This document is a Price Schedule for the Garrison Dam Spillway Modification Anchor Investigation Phase 2 project located in North Dakota. The price schedule contains 14 line items detailing specific tasks for anchor foundation work, including mobilization/demobilization, drilling and installing different types of foundation anchors (Conventional Bond Zone, Underreamed, and Belled), grout confirmation borings, surveying, water tightness testing, anchor pad construction, anchor system components fabrication, field testing, long-term monitoring, site restoration, and work submittals.
The tasks involve comprehensive subsurface drilling, anchor system installation, grouting, testing, and documentation across 12 anchors, with precise technical requirements for each stage of work. The price schedule allows for various quantities measured in linear feet (LF), jobs, and individual elements (EA), with specific notes indicating that prices must be entered for all line items and that any modifications to the total amount must be proportionally applied across the line items. The project is being conducted by the Department of the Army Corps of Engineers Engineering District Omaha under solicitation number W9128F25QA010.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. SUPPLIES/SERVICE DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
Mobilization and Demobilization
The work of this item shall include costs associated with mobilization and demobilization of all equipment and personnel necessary for completion of work in this Performance Work Statement (PWS). 1 Job
Task 1 - Drill and Install Conventional Bond Zone (CBZ) Foundation Anchor Construction
The work for this item shall include all equipment, materials, and labor necessary for subsurface drilling and installation of CBZ foundation anchor system including drilling the pilot hole, bond zone drilling, bond zone verification, anchor system installation, primary grout placement, secondary grout placement after completion of anchor testing, instrumentation, and anchor lock-off. 213 LF
Task 2 - Drill and Install Underreamed Foundation Anchor Construction
The work for this item shall include all equipment, materials, and labor necessary for subsurface drilling and installation of underream foundation anchor system including drilling the pilot hole, sump, underream drilling in bond zone, underream dimension verification, anchor system installation, primary grout placement, and secondary grout placement after completion of anchor testing. Anchor below and above ground testing included in other cost items. 361 LF
Task 3 - Drill and Install Belled Foundation Anchor Construction
The work for this item shall include all equipment, materials, and labor necessary for subsurface drilling and installation of belled foundation anchor system including drilling the pilot hole and sump, excavating bell, bell dimension verification, anchor system installation, primary grout placement, and secondary grout placement after completion of anchor testing. Anchor below and above ground testing included in other cost items. 516 LF
Task 4 - Grout Confirmation Borings
The work for this item shall include all equipment, materials, and labor necessary for drilling and logging of two (2) grout confirmation borings. 200 LF
0006 Task 5: Surveying The work for this item shall include all equipment and labor necessary to survey each boring, anchor, or test pad location in accordance with the PWS. 1 Job
Task 6a: Initial Water Tightness Testing
The work for this item shall include the equipment, materials, and labor necessary for initial watertightness testing of the primary grout zone + 5 feet of the CBZ, underream, and belled anchors prior to anchor installation. If the intitial water testing fails, see CLIN 0008 for this work description. 12 EA
Task 6b: Additional Water Tightness Testing
The work for this item shall include the equipment, materials, and labor necessary for pre-grouting, redrilling, and additional watertightness testing of the primary grout zones + 5 feet of any anchor type (CBZ, underream, and belled anchors (if the initial water tightness testing fails)) prior to anchor installation.
This CLIN will only be exercised when directed by the COR. 12 EA
Task 8: Reinforced Concrete Anchor Pad Construction
The work for this item shall includes activities necessary for all work related to the placement of reinforced concrete for anchor pad construction. This item inclues the cost of all labor, testing, equipment and tools, materials and supplies required to complete the reinforced concrete work under this contract including excavating, furnishing, forming, placing, curing, and finishing the concrete, including cement, reinforcing and joint materials as needed. 12 EA
Task 9: Anchor Bar Type, Fabrication, and Anchor System Components
The work for this item shall include the equipment, materails, transportation, and labor necessary to fabricate and procurement the anchor system components for onsite delivery of the anchor bar and anchor system compoments in accordance with the PWS. Including installation of the corrosion protection system required for the twelve anchors listed in this PWS. 1 Job
PRICE SCHEDULE
Spillway Modification Anchor Investigation Phase 2 Garrison Dam, ND
0011 Task 12: Anchor Field Testing
The work for this item shall include the equipment, materials, and labor necessory for in-situ field setup, reporting and field load testing in accordance with the PWS requirements. All bar anchors must have tension applied Verification tests in accordance with FWHA NHI 05-039 or (Modified) Extended Creep Test in accordance with PTI DC35.1-14 as required in the PWS. No more than three anchors may have modified extended creep tests. Verification and Modified Extended Creep Tests schedules are provided in Attachment II. 1 Job
Task 13: Anchor Long-Term Monitoring
The work for this item shall include but not be limited to all labor, equipment, materials, testing, calibration and performing all operations in connection with furnishing, transporting, and installing all instrumentation, data collection and monitoring equipment as specified in the PWS. 1 Job
0013 Site Restoration
The work for this item shall include but not be limited to labor, equipment, materials, and performing all operations in connection with furnishing, transporting, and placing top soil, subgrade preparation, seed, mulch, fertilizer and other requirements included in the PWS. 1 Job
0014 Work Submittals
This item includes the materials and labor necessary for preparation of all work submittals including pre-fieldwork submtitals, contract admistration, and the Anchor Field Installation and Testing Report. 1 Job
ALL LINE ITEMS TOTAL
NOTES:
1. Prices must be entered for all line items in the schedule. Additions will be subject to verification by the Government. In case of variation between the unit prices and the total amount, the unit price will be considered the price submitted.
2. A modification to a quote which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump sum price affected.
If the modification is not so apportioned, the single adjustment will be applied to Item Nos. 0001 thru 0014.
File details come from the government source that posted it. Updated .