request for Proposal provides requirements expected of the Design-Build Contractor during the design and construction of this project.
The RFP bridging documents present an overall design concept of the project; provide useful project information; establish some definition of the systems to be used; and incorporate requirements expected by the Using Service.
It shall be the responsibility of the Design-Build Contractor to assemble the best-value-priced construction systems for this project that meet or exceed the design criteria set forth herein.
Offerors should not consider changes to RFP criteria requirements during proposal preparation. After contract award, any changes to the RFP criteria requirements require approval by the Contracting Officer.
See Section 01 33 00.32 DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES for additional requirements.
1.4.2 Codes and Criteria
All pertinent building codes, life safety codes, and reference criteria shall be met or exceeded. This project utilizes the DoD Building Code, as defined by UFC 1-200-01 and its references.
If there is a conflict in requirements, order of precedence shall be as follows, in order of decreasing precedence:
a. Life Safety, as defined by DoD Building Code UFC 1-200-01 and its references
b. RFP Specifications
c. RFP Drawings
d. Non-life safety criteria, as defined by DoD Building Code UFC 1-200-01 and its references
e. Other criteria as listed herein
1.4.3 Phasing of Work, Security, and Construction Staging
See Section 01 14 00 WORK RESTRICTIONS for requirements.
The Contractor shall maintain a construction area fence throughout the
SECTION 01 81 00 Page 6Am #0003
South, scope not included in other CLINs. This is the Primary Construction Scope including but not limited to Ringwalls Antenna foundations, all concrete pads (GTE shelter, CNE shelter, Radome ECUs, Radome transformers, equipment, housekeeping pads act.), and Antenna reflector assembly pads.
d. 0006: Entire work complete for construction of generator and supporting systems. Including but not limited to Backup generators and all conduit/pathways.
e. 0007: Entire work complete for construction of site fueling and supporting systems. Including but not limited to Fueling systems and all conduit/pathways.[**Am-3} duration of the contract. See Section 01 89 00 SITE WORK REQUIREMENTS for additional information.
See drawings for construction staging areas.
1.4.4 Sustainability
1.4.4.1 Criteria
Per UFC 1-200-02 High Performance Sustainable Building principles, sustainability is not required for this project since these shelters are unoccupied and not meant to be habitable.
1.4.4.2 Cybersecurity
All facility related control systems shall be planned, designed, acquired, executed, and maintained in accordance with UFC 4-010-06, and as required by each individual DoD Service's implementation policy. Systems requiring cybersecurity include, but are not limited to, the following:
a. Fire Alarm/Mass Notification Reporting System(s)
b. Building Automation, DDC, and EMCS System(s)
c. Building Lighting System(s) (if networked)
d. Building Electronic Security System(s)
e. Any other building system or component installed which may be networked or is provided with Ethernet, USB, or other ports or analog or digital connections to or through which connections to another electronic device may occur.
See Sections 01 86 10.02 MECHANICAL REQUIREMENTS, 01 86 26 ELECTRICAL REQUIREMENTS, 01 86 29 COMMUNICATIONS REQUIREMENTS and UFC 4-010-06 for additional requirements.
1.4.5 Design and Construction Measurement Units
Design, products, and construction for the project shall be accomplished using English units of measurement. All measurement in the technical specifications sections shall be shown in English.
1.4.6 Personnel Qualifications and Experience
Design and construction personnel qualifications and experience shall be per the requirements of Section 01 33 00.32 DESIGN AND CONSTRUCTION
DELIVERABLES/PROCEDURES.
1.4.7 Design and Construction Deliverables
See Section 01 33 00.32, DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES.
1.4.8 Operations and Maintenance Requirements
See Section 01 78 23 OPERATION AND MAINTENANCE DATA for requirements.
PART 2 PRODUCTS
NOT USED
SECTION 01 81 00 Page 7Am #0003
PART 3 EXECUTION
NOT USED
-- End of Section --
SECTION 01 81 00 Page 8Am #0003
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 86 10.01
MECHANICAL REQUIREMENTS (HVAC)
03/24
PART 1 GENERAL
1.1 MECHANICAL SYSTEM CRITERIA
1.1.1 General Parameters/References
1.2 FACILITY DESCRIPTION
1.3 MECHANICAL SCOPE OF WORK
1.3.1 Mechanical General Requirements
1.3.2 Mechanical/Electrical Equipment Coordination
1.3.3 Submittal Requirements
1.3.4 Sustainable Design
1.3.5 Description of Work
1.3.5.1 Room Descriptions
1.3.5.1.1 Shelters
1.4 MECHANICAL SYSTEMS
1.4.1 Environmental Control Units
1.5 DESIGN CONDITIONS
1.5.1 Site Elevation
1.5.2 Latitude
1.5.3 Longitude
1.5.4 Outside Design Conditions
1.5.5 Inside Design Conditions
1.5.6 Minimum Ventilation Requirements
1.5.7 Cooling Load
1.5.8 Building Heating Load
1.5.9 Noise Levels
1.5.10 Structural
1.5.11 Operation
1.5.12 Mechanical/Electrical Equipment Coordination
1.5.13 Utility Interruption
1.5.14 Spare Parts List
1.6 EQUIPMENT IDENTIFICATION AND ABBREVIATIONS
1.6.1 Abbreviations
1.7 SEISMIC PROTECTION FOR MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT
1.7.1 Piping
1.7.2 Ductwork
1.7.3 Miscellaneous Equipment
1.8 THERMAL INSULATION OF MECHANICAL SYSTEMS
1.8.1 Insulation Covers
1.9 AIR SUPPLY AND DISTRIBUTION SYSTEM REQUIREMENTS
1.9.1 Equipment Capacities
1.9.2 Outdoor Air Ventilation Rates
1.9.3 Noise Criteria
1.10 VENTILATION AND EXHAUST SYSTEMS
1.10.1 Intake, Relief and Exhaust Requirements
1.10.2 Exhaust Fans
1.11 CYBERSECURITY
SECTION 01 86 10.01 Page 1Am #0003
1.12 BUILDING TEMPERATURE CONTROL SYSTEM
1.12.1 General DDC Requirements
1.12.2 Alarm Monitoring
1.12.3 Stand-Alone Operation
1.12.4 Input / Output Devices
1.12.5 Control Wiring
1.12.6 Control Valves and Actuators
1.12.7 Control Dampers and Actuators
1.12.8 Control Schematic
1.12.9 Sequence of Control
1.12.10 Description of Components
1.12.11 Legends and Schedules
1.12.12 System Checklists and Startup Instructions
1.13 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC SYSTEMS
1.13.1 Balancing Firm Qualifications
1.13.2 Balancing, Commissioning and Integration
1.14 COMMISSIONING OF HVAC SYSTEMS
1.14.1 General
1.14.2 Commissioning Firm Qualifications
1.14.3 Checklists
1.14.4 Pre-commissioning Checks
1.14.5 Functional Performance Tests
1.15 OPERATION AND MAINTENANCE REQUIREMENTS
1.15.1 Facility Operation and Maintenance Manuals
1.15.2 Operation and Maintenance Training Course and Manuals
1.16 TECHNICAL SPECIFICATIONS
1.17 BALANCE OF EQUIPMENT AND MATERIALS
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
2.2 MECHANICAL SYSTEM PRODUCTS
2.2.1 General Mechanical Requirements
2.2.2 Vibration Isolation / Equipment Pads
2.2.3 Mechanical Equipment Requirements
2.2.3.1 Equipment Identification
2.2.3.2 Environmental Control Unit
2.2.3.3 Spare Parts
2.2.4 AIR SUPPLY AND DISTRIBUTION SYSTEM
2.2.4.1 Ductwork
2.2.4.2 Grilles, Registers and Diffusers
2.2.4.2.1 Ceiling Mounted Supply Diffusers
2.2.4.2.2 Ceiling Mounted Return and Transfer Grilles
2.2.4.2.3 Ceiling Mounted Exhaust Grilles
2.2.5 VENTILATION AND EXHAUST SYSTEMS
2.2.5.1 Exhaust Fans
2.2.5.2 Exhaust Fans for Exhaust cooling
2.3 PLUMBING SYSTEM PRODUCTS
2.3.1 Domestic Water Meters
PART 3 EXECUTION
SECTION 01 86 10.01 Page 2Am #0003
SECTION 01 86 10.01
MECHANICAL REQUIREMENTS (HVAC)
03/24
PART 1 GENERAL
1.1 MECHANICAL SYSTEM CRITERIA
1.1.1 General Parameters/References
The publications listed below form a part of this section to the extent referenced. The publications are referred to in the text by basic designation only. The design shall be fully coordinated with all other requirements stated in this document. The latest edition of the following standards and codes in effect and amended as of the date of the supplier's proposal, and any subsections thereof as applicable, shall govern design and selection of equipment and material supplied:
ASSOCIATED AIR BALANCE COUNCIL (AABC)
AABC MN-1 (2002; 6th ed) National Standards for Total System Balance
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A13.1 (2015) Scheme for the Identification of Piping Systems
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE Handbooks (2017-2020)
ASHRAE 15 (2019) ANSI/ASHRAE Standard 15-Safety Standard for Refrigeration Systems and ANSI/ASHRAE Standard 34-Designation and Safety Classification of Refrigerants
ASHRAE 90.1 - IP (2019) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 189.1 (2014) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings
ASHRAE 55 (2023) Thermal Environmental Conditions for Human Occupancy
ASHRAE 62.1 (2022) Ventilation for Acceptable Indoor Air Quality
ASHRAE 90.1 (2019) Energy Standard for Buildings Except Low-Rise Residential Buildings
SECTION 01 86 10.01 Page 3Am #0003
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME CSD-1 (2021) Control and Safety Devices for Automatically Fired Boilers
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM D1785 (2021) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2024) International Building Code
ICC IMC (2024) International Mechanical Code
ICC IPC (2024) International Plumbing Code
ICC IEC (2021) International Energy Code
ICC IGC (2021) International Gas Code
NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)
NEBB-01 (2009) Procedural Standards for Whole Building Systems Commissioning of New Construction; 3rd Edition
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 54 (2024) National Fuel Gas Code
NFPA 70 (2023; ERTA 7 2023; TIA 23-15) National Electrical Code
NFPA 72 (2022; ERTA 22-1) National Fire Alarm and Signaling Code
NFPA 90A (2024) Standard for the Installation of Air Conditioning and Ventilating Systems
NFPA 91 (2020) Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists and Noncombustible Particulate Solids
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA Guidelines (2008) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition
SMACNA 1966 (2020) HVAC Duct Construction Standards Metal and Flexible, 4th Edition
SECTION 01 86 10.01 Page 4Am #0003
U.S. ARMY CORPS OF ENGINEERS (USACE)
ODDG (2019) Omaha District Design Guide for Design Solicitations
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 1-200-01 (2022; with Change 3, 2024) DoD Building Code
UFC 1-200-02 (2020; Change 2, 2022) High Performance and Sustainable Building Requirements
UFC 3-301-01 (2023; with Change 3, 2025) Structural Engineering
UFC 3-400-02 (2018) Design: Engineering Weather Data
UFC 3-401-01 (2013; Change 1, OCT 2015) Mechanical Engineering
UFC 3-410-01 (2013; Change 9, 09 JAN 2024) Heating, Ventilating, and Air Conditioning Systems
UFC 3-410-02 (2018; with Change 2, 2021) Direct Digital Control for HVAC and Other Building Control Systems
UFC 3-420-01 (2021) Plumbing Systems
UFC 3-430-01FA (2003) Heating and Cooling Distribution Systems
UFC 3-430-07 (2003; Change 5, 07 MAY 2019) Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels
UFC 3-450-01 (2022) Noise and Vibration Control
UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection Engineering for Facilities
UFC 4-010-01 (2018; with Change 3, 2024) DoD Minimum Antiterrorism Standards for Buildings
UFC 4-010-06 (2023) Cybersecurity of Facility-Related Control Systems
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
EO 13834 (17 May 2018) Efficient Federal Operations
PL 109-58 Energy Policy Act of 2005 (EPAct05)
PL 110-140 Energy Independence and Security Act of
SECTION 01 86 10.01 Page 5Am #0003
1.2 FACILITY DESCRIPTION
See Section 01 81 00 for a description of the facility and overall scope of work.
1.3 MECHANICAL SCOPE OF WORK
1.3.1 Mechanical General Requirements
The mechanical engineering design and construction of the following shall be included, as a minimum:
Heating, Ventilation, Exhaust Systems, and Air Conditioning Systems
[*Am-3]<text deleted>[**Am-3]
Building Direct Digital Control System for plumbing and Heating, Ventilation and Air Conditioning (HVAC) systems and equipment
Operation and Maintenance Requirements
Testing, Balancing and Commissioning
All systems description and performance requirements in this specification indicate the minimum requirements. Calculations shall be performed to determine equipment capacities and sizing.
The contractor shall perform heating, ventilation and air conditioning calculations to determine the HVAC loads for the building. [*Am-2]<text deleted>[**Am-2] HVAC loads for Communications Room shall be coordinated with end-user. Computer load calculations shall be provided and shall include complete input and output summaries, room load calculations, block load calculations and calculations for each system / air handling unit.
Pre-approved computer load analysis programs are Hourly Analysis Program (HAP) by Carrier Corp., Trace 700 by Trane Corp., Trace 3D Plus by Trane Corp., DOE-2 by US Department of Energy and EnergyPlus by DoD/DoE. If the designer wishes to use a different load analysis program, this shall be specifically listed in the proposal and requires approval by the Contracting Officer's Representative. Room air flow requirements shall be computed based on the individual room loads.
Design drawings and specifications shall be developed as required to meet the mechanical scope of work. This shall include locations of air handling units, boilers, pumps, chillers, fan coil units, ductwork, diffusers, grilles, supply fans, exhaust fans, air intakes and exhausts, temperature sensors, heating and chilled water piping and condensate drain lines, as a minimum.
Equipment selections shall be made for all major pieces of equipment, including but not limited to, boilers, chillers, pumps, fan coil units, air handling units, supply fans, exhaust fans, air intake louvers or hoods, air exhaust louvers or hoods. Catalog data shall be provided as part of the design analysis to demonstrate that the selected equipment will meet the applicable operational and physical space requirements.
Provide mechanical systems, complete and ready for operation. The design and construction of all mechanical systems, including manufacturer's products, shall meet the instructions and requirements contained herein and the requirements of the referenced technical guide specifications.
SECTION 01 86 10.01 Page 6Am #0003
[*Am-3]<text deleted>[**Am-3]
Where conflicts between these instructions and the guide specifications or above mentioned criteria exist, the most stringent shall take precedence.
Any installation requirements within these instructions, but not contained in the specifications, shall be added to the specification or shown on the drawings.
The design shall be economical, maintainable, energy efficient and shall take into account the functional requirements and planned life of the facility. Ease of access to components and systems in accordance with industry standards and safe working practices is a design requirement.
Calculations shall be provided for all new mechanical equipment such as piping, pumps, fans, ducts, unit heaters, domestic water heaters, and cooling units regardless of end use. Heating and cooling calculations for the building must be performed by computer analysis i.e., Elite Software Inc., Trane Trace Load 700, Trane Trace 3D Plus, Carrier E20-II Hourly Analysis Program (HAP) etc. Documentation shall include complete input and output summaries.
The Contractor shall assume full responsibility of all final calculations, equipment designs, equipment selections, equipment layouts, and to provide fully operational systems, regardless of whether calculations, equipment designs, equipment selections or equipment layouts where provided as part of the request for proposal.
1.3.2 Mechanical/Electrical Equipment Coordination
Arrangement of all mechanical equipment and piping shall be coordinated with electrical work to prevent interference with electrical conduits.
This shall include placement of mechanical equipment and electrical conduits in manner that the conduits do not restrict access to the mechanical equipment for maintenance, repair or replacement. Clearances required by NFPA 70 above and in front of electrical panels and devices shall be maintained. Mechanical equipment (pipes, ducts, etc.) shall not be installed OVER OR WITHIN SPACE which is dedicated to transformers, panelboards, or other electrical equipment unless items solely serve the area. When electrical equipment is located in a mechanical equipment space, the dedicated electrical space shall be indicated by a dashed line and noted "Electrical Equipment Space".
1.3.3 Submittal Requirements
Drawings, specifications, design analysis and calculations shall be provided as required for the 60 percent design and the Final design submittals, and shall be in accordance with Section 01 33 00.36 60 PERCENT DESIGN REQUIREMENTS, and Section 01 33 00.38 100 PERCENT DESIGN
REQUIREMENTS.
1.3.4 Sustainable Design
The design of the facility shall incorporate and promote sustainable design principles for the built environment, as outlined in UFC 1-200-02
HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS.
1.3.5 Description of Work
Design shall consist of heating, ventilating, air-conditioning (HVAC) load calculations, and equipment sizing and layout to meet project requirements.
SECTION 01 86 10.01 Page 7Am #0003
1.3.5.1 Room Descriptions
1.3.5.1.1 Shelters
The shelters shall have an independent packaged heat pump unit with electric backup heat. The outdoor unit for the system shall be located outside on the pad for the shelter. HVAC systems are required to meet [*Am-3]Resilience Level 2 as defined in Appendix E.[**Am-3]
1.4 MECHANICAL SYSTEMS
The following provides direction for the mechanical systems and shall be applied to equipment provided.
1.4.1 Environmental Control Units
Building heating and cooling shall be accomplished using a heat pump type packaged unit. Locate unit outside.
1.5 DESIGN CONDITIONS
The following conditions shall be taken into consideration for the design.
Location and weather related design information is provided by UFC 3-400-02, Design: Engineering Weather Data and shall be used in designing the mechanical systems.
1.5.1 Site Elevation
Equipment design elevation is 6187 feet above sea level.
1.5.2 Latitude
38.81º North
1.5.3 Longitude
104.7º West
1.5.4 Outside Design Conditions
Summer Conditions: 90ºF dry bulb - 1%; 59ºF MCWB - 1%
Mean Daily Range: 25ºF dry bulb
Winter Conditions: 2ºF dry bulb - 99.6%; 1ºF MCWB - 99.6%
Cooling Degree Days: 2967; Note: CDD50
Heating Degree Days: 6265; Note: HDD65
1.5.5 Inside Design Conditions
Occupied Areas: 68 F DB - (Heating); 78 F DB - (Cooling); 60% RH Max
Comm Room: 72 deg F - Year Around
Mechanical Room: 55 deg F dry bulb - (Heating); 10 deg F above Ambient (Mechanical Ventilation for Cooling)
SECTION 01 86 10.01 Page 8Am #0003
[*Am-3]Resilience Level 2 as defined in Appendix E.[**Am-3]
1.5.6 Minimum Ventilation Requirements
All normally occupied spaces shall be mechanically ventilated in accordance with ASHRAE 62.1
1.5.7 Cooling Load
Per load calculations. Coordinate with Electrical Designer.
1.5.8 Building Heating Load
Per load calculations.
1.5.9 Noise Levels
Noise levels shall remain within acceptable criteria as defined by
UFC 3-450-01.
1.5.10 Structural
Attach interior ceiling mounted fixtures to the supporting structural system (i.e., use seismic detailing from UFC 1-200-01) in structures. This includes mechanical equipment, ducting, and piping.
Equipment and piping requiring structural support shall be located in such a way as to minimize support steel costs while providing adequate maintenance access.
1.5.11 Operation
The system shall be designed to operate automatically year round, twenty four (24) hours per day, seven (7) days per week. Equipment and systems shall be designed for remote operation.
1.5.12 Mechanical/Electrical Equipment Coordination
Arrangement of all mechanical equipment ductwork and piping shall be coordinated with electrical work to prevent interference with electrical conduits. Electrical conduits and mechanical piping and ductwork shall not restrict access to the mechanical equipment for maintenance or repair.
Clearances required by NFPA 70 above, in front of, and to the sides of electrical panels and devices shall be maintained. Mechanical equipment (pipes, ducts, etc.) shall not be installed OVER OR WITHIN SPACE which is dedicated to transformers, panels, panelboards, or other electrical equipment unless items solely serve the area and the installation meets all applicable codes. When electrical equipment is located in a mechanical equipment space, the dedicated electrical space shall be indicated by a dashed line and noted "Electrical Equipment Space".
1.5.13 Utility Interruption
Certain limitations on utility interruptions apply. Unauthorized utility interruptions will not be permitted. Any work that requires a utility interruption shall be scheduled in advance. Outages are subject to postponement or cancellation by site authorities without prior notification. Coordination requirements of utility interruptions shall be in accordance with Section 01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS. All utility interruptions shall be identified with notes on the project drawings.
SECTION 01 86 10.01 Page 9Am #0003
1.5.14 Spare Parts List
Proprietary spare parts lists that require more than a 60 day lead time, and/or any special service tools shall be provided to the Government prior to acceptance of the system.
1.6 EQUIPMENT IDENTIFICATION AND ABBREVIATIONS
This section contains requirements for the identification and abbreviation of mechanical equipment.
1.6.1 Abbreviations
The following list of abbreviations shall be used to describe the mechanical equipment types:
Air-Cooled Condensing Unit CU
Air Filter AF
Air Handling Unit AHU
Air Separator AS
Airflow Measuring Station AFS
Building Automation System BAS
Boiler BLR
Cabinet Unit Heater CUH
Environmental Control Unit ECU
Exhaust Fan EF
Expansion Tank ET
Control Valve CV
Diffuser D
Domestic Hot Water DHW
Gov't Furnished Contractor Installed GFCI
Gov't Furnished Gov't Installed GFGI
Grille G
Heating Coil HC
Heating Hot Water HW
Intake Hood IH
Local Control Panel LCP
Louver L
Motor Operated Damper MOD
Heating Water Pump HWP
Boiler Pump BP
SECTION 01 86 10.01 Page 10Am #0003
Register R
Supply Fan SF
Unit Heater UH
Utility Monitoring and Control System UMCS
The proposal shall indicate any abbreviations to be used for mechanical equipment not listed.
1.7 SEISMIC PROTECTION FOR MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT
Structural bracing and mounting of mechanical piping, ductwork, and equipment shall be designed in accordance with UFC 1-200-01 and the ODDG.
1.7.1 Piping
Piping within the facility, except fire protection piping, is required to have seismic restraints complying with UFC 1-200-01 and UFC 3-301-01.
1.7.2 Ductwork
Ductwork within the facility is required to have seismic restraints complying with UFC 1-200-01.
1.7.3 Miscellaneous Equipment
Miscellaneous items which consist of a number of individual components built into an assembly by the manufacturers may require additional internal reinforcements to meet the requirements of UFC 1-200-01 and
UFC 3-301-01.
1.8 THERMAL INSULATION OF MECHANICAL SYSTEMS
Insulation of hydronic water piping systems and equipment, refrigeration lines and equipment, and the insulation of the duct systems shall meet the more stringent of ASHRAE 189.1, UFGS 23 07 00, and the ODDG.
Refrigeration and hydronic water piping shall be required to follow tabulated thicknesses. All supply air ductwork shall be insulated.
Return air ductwork shall be insulated as needed to prevent condensation formation or heat transfer if ductwork runs through an area with air temperature more than 15 degrees Fahrenheit different from the return air temperature. Provide calculations to prove, if insulation is not provided for ducts, the space will be properly cooled and condensation will not form on ductwork. Relief / exhaust air ductwork within 10 feet of a building penetration shall be insulated. Insulation Tables in UFGS 23 07 00 shall be retained and shall not be replaced with insulation schedules on the drawings.
1.8.1 Insulation Covers
Provide removable and reusable insulation covers at all check valves, control valves, strainers, filters, or any other piping component requiring access for routine maintenance. Exposed exterior insulation shall be covered by an embossed aluminum metal jacket. All piping with
SECTION 01 86 10.01 Page 11Am #0003 metal jacket shall be identified on the drawings.
1.9 AIR SUPPLY AND DISTRIBUTION SYSTEM REQUIREMENTS
The design of all system shall comply with the recommendations of the American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) Handbooks, to the requirements of NFPA Standard 90A and the requirements of UFGS Section 23 30 00 HVAC AIR DISTRIBUTION.
1.9.1 Equipment Capacities
Equipment capacities and flow rates shall be corrected for altitude in the Contractors calculations and shall be shown as such on the Contractors drawings.
1.9.2 Outdoor Air Ventilation Rates
Minimum outdoor air ventilation rates shall be provided for occupants and spaces by mechanical ventilation system as required by ASHRAE 62.1
1.9.3 Noise Criteria
Noise criteria shall be in accordance with the following and ASHRAE HVAC APPLICATIONS, and UFC 3-450-01, unless otherwise indicated:
1. Office 25 NC (max)
2. Restrooms 35 NC (max)
1.10 VENTILATION AND EXHAUST SYSTEMS
The design of all systems shall comply with the ASHRAE Handbooks, ASHRAE Standard 62.1, NFPA 90A, and NFPA 91, and shall meet the requirements of the ODDG. Ventilation cooling shall only be utilized if interior temperature exceeds exterior temperature except in instances when continuous exhaust/ventilation is required by code.
1.10.1 Intake, Relief and Exhaust Requirements
Outside air intakes shall be located in areas where potential for air contamination is lowest, and shall be located at least 10 feet above the adjacent finished grade. Motorized insulated low-leakage dampers with blade and jamb seals shall be provided at all outside air intake and exhausts unless otherwise prohibited by code. The maximum leakage rate permitted for outside air intakes shall be based upon UFC 3-410-01 and UFC 4-010-01. Louvers shall be of the storm/drainable type and shall be AMCA certified. Louvers shall be selected based on the following criteria: maximum free area face velocity of 800 feet/min; maximum pressure drop of 0.1 in W.C.; and a water penetration of less than 0.01 oz/square foot.
1.10.2 Exhaust Fans
Care shall be taken to ensure that the noise level generated by exhaust fans is not transmitted to the interior of the building. Sone value of fans measured five feet from fan inlet shall be less than 20 sones. Sound transmission data shall be submitted for approval and design shall indicate noise criteria on schedules. Exhaust fans shall be commercial duty with the exception that small toilet rooms may be ventilated with ceiling mounted exhaust fans.
SECTION 01 86 10.01 Page 12Am #0003
1.11 CYBERSECURITY
The design and construction shall comply with applicable requirements of UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
1.12 BUILDING TEMPERATURE CONTROL SYSTEM
The temperature controls (HVAC controls) system for the facility shall be direct digital controls (DDC) and shall be tied into and fully integrated with the existing Installation wide utility monitoring and control system.
Access to the building HVAC control system by the Installation UMCS operator shall be seamless via the UMCS operator work station. The design of the control systems for the HVAC equipment shall be in accordance with UFC 3-410-02 and UFC 4-010-01. Installation shall be in accordance with Specification Section 23 09 93 DIRECT DIGITAL CONTROL FOR HVAC & OTHER
LOCAL BUILDING SYSTEMS.
System integration shall include developing interfaces for each piece of equipment and provide a graphical representation of the equipment and control menu screen. Historical data for equipment, buildings, and systems shall be stored for use in determining system maintenance and equipment operation. System integration shall include developing algorithms, analog, and discrete logic to fully automate the starting and stopping of all system equipment. The logic shall also provide for manual operator override, set point adjustments, and control loop adjustments.
The control system shall be designed to provide continuous and automatic control of all HVAC equipment indicated in this specification section.
Programmable controllers and equipment provided with packaged control systems, such as chillers and computer room air conditioning units, shall interface with the control system using the new building control system network. The equipment control systems shall allow monitoring and control of equipment from the building HVAC control system or the Installation wide UMCS.
The temperature control panels shall be located in the mechanical room.
The number of control panels shall be dictated by the number of and types of equipment in the final design. The control system shall allow the UMCS operator to easily adjust setpoint, operating times and other system parameters, if and when necessary, once the building control system has been integrated into the UMCS. Provide a temperature sensor for the mechanical room that is connected to the building automation control system. The sensor shall send an alarm when the temperature drops below 40 degrees Fahrenheit or exceeds 90 degrees Fahrenheit. The alarm shall be programmed to send an alarm to the installation wide UMCS system.
1.12.1 General DDC Requirements
All mechanical systems and equipment, shall be controlled by local direct digital control (DDC) equipment located in the facility's Mechanical room or at the equipment. The DDC system shall be capable of operating in a stand-alone fashion. To facilitate maintenance and to allow manual starting and stopping of equipment by maintenance personnel, a hard-wired Hand-Off-Automatic control switch shall be provided for each air handling unit, pump, and exhaust fan.
a. Temperature Control Contractor Experience - The temperature control Contractor shall have a minimum of 5 years of experience installing DDC systems. The Contractor shall provide for approval the names and
SECTION 01 86 10.01 Page 13Am #0003 qualification of supervisory personnel (i.e. Project Manager and/or Superintendent) that will be used on this project. The Contractor shall also provide a list of references to be contacted from recent projects on which the proposed personnel performed similar duties. Approval shall be based on previous experience with the DDC system to be installed, qualifications and demonstrated ability of proposed personnel to manage resources in an efficient and effective manner. Experience and supervisory personnel qualifications must be submitted and approved before submittal of any technical data.
b. Emergency Service During Warranty - The Government will initiate service calls when the installed DDC/UMCS is not functioning properly.
Qualified personnel shall be available to provide service to the complete DDC/UMCS installed under this project. Qualified personnel shall be defined as a factory trained journeyman in the brand of control system provided, this level of training shall be considered a minimum. The Government shall be furnished with a telephone number where the service supervisor can be reached at all times. Service personnel shall be at the site within 3 hours after receiving a request for service. The control system shall be restored to proper operating condition within 3 calendar days after receiving a request for service.
c. Software - The Contractor shall provide all software updates and verify operation in the system. These updates shall be accomplished in a timely manner, fully coordinated with base operators, and shall be incorporated into the operations and maintenance manuals, and software documentation provided as submittals for review by the Government. There shall be at least one scheduled update near the end of the first years warranty period, at which time the Contractor shall install and validate the latest released version of the Contractor's software. All software shall be licensed for use by the installation.
d. Fuses shall not be used for surge protection. Provide transient voltage surge suppression (TVSS).
e. System descriptions and analyses submittal shall indicate how the new system will interface with the existing UMCS.
1.12.2 Alarm Monitoring
Alarm monitoring shall be provided for all major pieces of equipment.
Indication of failure shall alarm at the UMCS Operators work station. The maximum allowable time for the UMCS to display an alarm condition is 10 seconds starting from the time the alarm condition first exists. The maximum allowable time for equipment to respond to manual UMCS commands is 10 seconds starting from the time the command is initiated at the work station. Alarm monitoring shall include, but not limited to the following alarm indications:
a. Loss of Flow
b. High and low temperature
c. Equipment General Alarm
d. Start/stop actual status different from commanded state
SECTION 01 86 10.01 Page 14Am #0003
1.12.3 Stand-Alone Operation
The control system / equipment installed as part of this contract shall be fully capable of stand-alone operation on a continuous basis. All programs, including those based upon real-time clock or calendar events, shall reside in the local DDC equipment.
1.12.4 Input / Output Devices
The control system shall utilize off-the-shelf input and output instruments (e.g., RTD sensors, space temperature sensors, actuators) which are commercially available from third party vendors who may be independent from the DDC system manufacturers. All sensing devices shall be capable of removal from the system without disruption of service to the system in which they are installed.
1.12.5 Control Wiring
Cable and wire for the DDC system shall be separate from the distribution system serving any other system. All cable and wiring shall be installed in conduit. The control wiring shall be provided by the Contractor.
Control wiring shall be as specified and extended on the Contractor's drawings in accordance with UFGS 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC and UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems.
1.12.6 Control Valves and Actuators
Sizing of control valves shall take into account upstream and downstream fittings and shall be in accordance with Instrument Society of America standard ISA S75.Ol-1985. All valves shall be provided with 0-10 vdc operated valve actuators.
1.12.7 Control Dampers and Actuators
New air handling units and exhaust fans shall be provided with low leakage dampers and 4-20 mA operated electronic damper actuators. Low leakage dampers shall have a maximum leakage rate of 3 cfm/sf with a differential pressure of one inch of water gage across the damper. Damper position feedback is required.
HVAC Control Drawings
The HVAC control contractor's drawings, for both the 60 percent and Final submittals, shall be in accordance with SECTION 01 33 00.36 - 60 PERCENT
DESIGN REQUIREMENTS, & SECTION 01 33 00.38 - 100 PERCENT DESIGN
REQUIREMENTS. Control contractor's drawings for the building shall include a system schematic section, a detailed sequence of control, a list of required components with a brief description of each component, legend and schedules, a listing of input and output points and a matrix showing the point type, alarms and applications programs associated with each of the input or output points. EMCS details and points to be monitored shall be detailed on the drawings and follow the conventions as set forth in UFC 3-410-02. Point schedule format shall follow the format available through WBDG. System I/O summaries shall be detailed.
1.12.8 Control Schematic
The control schematic shall be a schematic representation of the HVAC
SECTION 01 86 10.01 Page 15Am #0003 system and the associated control equipment. The control schematic shall be drawn to a large scale to allow for ample space to indicate any necessary performance parameters such as setpoint, etc. Each component shall be identified by a unique alpha-numeric designator such as Sl for sensor number 1. This provides a means of cross referencing to the description of components and the sequence of control. All major control items relative to the system shall be shown. This may include, but shall not be limited to:
Air Handlers Fan coil units Boilers Cooling Coils Heating Coils Freezestats w/manual reset Smoke Detectors w/connection to the FACP Temperature Sensors Valves and Valve Actuators Dampers and Damper Actuators
1.12.9 Sequence of Control
The sequence of control is a written statement of the operation of the system. It should be as detailed and complete as possible and it should refer to individual components by their alpha-numeric designator whenever possible. The sequence shall break the overall system into sub-systems, such as supply fan control, mixed air control, heating control, cooling control, etc., and shall describe the operation of each of the subsystems.
The sequence of control shall also describe the operation of all safety devices such as smoke detectors or freezestats, fire alarm interlock and shall describe the operation of the system in both the occupied, warm-up and unoccupied modes.
1.12.10 Description of Components
The description of components shall provide a generic description of the performance of each component. The components shall be referred to by their alpha-numeric designator.
1.12.11 Legends and Schedules
The legend shall provide a definition of all symbols used in the control drawings. Schedules shall provide all necessary information to clarify the operation of the components or the overall system.
1.12.12 System Checklists and Startup Instructions
The designer shall develop Pre-commissioning Test Checklists, Functional Performance Test Checklists, and Startup Instructions for each system and item of equipment controlled by the temperature control system and shall include them in the temperature controls Specification.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .