This image is a technical drawing titled "Concrete Pad Plan and Details" (Sheet S-101), which appears to be a detailed architectural/engineering schematic for the Garrison Dam Spillway Modification Project. The drawing contains multiple section views and grid-based diagrams showing concrete pad configurations, with detailed annotations and measurement markings. The technical drawing includes complex structural diagrams with textured representations of concrete elements, reinforcement layouts, and precise dimensional annotations across different view angles. The document is part of the engineering documentation for the Phase 2 Anchor Testing requirement, which is associated with the Department of the Army Corps of Engineers Engineering District Omaha solicitation (W9128F25QA010).
View the file
Other files for this federal contract opportunity
Other files attached to Garrison Dam Spillway Modification Project - Phase 2 Anchor Testing, newest first.