4002 - Attachment II - Foundation Anchor Verification and Modified Extended Creep Test Steps.pdf

PDF 98 KB Posted

Attached to
Garrison Dam Spillway Modification Project - Phase 2 Anchor Testing Federal contract opportunity
Solicitation number
W9128F25QA010
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document is a technical specification for foundation anchor verification and modified extended creep testing procedures for the Garrison Dam Spillway Modification Project (Phase 2). The document contains two detailed testing schedules: Table 1 (Verification Test Schedule) following FHWA NHI 05-039 and Table 2 (Modified Extended Creep Test Schedule) following PTI DC 35.1-14. Both tables outline precise loading and hold time steps for testing foundation anchors, with specific instructions for applying varying load levels (designated as AL and DL), recording total movement, residual movement, and calculating elastic movement. The testing process involves multiple loading cycles with incrementally increasing load percentages and specific hold times, designed to assess the anchor's performance and stability under different load conditions.

View the file

Other files for this federal contract opportunity

Other files attached to Garrison Dam Spillway Modification Project - Phase 2 Anchor Testing, newest first.
File Type Posted
Updated 15 Apr 2025 - Price Schedule for GDSM_PH2 Anchor Program.xlsx XLSX spreadsheet
4000 - 2025.04.15_Performance Work Statement for GDSM Anchor Inv Phase 2 FRS.pdf PDF
Updated Drawing - GR00108C-101.pdf PDF
Updated Drawing - GR00108S-503.pdf PDF
Updated Drawing - GR00108S-101.pdf PDF
Updated Drawing - GR00108C-102.pdf PDF
Amendment 0002 - W9128F25QA0100002.pdf PDF
Amendment 0001 - W9128F25QA010.pdf PDF
Site Visit Attendance - Garrison Spillway Anchor Testing - 3 Apr 2025.pdf PDF
4007 - Attachment VII - Anchors Phase 2 Geotechnical Data Report_Volume I_20250318.pdf PDF
W9128F25QA010_Solicitation for GDSM Anchor Testing Phase 2.pdf PDF
3000 - SCA 2015-5383 Rev 24 23 Dec 2024 - McLean County ND.pdf PDF
4000 - 2025.03.17_Performance Work Statement for GDSM Anchor Inv Phase 2 FRS.pdf PDF
4005 - Attachment V - GDSM Anchors Phase 2 DIPP_20250318.pdf PDF
1000 - Instructions to Offerors with Provision 52.212-2 and Site Visit Info.pdf PDF
2000 - Price Schedule for GDSM_PH2 Anchor Program.pdf PDF
4001 - Attachment I - Submittal Items and Schedule.pdf PDF
4003 - Attachment III - Phase 2 Anchor Investiagion Drawings.pdf PDF
4004 - Attachment IV - Submittal Form 4025-R.pdf PDF
4006 - Attachment VI - GDSM Utilities Survey 2023.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GDSM ANCHOR INVESTIGATION PHASE 2

FOUNDATION ANCHOR VERIFICATION AND MODIFIED EXTENDED CREEP TEST STEPS

FEB 2025

Table 1 Verification Test Schedule

Pe r F

H W

A N

H I 0

5-

Step Loading Applied Load Hold Time (min) 1 Apply AL AL 2.5

2 Cycle 1

0.15 DL 2.5

0.30 DL 2.5

0.45 DL 2.5

AL 1

3 Cycle 2

0.15 DL 1

0.45 DL 1

0.60 DL 2.5

0.75 DL 2.5

0.90 DL 2.5

1.00 DL 2.5

AL 1

4 Cycle 3

0.15 DL 1

1.00 DL 1

1.15 DL 2.5

1.30 DL --

Hold load for 10 min. If total movement is greater than 0.040" for 1-10 minutes, extend to 60 minutes hold.

Cycle 3 (cont.)

1.45 DL 2.5

AL 1

7 Cycle 4

0.15 DL 1

1.45 DL 1

1.60 DL 1

1.75 DL 2.5

1.90 DL 2.5

2.00 DL 10

1.50 DL 5

1.00 DL 5

0.50 DL 5

AL 5

8 Remove load and process results.

Note: Record and plot Total Movement (ti), Residual Movement (ri), and calculate Elastic Movement (ei) in accordance with FHWA NHI 05-039.

GDSM ANCHOR INVESTIGATION PHASE 2

FOUNDATION ANCHOR VERIFICATION AND MODIFIED EXTENDED CREEP TEST STEPS

FEB 2025

Table 2. Modified Extended Creep Test Schedule

Pe r P

TI

D

C

5.

1-

Step Applied Load Hold Time (min)

AL 10

0.25DL 10

AL Until Stable

0.25 DL Until Stable

0.50 DL 30

AL Until Stable

0.25 DL Until Stable

0.50 DL Until Stable

0.75 DL 30

AL Until Stable

0.25 DL Until Stable

0.50 DL Until Stable

0.75 DL Until Stable

1.00 DL 45

AL Until Stable

0.25 DL Until Stable

0.50 DL Until Stable

0.75 DL Until Stable

1.00 DL Until Stable

1.20 DL 60

AL Until Stable

0.25 DL Until Stable

0.50 DL Until Stable

0.75 DL Until Stable

1.00 DL Until Stable

1.20 DL Until Stable

1.33 DL 300

Ad di tio n

Pe r F

H W

A N

H I 0

5-

(p ar tia l t es t s ch ed ul e)

AL Until Stable

1.45 DL 1

1.60 DL 1

1.75 DL 2.5

1.90 DL 2.5

2.00 DL 10

1.50 DL 5

1.00 DL 5

AL 5

8 Remove load and process results.

Note: Record and plot Total Movement (ti), Residual Movement (ri), and calculate Elastic Movement (ei) in accordance with PTI DC35.1-14 incorporating additional steps shown.

File details come from the government source that posted it. Updated .