Attachment-4 OA_FP GSU Transformer Contract Drawings 3 of 3.pdf
PDF 11 MB Posted
- Solicitation number
- W9128F25RA053
About this file
These engineering drawings detail the design and specifications for generator step-up (GSU) transformers for the Oahe and Fort Peck Dams power plants. The technical drawings include multiple sheets covering transformer configurations, temporary storage and staging locations, vault and pedestal details, electrical schematics, monitoring systems, wiring methods, and terminal block connections. Specifically, the drawings show plans for:
- 10 new GSU transformers at Oahe Dam
- 2 new GSU transformers at Fort Peck Dam
- Detailed layouts for transformer tanks, windings, cooling systems, control cabinets, and monitoring equipment
- Fiber-optic temperature probes and monitoring configurations
- Electrical and control wiring diagrams
- Mounting and vault installation specifications for 115kV and 230kV transformers
- Grounding, oil containment, and cable protection details
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .