Attachment 6 Sheet G_204.pdf
PDF 706 KB Posted
- Solicitation number
- W9128F25RA053
About this file
This document is a Requirements Summary Sheet for a 115 kV Three-Phase Generator Step-Up (GSU) Transformer for the U.S. Army Corps of Engineers' Oahe Dam project in Omaha, Nebraska. The transformer specifications include a 103,000 kVA rating with 115,000 Grdy (H) to 13,800 Delta (X) voltage configuration, designed for OFAF or ODAF cooling class, and capable of operating at a 65°C temperature rise. Key technical details include a maximum oil volume of 4,400 gallons, a transformer weight of 212,000 lbs, and a maximum sound level of 70 dB. The transformer features a nitrogen gas blanketed oil preservation system, seismic calculations for main tank and components, and extensive factory acceptance testing requirements including sweep frequency response analysis, lightning impulse tests, and temperature rise tests. The document specifies numerous accessories and spare parts, including multiple types of bushings, temperature indicators, pressure relief devices, and a comprehensive control cabinet with various monitoring and safety features.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J O
R D
A N
S F
IN
K
P
.E
R E
Q U
IR
E
M E
N T
S S
U M
M A
R Y
S H
E E
T
O A
H E
K
V
-P H
A S
E T
R A
N S
F O
R M
E R
G-204
D
F
IL
E R
M
W A
T K
IN
S
/2
/2
C L
A S
S O
D A
F
A L
L O
W A
N C
E F
O R
O
IL
-D
IR
E C
T E
D
A
IR
-F O
R C
E D
C
O O
L
IN
G
F O
P .0
G
-2 .d g n
D
F
IL
E
A N
S I
D
F
IN
A L
F O
R T
P E
C K
A N
D O
A H
E D
A M
S T
R A
N S
F O
R M
E R
S U
P P
L Y
P O
W E
R H
O U
S E
M
IS
S O
U R
I R
IV
E
R
O A
H E
D A
M
W F
R
O M
A H
A N
E B
R A
S K
A
O M
A H
A D
IS
T
R
IC
T
P O
R T
L A
N D
O
R E
G O
N
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
S
F
IL
E N
A M
E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
J A
N U
A R
Y
NAMEPLATE DATA:
TANK AND CONSTRUCTION:
ACCESSORIES:
BUSHINGS:
INSULATING OIL:
CONTROL CABINET AND POWER CABINET:
SPARE PARTS:
FACTORY ASSEMBLY AND PAINT:
FACTORY ACCEPTANCE TESTS (F.A.T.):
REQUIREMENTS SUMMARY SHEET
OAHE DAM 115 KV THREE-PHASE GSU TRANSFORMER
(REFERENCE SPECIFICATION SECTION 48 19 23.05 26)
NAPTHENIC BASE - ASTM D 3487 TYPE II; 0.3% BY MASS OF OXIDATION INHIBITOR∙ TYPE:
(4) COMPLETELY ASSEMBLED AND WITNESSING OF FACTORY ACCEPTANCE TESTS
(3) COMPLETED CORE/COIL ASSEMBLY, BUT PRIOR TO TANKING
(2) AFTER COMPLETION OF WINDINGS BUT PRIOR TO LANDING ON CORE
(1) DESIGN REVIEW MEETING
GOVERNMENT INSPECTIONS PERFORMED DURING∙ INSPECTIONS:
FOR ONE WEEK PRIOR TO OIL FILLING.
PRIMER COAT, OIL-RESISTANT FINISH COAT - WHITE. ALLOW TO CURE∙ INTERIOR PAINT:
CABINETS, SHALL REMAIN UNPAINTED. COVER TO RECEIVE A NON-SLIP COATING.
5BG 7/0.4 HIGH-GLOSS. CORROSION RESISTANT SURFACES, AND STAINLESS STEEL
PRIMER COAT, EPOXY BASE COAT, POLYURETHANE TOP COAT - MUNSELL∙ EXTERIOR PAINT:
MATCH-MARKED FOR EASE OF REASSEMBLY.
TRANSFORMER TO BE FULLY ASSEMBLED, WITH REMOVABLE COMPONENTS∙ ASSEMBLY:
4,400 GAL∙ MAXIMUM OIL VOLULME:
212,000 LB∙ MAXIMUM TRANSFORMER WEIGHT:
70 DB∙ MAXIMUM SOUND LEVEL (ONAF):
NITROGEN GAS BLANKETED∙ OIL PRESERVATION SYSTEM:
65 ºC∙ TEMPERATURE RISE:
5 TAPS; 2 @ +2.5%, 2 @ -2.5% OF NOMINAL 115 KV TAP∙ SECONDARY WINDING (H) DETC:
60 HZ∙ FREQUENCY:
13.5% @ 103,000 KVA (H-X)∙ IMPEDANCE:
THREE-PHASE∙ PHASING:
550 (H) / 110 (X) / 150 (H0)∙ BIL LEVELS, KV:
115,000 GRDY (H) - 13,800 DELTA (X)∙ VOLTAGE RATINGS:
103,000∙ KVA RATING:
OFAF OR ODAF∙ COOLING CLASS:
CLASS II GSU POWER TRANSFORMER∙ TYPE:
ANALOG TEMPERATURE GAUGE FUNCTIONAL VERIFICATION∙
BUSHING CURRENT TRANSFORMER ROUTINE TESTS∙
AND POWER FACTOR TESTS DURING TRANSFORMER F.A.T.
EACH HIGH-VOLTAGE AND HIGH-VOLTAGE NEUTRAL BUSHING ARE TO UNDERGO CAPACITANCE∙
ALL ELECTRICAL AND ELECTO-MECHANICAL DEVICES ARE TO BE FUNCTIONALLY TESTED∙
DE-ENERGIZED TAP CHANGER MECHANICAL OPERATIONAL TEST (5 COMPLETE CYCLES)∙
SHIPPING CONFIGURATION
- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER IN THE
OIL FILLED
- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER FULLY ASSEMBLED AND
- CABLE INTEGRITY TEST REQUIRED
SWEEP FREQUENCY RESPONSE ANALYSIS (WITH ELECTRONIC DATA FILES)∙
LEAKAGE REACTANCE (WITH ELECTRONIC DATA FILES)∙
ONE HOUR LEVEL: 300 PC
INDUCED VOLTAGE TESTS - ACCEPTANCE CRITERIA: 7,200 CYCLE ENHANCEMENT LEVEL: 500 PC;∙
MANUFACTURED
AUDIBLE SOUND LEVEL TESTS ARE TO BE PERFORMED ON THE FIRST TRANSFORMER∙
LIGHTNING IMPULSE TESTS∙
- OFAF WITH ALL COOLING GROUPS IN OPERATION AT 100% RATED LOAD
- OFAF WITH ONE COOLING GROUP IN OPERATION AT 70% RATED LOAD
MANUFACTURED, AT THE FOLLOWING COOLING STAGES:
TEMPERATURE RISE TESTS ARE TO BE PERFORMED ON THE FIRST TRANSFORMER∙
ALL 'ROUTINE' TESTS (IEEE C57.12.00, TABLE 17)∙
HEAVY-DUTY WITH LARGE THRUST-FACE SLEEVE BEARINGS, THERMO-SYPHON DESIGN.∙ PUMPS:
HOT-DIP GALVANIZED ENCLOSURES AND FAN GUARDS.∙ FORCED-AIR (OFAF) COOLERS:
STEEL. MAXIMUM DESIGN FLUX DENSITY OF 1.75 TESLA. STEP-LAP CONSTRUCTION.
LAMINATIONS MAXIMUM THICKNESS OF 0.270MM, COLD-ROLLED, GRAIN-ORIENTED∙ CORE:
SEISMIC CALCULATIONS REQUIRED FOR MAIN TANK AND ALL MAJOR COMPONENTS.∙ SEISMIC:
DESIGN LOADS FOR EACH EYE SHALL BE TWO TIMES THE ACTUAL LOAD.∙ LIFTING EYES:
DESIGNED FOR PAD MOUNTING WITH SEISMIC WELDING TO STEEL PLATES.∙ BASE:
8517412)
DESIGNED FOR USE WITH THE FALL ARREST ANCHOR POST. (EXAMPLE MODEL DBI-SALA
UNI-ANCHOR PLATE AND LUG,∙ PORTABLE FALL ARREST ANCHOR POST MOUNTING PLATE:
GROUND PAD AT BASE OF TANK.
#4/0 INSULATED COPPER CONDUCTOR FROM NEUTRAL BUSHING TO TANK∙ GROUNDING:
STAINLESS STEEL BALL-TYPE (RADIATORS MAY USE BUTTERFLY-TYPE)∙ VALVES:
CROSS-SECTION.
O-RING GASKETS ARE NOT TO BE USED FOR GASKET GROOVES OF RECTANGULAR
THAT THE LOW-VOLTAGE BUSHING GASKETS ARE TO BE FLUOROELASTOMETIC RUBBER.
NITRILE NBR (BUNA-N), DURO 50-70, 25% COMPRESSION, WITH THE EXCEPTION∙ GASKETS:
24-INCH DIAMETER (QTY: 3)∙ MANHOLE:
(QTY 1): PRESSURE REGULATOR FOR INERT-GAS EQUIPMENT∙
(QTY 1): VALVE OF EACH SIZE AND TYPE∙
(QTY 1): FUSE OF EACH TYPE AND RATING∙
PLATE TO THE FIBER-OPTIC WINDING TEMPERATURE MONITOR
(QTY 5): FIBER OPTIC EXTENSION CABLE THAT CONNECTS THE FEED-THROUGH WALL∙
(QTY 1): COOLING FAN COMPLETE WITH MOTOR∙
(QTY 1): OIL FLOW SWITCH∙
(QTY 1): OIL PUMP WITH MOTOR∙
(QTY 1): OIL TEMPERATURE INDICATOR∙
(QTY 1): WINDING TEMPERATURE INDICATOR∙
(QTY 1): LIQUID LEVEL INDICATOR∙
(QTY 1): RAPID PRESSURE RISE SEAL-IN RELAY∙
(QTY 1): RAPID PRESSURE RISE RELAY∙
(QTY 1): PRESSURE RELIEF DEVICE∙
(QTY 1): RELAY AND CONTACTOR OF EACH TYPE AND RATING∙
(QTY 1): ANNUNCIATOR∙
(QTY 1): BUSHING CURRENT TRANSFORMER OF EACH TYPE AND RATING∙
(QTY 1): SET OF GASKETS FOR TRANSFORMER ON-SITE REASSEMBLY AFTER DELIVERY∙
(QTY 1): COMPLETE GASKET SET∙
(QTY 1): 25 KV LOW-VOLTAGE WINDING BUSHING∙
(QTY 1): 25 KV HIGH-VOLTAGE NEUTRAL BUSHING∙
(QTY 1): 115 KV HIGH-VOLTAGE WINDING BUSHING∙
ANODIZED ALUMINUM OR STAINLESS STEEL WITH ENGRAVED BLACK LETTERING.
- DEVICE NAMEPLATES WITHIN THE CONTROL AND POWER CABINETS MADE OF
BUSHINGS MADE OF STAINLESS STEEL WITH BLACK LETTERING.
- EQUIPMENT NAMEPLATES FOR THE HIGH-VOLTAGE BUSHINGS AND LOW-VOLTAGE
LIFT POSITIONS
- AN ADDITIONAL LIFTING DIAGRAM NAMEPLATE INDICATING SLING LOCATIONS AND
CALCULATED X/R RATIO∙
PRESSURE AND VACUUM THE TANK WILL WITHSTAND∙
GOVERNMENT CONTRACT NUMBER∙
PLANT LOCATION∙
MANUFACTURING DATE∙
TABLE 7, INCLUDING THE FOLLOWING:
- CAST BRONZE OR STAINLESS STEEL WITH INFORMATION LISTED IN IEEE C57.12.00,
∙ NAMEPLATES:
- FOLD-DOWN MAINTENANCE TRAY ON INSIDE OF CONTROL CABINET DOOR.
GRADE HUMIDISTAT / THERMOSTAT CONTROL.
- PTC RESISTOR DESIGN ENCLOSURE HEATERS WITH INTEGRAL FANS, AND INDUSTRIAL
CABINET.
- 120 V AC, 20 A HOSPITAL GRADE GFCI RECEPTACLE MOUNTED INSIDE THE CONTROL
- 120 V AC, 1,000 LUMEN LED TYPE A19 LAMPS WITH DOOR-ACTUATED SWITCH.
IN POWER CABINET.
- ALL CIRCUITS, WIRING AND EQUIPMENT RATED GREATER THAN 120 V AC TO BE MOUNTED
IN CABINET DOOR FOR VIEWING.
ON SWING PANEL WITHIN CONTROL CABINET, WITH WEATHERPROOF WINDOW PROVIDED
- FIBER-OPTIC WINDING TEMPERATURE MONITOR (EXAMPLE: NEOPTIX, MODEL 408) MOUNTED
DOOR FOR VIEWING.
PANEL WITHIN CONTROL CABINET, WITH WEATHERPROOF WINDOW PROVIDED IN CABINET
- TRANSFORMER MONITOR WITH COOLING CONTROL (SEL MODEL 2414) MOUNTED ON SWING
FOR VIEWING.
WITHIN CONTROL CABINET, WITH WEATHERPROOF WINDOW PROVIDED IN CABINET DOOR
- ONE 10 PT. ANNUNCIATOR (EXAMPLE: SEL MODEL 2533) MOUNTED ON SWING PANEL
SERIES 24)
- LOCKOUT RELAY WITH TRIP COIL MONITORING AND INDICATORS (EXAMPLE: ELECTROSWITCH
∙ SPECIAL FEATURES:
- 125 AND 250 V DC CIRCUITS - RATED 125/250 OR 250 V DC, AND 10,000 A INTERRUPTING
- 120 V AC CIRCUITS - RATED 250 V DC AND 120/240 OR 240 V AC, AND 10,000 A INTERRUPTING
- 480 V AC CIRCUITS - RATED 600 V AC AND 35,000 A INTERRUPTING AT 480 VAC
∙ MOLDED-CASE CIRCUIT BREAKERS:
120 V AC CIRCUITS - 10 A
- SINGLE-BREAK INDUCTIVE LOAD INTERRUPTING RATING: 125 V DC CIRCUITS - 1.5 A;
- RATED FOR 600 V AC OR 250 V DC
∙ SWITCHES:
120 V AC CIRCUITS - 6.0 A
- SINGLE-CONTACT INDUCTIVE LOAD INTERRUPTING CAPACITY: 125 V DC CIRCUITS - 1.0 A;
- RATED FOR 125 V DC OR 120 V AC; MEETS REQUIREMENTS OF NEMA ICS5; 10 A CONTACTS
∙ AUXILIARY RELAYS:
600 V, 30 A MINIMUM, 90 ºC RATED TERMINATIONS.∙ TERMINAL BLOCKS:
RESISTANT MALLEABLE CAST IRON WITH CAST COVERS AND LIQUID-TIGHT HUBS.
JOINT COMPOUND APPLIED. OUTLET AND JUNCTION BOXES ARE TO BE CORROSION
CHANNELS NOT ALLOWED. ALL CONDUIT THREADED JOINTS ARE TO HAVE A CONDUCTIVE
ALL WIRING TO BE RUN IN CONDUIT. WIRE RUNS THROUGH TANK REINFORCING∙ CONDUIT:
GROUND - GREEN/YELLOW
PHASE B - ORANGE; PHASE C - YELLOW; GROUNDED NEUTRAL - WHITE; INSULATED
XLPE; 3-PHASE POWER CONDUCTORS COLOR CODED: PHASE A - BROWN;∙ WIRING:
POWER - 125 V DC; COOLING FANS - 480 V AC, 3-WIRE, 3-PHASE, 60 HZ
CONTROL POWER - 125 V DC; ANNUNCIATION∙ GOVERNMENT-FURNISHED POWER:
IN CONTROL CABINET. SOLAR SHIELDING ON TOP, FRONT AND SIDE PANELS OF ENCLOSURES.
PROVISIONS. WINDOWS FOR VIEWING THE TEMPERATURE MONITOR AND ANNUNCIATOR
WEATHER-PROOF TYPE 304 STAINLESS STEEL WITH LOCKING∙ CABINET MATERIAL:
ABB RND2)
DUAL TANK NITROGEN REGULATOR CABINET WITH ELECTRICAL PACKAGE (EXAMPLE∙
(EXAMPLE: DBI-SALA, MODEL 8516691)
PORTABLE FALL ARREST SYSTEM ANCHOR POST WITH DAVIT ARM∙
RAPID PRESSURE RISE RELAY (EXAMPLE: QUALITROL, MODEL 900-FLA)∙
SCHAFFER MODEL R9)
ON-LINE DISSOLVED GAS AND MOISTURE CONTENT MONITOR (EXAMPLE: MORGAN∙
(EXAMPLE: QUALITROL, MODEL XPRD)
DIRECTED-FLOW PRESSURE RELIEF DEVICE WITH METAL DISCHARGE PIPING∙
OIL FLOW INDICATORS∙
OIL LEVEL INDICATOR (EXAMPLE: QUALITROL, MODEL 042)∙
WTI AND OTI GAUGES WITH RTDS (EXAMPLE: AKM)∙
2.5 KV CLASS, 45 KV BIL, 100 AMP∙ SFRA TEST SHIPPING BUSHING:
2.5 KV CLASS, 45 KV BIL, 100 AMP∙ CORE GROUNDS:
(ONE 600:5 CT MRCT, 0.3B-1.8 METERING ACCURACY, C400 MINIMUM RELAYING ACCURACY)
EXTERIOR WITH RESIN-IMPREGNATED SYNTHETIC (RIS) CONDENSER CORE DESIGN
25 KV CLASS, 150 KV BIL, 400 AMP, DRAW-LEAD DESIGN, COMPOSITE∙ NEUTRAL (H0):
INDICATING EQUIPMENT OR TRANSFORMER TEMPERATURE MONITOR SYSTEM)
(BUSHING CURRENT TRANSFORMERS AS REQUIRED FOR THE WINDING TEMPERATURE
BULK-TYPE, LOW-CORONA, LIGHT CONTAMINATION, 125 ºC TEMPERATURE RISE RATING
25 KV CLASS, 150 KV BIL, 6,000 AMP, PORCELAIN CONSTRUCTION,∙ PRIMARY WINDING (X):
C400 RELAYING ACCURACY)
CORE DESIGN (TWO 1,200:5 MRCT PER BUSHING, 0.3B-1.8 METERING ACCURACY,
COMPOSITE EXTERIOR WITH RESIN-IMPREGNATED SYNTHETIC (RIS) CONDENSER
115 KV CLASS, 550 KV BIL, 800 AMP, DRAW-LEAD DESIGN, ∙ SECONDARY WINDING (H):
UNUSUAL SERVICE CONDITIONS:
CELSIUS (SEE SHEET G-202)
36.4 DEGREESMAXIMUM AVERAGE AMBIENT AIR TEMPERATURE (24-HOUR PERIOD):∙
47.2 DEGREES CELSIUS (SEE SHEET G-202)MAXIMUM AMBIENT AIR TEMPERATURE:∙
TEMPERATURE OF 45 DEGREES CELSIUS.
∙ TRANSFORMERS ARE TO BE CAPABLE OF FULL LOAD OPERATION AT AN AMBIENT
File details come from the government source that posted it. Updated .