This document is a Bid Inquiry Contracting Officers Report containing 66 closed inquiries related to a Relay Ground Station (RGS) project. The inquiries cover various technical, logistical, and procedural aspects of the solicitation, with contractors seeking clarification on site access, design requirements, electrical and mechanical specifications, and contract submission details.
Key topics addressed include site visit procedures (meeting at the Visitor Control Center for badging), telecommunications infrastructure, transformer and power distribution specifications, geotechnical survey requirements, and clarifications on document naming conventions and submission guidelines. Multiple responses were provided by government representatives from the Military Branch, Electrical, and NWO Omaha District, with many inquiries ultimately directing bidders to refer to specific sections of the Site Preliminary Design Document (SPDD) or upcoming amendments for additional details. The document is marked as Controlled Unclassified Information (CUI) and contains procurement-sensitive information related to the solicitation process.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information (CUI) Only
Bid Inquiry Contracting Officers Report Closed Inquiries
Project: Relay Ground Station Review: Bidder Inquiry (00002) (sorted by CommentID ) Displaying 66 inquiries.
Id Discipline Sheet Detail Spec 11570318 General Page 15 of 60 of the Solicitation Comment Classification: UNCLASSIFIED (U)
Will we drive our personal vehicles to the North Portal parking lot?
By: Dave Ashworth; Tribal One; (337-718-8996). On: Oct 16 2025. Forward request by email.
1-0 Evaluation For Information Only. All site visit attendees will meet POC at the Visitor Control Center (VCC) for badging/access. Once all participants have access, Contractors will drive POVs to the North Portal Parking Lot for RA access. By: Jonathan Foster; Electrical; (5015391458) On: Oct 20 2025 1-1 Government Response. All site visit attendees will meet POC at the Visitor Control Center (VCC) for badging/access. Once all participants have access, Contractors will drive POVs to the North Portal Parking Lot for RA access. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 23 2025 1-2 Government Response. This new text supercedes ALL previous replies.
All site visit attendees will meet POC at the Visitor Control Center (VCC) for badging/access. Once all participants have access, Contractors will drive POVs to the North Portal Parking Lot for RA access. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025
1-3 Government Response. This new text supercedes ALL previous replies.
All site visit attendees will meet POC at the Visitor Control Center (VCC) for badging/access. Once all participants have access, Contractors will drive POVs to the North Portal Parking Lot for RA access. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025
1-4 Government Response. This new text supercedes ALL previous replies.
All site visit attendees will meet POC at the Visitor Control Center (VCC) for badging/access. Once all participants have access, Contractors will drive POVs to the North Portal Parking Lot for RA access. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025
1-5 Government Response. This new text supercedes ALL previous replies.
All site visit attendees will meet POC at the Visitor Control Center (VCC) for badging/access. Once all participants have access, Contractors will drive POVs to the North Portal Parking Lot for RA access. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11570320 General Page 15 or 60 of the Solicitation Comment Classification: UNCLASSIFIED (U)
Do I need to make an appointment at the VCC and how early do we need to arrive for this process?
By: Dave Ashworth; Tribal One; (337-718-8996). On: Oct 16 2025. Forward request by email.
1-0 Evaluation For Information Only. No appointments are given for badging, processing time varies considerably, however the time and day of the week were selected during typically low traffic times. Recommendation would be to arrive at least 30 minutes prior for badging. By: Jonathan Foster; Electrical; (5015391458) On: Oct 20 2025
1-1 Government Response. No appointments are given for badging, processing time varies considerably, however the time and day of the week were selected during typically low traffic times. Recommendation would be to arrive at least 30 minutes prior for badging. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 23 2025
1-2 Government Response. This new text supercedes ALL previous replies.
No appointments are given for badging, processing time varies considerably, however the time and day of the week were selected during typically low traffic times.
Recommendation would be to arrive at least 30 minutes prior for badging. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11570327 General Page 15 or 60 of the Solicitation Comment Classification: UNCLASSIFIED (U)
Will you have an escort meeting us at the VCC and then someone at the North Portal to escort to the site visit?
By: Dave Ashworth; Tribal One; (337-718-8996). On: Oct 16 2025. Forward request by email.
1-0 Evaluation For Information Only. Site visit POC will meet at the VCC and RA portal, additional escorts for the site visit will be provided as needed. By: Jonathan
Foster; Electrical; (5015391458) On: Oct 20 2025 1-1 Government Response. Site visit POC will meet at the VCC and RA portal, additional escorts for the site visit will be provided as needed. By: Brian King; Military
Branch, P P M Division; (719-330-1045) On: Oct 23 2025 1-2 Government Response. This new text supercedes ALL previous replies.
Site visit POC will meet at the VCC and RA portal, additional escorts for the site visit will be provided as needed. By: Brian King; Military Branch, P P M Division;
(719-330-1045) On: Nov 06 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11570328 General Page 15 or 60 of the Solicitation Comment Classification: UNCLASSIFIED (U)
Will you have an escort meeting us at the VCC and then someone at the North Portal to escort to the site visit?
By: Dave Ashworth; Tribal One; (337-718-8996). On: Oct 16 2025. Forward request by email.
1-0 Evaluation For Information Only. Site visit POC will meet at the VCC and RA portal, additional escorts for the site visit will be provided as needed. By: Jonathan
Foster; Electrical; (5015391458) On: Oct 20 2025 1-1 Government Response. Site visit POC will meet at the VCC and RA portal, additional escorts for the site visit will be provided as needed. By: Brian King; Military
Branch, P P M Division; (719-330-1045) On: Oct 23 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11584655 Site n/a n/a Comment Classification: UNCLASSIFIED (U)
Will the Government provide the existing topographic survey or contour site plan for Section or Area 101 where the new RGS-S facilities will be located?
By: Brian Morris; Quick Add Office; (385-333-4400). On: Oct 28 2025. Forward request by email.
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosedReport&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=SpecText mailto:dashworth@tribal.one https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11570318 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11570318 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:dashworth@tribal.one https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11570320 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11570320 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:dashworth@tribal.one https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11570327 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11570327 mailto:jonathan.c.foster@usace.army.mil mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:dashworth@tribal.one https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11570328 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11570328 mailto:jonathan.c.foster@usace.army.mil mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian@hhicorp.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584655 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584655
1-0 Evaluation For Information Only. The government will provide a survey as part of Am-0001. The contractor will use this survey as a guide to then provide their own survey. Refer to the following speciation sections:
01 89 00 Site Work Requirements paragraph 1.2 GOVERNMENT SUPPLIED ENGINEERING SURVEY states the Contractor shall use Government supplied survey data as information only in the preparation of their proposal and design. An engineering field survey shall be performed by the Contractor...The Government field survey data information was gathered by a topographical survey performed in 2024...'
01 89 00 Site Work Requirements paragraph 1.3 CONTRACTOR SUPPLIED ENGIEERING SURVEY states 'The Contractor shall complete the engineering survey of the project site....The survey shall be used by the Contractor to prepare their design drawings...' By: Jonathan Foster; Electrical; (5015391458) On: Oct 29 2025
1-1 Government Response. The government will provide a survey as part of Am-0001. The contractor will use this survey as a guide to then provide their own survey.
Refer to the following speciation sections:
01 89 00 Site Work Requirements paragraph 1.2 GOVERNMENT SUPPLIED ENGINEERING SURVEY states the Contractor shall use Government supplied survey data as information only in the preparation of their proposal and design. An engineering field survey shall be performed by the Contractor...The Government field survey data information was gathered by a topographical survey performed in 2024...'
01 89 00 Site Work Requirements paragraph 1.3 CONTRACTOR SUPPLIED ENGIEERING SURVEY states 'The Contractor shall complete the engineering survey of the project site....The survey shall be used by the Contractor to prepare their design drawings...' By: Brian King; Military Branch, P P M Division; (719-330-1045) On:
Oct 31 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584678 Structural n/a 01 83 00 Comment Classification: UNCLASSIFIED (U)
Section 01 83 00, Part 1.3.10.1 states that the "Interface Control Document (ICD) [will be] provided by the government." It doesn't appear that the ICD has been included with the bid documents or that we have overlooked the document. Would the Government direct offerors to where the ICD is located or provide that document for the use of those bidding this project?
By: Brian Morris; Quick Add Office; (385-333-4400). On: Oct 28 2025. Forward request by email.
1-0 Evaluation For Information Only. There will not be an ICD until there is a GTE/CNE contractor is on board. GTE/CNE shelter pads should be estimated based on the existing information in the bidding package (RFP, SPDD). Bid as shown. By: Jonathan Foster; Electrical; (5015391458) On: Oct 30 2025 1-1 Government Response. :There will not be an ICD until there is a GTE/CNE contractor is on board. GTE/CNE shelter pads should be estimated based on the existing information in the bidding package (RFP, SPDD). Bid as shown. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11584721 Other n/a 01 83 00 Comment Classification: UNCLASSIFIED (U)
Part 1.3.10.1 - Reflector Assembly Areas and Pads states that distance locations are provided or shown in Appendix E. It doesn't appear that Appendix E has been provided with the bid documents. Would the Government direct offerors to where Appendix E is located or provide that document?
By: Brian Morris; Quick Add Office; (385-333-4400). On: Oct 28 2025. Forward request by email.
1-0 Evaluation For Information Only. Specification Appendix A is the Site Preliminary Design Document (SPDD). Appendix E, as referenced in SPDD sections 3.2.7.1 and 3.2.7.3, is contained in the SPDD itself. By: Jonathan Foster; Electrical; (5015391458) On: Oct 30 2025 2-0 Evaluation For Information Only. Appendix E, as referenced in 01 83 00 paragraph 1.3.10.1, is located within the Site Preliminary Design Document (SPDD). The
SPDD is Appendix A of the specifications. By: Kaitlin Peacock; NWO Omaha District; (719-556-0934) On: Oct 31 2025 2-1 Government Response. Specification Appendix A is the Site Preliminary Design Document (SPDD). Appendix E, as referenced in SPDD sections 3.2.7.1 and
3.2.7.3, is contained in the SPDD itself.
Appendix E, as referenced in 01 83 00 paragraph 1.3.10.1, is located within the Site Preliminary Design Document (SPDD). The SPDD is Appendix A of the specifications. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584832 General Solicitation Comment Classification: UNCLASSIFIED (U)
Due to complex pricing, detailed technical requirements, and the need to get PPQs filled out and signed during the current shutdown, will the government extend the proposal due date for 2 weeks?
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation Concurred. See W9128F26RA012 Amendment 0001 for updated bidder inquiry and submission deadline information. By: Monica
McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-1 Government Response. Closed By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-2 Government Response. This new text supercedes ALL previous replies.
See W9128F26RA012 Amendment 0001 for updated bidder inquiry and submission deadline information. By: Brian King; Military Branch, P P M Division; (719-330- 1045) On: Nov 06 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584835 General Solicitation 3.3.5 Comment Classification: UNCLASSIFIED (U)
Under the instructions for Volume II - Pricing, solicitation lists "W9128F26RA012_FIRMNAME_FACTOR 4" and "W9128F26RA012_FIRMNAME_Appendix" for filenames, however there are no requirements for an appendix to the pricing volume. Should offerors submit only one file, "W9128F26RA012_FIRMNAME_FACTOR 4," for this volume?
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation Concurred. See W9128F26RA012 Amendment 0001. Proposal file naming has been corrected, an appendix is removed, and all pricing proposal information shall be submitted in a single document. By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-1 Government Response. Closed By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-2 Government Response. The text below appends or clarifies ALL previous replies.
See W9128F26RA012 Amendment 0001. Proposal file naming has been corrected, an appendix is removed, and all pricing proposal information shall be submitted in a single document. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584838 General Solicitation 3.2.2 and 3.3.5 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian@hhicorp.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584678 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584678 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian@hhicorp.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584721 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584721 mailto:jonathan.c.foster@usace.army.mil mailto:Kaitlin.M.Peacock@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584832 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584832 mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584835 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584835 mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:brian.n.king@usace.army.mil
Comment Classification: UNCLASSIFIED (U)
Under section 3.2.2, the required pricing filename is listed as "W9128F26RA012_FIRMNAME_VOLUME II_PRICING". Under 3.3.5, the required pricing filename is listed as "W9128F26RA012_FIRMNAME_FACTOR 4". Will the government please clarify which filename offerors should use?
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation Concurred. See W9128F26RA012 Amendment 0001 for corrected file naming requirement. By: Monica McKensey; Contracting Division; (402-996-
3708) On: Nov 05 2025 1-1 Government Response. Closed By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-2 Government Response. The text below appends or clarifies ALL previous replies.
See W9128F26RA012 Amendment 0001 for corrected file naming requirement. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11584840 General Solicitation 3.2 and 3.3 Comment Classification: UNCLASSIFIED (U)
Solicitation lists Tab A SF-1442, Tab B Reps and Certs, Tab C Teaming Arrangements and Tab D Technical in both volume I Technical AND volume II Pricing. Please confirm Tabs A, B, and C belong in volume II only and Tab D belongs in volume I only.
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation Concurred. In accordance with Section 00 21 00, Paragraph 3.2.1, Volume I submission shall contain all information and tabs as listed. By: Monica
McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-1 Government Response. Closed By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-2 Government Response. The text below appends or clarifies ALL previous replies.
In accordance with Section 00 21 00, Paragraph 3.2.1, Volume I submission shall contain all information and tabs as listed. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584842 General Solicitation Table 1, Scenario based Examples Comment Classification: UNCLASSIFIED (U)
Scenario 6 says that prime contractors may not use the past performance of subcontractor/teammates. This is a disadvantage to small businesses, who subcontract out the majority of work on projects. Will the government reconsider and accept past performances of offeror's subcontractors, so long as there is a teaming agreement in place?
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation Concurred. Scenario 6, contained in Section 00 21 00, table attachment remains unchanged. By: Monica McKensey; Contracting Division; (402-996-
3708) On: Nov 05 2025 1-1 Government Response. Closed By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-2 Government Response. The text below appends or clarifies ALL previous replies.
Scenario 6, contained in Section 00 21 00, table attachment remains unchanged. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11584955 General Specifications 01 30 00.24 ¶ 1.9 Comment Classification: UNCLASSIFIED (U)
Are Mission Delay Days considered excusable and non-compensable only? Is contract time extension automatic or requires CO approval?
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation Concurred. Up to 15 mission delay days shall be accounted for in the overall complete date stated in 01 30 00.24 paragraph 1.9. No time extension will be granted. By: Jonathan Foster; Electrical; (5015391458) On: Oct 30 2025 1-1 Government Response. Up to 15 mission delay days shall be accounted for in the overall complete date stated in 01 30 00.24 paragraph 1.9. No time extension will be granted. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11584963 General Specifications 01 30 00.24 ¶ 1.41 Comment Classification: UNCLASSIFIED (U)
Please clarify approval authority for Contractor-provided Wi-Fi network and required documentation under par. 1.41.4.2.
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025.
Requires Amendment.
Forward request by email.
1-0 Evaluation For Information Only. Contractor-provided Wi-Fi networks are not permitted. Please refer to the forthcoming amendment for additional details. By:
Jonathan Foster; Electrical; (5015391458) On: Nov 03 2025
2-0 Evaluation Concurred. Contractor-provided Wi-Fi networks are not permitted. Please refer to the forthcoming amendment for additional details. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 03 2025
2-1 Government Response. Contractor-provided Wi-Fi networks are not permitted. Please refer to the forthcoming amendment for additional details. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 03 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584967 General Specifications 01 14 00 ¶ 1.6 Comment Classification: UNCLASSIFIED (U)
Are electronic design submittals required to carry CUI headers/footers? If so, please provide approved marking format.
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation For Information Only. CUI markings will be required in accordance with specification 01 14 00 paragraph. By: Jonathan Foster; Electrical;
(5015391458) On: Oct 30 2025 2-0 Evaluation For Information Only. CUI markings will be required in accordance with specification 01 14 00 paragraph. Marking format will be provided post-award.
By: Kaitlin Peacock; NWO Omaha District; (719-556-0934) On: Oct 31 2025 mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584838 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584838 mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584840 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584840 mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584842 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584842 mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584955 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584955 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584963 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584963 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584967 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584967 mailto:jonathan.c.foster@usace.army.mil mailto:Kaitlin.M.Peacock@usace.army.mil
2-1 Government Response. CUI markings will be required in accordance with specification 01 14 00 paragraph. Marking format will be provided post-award. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584975 General Specifications 01 32 01.00 10 Comment Classification: UNCLASSIFIED (U)
Should SSAMP updates be submitted with monthly schedule updates or only when scope changes?
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation Concurred. SSAMP updates should only be submitted when required to address information that changes or a condition not already captured. By:
Jonathan Foster; Electrical; (5015391458) On: Oct 30 2025 1-1 Government Response. SSAMP updates should only be submitted when required to address information that changes or a condition not already captured. By:
Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11584985 General Specifications 01 30 00.24 ¶ 1.22 Comment Classification: UNCLASSIFIED (U)
Please confirm which Base entities (SSC, SFS, NIWC, AFCEC) must attend the Preconstruction Conference and approve agenda.
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation For Information Only. See the following information provided by NIWC:
GTE/CNE contractor: TBD, contract not awarded yet NIWC PAC: Tom Morris, RGS Project Manager (619-553-9680, thomas.s.morris20.civ@us.navy.mil), James Ky, F&I Project Engineer (808-602-8432, james.ky.civ@us.navy.mil) SSC: Maj Kyle Lamberth, RGS Project Manager (337-718-3014, kyle.lamberth.1@spaceforce.mil) David OBrien, RGS-S (209-603-1999, David.OBrien.40.ctr@spaceforce.mil) By: Jonathan Foster; Electrical; (5015391458) On: Oct 29 2025
2-0 Evaluation For Information Only. USACE will facilitate Government attendance at the Preconstruction Conference. By: Kaitlin Peacock; NWO Omaha District;
(719-556-0934) On: Oct 31 2025
2-1 Government Response. USACE will facilitate Government attendance at the Preconstruction Conference. By: Brian King; Military Branch, P P M Division; (719- 330-1045) On: Oct 31 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584988 General Specifications SPDD § 3.4.1 / Final Design § 6.3.1 Comment Classification: UNCLASSIFIED (U)
Please confirm location and voltage of primary power tie-in point for RGS-S facility.
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation For Information Only. Bid as shown. Refer to EP601 for information By: Jonathan Foster; Electrical; (5015391458) On: Oct 29 2025 1-1 Government Response. Bid as shown. Refer to EP601 for information By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11584993 General Specifications SPDD § 3.3.3 / Final Design § 5.2.3 Comment Classification: UNCLASSIFIED (U)
Clarify secondary containment volume requirements for 20,000 gal bulk fuel tank per UFC 3-460-01 or state code.
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation For Information Only. Since the 20k tanks are UL-2085, UFC 3-460-01 Section 8-14.1 exempts additional spill containment methods for double walled tanks via NFPA 30. As such, only general containment is required, and this is satisfied in Sheet FM402 keynote 3 which states "concrete tank pad with containment curbing. Size to be determined by DOR." By: Jonathan Foster; Electrical; (5015391458) On: Oct 31 2025
1-1 Government Response. the 20k tanks are UL-2085, UFC 3-460-01 Section 8-14.1 exempts additional spill containment methods for double walled tanks via NFPA
30. As such, only general containment is required, and this is satisfied in Sheet FM402 keynote 3 which states "concrete tank pad with containment curbing. Size to be determined by DOR." By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 03 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11585000 General Specifications 01 30 00.24 ¶ 1.23 Comment Classification: UNCLASSIFIED (U)
When and from whom will the Government provide the Red Zone Checklist template?
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation For Information Only. Government Contracting Officer's Representative will provide the checklist prior to 75% completion in accordance with 01 30
00.24 paragraph 1.23. By: Kaitlin Peacock; NWO Omaha District; (719-556-0934) On: Oct 31 2025 1-1 Government Response. Government Contracting Officer's Representative will provide the checklist prior to 75% completion in accordance with 01 30 00.24 paragraph 1.23. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11585004 General Specifications 01 41 26 Comment Classification: UNCLASSIFIED (U)
Confirm whether Contractor or USACE holds CDPHE NPDES Construction Permit for storm water discharges.
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 28 2025. Forward request by email.
1-0 Evaluation For Information Only. 01 41 26.05 24 paragraph 3.1 The EPA considers the Government and the Contractor co-permittees.
Bid as shown within specifications. By: Jonathan Foster; Electrical; (5015391458) On: Oct 30 2025 mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584975 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584975 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584985 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584985 mailto:jonathan.c.foster@usace.army.mil mailto:Kaitlin.M.Peacock@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584988 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584988 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584993 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11584993 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11585000 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11585000 mailto:Kaitlin.M.Peacock@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11585004 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11585004
1-1 Government Response. 01 41 26.05 24 paragraph 3.1 The EPA considers the Government and the Contractor co-permittees. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11585722 General Solicitation 3.2.1 and 2.3.4.1 Comment Classification: UNCLASSIFIED (U)
3.2.1 states the volume I technical Proposal shall be named ""W9128F26RA012_FIRMNAME_VOLUME I_TECHNICAL".
2.3.4.1 (which should be listed as 3.4.3.1) states "Volume I, Technical Proposal, shall be submitted as the following separate files:
W9128F26RA012_FIRMNAME_FACTORS 1_thru_3 W9128F26RA012_FIRMNAME_Appendix_Schedule" Will the government please clarify the filename(s) for volume I?
By: Jason Peak; Miami Federal; (703-939-7517). On: Oct 29 2025. Forward request by email.
1-0 Evaluation Concurred. See W9128F26RA012 Amendment 0001 for corrected information. By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov
05 2025 1-1 Government Response. Closed By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-2 Government Response. The text below appends or clarifies ALL previous replies.
See W9128F26RA012 Amendment 0001 for corrected information. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 06 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11586070 Contracting Solicitation page 1 Block13 Comment Classification: UNCLASSIFIED (U)
Please extend the due date to 12/21. With the extension recommend changing paragraph 1.5 to not also continually extend the Bidder Inquiry period.
By: Travis Cooper; Weston Solutions, Inc. - West Chester, PA; (3037296100). On: Oct 29 2025. Forward request by email.
1-0 Evaluation Concurred. See W9128F26RA012 Amendment 0001 for updated bidder inquiry and submission deadline information. By: Monica
McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-1 Government Response. Closed By: Monica McKensey; Contracting Division; (402-996-3708) On: Nov 05 2025 1-2 Government Response. This new text supercedes ALL previous replies.
See W9128F26RA012 Amendment 0001 for updated bidder inquiry and submission deadline information. By: Brian King; Military Branch, P P M Division; (719-330- 1045) On: Nov 06 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11586088 Program Management Design Analysis Paragraph 3 Comment Classification: UNCLASSIFIED (U)
Please provide contact information for the GTE/CNE contractor(s), NIWC Pacific and SCC for coordination purposes
By: Travis Cooper; Weston Solutions, Inc. - West Chester, PA; (3037296100). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information Only. Coordination shall be facilitated with USACE Contracting Officer's Representative post-award. By: Jonathan Foster; Electrical;
(5015391458) On: Oct 30 2025 1-1 Government Response. Coordination shall be facilitated with USACE Contracting Officer's Representative post-award By: Brian King; Military Branch, P P M
Division; (719-330-1045) On: Oct 31 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11586159 Contracting Solicitation Comment Classification: UNCLASSIFIED (U)
Please provide the milestone table for this project including the major deliverables and expected due dates
By: Travis Cooper; Weston Solutions, Inc. - West Chester, PA; (3037296100). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information Only. Contractor is responsible for scheduling design and construction activities within the period of performance. If further information is necessary, please submit a more detailed inquiry. By: Kaitlin Peacock; NWO Omaha District; (719-556-0934) On: Oct 31 2025 1-1 Government Response. Contractor is responsible for scheduling design and construction activities within the period of performance. If further information is necessary, please submit a more detailed inquiry. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11586162 General 01 33 00.32 Comment Classification: UNCLASSIFIED (U)
Please confirm the design requirements of 60%, 100% and IFC
By: Travis Cooper; Weston Solutions, Inc. - West Chester, PA; (3037296100). On: Oct 29 2025. Forward request by email.
1-0 Evaluation Concurred. Please refer to specification sections 01 33 00.32 and 01 33 00.36 for further details. By: Jonathan Foster; Electrical; (5015391458) On:
Oct 29 2025 2-0 Evaluation For Information Only. Refer to specification sections 01 33 00.32 and 01 33 00.36 for further details. Omaha District Design Guide will be included in
Amendment 000x. By: Kaitlin Peacock; NWO Omaha District; (719-556-0934) On: Oct 31 2025 2-1 Government Response. Refer to specification sections 01 33 00.32 and 01 33 00.36 for further details. Omaha District Design Guide will be provided as an
Amendment. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11586189 Site Drawings Comment Classification: UNCLASSIFIED (U)
Provide the location of the contractor laydown area and contractor office
By: Travis Cooper; Weston Solutions, Inc. - West Chester, PA; (3037296100). On: Oct 29 2025. Forward request by email.
1-0 Evaluation Check and Resolve. FURTHER INFORMATION REQUIRED. Revise what is currently shown on CS101 KEY NOTE 7; does not make sense to be across Kepler Ave. Show construction zone fence on drawings. By: Kaitlin Peacock; NWO Omaha District; (719-556-0934) On: Oct 31 2025 mailto:brian.n.king@usace.army.mil mailto:jpeak@miamifed.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11585722 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11585722 mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:travis.cooper@westonsolutions.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586070 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586070 mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:monica.a.mckensey@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:travis.cooper@westonsolutions.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586088 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586088 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:travis.cooper@westonsolutions.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586159 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586159 mailto:Kaitlin.M.Peacock@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:travis.cooper@westonsolutions.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586162 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586162 mailto:jonathan.c.foster@usace.army.mil mailto:Kaitlin.M.Peacock@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:travis.cooper@westonsolutions.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586189 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586189 mailto:Kaitlin.M.Peacock@usace.army.mil
2-0 Evaluation Concurred. Revised contractor laydown will be issued in forthcoming amendment. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 04 2025
3-0 Evaluation Concurred. Revised contractor laydown will be issued in forthcoming amendment. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 04 2025
3-1 Government Response. Revised contractor laydown will be issued in forthcoming amendment. By: Brian King; Military Branch, P P M Division; (719-330-1045) On:
Nov 04 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11586199 Geotechnical Drawing Comment Classification: UNCLASSIFIED (U)
Please provide the geotechnical and hazardous material surveys that have been completed for areas where work will be executed in this project
By: Travis Cooper; Weston Solutions, Inc. - West Chester, PA; (3037296100). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information Only. Bid As Shown.
Refer to 01 33 00.36 1.7.5 Geotechnical Investigation Report The geotechnical investigation data for this RFP are to be coordinated by the contractor. Verify the actual soil conditions present at each site location prior to commencing final design.
Also refer to 01 83 00 paragraph 1.3.10.1 Foundation Design Foundation design criteria and the foundation type proposed to be built by the Contractor shall be based on recommendations contained in the Final Geotechnical Investigation Report. The Final Geotechnical Investigation Report shall be provided by the Contractor. By: Jonathan Foster; Electrical; (5015391458) On: Nov 03 2025
1-1 Government Response. Bid As Shown.
Refer to 01 33 00.36 1.7.5 Geotechnical Investigation Report The geotechnical investigation data for this RFP are to be coordinated by the contractor. Verify the actual soil conditions present at each site location prior to commencing final design.
Also refer to 01 83 00 paragraph 1.3.10.1 Foundation Design Foundation design criteria and the foundation type proposed to be built by the Contractor shall be based on recommendations contained in the Final Geotechnical Investigation Report. The Final Geotechnical Investigation Report shall be provided by the Contractor. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 04 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11586236 Security RFP Comment Classification: UNCLASSIFIED (U)
Contract references requirement for SECRET cleared workers and DD 254. Please provide DD254 for this project.
By: Travis Cooper; Weston Solutions, Inc. - West Chester, PA; (3037296100). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information Only. DD254 will be provided post-award. By: Kaitlin Peacock; NWO Omaha District; (719-556-0934) On: Oct 31 2025 1-1 Government Response. DD254 will be provided post-award. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Oct 31 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11586279 Contracting Solicitation Comment Classification: UNCLASSIFIED (U)
Can the QC Manager be dual hatted as the SSHO?
By: Travis Cooper; Weston Solutions, Inc. - West Chester, PA; (3037296100). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information Only. No, a Level 1 SSHO is required in accordance with 01 35 26 paragraph 1.7.3. Level one SSHO has full-time safety responsibilities in accordance with EM 385-1-1.
The QC manager may also perform duties of Project Superintendent in accordance with 01 45 00 paragraph 1.6.2.1. By: Kaitlin Peacock; NWO Omaha District;
(719-556-0934) On: Oct 31 2025
1-1 Government Response. No, a Level 1 SSHO is required in accordance with 01 35 26 paragraph 1.7.3. Level one SSHO has full-time safety responsibilities in accordance with EM 385-1-1.
The QC manager may also perform duties of Project Superintendent in accordance with 01 45 00 paragraph 1.6.2.1. By: Brian King; Military Branch, P P M Division;
(719-330-1045) On: Oct 31 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11586591 Electrical ES101 n/a Comment Classification: UNCLASSIFIED (U)
Sheet CS101, Keynote 10 calls for transformer foundation pads. These are located at each antenna site. Sheet ES101 shows a three phase transformer at the site facilities electrical shelter, but nothing is shown at the three antenna sites. Will the Government verify the number of transformers that are needed on the project, i.e., is only one transformer needed or four?
By: Brian Morris; Quick Add Office; (385-333-4400). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information Only. Bid as shown. Refer to EP600 series sheets for additional information. By: Jonathan Foster; Electrical; (5015391458) On: Nov
03 2025 1-1 Government Response. Bid as shown. Refer to EP600 series sheets for additional information. By: Brian King; Military Branch, P P M Division; (719-330-1045)
On: Nov 03 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11586819 Communications TS103 n/a Comment Classification: UNCLASSIFIED (U) mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:travis.cooper@westonsolutions.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586199 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586199 mailto:jonathan.c.foster@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:travis.cooper@westonsolutions.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586236 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586236 mailto:Kaitlin.M.Peacock@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:travis.cooper@westonsolutions.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586279 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586279 mailto:Kaitlin.M.Peacock@usace.army.mil mailto:brian.n.king@usace.army.mil mailto:brian@hhicorp.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586591 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=11586591
Will the Government confirm that all telecommunications duct bank and raceway (including manholes) are currently installed as shown in TS103 and contractors are only required to provide and install the OSP fiber optic cable?
By: Brian Morris; Quick Add Office; (385-333-4400). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information Only. The contractor is required to provide the OSP fiber optic cabling only. All duct banks, utilidors, and manholes are existing. Please refer to the forthcoming amendment for further details. By: Jonathan Foster; Electrical; (5015391458) On: Nov 03 2025
1-1 Government Response. The contractor is required to provide the OSP fiber optic cabling only. All duct banks, utilidors, and manholes are existing. Please refer to the forthcoming amendment for further details. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 03 2025
Current Request Status: Request Closed Information for this report is procurement sensitive.
11586826 Communications TS102 n/a Comment Classification: UNCLASSIFIED (U)
Will the Government confirm that all telecommunications duct bank and raceway (including manholes) are currently installed as shown in TS102 and contractors are only required to provide and install the OSP fiber optic cable?
By: Brian Morris; Quick Add Office; (385-333-4400). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information Only. The contractor is required to provide the OSP fiber optic cabling only. All duct banks, utilidors, and manholes are existing. Please refer to the forthcoming amendment for further details. By: Jonathan Foster; Electrical; (5015391458) On: Nov 03 2025 1-1 Government Response. The contractor is required to provide the OSP fiber optic cabling only. All duct banks, utilidors, and manholes are existing. Please refer to the forthcoming amendment for further details. By: Brian King; Military Branch, P P M Division; (719-330-1045) On: Nov 03 2025 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11586844 Communications TS101 n/a Comment Classification: UNCLASSIFIED (U)
Will the Government confirm that all telecommunications duct bank and raceway running from MHM113E to MHM113F and beyond to Match Line TS103 are currently installed as shown in TS101 and contractors are only required to provide and install the OSP fiber optic cable?
By: Brian Morris; Quick Add Office; (385-333-4400). On: Oct 29 2025. Forward request by email.
1-0 Evaluation For Information…