Solicitation Amendment W9128F25RA0530005 SF 30.pdf

PDF 3 MB Posted

Attached to
GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT
Solicitation number
W9128F25RA053
Issued by

About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a GSU Transformer Supply project for the U.S. Army Corps of Engineers, Omaha District, covering transformer requirements for Oahe Dam in South Dakota and Ft. Peck Dam in Montana. Amendment No. 0005, issued on 16 SEP 2025, modifies specifications and drawings, with electronic proposals due by 2:00 p.m. local time on 14 OCT 2025.

The amendment includes several key changes: updated price schedule, modifications to the Economic Price Adjustment clause, deletion of certain evaluation clauses, and revisions to specification pages and drawings. Specifically, it updates pages for sections 00 10 00, 01 22 00, and 48 19 23.05 26, and reissues Sheets G-203 and G-204 with a latest revision date of 22 AUG 2025. The amendment introduces changes to pricing terms, particularly around economic price adjustments, and provides detailed instructions for submitting electronic proposals.

View the file

Other files

File Type Posted
Attachment 2 Sheet G-103 Am-0006.pdf PDF
Solicitation Amendment W9128F25RA0530006 SF 30.pdf PDF
Attachment 1 Specifications Am-0006.pdf PDF
Attachment 3 Transformer Oil Tests Table Am-0006.pdf PDF
Solicitation Amendment W9128F25BA0080002 SF 30.pdf PDF
Attachment 6 Sheet G_204.pdf PDF
Attachment 4 Specifications AM 0005.pdf PDF
Attachment 5 Sheet G_203 .pdf PDF
Attachment 1 Price Schedule Am-0005.pdf PDF
Attachment 3 Section 01 22 00 Am-0005.pdf PDF
Attachment 2 Addendum to 52.212-2 Am-0005.pdf PDF
Solicitation Amendment - W9128F25RA0530005.pdf PDF
Attachment-1 Price Schedule - Updated.pdf PDF
Solicitation Amendment W9128F25RA0530004 SF 30.pdf PDF
Solicitation Amendment W9128F25RA0530003 SF 30.pdf PDF
Site Visit Attendees Attendees Oahe Dam_SD.pdf PDF
Site Visit Attendees Fort Peck_MT.pdf PDF
Solicitation Amendment - W9128F25RA0530002 SF 30.pdf PDF
Solicitation Amendment W9128F25RA0530001 SF 30.pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 2 of 3 (1).pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 2 of 3.pdf PDF
Attachment-5 OA_FP GSU Transformer Supply specs.pdf PDF
Attachment-3 Oahe GSU Transformer Reference Drawings.pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 1 of 3.pdf PDF
Addendum to 52.212-2.pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 3 of 3.pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 2 of 3.pdf PDF
Attachment-2 Fort Peck GSU Transformer Reference Drawings.pdf PDF
Attachment-1 Price Schedule.pdf PDF
Solicitation - W9128F25RA053.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Continuation of Supplies or Services and Prices/Costs

Miscellaneous text in this section has been deleted:

See Attachment #1 Price Schedule - Updated 10 Sep 2025

Addendum to Contract Clauses

Additional Information/Notes

The following clauses were added:

FAR Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

52.229-3 Federal, State, and Local Taxes. Feb 2013

The following clauses were modified:

52.216-2Economic Price Adjustment-Standard Supplies. (Tailored)Nov 2021 hereby reads as follows:

Economic Price Adjustment-Standard Supplies (Nov 2021)

The Contractor warrants that the unit price stated in the Schedule for is (a) CLINS 0001, 0002, and 0010 not in excess of the Contractor's applicable established price in effect on the contract date for like quantities of the same item. The term "unit price" excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term "established price" means a price that-

Is an established catalog or market price for a commercial product sold in substantial quantities to the (1) general public; and

Is the net price after applying any standard trade discounts offered by the Contractor.(2)

The Contractor shall promptly notify the Contracting Officer of the amount and effective date of each (b) decrease in any applicable established price. Each corresponding contract unit price shall be decreased by the same percentage that the established price is decreased. The decrease shall apply to those items delivered on and after the effective date of the decrease in the Contractor's established price, and this contract shall be modified accordingly.

W9128F25RA0530005

If the Contractor's applicable established price is increased after the contract date, the corresponding (c) contract unit price shall be increased, upon the Contractor's written request to the Contracting Officer, by the same percentage that the established price is increased, and the contract shall be modified accordingly, subject to the following limitations:

The aggregate of the increases in any contract unit price under this clause shall not exceed 20 percent (1) of the original contract unit price.

The increased contract unit price shall be effective-(2)

On the effective date of the increase in the applicable established price if the Contracting Officer (i) receives the Contractor's written request within 10 days thereafter; or

If the written request is received later, on the date the Contracting Officer receives the request.(ii)

The increased contract unit price shall not apply to quantities scheduled under the contract for (3) delivery before the effective date of the increased contract unit price, unless failure to deliver before that date results from causes beyond the control and without the fault or negligence of the Contractor, within the meaning of the Default clause.

No modification increasing a contract unit price shall be executed under this paragraph (c) until the (4) Contracting Officer verifies the increase in the applicable established price.

Within 30 days after receipt of the Contractor's written request, the Contracting Officer may cancel, (5) without liability to either party, any undelivered portion of the contract items affected by the requested increase.

During the time allowed for the cancellation provided for in paragraph (c)(5) of this clause, and (d) thereafter if there is no cancellation, the Contractor shall continue deliveries according to the contract delivery schedule, and the Government shall pay for such deliveries at the contract unit price, increased to the extent provided by paragraph (c) of this clause.

(End of clause)

Additional EPA information related to this contract:

Solicitation Amendment 0004

Economic Price Adjustment (EPA) (Am0004)

This paragraph details how FAR 52.216-2 Economic Price Adjustment-Standard Supplies applies to this contract. See Section 00 10 00 EPA Clause Section and sub CLINs 0001, 0002, 0009, 0010, and 0014 for the specific material, item limitations, and indices applicable to the Economic Price Adjustment clause for this contract.

Formula (Am0004)

The following formula will be used to calculate contract economic price adjustment:

E = PMT x [(SSc/SSb) - 1.0]

Where:

E is the economic price adjustment, PMT is the dollar value of the material per the final proposal submission, SSc is the current material index value, and SSb is the base material index value at time of final proposal submission of this contract.

EPA Submission Requirements and Process (Am0004)

For materials covered under the EPA clause, the Contractor shall submit to the Contracting Officer proof of purchase, which shall indicate the material quantity (lbs) and delivery date. When the EPA is determined to be warranted, a pay activity will be added to the applicable CLIN to pay for the increase.

The following clauses were deleted:

FAR Clauses Incorporated by Full Text

52.212-2 Evaluation-Commercial Products and Commercial Services.

(Tailored)

(Nov 2021)

Evaluation-Commercial Products and Commercial Services (Nov 2021)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: (See Addendum to 52.212-2 for additional evaluation details.)

I. Factor 1 - Technical Requirements and Approach

II. Factor 2 - Work Plan

III. Factor 3 - Past Performance

IV. Factor 4 - Small Business Participation

V. Factor 5 - Price

The following Table shows Factors to be evaluated and relative evaluation importance.

Factor Description Relative Importance

FACT

OR 1

Technical Requirement and Approach

Most Important Factor

FACT

OR 2

Work Plan Equal to Factor 1

FACT

OR 3

Past Performance Less important than Factors 1 and 2.

FACTO

R 4

Small Business Participation

Less important than Factors 1-3.

FACT

OR 5

Price All evaluation factors, other than price, when combined, are significantly more important than price.

(b) . The Government will evaluate offers for award purposes by adding the total price for all Options options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

List of Contract Documents, Exhibits, or Attachments

The attachments table has changed from:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

FP_OA Price Schedule

Attachment #1 Price Schedule 08 Apr 2025 Attachment No

Addendum to 52.212-2

Addendum to 52.212-2 15 Apr 2025 Attachment No

To:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

Attachment 1 Price Schedule Am-0005

Attachment 1 Price Schedule AM 0005 19 Sep 2025 Attachment No

Attachment 2 Addendum to 52.212-2 Am-0005

Attachment 2 Addendum to 52.212-2

AM 0005

19 Sep 2025 Attachment No

Attachment 3 Section 01 22 00 Am-0005

Attachment 3 - Section 01 22 00 AM

19 Sep 2025 Attachment No

Attachment 4 Specifications AM

Specification 19 Sep 2025 Attachment No

Attachment 5 Sheet G_203

Drawings 19 Sep 2025 Attachment No

Attachment 6 Sheet G_204

Drawings 19 Sep 2025 Attachment No

The following contract documents were added:

Attachment 1 Price Schedule Am-0005 Attachment 2 Addendum to 52.212-2 Am-0005

Attachment 3 Section 01 22 00 Am-0005 Attachment 4 Specifications AM 0005 Attachment 5 Sheet G_203 Attachment 6 Sheet G_204

The following contract documents were deleted:

Addendum to 52.212-2 FP_OA Price Schedule

Miscellaneous text in this section has been modified to:

Attachment #1 - Price Schedule AM 0005

Attachment #2 - Addendum to 52.212-2 AM 0005

Attachment #3 - Section 01 22 00 AM 0005

Attachment #4 - Specifications AM 0005

Attachment #5 - Sheet G-203

Attachment #6 - Sheet G-204

16 SEP 2025

Solicitation No. W9128F25RA053

Date of Issue: 15 APR 2025 Date of Receiving Proposals: 14 OCT 2025

SUBJECT: Amendment No. 0005 to Specifications and Drawings for GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

b. . Delete and substitute or add specificationSpecifications (New and/or Revised and Reissued) pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by "*Am- 5" (underlining of added text and/or strikeout of deleted text).

Pages or Sections Deleted Pages or Sections Substituted or Added 00 10 00 01 10 00 01 22 00 01 22 00 Am-0005 48 19 23.05 26 48 19 23.05 26 Am-0005 Addem 52.212-2 Addem 52.212-2

d. The following drawings are revised with latest revision date of 22 AUGDrawings (Reissued).

2025, and reissued with this amendment.

(1) , Oahe 230kV 1-Phase Transformers Requirements Summary Sheet Sheet G-203

(2) , Oahe 115kV 3-Phase Transformer Requirements Summary Sheet Sheet G-204

2. This amendment is a part of the proposing documents, and a receipt acknowledgement shall be provided with the SF1442. All other conditions and requirements of the specifications remain unchanged.

3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.

4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 14 OCT 2025, as stated in the Request For Proposal.

Attachments:

Spec Pages listed in 1.a. above Dwgs. listed in 1.b. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 681024901

16 SEP 2025

JNS/2179

IDCode: J
Page: 1
Pages: 7
AmendNo: 0005
EffDate: 11 SEP 2025
ReqNo:
ProjNo:
IssCode: W9128F
AdmCode:
IssuedBy: W071 ENDIST OMAHA

KO CONTRACTING OFFICE, 1616 CAPITOL AVENUE

OMAHA, NE 68102-4901

UNITED STATES

BRANDIE MURPHY, EMAIL: BRANDIE.L.MURPHY@USACE.ARMY.MIL TELEPHONE: 402-995-2332

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W9128F25RA053
SolDate: 15 APR 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: THE PURPOSE OF THIS AMENDMENT IS TO INCORPORATE CHANGES TO THE SPECIFICATIONS AND DRAWINGS, ADD FAR CLAUSE 52.229-3, AND REVISED ADDENDUM TO 52.212-2. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
ContNameTitle:
CoNameTitle: MARC R. PROIETTO
ContDate:
CODate: 19 SEP 2025