Attachment-3 Oahe GSU Transformer Reference Drawings.pdf
PDF 13 MB Posted
- Solicitation number
- W9128F25RA053
About this file
These technical drawings are detailed engineering schematics for generator step-up (GSU) transformers for the Oahe Dam and Fort Peck Dam power plants. The multi-page document contains intricate mechanical and electrical design plans, including elevation views, floor plans, cross-section diagrams, and equipment arrangement layouts for transformer installations. The drawings provide comprehensive architectural and engineering specifications for the power plant facilities, with specific focus on transformer positioning, structural details, and associated infrastructure at elevation 1456.0, covering generator bays, assembly areas, mechanical spaces, and tail race sections. Each page is marked "INFORMATION ONLY" and originates from the U.S. Army Corps of Engineers District in Omaha, Nebraska, as part of the technical documentation for the GSU Transformer Supply project.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G2hdcddf Information Only
| MO57-81E119.2 |
| MO57-81E120.2 |
| MO57-81E121.3 |
| MO57-81E135.3 |
| MO57-81E219 |
| MO-OPN84E101 |
| MO-OPN84E170 |
| MO-OPN84E171_1 |
| MO-OPN84E177_1 |
File details come from the government source that posted it. Updated .