This Site Preliminary Design Document (SPDD) details the facilities and infrastructure (F&I) requirements for the Relay Ground Station – South (RGS-S) project at Schriever Space Force Base in Colorado. The project is sponsored by the United States Space Force and is part of the Overhead Persistent Infrared (OPIR) enterprise modernization effort, supporting Next-Generation OPIR programs and legacy Space Based Infrared System capabilities.
The project will involve multiple contractors, including a Ground Terminal Equipment/Communications and Networking Equipment (GTE/CNE) contractor, an F&I contractor, and a Command, Control, Communications, Computers, Intelligence/Information Technology (C4I/IT) contractor. Key infrastructure requirements include three 13.5-meter antenna sets with radomes, shelters, power distribution systems, backup generators, telecommunications infrastructure, and electronic security systems. The site is designed to withstand extreme weather conditions, with wind resistance up to 140 mph sustained and 150 mph gusts, and is intended to be a resilient, lights-out facility capable of uplink and downlink communications with various space vehicles. The project is funded through Research, Development, Test, and Evaluation (RDT&E) appropriations, with site activation planned for FY28 Q1.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Relay Ground Station – South (RGS-S) Schriever Space Force Base, Colorado
Site Preliminary Design Document (SPDD)
Naval Information Warfare Center Pacific
53560 Hull Street San Diego, CA 92152-5001
13 August 2025 V1.0
Controlled by: NIWC Pacific, MILCON Infrastructure & System Modernization Branch H4HE0 CUI Category: Controlled Technical Information Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Administrative or Operational Use (Date of Determination 13 August 2025). Other requests shall be referred to Commanding Officer, Naval Information Warfare Center Pacific, 53560 Hull Street, Attn: Code H, San Diego, CA 92152-5001, or higher Department of Defense Authority.
HANDLING AND DESTRUCTION NOTICE: Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.
POC: James Ky, james.ky.civ@us.navy.mil
SUBMITTER
Engineer, Facilities and Infrastructure Date
NIWC Pacific
APPROVAL
RGS Facilities and Infrastructure Lead Date
NIWC Pacific
CONCURRENCE
RGS-S Program Manager Date
SSC/SNGI
Table of Contents
TABLE OF CONTENTS
REVISION HISTORY TABLE
1 SCOPE
1.1 PURPOSE
1.2 DOCUMENT REVISION PLAN
1.3 PROJECT BACKGROUND
1.3.1 Work Breakdown and Contracts
1.4 PROJECT SITE
1.5 KEY MILESTONES & WORK COORDINATION
1.6 ROLES AND RESPONSIBILITIES ASSUMPTIONS
2 APPLICABLE DOCUMENTS
2.1 REFERENCE DOCUMENTS
3 SITE DESIGN
3.1 SITE LAYOUT
3.2 CIVIL AND ENVIRONMENTAL
3.2.1 Conservation Measures
3.2.2 Excavation, Grading and Leveling
3.2.3 Laydown & Staging
3.2.4 Shelters
3.2.5 Trenching
3.2.6 Paving
3.2.7 Foundations
3.3 MECHANICAL
3.3.1 Environmental Control Units
3.3.2 Fire Alarm & Extinguishing System
3.3.3 Generator System and Fuel Storage Tanks
3.4 ELECTRICAL
3.4.1 Power Distribution
3.4.2 Backup Power
3.4.3 Lighting
3.4.4 Antennas/Ringwalls
3.4.5 Shelters
3.4.6 Grounding and Lightning Protection
3.4.7 Environmental Control Units
3.5 TELECOMMUNICATIONS
3.5.1 On-site Pathways and Racks
3.5.2 Offsite Pathways and Cabling
3.5.3 Classified Information Spaces
3.6 SECURITY
3.6.1 Electronic Security Systems
3.6.2 Physical Security
APPENDIX A. ABBREVIATIONS
APPENDIX B. ESS FIGURES & DETAILS
APPENDIX C. SHELTER, RACK DETAILS
APPENDIX D. COMMUNICATIONS FIGURES AND DIAGRAMS
APPENDIX E. GTE/CNE SYSTEM EQUIPMENT F&I SUPPORT DETAILS
Figures Figure 1 – Site Documents Flow Chart Figure 2 – Work Breakdown and Contracts Figure 3 – Notional Site Layout Figure 4 – ESS shelter infrastructure Figure 5 – ESS radome infrastructure Figure 6 – ESS door entry details Figure 7 – Partial Site Facilities Shelter Layout Figure 8 – Notional OSP layout Figure 9 – Pedestal Foundation Interface Data Sheet Figure 10 – Crane location for pedestal installation Figure 11 – Crane location for placing reflector on pedestal Figure 12 – Reflector lifted to pedestal Figure 13 – Radome crane lift Figure 14 – Radome Assembly Area Figure 15 – Reflector Assembly Pad Figure 16 – Radome Floor Trench Note: GFE in above diagram will be responsibility of F&I contractor Figure 17 – GTE/CNE Contractor Distribution Diagrams
Tables Table 1 – Power Requirements
Revision History Table Rev. Date Description of Change Ver.
25 Jul 2025
Changes from draft v0.3:
1) CNE to Bldg 712 to be accomplished by DB RFP (previously NIWC)
2) SpOC Resilience Level 2 (new)
3) Windspeed updated to 140mph sustained, 150mph gusts (previously 100mph sustained)
4) Temperature of shelters shall be integrated into a GTE/CNE contractor provided reporting system. (new, previously only fire alarms/generator status)
5) Height of foundation shall be 20.565” above finished floor (previously 36”)
6) Estimated power requirement updated to 621.1 kVA (previously 634.7kVA)
7) C4I/OSP section and figures updated
8) Document revision plan updated
9) Removed references to fencing
10) Updated level area around radomes to 50ft (previously 30ft)
11) Various administrative corrections and clarifications as a result of comments from SSC.
12) Milestone schedule updated
1.0
1 Scope
1.1 Purpose
The purpose of this document is to specify facilities and infrastructure (F&I) needed to support mission requirements for Relay Ground Station – South (RGS-S), based on established stakeholder requirements and assumptions. This document is intended for use by the Design- Construction Agent (DCA) (i.e., United States Army Corps of Engineers [USACE]) to facilitate development of planning products (e.g., Request For Proposals [RFPs]).
1.2 Document Revision Plan
To meet the planned site activation date, Naval Information Warfare Center (NIWC) Pacific plans to issue versions of the Site Preliminary Design Document (SPDD) to support the site preparation Request For Proposals (RFP) process, as illustrated and described below.
Figure 1 – Site Documents Flow Chart
SPDD Version 1.0 will incorporate validated derived F&I requirements and specifications, based on the approved requirement documents and SSC-provided antenna placement obscuration analysis. Preliminary F&I requirements and specifications will also be included, based on specifications from previous RGS system design(s) and stated assumptions.
SPDD Version 2.0 will incorporate any updated specifications and requirements provided by the Ground Terminal Equipment (GTE) / Communications and Networking Equipment (CNE) contractor. These updated specifications and requirements will be provided by the GTE/CNE contractor to incorporate any additional F&I needed to support GTE and CNE. Preliminary site design developed as part of the planning process (e.g., draft RFP) will also be incorporated into the updated SPDD.
This document does not supersede government requirements and standards that drive the design of the facility by the design agent. The requirements represented herein are necessary to support the project; however, if any of the requirements specified in this document violate any facility requirements (e.g., life safety, electrical and energy standards, etc.), it is the responsibility of the design agent to address the potential issue and work with NIWC Pacific representatives to develop alternatives that will meet the core goals of the project.
1.3 Project Background
RGS-S is sponsored by the United States Space Force (USSF) and is a vital part of the Overhead Persistent Infrared (OPIR) enterprise modernization effort. RGS-S will support the Next-Generation Overhead Persistent Infrared (Next-GEN OPIR) programs and continued operations of legacy Space Based Infrared System (SBIRS) capabilities.
RGS-S is a Research, Development, Test, and Evaluation (RDT&E) appropriations funded project, which includes design, procurement, development, integration, and testing of advanced technology hardware and software systems capable of uplink and downlink communications with Legacy SBIRS GEO, DSP, Next Generation GEO (NGG), and Next Generation Polar (NGP) space vehicles. This RDT&E funded project will be a lights-out facility, located at Schriever Space Force Base in Colorado. Site improvements will be necessary to support system equipment.
1.3.1 Work Breakdown and Contracts
The facility will be comprised of four work areas that will be accomplished with three separate contracts. The work areas are:
1. Ground Terminal Equipment, accomplished by GTE/CNE contractor
2. Communications and Networking Equipment, accomplished by GTE/CNE contractor
3. Facilities and Infrastructure, accomplished by F&I contractor
4. Command, Control, Communications, Computers, Intelligence/Information Technology
(C4I/IT), accomplished by NIWC PAC C4I contractor
Figure 2 – Work Breakdown and Contracts
1.3.1.1 Ground Terminal Equipment
GTE will be designed, procured, developed, integrated, and tested by the GTE/CNE contractor via RDT&E-funded contract with NIWC Pacific.
GTE will provide the capability to receive, transmit, and track DSP, SBIRS GEO, NGG, and NGP space vehicles. GTE will primarily consist of 13.5-meter antennas, radomes, transmitters, receivers, motor assemblies, and other associated radio frequency (RF) components. Supporting equipment will be housed in its own environmentally-controlled GTE shelter."
RGS-S will include three (3) sets of GTE housed in radomes designed and provided by GTE/CNE contractor for its environmental requirements.
1.3.1.2 Communications and Networking Equipment
CNE will be designed, procured, developed, integrated, and commissioned by the GTE/CNE contractor via RDT&E-funded contract with NIWC Pacific.
MeshONE-T will provide communications and data traffic from CNE to the RGS-S external interfaces (end users) for data processing. The GTE/CNE contractor will be responsible for the CNE between the GTE and the meshONE-T equipment. Defensive Cyber Operations for Space (DCO-S) team will provide equipment for cyber services for the CNE.
CNE will provide the interface between GTE and external interfaces. CNE will primarily consist of routers, modems, firewalls, computers, cryptos, and other associated networking equipment and will be housed in its own environmentally-controlled CNE shelter. This equipment will provide communications services, cyber services, networking services, encryption, fault detection, local configuration, administrative functions, and timing.
Since RGS-S is a relay station, no mission data processing functionality will be performed on site.
1.3.1.3 Facilities and Infrastructure
F&I will be designed, procured, installed, and commissioned by the F&I contractor via RDT&E-funded contract.
F&I will support GTE and CNE, and C4I/IT. RGS-S F&I must comply with United Facilities Criteria (UFC) 1-200-01 (DoD Building Code).
1.3.1.4 Command, Control, Communications, Computers, Intelligence/Information Technology
C4I/IT will be designed, procured, installed, and tested by NIWC Pacific.
C4I/IT will consist of outside cable plant (OSP) within the site and ESS. A service provider will provide network and telephony capabilities.
1.4 Project Site
The RGS-S site is located at Schriever SFB outside of Colorado Springs, CO. The site area was approved by the Schriever SFB Facility Board on 06 June 2023. The site is situated inside the restricted area, between the west RA fence line and building 712, south of Kepler Avenue.
Access to this area would be via Kepler Road.
1.5 Key Milestones & Work Coordination
Based on schedule constraints, it is anticipated that the GTE/CNE contractor will need to accomplish on-site installation in parallel with the F&I site preparation work.
Key dates for Site Preparation and Site Activation:
• F&I Start Site Preparation: FY26 Q2
• GTE/CNE Start Installation: FY27 Q1
• F&I Complete Site Preparation: FY27 Q1
• GTE/CNE Complete Installation: FY27 Q3
• Site Activation: FY28 Q1
Note: “Complete Site Preparation” reflects the date when all F&I work and testing should be complete, including site energization. Site Activation is the mission need date and ‘complete’ dates are required based on the Integrated Master Schedule (IMS).
1.6 Roles and Responsibilities Assumptions
This project will require support from the F&I contractor for site planning, site design, site preparation, and site installation as well as support from the GTE/CNE contractor for GTE and CNE development and installation.
The F&I contractor is expected to provide F&I as described in paragraph 3. The GTE/CNE contractor will be expected to provide separate shelters for its own equipment as required.
NIWC Pacific and SSC will work with the GTE/CNE contractor to coordinate activities with the F&I contractor and provide support as needed.
NIWC Pacific will design and install C4I/IT systems consisting of on-site OSP and ESS. NIWC will coordinate with a service provider for networks and telephony.
2 Applicable Documents
When utilizing any reference, the most recent revision shall apply, or the revision as determined by the Authority Having Jurisdiction.
2.1 Reference Documents
Document ID Document Title UFC 1-200-01 DoD Building Code
MIL-STD-188-124B
Grounding, Bonding, and Shielding for Common Long Haul / Tactical Communication Systems Including Ground Based Communications- Electronics Facilities and Equipment
ANSI/IEEE-C2 National Electric Safety Code NFPA 70 National Electric Code NFPA 780 Standard for the Installation of Lightning Protection Systems UFC 3-575-01 Lightning and Static Electricity Protection Systems MIL-HDBK-419A Grounding, Bonding, and Shielding for Electronic Equipment and Facilities UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design TIA-568 Generic Telecommunications Cabling for Customer Premises TIA-569 Telecommunications Pathways and Spaces DoDM 5200.01, Volume 3 DoD Information Security Program: Protection of Classified Information CNSSAM TEMPEST/1-13 RED/BLACK Installation Guidance UFC 4-021-02 Electronic Security Systems MCO 5530.14A Marine Corps Physical Security Program Manual UFC 3-600-01 Fire Protection Engineering For Facilities DAFI31-101 Department of the Air Force Instruction 31-101, Base Defense Operations HQ SpOC Infrastructure Resilience Level Guidance
TRD FR-100068
Space Sensing Ground Infrastructure (SNGI) Relay Ground Station - South (RGS-S) Technical Requirements Document
3 Site Design
The project effort will include F&I planning, design, preparation, and installation activities at Schriever SFB.
F&I will primarily consist of the following:
• Antenna pedestal foundation and radome ringwalls
• Site Facilities Electrical and Communications Shelter(s) for F&I equipment, as required
• Power distribution, grounding, lightning protection
• Backup power generators and fuel storage
• Concrete pads for shelters, utilities
• Antenna reflector assembly pads
• Vehicular and pedestrian pathways and paving
• OSP telecommunications duct banks, conduits and pathways
• On-site telecommunications conduits and pathways
• Fire alarm & suppression system(s)
• Site lighting with Closed-Circuit Television (CCTV) mounting points
• Stormwater drainage infrastructure & improvements
Preliminary specifications and requirements for facilities and infrastructure project efforts are specified in the following subsections with notional and conceptual designs captured in the appendices. These drawings and figures are for reference only and actual specifications, layouts, dimensions, etc. will be determined during design.
RGS-S F&I shall be designed to meet Headquarters Space Operations Command (HQ SpOC) Resilience Level 2 per HQ SpOC Infrastructure Resilience Level Guidance. Resilience Level 2 incorporates redundant, N+1 system capacity components at a minimum, permitting the system to recover despite failure of a specific system component.
Site should be designed to withstand extreme weather, including sustained surface winds of 140 mph and gusts up to 150 mph.
3.1 Site Layout
The notional site layout is shown in Figure 3 – Notional Site Layout. The following assumptions and requirements were used:
• 68 ft. diameter rigid radome (GTE/CNE contractor provided)
• 30 ft. area around radome drip lines for patrol access
• 50 ft. level area around radome for construction
• A single 20 ft. wide service road for vehicular access
• GTE shelter, 27 x 10 ft. and attached ECU 8 x 5 ft (both GTE/CNE contractor provided).
• CNE shelter, 27 x 10 ft. and attached ECU 8 x 5 ft (both GTE/CNE contractor provided).
• Site Facilities Communications Shelter
• Site Facilities Electrical Shelter for switchgear and related equipment
• Three 500 kW generators (bid option)
• Fuel storage tank (bid option)
• Antenna reflector assembly pads, 8 x 4.2 ft.
The locations of the antennas, indicated in the table below, are based on visibility and obscuration analysis and incorporate known limiting factors at the project site; these locations and elevations are approximate and subject to change. Any recommended change to antenna locations must be reviewed by NIWC Pacific and approved by SSC, as the locations and elevations may affect construction, visibility, and obscuration. The proposed locations of the antennas are as follows:
Antenna Latitude Longitude Altitude 1 38.799675 -104.531765 6262.60’ 2 38.799678 -104.530027 6248.98’ 3 38.798781 -104.530037 6238.35'
Figure 3 – Notional Site Layout
3.2 Civil and Environmental
3.2.1 Conservation Measures
The Request for Environmental Impact Analysis (AF Form 813) dated 06 June 2023 approved the site for Categorical Exclusion (CATEX) #A2.3.11.
3.2.2 Excavation, Grading and Leveling
Excavation, grading and leveling is required throughout the site at antenna locations and surrounding areas. The grading and leveling plan will need to be coordinated with the GTE/CNE contractor as the ground elevation may affect GTE location, construction, blockage, and visibility.
All areas requiring any specific terrain adjustments should be completed before trenching and pathways.
A level plane area extending 50’ outside the radome drip lines of each antennas shall be prioritized for radome construction.
Applicable areas shall be designed to accommodate a 100 ton crane, 25 ton cranes, and tractor trailors with flat-bed trucks simultaneously to support construction activities and antenna and radome assembly and integration..
3.2.3 Laydown & Staging
Provide a clear open staging area within the site for the reinstallation and staging of large site materials and equipment.
A temporary container storage area roughly 60’ by 82’ is required for GTE equipment during installation.
Provide sufficient prepared access space around the entire circumference of radome ringwalls for movement and operation of equipment required for the GTE/CNE contractor’s antenna and radome assembly and installation. See Figure 10 – Crane location for pedestal installation, through Figure 14 – Radome Assembly Area.
3.2.4 Shelters
3.2.4.1 Shelter Complex
The F&I contractor must determine specifications and provide Site Facilities Shelter(s) that accommodate all required facility and infrastructure equipment including switchgear, transformers, backup power, and Environmental Control Units (ECU) housed in shelters as required. Temperature of shelters shall be integrated into a GTE/CNE contractor provided reporting system.
3.2.4.2 GTE Shelter and CNE Shelter
The GTE Shelter and CNE Shelter provided by the GTE/CNE contractor shall be placed side-by-side with a spacing of 10-20 feet between them. Both shelters shall face the same direction.
3.2.5 Trenching
The site should be prepared with the necessary trenching and concrete-encased duct banks in support of all utilities systems.
A diversified utility duct bank system must be provided for the delivery of electrical energy from the distribution feeders to the substation that will provide all grid-fed electrical service for this site, and from the substation to the Site Facilities Electrical shelter. Additional utility duct banks on site must be provided from the Site Facilities Electrical shelter to the CNE shelter, GTE shelter, GTEs, and generators.
A diversified communications duct bank system must be provided to connect telecommunications maintenance holes (TMH) separately to the Site Facilities Communications shelter and CNE shelter. Additional communications duct banks on site must be provided from the Site Facilities Communications shelter to the CNE shelter, and from the GTE shelter to each of the radomes/antennas. Notional communications duct bank connectivity is shown in Appendix D.
3.2.6 Paving
Paving should be provided for improved pathways for foot and vehicular traffic to traverse though the site in support of site perimeter patrol, operations and maintenance of the various programs on-site, and regular maintenance tasks required for the operational tasks of the site. Paving will be minimized in actual design to reduce cost.
3.2.6.1 Roads & Walking Paths
An access roadway from the main access road leading up to the exterior of the site must be provided. Improved roads and/or walking paths between the Site Facilities shelters, CNE shelter, GTE shelter, and each of the GTEs should be provided. Emergency egress should have no less than a single trailer-truck width roadway to exit the site. Roads to pads and staging areas should be surfaced and graded to accommodate truck, tractor-trailer and 100-ton crane traffic. Tractor-trailer weight is approximately 72,000 to 80,000 pounds.
3.2.7 Foundations
Foundations should be designed to withstand extreme weather, including sustained surface winds requirements previously mentioned. Final foundation design shall be based on load calculations with installed components. Anchor points and or ballasts shall be provided to support the shelters and ECUs.
The surface below the shelters shall be designed to prevent moisture from pooling under the shelters. Concrete pads supporting ECUs shall be designed and constructed to allow for condensate drainage and avoid pooling. All concrete must be cured minimum of four weeks prior to GTE equipment arrival.
3.2.7.1 Antenna Foundation
Each antenna will require a reinforced concrete antenna foundation per requirements specified by GTE/CNE contractor within the radome ringwall. Each antenna foundation shall be designed to support 100,800 lbs. Foundations must have a minimum 3,500 PSI rating and minimum diameter of 8ft. Height of foundation shall be 20.565” above finished floor, with depth dependent on soil conditions. The foundation reinforcement will be no less than two layers of tied rebar connected vertically at numerous locations. The upper reinforcement layer will include additional rebar that tie in twelve (12) – 1.125-inch ground anchor bolts to secure the antenna pedestal. The anchor bolt formation and spacing details will be provided. All antenna foundations shall be structurally isolated from the radome ringwall and radome interior floor slab in order to preclude the transmission of vibrations to the antenna pedestal.
Notional interface requirements are shown in the L3 Datron Advanced Technologies Foundation Interface Data Sheet Drawing No. 8001-0110 dated 8-18-22 in Appendix E.
3.2.7.2 Radome Ringwall Foundation
A radome ring wall will be required for each GTE antenna. The ringwalls must have a minimum 6,000 PSI rating, an outer diameter of 655 inches, an inner diameter of 599 inches, thickness of 28 inches, and height of 10 ft. Additional wall height will be associated with the below ground portion needed to reach a horizontal footer. This depth will be dictated by local soil conditions.
Ringwalls shall be designed to support a weight of 45,000 lbs. The flooring of the radome ringwalls, sans the centered antenna pedestal, must be concrete with a minimum 3,500 PSI rating. The antenna ring wall shall have one single personnel door that has a passable opening no less than 36” wide and 80” high, and one equipment door set that has a passable opening no less than 10 feet (120 inches) wide and no less than 9 feet (108 inches) high. Both doors shall have a threshold that will allow equipment on wheels to easily traverse the threshold.
3.2.7.3 Reflector Assembly Areas and Pads
In support of the antenna build on site, reflector assembly areas and assembly pads are required.
Each assembly area must be large enough to build up an antenna dish. Distance between assembly area and antenna locations are shown in Appendix E. The area should be close enough to each antenna location so that the crane can hoist the reflector from the assembly pad directly onto the pedestal without the crane having to relocate its position. The number of areas required will depend on the site layout and how that affects the antenna assembly and, specifically, crane lift process. Ideally, the areas can be shared between adjacent antennas, resulting in one area for two antennas.
Assembly pads are required at the center of each assembly area as specified in Appendix E.
3.2.7.4 CNE Shelter and ECU Pad
Provide a concrete slab for one (1) 10'W x 27'L x10'H shelter weighing 42,000 pounds and ECU.
Recommended size is 13ft x 37ft with a minimum 3,500 PSI rating. The bolt down pattern of the shelter can be adjusted to spread the load as required.
3.2.7.5 GTE Shelter and ECU Pad
Provide a concrete slab for one (1) 10'W x 27'L x10'H shelter weighing 42,000 pounds and ECU.
Recommended size is 13ft x 37ft with a minimum 3,500 PSI rating. The bolt down pattern of the shelter can be adjusted to spread the load as required.
3.2.7.6 Site Facilities Shelter Pad(s)
The F&I contractor must determine specifications of shelter pad(s) that accommodates the Site Facilities Shelter(s), including electrical power equipment (e.g., switchgear) and associated ECU.
3.2.7.7 Back-up Power Generators
The F&I contractor must determine specifications of concrete pad(s) based on specified generator sizes that accommodate the site electrical power load.
3.2.7.8 Generator Fuel Tanks Pad(s)
The F&I contractor must determine specifications of fuel tank pad(s) based on specified fuel tank sizes that accommodate the site electrical power load.
3.2.7.9 Miscellaneous Pads
Multiple mounting pads will also be needed to support contractor-provided ECU equipment and contractor-provided transformers at each of the antennas. Each antenna will require two (2) pads for ECU and one (1) for a step-down transformer. Each ECU pad must have a minimum dimension of 8ft x 4ft with a minimum 3,500 PSI rating. Each transformer pad must have a minimum dimension of 4ft x 4ft with a minimum 3,500 PSI rating.
3.3 Mechanical
3.3.1 Environmental Control Units
The F&I contractor will provide ECUs for the Site Facilities shelters and other F&I contractor-determined support shelters as required. ECUs for each antennas and their associated support shelters (i.e. CNE Shelter, GTE Shelter) will be provided by the GTE/CNE contractor.
The operations and functionality of mission critical ECUs should have the capacity to remotely operate, monitor, alert, and report all activities taking place at the site’s ECU systems using a standardized remote reporting & command protocol and system to allow the environmental systems to be operated as a lights-out facility.
3.3.2 Fire Alarm & Extinguishing System
3.3.2.1 Classification of Spaces
All GTE/CNE contractor provided antennas and shelters shall be classified as Telecommunications Facilities.
3.3.2.2 Fire Alarm
Fire alarms shall be installed and integrated with SSFB for centralized monitoring and dispatch of response personnel such as fire and police in accordance with the base Installation Facilities Standards (IFS). Fire alarm status shall also be integrated into a GTE/CNE contractor provided reporting system.
3.3.3 Generator System and Fuel Storage Tanks
The F&I contractor must design, size, and install the generator system to accommodate the electrical requirements. Generator system status shall be integrated into a GTE/CNE contractor provided reporting system.
The notional layout assumes a single fuel storage tank.
3.4 Electrical
3.4.1 Power Distribution
Electrical power for the site should be supplied via the “E-House” electrical distribution. Power supplied, frequency and voltage variations for all loads shall not exceed 5% variation from nominal. Transient voltage surge suppression in the load side of the main commercial power point of presence shall be provided.
The total expected power required for the site, with estimates for the F&I contractor’s Site Facilities shelters, associated equipment or other site loads, is approximately 627.7 kVA.
Anticipated Power Requirements are shown in Table 1.
Table 1 – Power Requirements
The main power supply feeder should be underground for the longest allowable distance to contain and protect the circuit. This will also minimize disruption and damage to both the electrical supply as well as end equipment/devices.
3.4.2 Backup Power
The F&I contractor shall provide a generator system that serves as backup electrical supply for all electrical loads for the site. Backup power generators shall be capable of remote operation.
Loads shall be assumed automatically. Distributed backup power shall be sufficient to maintain system operation in the event of a partial or complete loss of commercial power. The generator system should work in concert with the GTE/CNE contractor provided UPS (uninterruptable
Load Qty kVA Ext. kVA
Antenna Motion 3 5.2 15.6
Antenna Rx Electronics (Receive)
Antenna Tx Electronics (Transmit)
Antenna Base and Radome ECU 3 33 99
Antenna Radome Only ECU 3 48.6 145.8
Antenna Radome Only Blow ers 6 16 96
GTE Shelter ECU 1 33 33
CNE Shelter ECU 1 33 33
Site Facilities Electrical Shelter 1 8 8
Generator Shelters 3 3 9
Site Facilities Communication Shelter 1 25 10
Site Facilities Shelter ECUs 2 33 66
Other Site Loads (ECU, interior lighting, etc.) 1 5 10
ESS and Physical Security 1 13 13
627.7
GTE Shelter 1
TOTAL
CNE Shelter 1 25 25
25 25
13.1 39.3 power supply) systems to offer continuous site power for all critical loads that accommodates power fluctuations and power outages. Generator system shall be concurrently maintainable N+1 configuration; Generator system shall cover the total power requirement to allow for concurrent maintenance of any generator while still providing the site’s full load power requirements with the remaining generators. Critical branch backup circuitry shall be provided from the backup power generation system to the shelter critical loads.
3.4.3 Lighting
The F&I contractor shall provide antenna ring wall lighting circuit and appropriately spaced sconces pointing up for illumination mounted to the interior of the ringwall. Selected lighting type shall be approved by the GTE/CNE contractor to ensure that it does not interfere with the S and Ka-Band receive function of the antennas.
3.4.4 Antennas/Ringwalls
The F&I contractor shall provide switch panels installed on the exterior of each antenna ring wall.
The panel shall be appropriately sized and provided with circuit breakers to provide power to the radome HVAC system consisting of a survivable ECU, COTS ECU, two (2) radome blower fans, the antenna pedestal power disconnect switch, radome ringwall convenience receptacles, local equipment disconnect convenience receptacles, radome aircraft anti-collision light, and lighting.
208VAC, 3 phase, 60hz power shall be available at each antenna with two feeder circuits to each antenna base, two circuits to ECUs will be located outside the radome ringwall, two circuits to circulator fans located outside the ringwall and a circuit for lighting and utility circuits inside the ringwall. All circuit breakers at each antenna panel shall be remote trip / shunt trip type breakers.
Antenna distribution connection panel shall have both power surge and over voltage protection.
There shall be an electrical conveyance from exterior ring wall electrical distribution panel through the slab and up to the 200A non-fused electrical disconnect. Provide 200A 3-phase 120/208V electrical conductors from the electrical distribution panel on the exterior of the ring wall to the line side of the 200A non fused disconnect. Provide 200A at 120/208V 60 Hz electrical service at each antenna power non fused disconnect switch. Provide conveyance and conductors for a 120/208V 100A electrical feed to a F&I contractor provided and installed 100A non-fused electrical disconnect located adjacent to radome floor trench near the interior of the radome ringwall IAW Radome Floor Trench Conceptual Layout.
3.4.5 Shelters
The F&I contractor shall provide circuit breakers in a panel capable of providing 150A, 208VAC, 3 phase, 60hz power within 10 feet of the GTE shelter and the CNE shelter. A distribution connection panel on the exterior of the shelter area for power delivery to required shelter circuits.
Circuit breakers at the shelter electrical connection panels with remote trip / shunt trip type breakers. Shelter distribution connection panel that has power surge and over voltage protections. Enclosures for circuit breakers shall be provided that will support all loads being connected in the future by SO type multiconductor cable with strain relief connectors.
3.4.6 Grounding and Lightning Protection
Requirements shall be IAW TIA 607, 8.1.2 Enhanced requirements. The grounding electrode system shall be designed to have a resistance of 10 ohms or less, preferably 5 ohms or less. The grounding electrode system design should take into account seasonal fluctuations such as moisture and temperature.
Provide radome ringwall with sufficient earth grounding as required for local code. Include interfaces to allow radome, antenna grounding and lightning protection tie-in to be completed during assembly. GTE/CNE contractor will supply lightning protection atop the radome. Each antenna and shelter must be connected to an exterior ground ring. Lightning protection connection to ground ring shall be in the interior of the ringwall.
3.4.7 Environmental Control Units
Each GTE/CNE contractor provided survivable ECU shall be provided with two 175A, 120/208VAC, 60hz electrical power circuits protected by a circuit breaker. Enclosures for circuit breakers shall be provided that will support all loads being connected in the future by SO type multiconductor cable with strain relief connectors.
3.5 Telecommunications
3.5.1 On-site Pathways and Racks
Cabling pathways and infrastructure must conform to UFC 3-580-01, TIA-568, and TIA-569.
Electrical wires and communication cables (e.g. voice, video and data cables) must be routed on different pathways IAW section UFC 3-580-01. Pull rope shall be installed in all empty pathways.
All on-site OSP cabling will be installed by NIWC Pacific.
A minimum of two (2) PVC 4” underground conduit/pathways shall be installed per route. All shelters and ringwalls shall have two 4” metallic entry conduits for OSP routing. Each PVC pathway shall be installed with a minimum of two (2) collapsable fabric mesh innerducts each consisting of three (3) cable chambers.
A notional onsite communication outside plant pathway layout is depicted in Appendix D. The intent of the diagrams is to depict the diverse path requirements and not provide a preferred site design (i.e. pathway configurations, conduit sizes and quantities, etc). Each antenna shall have two diverse OSP entry routes.
Each equipment rack must be equipped with a copper busbar that is bonded to the equipotential ground system; minimum grounding connection size must be in accordance with NFPA 70, Table
250.122. Bond the cabinet frame to the cabinet busbar. Bond all detachable metallic parts of the equipment cabinet to the cabinet frame. Ground shall have a resistance of 10 ohms or less, preferably 5 ohms or less. Equipment racks for the GTE and CNE shelters will be the responsibility of the GTE/CNE contractor. Equipment racks must be Seismic Zone 4 Network Equipment-Building System GR-63-CORE compliant.
The C4I communications rack inside the SFS(COMMS) shelter shall be furnished with three (3) NEMA 5-20R. Each NEMA 5-20R shall be on a dedicated 20A circuit breaker. Other dedicated 20A branch circuits shall be provisioned to the ESS infrastructures at all shelters and ringwalls as illustrated in Appendix B.
Interior cable trays and ladders used to route OSP/ISP between conduit pathways and equipment cabinets must be installed and grounded IAW TIA-569 and TIA-607-C respectively.
Telecommunication Handholes (THH) shall have a design/test load that adheres to ANSI/SCTE 77 2023 tier 15 rating. THH dimensions shall not be smaller than 4' width x 4' length 4' depth. THH shall have surface covers with a legible unique identifier # and the word “communications”. The THH cover shall be removable from top and whose compartment are below-the-surface connected with underground pathways. Telecommunication pathways.
Telecommunication pathways shall consist of Schedule 40 rigid non-metallic conduit compliant with NEMA TC-2 and International Organization for Standardization (ISO) 4427. These pathways shall be buried no less than 24” from grade to top of pathway.
3.5.2 Offsite Pathways and Cabling
Notional offsite communication pathways are depicted in Appendix D.
The following offsite pathways and cabling have been identified:
• CNE shelter to Bldg 712, 36 strands (meshONE-T primary node)
• Site Facilities Communications shelter to Bldg 400, 36 strands (meshONE-T alternate node)
• Site Facilities Communications shelter to Bldg 600, 12 strands (fire, environmental)
• Site Facilities Communications shelter to Bldg 300, 12 strands (security)
• Site Facilities Communications shelter to Bldg 780, 36 strands (ITN for NIPR/telephones)
The OSP cable shall have the following specifications: OS2, 36 strand, loose tube (not ribbon), plenum rated black jacket, dielectric unarmored sheath.
All OSP OS2 fiber strands shall terminate on fiber optic patch panels with Lucent Connector / Ultra Physical Contact (LC/UPC) duplex jacks
3.5.3 Classified Information Spaces
The only secure spaces for the site are the GTE/CNE shelters. The GTE/CNE contractor will ensure its space is designed in accordance with DoDM 5200.01, Volume 3 for classified information processing. In addition, classified (RED) and unclassified (BLACK) requirements must comply with CNSSAM TEMPEST 1-13.
3.6 Security
3.6.1 Electronic Security Systems
The ESS will be designed, procured, installed, configured, and tested by NIWC Pacific. ESS shall comprise of access control system (ACS), intrusion detection system (IDS) and closed-circuit television (CCTV) system at each door entry. The site facility communication shelter shall serve as the core where all the ESS signals and video footage shall be aggregated and transmitted out.
The F&I contractor shall be responsible for installing ESS infrastructure, to include: conduits, J-boxes, enclosures, and electrical as shown in Appendix B.
3.6.2 Physical Security
RGS-S is a PL-3 asset and should be designed and built to PL-3 requirements in accordance with DAFI 31-101, however, it is within a PL-2 compound and the applicable PL-2 requirements shall apply.
Lighting will be required to illuminate facilities and entryways.
Any portion of the site shelters should plan, design, construct, commission, and operate within a security measure area and should implement all the physical measures that are required to ensure the security measure area(s) integrity.
Appendix A. Abbreviations
The following abbreviations are referenced within the body of the document. Exception:
Abbreviations found within tables and document titles are excluded from this list.
Acronym Definition A-E Architect-Engineer ACS Access Control System APA anomalies per acre C2 Command & Control
C4I/IT Command, Control, Communications, Computers, Intelligence/Information Technology
CAT3 Category 3 CCTV Closed-Circuit Television CIS Critical Infrastructure Support CNE Communications and Networking Equipment
CNSSAM Committee on National Security Systems Advisory Memorandum
DCA Design Construction Agent DCO-S Defensive Cyber Operations for Space DGM Digital Geophysical Mapping DSP Defense Support Program ECU Environmental Control Unit EMI Electromagnetic Interference EMR Electromagnetic Radiation ESS Electronic Security System F&I Facilities and Infrastructure
FORGE Future Operationally Resilient Ground Evolution FRCS Facility Related Control System GEO Geosynchronous GEP Ground Entry Point GTE Ground Terminal Equipment
HERF Hazards of Electromagnetic Radiation to Fuel HQ SpOC Headquarters Space Operations Command
HVAC Heating, Ventilation, and Air Conditioning IDS Intrusion Detection System ISP Inside Plant
LC/UPC Lucent Connector / Ultra Physical Contact MOA Memorandum of Agreement
MPPEH Material Potentially Presenting an Explosives Hazard NEMA National Electrical Manufacturers Association NGG Next Generation GEO NGP Next Generation Polar NIWC Naval Information Warfare Center OPIR Overhead Persistent Infrared OS2 Optical Single-Mode 2
Acronym Definition OSP Outside Plant
RDT&E Research, Development, Test, and Evaluation RGS-S Relay Ground Station – South
RF Radio Frequency SBB Secondary Bonding Busbar
SBIRS Space Based Infrared System SPDD Site Preliminary Design Document SSC Space Systems Command T&E Threatened and Endangered TMH Telecommunication Manhole
TRANSEC Transmission Security UFC Unified Facilities Criteria UPS Uninterruptible Power Supply
USACE United States Army Corps of Engineers USSF United States Space Force
Appendix B. ESS Figures & Details
Figure 4 – ESS shelter infrastructure
CR
KP
DC
MD
CCTV
LEGEND
CARD READER JBOX
KEY PAD JBOX
CLOSED CIRCUIT TV JBOX
MOTION DETECTION JBOX
DOOR CONTROL JBOX
CR
CCTV
KP
NOTES:
1. C4I EQUIPMENT INCLUDES FO PP
FOR OSP, ESS NETWORK SWITCH
AND UPS (ALL GFGI BY NIWC)
2. DB CONTRACTOR INSTALLS ALL
C4I INFRASTRUCTURE WHICH
INCLUDES: JBOX’S, ENCLOSURES,
CONDUITS AND ELECTRICAL
BRANCH CIRCUITS.
3. ALL ESS EQUIPMENT AND
ASSOCIATED CABLING SHALL BE
GFGI INSIDE DB INSTALLED C4I
INFRASTRUCTURE.
VWMC VERTICAL WALL MOUNTED CABINET
HOUSING C4I EQPMT (GFGI)
C4I
RACKMOUNTED
EQUIPMENT
NEMA 4X
OSP
ENCLOSURE
(FOR OSP
ENTRY PT)
NEMA 5-20R ON DEDICATED 20A
BREAKER FOR ESS EQUIPMENT
ESS ESS ENCLOSURE (LIKE ALTRONIX TROVE 2: 27.75"Wx 27.25"H X 6.5"D)
ES
SMD
EMT CONDUIT
JBOX/CONDUIT OTHER SIDE OF WALL (EXTERIOR)CR
FINISH FLOOR
BRANCH CIRCUIT TO
DEDICATED
20A BREAKER
TYPICAL RADOME INTERIOR ESS
ELEVATION VIEW
KPCR
ESS
ENCLS
MD CCTV
OSP ENTRY POINTS
BRANCH CIRCUIT TO
DEDICATED 20A
BREAKER
C4I
VWMC
WALL
MOUNTED
CABINET
(GFGI)
NEMA 4X
ENCLS
CONDUIT FOR OSP
TYPICAL RINGWALL ESS
TOP VIEW
MAIN ENTRY DOORDOOR
HINGE
SIDE
C4I
CONDUIT (GFGI)
REFER TO ESS DOOR
ENTRY DETAILS
Figure 5 – ESS radome infrastructure
Figure 6 – ESS door entry details
Appendix C. Shelter, Rack Details
Figure 7 – Partial Site Facilities Shelter Layout
Appendix D. Communications Figures and Diagrams
Figure 8 – Notional OSP layout
Appendix E. GTE/CNE System Equipment F&I Support Details
Figure 9 – Pedestal Foundation Interface Data Sheet
Figure 10 – Crane location for pedestal installation
Figure 11 – Crane location for placing reflector on pedestal
Figure 12 – Reflector lifted to pedestal
Figure 13 – Radome crane lift
Figure 14 – Radome Assembly Area
Figure 15 – Reflector Assembly Pad
Figure 16 – Radome Floor Trench
Note: GFE in above diagram will be responsibility of F&I contractor
Figure 17 – GTE/CNE Contractor Distribution Diagrams
Note: GFE in above diagram will be responsibility of F&I contractor
| Table of Contents |
| Revision History Table |
| 1 Scope |
| 1.1 Purpose |
| 1.2 Document Revision Plan |
| 1.3 Project Background |
| 1.3.1 Work Breakdown and Contracts |
| 1.3.1.1 Ground Terminal Equipment |
| 1.3.1.2 Communications and Networking Equipment |
| 1.3.1.3 Facilities and Infrastructure |
| 1.3.1.4 Command, Control, Communications, Computers, Intelligence/Information Technology |
| 1.4 Project Site |
| 1.5 Key Milestones & Work Coordination |
| 1.6 Roles and Responsibilities Assumptions |
| 2 Applicable Documents |
| 2.1 Reference Documents |
| 3 Site Design |
| 3.1 Site Layout |
| 3.2 Civil and Environmental |
| 3.2.1 Conservation Measures |
| 3.2.2 Excavation, Grading and Leveling |
| 3.2.3 Laydown & Staging |
| 3.2.4 Shelters |
| 3.2.4.1 Shelter Complex |
| 3.2.4.2 GTE Shelter and CNE Shelter |
| 3.2.5 Trenching |
| 3.2.6 Paving |
| 3.2.6.1 Roads & Walking Paths |
| 3.2.7 Foundations |
| 3.2.7.1 Antenna Foundation |
| 3.2.7.2 Radome Ringwall Foundation |
| 3.2.7.3 Reflector Assembly Areas and Pads |
| 3.2.7.4 CNE Shelter and ECU Pad |
| 3.2.7.5 GTE Shelter and ECU Pad |
| 3.2.7.6 Site Facilities Shelter Pad(s) |
| 3.2.7.7 Back-up Power Generators |
| 3.2.7.8 Generator Fuel Tanks Pad(s) |
| 3.2.7.9 Miscellaneous Pads |
| 3.3 Mechanical |
| 3.3.1 Environmental Control Units |
| 3.3.2 Fire Alarm & Extinguishing System |
| 3.3.2.1 Classification of Spaces |
| 3.3.2.2 Fire Alarm |
3.3.3 Generator System and Fuel Storage Tanks
| 3.4 Electrical |
| 3.4.1 Power Distribution |
| 3.4.2 Backup Power |
| 3.4.3 Lighting |
| 3.4.4 Antennas/Ringwalls |
| 3.4.5 Shelters |
| 3.4.6 Grounding and Lightning Protection |
| 3.4.7 Environmental Control Units |
| 3.5 Telecommunications |
| 3.5.1 On-site Pathways and Racks |
| 3.5.2 Offsite Pathways and Cabling |
| 3.5.3 Classified Information Spaces |
| 3.6 Security |
| 3.6.1 Electronic Security Systems |
| 3.6.2 Physical Security |
| Appendix A. Abbreviations |
| Appendix B. ESS Figures & Details |
| Appendix C. Shelter, Rack Details |
| Appendix D. Communications Figures and Diagrams |
| Appendix E. GTE/CNE System Equipment F&I Support Details |
| 2025-08-13T11:25:02-1000 | |
| KY.JAMES.1298879154 |
File details come from the government source that posted it. Updated .