This document is a comprehensive Pricing Schedule for the GSU (Generator Step-Up) Transformer Supply contract for the Oahe and Fort Peck Dams. The pricing schedule details multiple Contract Line Items (CLINs) for transformer design, manufacturing, testing, delivery, and associated services across three main transformer types: one 103,000 kVA three-phase transformer for Oahe Dam, nine 68,667 kVA single-phase transformers for Oahe Dam, and two 42,000/56,000 kVA three-phase transformers for Fort Peck Dam. Each CLIN is broken down into sub-components including design approvals, tank production, winding construction, core construction, assembly, and on-site testing, with specific percentage allocations for each stage of production.

The document includes an Economic Price Adjustment (EPA) section that allows for price modifications based on fluctuations in steel, copper, and transformer oil indices from the Bureau of Labor Statistics. The contract requires detailed pricing for each transformer type and associated services, with specific instructions that prices must be entered for all items and that total amounts submitted without individual item prices will be rejected. The transformers are characterized by different voltage ratings, cooling classes, and specific technical specifications, with delivery and installation to be coordinated at the Oahe and Fort Peck Dam power plant locations. The procurement is being conducted by the U.S. Army Corps of Engineers Omaha District, with a primary NAICS code of 335311 for Power, Distribution, and Specialty Transformer Manufacturing.

View the file

Other files

File Type Posted
Attachment 2 Sheet G-103 Am-0006.pdf PDF
Solicitation Amendment W9128F25RA0530006 SF 30.pdf PDF
Attachment 3 Transformer Oil Tests Table Am-0006.pdf PDF
Attachment 1 Specifications Am-0006.pdf PDF
Solicitation Amendment W9128F25BA0080002 SF 30.pdf PDF
Solicitation Amendment W9128F25RA0530005 SF 30.pdf PDF
Attachment 6 Sheet G_204.pdf PDF
Attachment 4 Specifications AM 0005.pdf PDF
Attachment 5 Sheet G_203 .pdf PDF
Attachment 1 Price Schedule Am-0005.pdf PDF
Attachment 2 Addendum to 52.212-2 Am-0005.pdf PDF
Solicitation Amendment - W9128F25RA0530005.pdf PDF
Attachment 3 Section 01 22 00 Am-0005.pdf PDF
Solicitation Amendment W9128F25RA0530004 SF 30.pdf PDF
Attachment-1 Price Schedule - Updated.pdf PDF
Solicitation Amendment W9128F25RA0530003 SF 30.pdf PDF
Site Visit Attendees Fort Peck_MT.pdf PDF
Site Visit Attendees Attendees Oahe Dam_SD.pdf PDF
Solicitation Amendment - W9128F25RA0530002 SF 30.pdf PDF
Solicitation Amendment W9128F25RA0530001 SF 30.pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 2 of 3 (1).pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 2 of 3.pdf PDF
Attachment-5 OA_FP GSU Transformer Supply specs.pdf PDF
Attachment-3 Oahe GSU Transformer Reference Drawings.pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 1 of 3.pdf PDF
Addendum to 52.212-2.pdf PDF
Solicitation - W9128F25RA053.pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 3 of 3.pdf PDF
Attachment-4 OA_FP GSU Transformer Contract Drawings 2 of 3.pdf PDF
Attachment-2 Fort Peck GSU Transformer Reference Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ft Peck/Oahe GSU Transformer Supply

OA00106

SECTION 00 10 00

Pricing Schedule

CLIN Description

Q u a n ti ty

U n it

M e a su r e

Unit Price Amount

Basis

BASE ITEMS

(OA) Design, manufacture and factory test 103,000 kVA, 115 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class OFAF, three-phase GSU power transformer.

1 JA

0001A

(OA) 60 % design approval of the 103,000 kVA, 115 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class OFAF, three-phase GSU power transformer.

1 EA $________ $________

Maximum of 5% of total CLIN 0001 Value.

0001B

(OA) Final design approval of the

103,000 kVA, 115 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class OFAF, three-phase GSU power transformer.

1 EA $________ $________

Maximum of 10% of total CLIN 0001 Value.

0001C

(OA) Tank Production for the 103,000 kVA, 115 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class OFAF, three-phase GSU power transformer.

1 EA $________ $________ Maximum of 20% of Total CLIN 0001 Value

0001D

(OA) Winding Construction for the

103,000 kVA, 115 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class OFAF, three-phase GSU power transformer.

1 EA $________ $________ Maximum of 20% of Total CLIN 0001 Value

0001E

(OA)Core Construction for the 103,000 kVA, 115 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class OFAF, three-phase GSU power transformer.

1 EA $________ $________ Maximum of 20% of Total CLIN 0001 Value

0001F

(OA)Assembly of the 103,000 kVA, 115 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class OFAF, three-phase GSU power transformer on-site.

1 EA $________ $________ Maximum of 20% of Total CLIN 0001 Value

0001G

(OA)Testing of the 103,000 kVA, 115 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class OFAF, three-phase GSU power transformer on-site.

1 EA $________ $________ Total Remaining of CLIN 0001 Value

SUB TOTAL CLIN 0001 $_________

____lbs of Core Steel @ $____/lbs

____lbs of Plate Steel @ $____/lbs

____lbs of Copper @ $______/lbs ______gal of Transformer Oil_ @ $_____/gal

(OA)Design, manufacture and factory test 68,667 kVA, 230/132.79 kV high-voltage, 13.8 kV low-voltage, cooling class OFAF, single-phase GSU power transformer.

9 JA

0002A

(OA) 60% design approval of the 68,667 kVA, 230/132.79 kV high-voltage, 13.8 kV low-voltage, cooling class OFAF, single-phase GSU power transformers.

EA $________ $________

Maximum of 5% of total CLIN 0002 Value.

0002B

(OA) Final design approval of the 68,667 kVA, 230/132.79 kV high-voltage, 13.8 kV low-voltage, cooling class OFAF, single-phase GSU power transformers.

1 EA $________ $________

Maximum of 10% of total CLIN 0002 Value.

0002C

(OA) Tank Production of the 68,667 kVA, 230/132.79 kV high-voltage, 13.8 kV low-voltage, cooling class OFAF, single-phase GSU power transformers.

9 EA $________ $________

Maximum of 20% of Total CLIN 0002 Value

0002D

(OA) Winding Construction of the 68,667 kVA, 230/132.79 kV high-voltage, 13.8 kV low-voltage, cooling class OFAF, single-phase GSU power transformer.

9 EA $________ $________

Maximum of 20% of Total CLIN 0002 Value

0002E

Core Construction of the 68,667 kVA, 230/132.79 kV high-voltage, 13.8 kV low-voltage, cooling class OFAF, single-phase GSU power transformer.

9 EA $________ $________

Maximum of 20% of Total CLIN 0002 Value

0002F

Assembly of the 68,667 kVA, 230/132.79 kV high-voltage, 13.8 kV low-voltage, cooling class OFAF, single-phase GSU power transformer.

9 EA $________ $________

Maximum of 20% of Total CLIN 0002 Value

0002G

Testing of the 68,667 kVA, 230/132.79 kV high-voltage, 13.8 kV low-voltage, cooling class OFAF, single-phase GSU power transformer.

9 EA $________ $________

Total Remaining of CLIN 0002 Value

SUB TOTAL CLIN 0002 $________

______lbs of Core Steel @ $________/lbs

______lbs of Plate Steel @ $________/lbs

______lbs of Copper @ $________/lbs ______gal of Transformer Oil @ $________/gal

(OA)Deliver the 103,000 kVA, 115 kV three-phase power transformer and accessories from the manufacturing facility complete to the Oahe Dam power plant.

1 EA $________ $________ None

(OA)Deliver the 68,667 kVA, 230/132.79 kV single-phase power transformer and accessories from the manufacturing facility complete to the Oahe Dam power plant.

9 EA $________ $________ None

(OA)Offload the 103,000 kVA, 115 kV three-phase power transformer and accessories at the Oahe Dam power plant temporary storage location, perform inspections, perform cleaning, provide temporary storage materials, perform transformer reassembly, furnish oil and perform oil-filling and processing, perform field tests, and provide the of services of an Erecting Engineer.

1 EA $________ $________ None

(OA)Offload the 68,667 kVA, 230/132.79 kV single-phase power transformer and accessories at the Oahe

Dam power plant temporary storage location, perform inspections, perform cleaning, provide temporary storage materials, perform transformer reassembly, furnish oil and perform oil-filling and processing, perform field tests, and provide the of services of an Erecting Engineer.

9 EA $________ $________ None

(OA)Move the 103,000 kVA, 115 kV three-phase power transformer from the temporary storage location to the permanent operating location, perform testing, perform inspections, perform cleaning, perform touch-up painting, and provide the of services of an Erecting

Engineer and Commissioning Agent.

1 EA $________ $________ None

(OA)Move the 68,667 kVA, 230/132.79 kV single-phase power transformer from the temporary storage location to the permanent operating location, perform testing, perform inspections, perform cleaning, perform touch-up painting, and provide the of services of an Erecting Engineer and Commissioning Agent.

9 EA $________ $________ None

(OA)Furnish spare parts (See Section 48

19 23.05 26)

1 LOT $________ $________

____lbs of Core Steel @ $____/lbs

____lbs of Plate Steel @ $____/lbs ____lbs of Copper @ $______/lbs

______gal of Transformer Oil_ @ $_____/gal

(FP)Design, manufacture and factory test 42,000/56,000 kVA, 230 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class ONAN/ONAF, three-phase

GSU power transformer.

2 JA

0010A

(FP) 60 % design approval of the

42,000/56,000 kVA, 230 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class ONAN/ONAF, three-phase

GSU power transformer.

1 EA $________ $________ Maximum of 5% of total CLIN 0010 Value.

0010B

(FP) Final design approval of the

42,000/56,000 kVA, 230 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class ONAN/ONAF, three-phase

GSU power transformer.

1 EA $________ $________ Maximum of 10% of total CLIN 0010 Value.

0010C

(FP) Tank Production of the

42,000/56,000 kVA, 230 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class ONAN/ONAF, three-phase

GSU power transformer.

2 EA $________ $________ Maximum of 20% of Total CLIN 0010 Value

0010D

(FP) Winding Construction of the

42,000/56,000 kVA, 230 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class ONAN/ONAF, three-phase

GSU power transformer.

2 EA $________ $________ Maximum of 20% of Total CLIN 0010 Value

0010E

(FP) Core Construction of the

42,000/56,000 kVA, 230 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class ONAN/ONAF, three-phase GSU power transformer.

2 EA $________ $________ Maximum of 20% of Total CLIN 0010 Value

0010F

(FP) Assembly of the 42,000/56,000 kVA, 230 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class ONAN/ONAF, three-phase GSU power transformer.

2 EA $________ $________ Maximum of 20% of Total CLIN 0010 Value

0010G

(FP) Testing of the 42,000/56,000 kVA, 230 kV Grd. Y high-voltage, 13.8 kV delta low-voltage, cooling class

ONAN/ONAF, three-phase GSU power transformer.

2 EA $________ $________ Total Remaining of CLIN 0010 Value

SUB TOTAL CLIN 0010 $________

____lbs of Core Steel @ $____/lbs ____lbs of Plate Steel @ $____/lbs

____lbs of Copper @ $______/lbs

______gal of Transformer Oil_ @ $_____/gal

(FP)Deliver the 42,000/56,000 kVA, 230 kV three-phase power transformer and accessories from the manufacturing facility complete to the Fort Peck Dam power plant.

2 EA $________ $________ None

(FP)Offload the 42,000/56,000 kVA, 230 kV three-phase power transformer and accessories at the Fort Peck Dam power plant temporary storage location, perform inspections, perform cleaning, provide temporary storage materials, perform transformer reassembly, furnish oil and perform oil-filling and processing, perform field tests, and provide the of services of an Erecting

Engineer.

2 EA $________ $________ None

(FP)Move the 42,000/56,000 kVA, 230 kV three-phase power transformer from the temporary storage location to the permanent operating location, perform testing, perform inspections, perform cleaning, perform touch-up painting, and provide the of services of an Erecting Engineer and Commissioning Agent.

2 EA $________ $________ None

(FP)Furnish spare parts (See Section 48 19 23.04 26)

1 LOT $________ $________

______lbs of Core Steel @ $________/lbs

______lbs of Plate Steel @ $________/lbs ______lbs of Copper @ $________/lbs

______gal of Transformer Oil @ $________/gal

The following CLIN/PRICE ITEMS is a LOT pricing item to be use for Economic Price Adjustment purposes. This CLIN will be administered in accordance with the Economic Price Adjustment Clause 52.216-2.

Economic Price Adjustment (EPA) FFP 1 LOT XXX

PROJECT NO.: ______________

FOB: DESTINATION

PURCHASE REQUEST NUMBER: ______________

The Government will make an Economic Price Adjustment (EPA) limited to the Steel, Copper, and Transformer Oil listed below, as FAR clause 52.216-

4. In accordance with FAR 52.216-4(a), supporting data shall include, but is not limited to, material invoices.

Cold Rolled Steel: $__________/lb.

Total number of pounds of Steel: __________ lbs.

Total cost of Steel: $__________ Steel Index that shall be used to calculate the EPA for Steel:

WPU101707 (Cold Rolled Steel Sheet and Strip - Bureau of Labor

Statistics)

Standard Plate Steel: $__________/lb.

Total number of pounds of Steel: __________ lbs.

Total cost of Steel: $__________

Steel Index that shall be used to calculate the EPA for Steel:

WPU101704 (Hot rolled steel bars, plates, and structural shapes)

Copper: $__________/lb.

Total number of pounds of copper: __________ lbs.

Total cost of copper: $__________

Copper Index that shall be used to calculate the EPA:

WPU102403 (Secondary copper, Alloyed and Unalloyed - Bureau of Labor

Statistics)

Transformer OIL: $__________/lb.

Total number of gallons of transformer oil: __________ gal.

Total cost of transformer oil: $__________ Transformer Oil that shall be used to calculate the EPA:

WPU057, (Petroleum products, refined - Bureau of Labor Statistics)

Not Separately

Priced

TOTAL BASE (Items 0001 thru 0014) $_________________

NOTES:

1. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the

Government. In case of variation between the Job (lump sum) prices and the total amount, the lump sum prices will be considered the price submitted.

2. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item

Nos. 0001 thru 0014.

3. Prices must be entered for each sub-CLIN associated with CLINs 0001, 0002, and 0010. If the total CLIN price does not match the sum of all sub-CLINs, the cost of the sub-CLIN will be considered the price submitted.

File details come from the government source that posted it. Updated .