About this file

This document is a Price Schedule for the Garrison Dam Spillway Modification (GDSM) Phase 2 Anchor Program, issued by the Department of the Army Corps of Engineers Engineering District Omaha. The comprehensive price schedule outlines 14 line items for a complex geotechnical anchor installation project, including tasks such as mobilization, foundation anchor construction using three different methods (Conventional Bond Zone, Underreamed, and Belled), grout confirmation borings, surveying, water tightness testing, concrete anchor pad construction, anchor bar fabrication, corrosion protection, field testing, long-term monitoring, and site restoration.

The project involves detailed technical work at the Garrison Dam in North Dakota, with specific line items for 12 anchors and associated testing and monitoring. Contractors are required to provide unit pricing for tasks ranging from initial mobilization to final site restoration, with quantities specified for each line item (e.g., 213 linear feet for Conventional Bond Zone anchor construction, 361 linear feet for Underreamed anchor construction). The solicitation (W9128F25QA010) indicates a site visit was scheduled for 3 April 2025, and potential bidders must request geotechnical data reports by contacting the Contracting Officer directly.

View the file

Other files for this federal contract opportunity

Other files attached to Garrison Dam Spillway Modification Project - Phase 2 Anchor Testing, newest first.
File Type Posted
4000 - 2025.04.15_Performance Work Statement for GDSM Anchor Inv Phase 2 FRS.pdf PDF
Updated Drawing - GR00108S-503.pdf PDF
Updated Drawing - GR00108S-101.pdf PDF
Updated Drawing - GR00108C-102.pdf PDF
Amendment 0002 - W9128F25QA0100002.pdf PDF
Updated Drawing - GR00108C-101.pdf PDF
Amendment 0001 - W9128F25QA010.pdf PDF
Site Visit Attendance - Garrison Spillway Anchor Testing - 3 Apr 2025.pdf PDF
4007 - Attachment VII - Anchors Phase 2 Geotechnical Data Report_Volume I_20250318.pdf PDF
W9128F25QA010_Solicitation for GDSM Anchor Testing Phase 2.pdf PDF
3000 - SCA 2015-5383 Rev 24 23 Dec 2024 - McLean County ND.pdf PDF
1000 - Instructions to Offerors with Provision 52.212-2 and Site Visit Info.pdf PDF
2000 - Price Schedule for GDSM_PH2 Anchor Program.pdf PDF
4001 - Attachment I - Submittal Items and Schedule.pdf PDF
4002 - Attachment II - Foundation Anchor Verification and Modified Extended Creep Test Steps.pdf PDF
4003 - Attachment III - Phase 2 Anchor Investiagion Drawings.pdf PDF
4004 - Attachment IV - Submittal Form 4025-R.pdf PDF
4006 - Attachment VI - GDSM Utilities Survey 2023.pdf PDF
4000 - 2025.03.17_Performance Work Statement for GDSM Anchor Inv Phase 2 FRS.pdf PDF
4005 - Attachment V - GDSM Anchors Phase 2 DIPP_20250318.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Spillway Modification Anchor Investigation Phase 2
Garrison Dam, ND
PRICE SCHEDULE
ITEM NO.SUPPLIES/SERVICEDESCRIPTIONQUANTITYUNITUNIT PRICETOTAL
0001Mobilization and DemobilizationThe work of this item shall include costs associated with mobilization and demobilization of all equipment and personnel necessary for completion of work in this Performance Work Statement (PWS).1JobXXXX
0002Task 1 - Drill and Install Conventional Bond Zone (CBZ) Foundation Anchor ConstructionThe work for this item shall include all equipment, materials, and labor necessary for subsurface drilling and installation of CBZ foundation anchor system including drilling the pilot hole, bond zone drilling, bond zone verification, anchor system installation, primary grout placement, secondary grout placement after completion of anchor testing, instrumentation, and anchor lock-off.213LF
0003Task 2 - Drill and Install Underreamed Foundation Anchor ConstructionThe work for this item shall include all equipment, materials, and labor necessary for subsurface drilling and installation of underream foundation anchor system including drilling the pilot hole, sump, underream drilling in bond zone, underream dimension verification, anchor system installation, primary grout placement, and secondary grout placement after completion of anchor testing. Anchor below and above ground testing included in other cost items.361LF
0004Task 3 - Drill and Install Belled Foundation Anchor ConstructionThe work for this item shall include all equipment, materials, and labor necessary for subsurface drilling and installation of belled foundation anchor system including drilling the pilot hole and sump, excavating bell, bell dimension verification, anchor system installation, primary grout placement, and secondary grout placement after completion of anchor testing. Anchor below and above ground testing included in other cost items.516LF
0005Task 4 - Grout Confirmation BoringsThe work for this item shall include all equipment, materials, and labor necessary for drilling and logging of two (2) grout confirmation borings.200LF
0006Task 5: SurveyingThe work for this item shall include all equipment and labor necessary to survey each boring, anchor, or test pad location in accordance with the PWS.1JobXXXX.
0007Task 6a: Initial Water Tightness TestingThe work for this item shall include the equipment, materials, and labor necessary for initial watertightness testing of the primary grout zone + 5 feet of the CBZ, underream, and belled anchors prior to anchor installation. If the intitial water testing fails, see CLIN 0008 for this work description.12EA
0008Task 6b: Additional Water Tightness TestingThe work for this item shall include the equipment, materials, and labor necessary for pre-grouting, redrilling, and additional watertightness testing of the primary grout zones + 5 feet of any anchor type (CBZ, underream, and belled anchors (if the initial water tightness testing fails)) prior to anchor installation. This CLIN will only be exercised when directed by the COR.XXXXXXXXXXXXXXXX
0008AAAdditional Water Tightness Testing - Single Underream AnchorsSee Price Schedule Item No. 0008.4EA
0008ABAdditional Water Tightness Testing - Bell AnchorsSee Price Schedule Item No. 0008.6EA
0008ACAdditional Water Tightness Testing - CBZ AnchorsSee Price Schedule Item No. 0008.2EA
0009Task 8: Reinforced Concrete Anchor Pad ConstructionThe work for this item shall includes activities necessary for all work related to the placement of reinforced concrete for anchor pad construction. This item inclues the cost of all labor, testing, equipment and tools, materials and supplies required to complete the reinforced concrete work under this contract including excavating, furnishing, forming, placing, curing, and finishing the concrete, including cement, reinforcing and joint materials as needed.12EA
0010Task 9: Anchor Bar Type, Fabrication, and Anchor System ComponentsThe work for this item shall include the equipment, materails, transportation, and labor necessary to fabricate and procurement the anchor system components for onsite delivery of the anchor bar and anchor system compoments in accordance with the PWS. Including installation of the corrosion protection system required for the twelve anchors listed in this PWS.1JobXXXX
Task 10: Anchor Corrosion ProtectionThe work for this item shall include the equipment, materials, and labor necessary for installation of the corrosion protection system required for the twelve anchors listed in this PWS.12EA
0011Task 12: Anchor Field TestingThe work for this item shall include the equipment, materials, and labor necessory for in-situ field setup, reporting and field load testing in accordance with the PWS requirements. All bar anchors must have tension applied Verification tests in accordance with FWHA NHI 05-039 or (Modified) Extended Creep Test in accordance with PTI DC35.1-14 as required in the PWS. No more than three anchors may have modified extended creep tests. Verification and Modified Extended Creep Tests schedules are provided in Attachment II.1JobXXXX
0012Task 13: Anchor Long-Term MonitoringThe work for this item shall include but not be limited to all labor, equipment, materials, testing, calibration and performing all operations in connection with furnishing, transporting, and installing all instrumentation, data collection and monitoring equipment as specified in the PWS.1JobXXXX
0013Site RestorationThe work for this item shall include but not be limited to labor, equipment, materials, and performing all operations in connection with furnishing, transporting, and placing top soil, subgrade preparation, seed, mulch, fertilizer and other requirements included in the PWS.1JobXXXX
0014Work SubmittalsThis item includes the materials and labor necessary for preparation of all work submittals including pre-fieldwork submtitals, contract admistration, and the Anchor Field Installation and Testing Report.1JobXXXX
ALL LINE ITEMS TOTAL

NOTES:

1. Prices must be entered for all line items in the schedule. Additions will be subject to verification by the Government. In case of variation between the unit prices and the total amount, the unit price will be considered the price submitted.