Dwgs_V1_a3.pdf
PDF 6 MB Posted
- Attached to
- FY14 MCA PN67157 USARPAC Command and Control Facility (C2F) Phase 2, Fort Shafter, Oahu, Hawaii
- Solicitation number
- W9128A-15-B-0001
About this file
15b1 Dwgs V1 a3 - advance copy
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
C001
G E
N E
R A
L C
IV
IL
N O
TE
S
TJ
/G
N /K
R
A F/
JM
/N
P M
D
C 2F
_P H
2- C
-0
A pr il
, 2
GENERAL CONSTRUCTION NOTES:
1. EXISTING TOPOGRAPHIC INFORMATION SHOWN ON THE DRAWINGS ARE
FROM TOPOGRAPHIC SURVEY/MAPPING FOR THE FY11 MCA PN 065650
USARPAC, COMMAND AND CONTROL FACILITY, FORT SHAFTER, OAHU, BY
SAM O. HIROTA, INC., JUNE 2010, AND FROM PHASE 1 DESIGN DRAWINGS.
2. COORDINATES AND AZIMUTHS ARE REFERRED TO HAWAII STATE PLANE
COORDINATE SYSTEM ZONE 3, NAD83 HARN (1993) ADJUSTED BY THE
NATIONAL GEODETIC SURVEY IN DEC. 1998.
3. ELEVATIONS ARE BASED ON CORPS OF ENGINEERS BM-29 (BRASS DISK)
ELEV.=93.15 FT. MEAN SEA LEVEL (MSL) 1983-2001 TIDAL EPOCH. SEE
SHEET CS101 FOR LOCATION.
4. AZIMUTHS ARE MEASURED CLOCKWISE FROM TRUE SOUTH. DISTANCES
IN U.S. SURVEY FEET. REFER TO OVERALL SITE PLAN FOR BENCHMARKS.
5. IN THE EVENT ANY HUMAN REMAINS, ARTIFACTS, OR
ARCHAEOLOGICAL/CULTURAL RESOURCES ARE UNCOVERED DURING
CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY SUSPEND WORK
AND NOTIFY THE CONTRACTING OFFICER, US ARMY GARRISON - HAWAII
CULTURAL RESOURCE MANAGER, DR. LAURIE LUCKING AT (808) 655-9707,
AND THE HONOLULU ENGINEER DISTRICT ARCHAEOLOGIST, MR. KANALEI
SHUN AT (808) 438-7000.
6. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER FOR THE
DISPOSITION OF UNDERGROUND UTILITIES UNCOVERED AND NOT
IDENTIFIED ON THE PLANS WHICH INTERFERES WITH NEW
CONSTRUCTION.
7. WHEN CHANGES IN ALIGNMENT OR GRADE FOR THE PROPOSED UTILITIES
ARE REQUIRED DUE TO UNFORESEEN CONFLICT WITH OTHER
UNDERGROUND UTILITIES, THE CONTRACTOR SHALL IMMEDIATELY
INFORM THE CONTRACTING OFFICER FOR DIRECTION ON HOW TO
PROCEED.
8. THIS PROJECT SHALL MEET THE ARCHITECTURAL BARRIERS ACT (ABA)
ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES.
9. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE (1) SET OF
APPROVED PLANS AT THE PROJECT SITE DURING THE CONSTRUCTION.
THE CONTRACTOR SHALL VERIFY AND CHECK ALL DIMENSIONS AND
DETAILS SHOWN ON THE DRAWINGS PRIOR TO THE START OF
CONSTRUCTION. ANY DISCREPANCY SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE CONTRACTING OFFICER FOR CLARIFICATION.
10. WORK INCIDENTAL TO THE CONTRACT AND NECESSARY TO COMPLETE
THE PROJECT, ALTHOUGH NOT SPECIFICALLY REFERRED TO ON THE
CONTRACT DOCUMENTS, SHALL BE FURNISHED AND PERFORMED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
11. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT
AREA AND SURROUNDING AREA FREE FROM RUBBISH, DUST, NOISE,
EROSION, ETC. THE WORK SHALL BE DONE IN CONFORMANCE WITH THE
AIR AND WATER POLLUTION CONTROL STANDARDS AND REGULATIONS OF
THE STATE DEPARTMENT OF HEALTH.
12. THE CONTRACTOR SHALL RESTORE TO THEIR ORIGINAL OR BETTER
CONDITION, ALL IMPROVEMENTS DAMAGED AS A RESULT OF THE
CONSTRUCTION, INCLUDING PAVEMENTS, EMBANKMENTS, CURBS, SIGNS,
LANDSCAPING, STRUCTURES, UTILITIES, WALLS, FENCES, ETC.
DEMOLITION AND RESTORATION OF EXISTING ITEMS SHALL BE
INCIDENTAL AND INCLUDED IN THE CONTRACT PRICE.
13. ALL EXISTING UTILITIES TO REMAIN IN USE, WHETHER OR NOT SHOWN ON
THE PLANS, SHALL BE PROTECTED AT ALL TIMES BY THE CONTRACTOR
DURING CONSTRUCTION UNLESS SPECIFIED ON THE PLANS TO BE
ABANDONED. ANY DAMAGES TO EXISTING UTILITIES SHALL BE REPAIRED
AND PAID FOR BY THE CONTRACTOR.
14. IN THE EVENT THAT CONTRACTOR DISCOVERS HAZARDOUS MATERIALS,
SUCH AS ASBESTOS MATERIALS, LEAD PAINT, ETC., THAT ARE NOT
IDENTIFIED ON THE CONTRACT DOCUMENTS; THE CONTRACTOR SHALL
IMMEDIATELY STOP WORK IN THIS AREA AND INFORM THE CONTRACTING
OFFICER OF THE SITUATION.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL FEDERAL,
STATE & LOCAL PERMITS AND APPROVALS REQUIRED FOR
CONSTRUCTION.
16. THE CONTRACTOR SHALL OBTAIN AN EXCAVATION PERMIT FROM THE
DIRECTORATE OF PUBLIC WORKS (DPW) PRIOR TO START OF ANY
EXCAVATION OR GRADING ACTIVITIES.
17. THE CONTRACTOR SHALL NOTIFY DPW AND AQUA ENGINEERS IN WRITING
AT LEAST 45 DAYS PRIOR TO CONNECTING TO OR COMMENCING WORK TO
THE EXISTING WATER AND SANITARY SEWER SYSTEMS.
18. THE CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLANS TO THE
CONTRACTING OFFICER AND DPW FOR ACCEPTANCE FOR WORK WITHIN
STREETS AND ROADS. TRAFFIC CONTROL PLANS SHALL BE IN
ACCORDANCE WITH THE LATEST EDITION OF MUTCD AND BASE
REQUIREMENTS. FOR WORK INVOLVING ROAD OR STREET CLOSURE, THE
CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN THAT INCLUDES
AS A MINIMUM THE FOLLOWING REQUIREMENTS:
A. A MINIMUM ROADWAY WIDTH OF 10 FEET SHALL BE OPEN AT ALL
TIMES.
B. AT THE END OF EACH DAY'S WORK OR AS SOON AS THE WORK IS
COMPLETED, THE CONTRACTOR SHALL REMOVE OR COVER ALL
TRAFFIC DEVICES NO LONGER NEEDED TO PERMIT FREE AND SAFE
PASSAGE OF TRAFFIC.
C. PROVIDE SAFE, NONSKID BRIDGING MATERIAL OVER TRENCHES IN
PAVEMENT AREAS TO HANDLE HS20-44 VEHICULAR TRAFFIC WHERE
NECESSARY TO PROVIDE SAFE PASSAGE OF TRAFFIC FOR OPEN
TRENCHES.
D. SAFE PEDESTRIAN TRAFFIC SHALL BE MAINTAINED AT ALL TIMES
DURING THE CONSTRUCTION PERIOD.
19. IF ANY ACCIDENT OCCURS THAT RELEASES PETROCHEMICAL OR TOXIC
SUBSTANCES, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER REPRESENTATIVE (COR) AND THE DEPARTMENT OF HEALTH
(808) 586-4400.
20. PORTABLE TOILETS SHALL BE PROVIDED IN CONVENIENT LOCATIONS AT
THE CONSTRUCTION SITE. IT SHALL BE PROPERTY SECURED AND
LOCATED AS FAR AS POSSIBLE FROM DRAINAGE WAYS.
21. THE CONTRACTOR MAY USE THE STAGING AREA AT CHAMBERLAIN RD
FOR 18 MONTHS AFTER NTP. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROTECTION OF THE HISTORIC SITE AS NOTED ON THIS SHEET FOR
THE 18 MONTH DURATION. THE CONTRACTOR SHALL FOLLOW THE
PROJECT LIMITS 18 MONTHS AFTER NTP AS SHOWN ON SHEET NO. C003.
1. THE CONTRACTOR SHALL OBSERVE AND COMPLY WITH ALL FEDERAL,
STATE AND LOCAL LAWS REQUIRED FOR THE PROTECTION OF PUBLIC
HEALTH, SAFETY AND ENVIRONMENTAL QUALITY.
2. THE CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL
NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES
AND OTHER PROTECTIVE FACILITIES, AND SHALL TAKE ALL NECESSARY
PRECAUTIONS FOR THE PROTECTION, CONVENIENCE AND SAFETY OF
THE PUBLIC.
PUBLIC HEALTH, SAFETY & CONVENIENCE NOTES:
1. THE EROSION CONTROL PLAN ILLUSTRATES CONCEPTUAL EROSION
CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO THE
COMMENCEMENT OF ANY GROUND DISTURBANCE, INCLUDING
DEMOLITION WORK. THE CONTRACTOR SHALL PREPARE THE STORM
WATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH
THE REVISED HAR CHAPTER 11-55 APPENDIX C. THE CONSTRUCTION
SHALL NOT START UNTIL THOSE REQUIREMENTS ARE MET.
2. THE CONTRACTOR SHALL INSTALL DRAIN INLET PROTECTION TO ALL
INLETS IN THE VICINITY THAT MAY BE AFFECTED BY CONSTRUCTION
RUNOFF PRIOR TO THE COMMENCEMENT OF CONSTRUCTION WORK.
3. THE CONTRACTOR SHALL COORDINATE STAGING AREAS WITH THE COR.
THE CONTRACTOR SHALL PROVIDE A CONSTRUCTION INGRESS/EGRESS
TO HIS STAGING AREA PER DETAIL B1, SHEET CG501.
4. MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS SHALL BE IN
PLACE BEFORE EARTHWORK OPERATIONS BEGIN.
5. EXPOSED TRENCHED AREAS SHALL BE PROTECTED FROM RUNOFF AND
WIND EROSION WITH STEEL PLATE COVERS UNTIL REPAVING CAN BE
ACCOMPLISHED.
6. DRAIN INLET PROTECTION SHALL BE MONITORED PERIODICALLY AND/OR
AFTER SIGNIFICANT RAINFALL EVENTS 0.5 INCHES OR GREATER FOR
STRUCTURAL INTEGRITY AND SEDIMENT BUILD-UP. DAMAGED OR
IMPROPERLY FUNCTIONING FILTERS SHALL BE REPLACED (PAID FOR BY
THE CONTRACTOR) AND SEDIMENT ACCUMULATION SHALL BE REMOVED.
AFTER EARTHWORK OPERATIONS, EXISTING CATCH BASINS AND DRAIN
MANHOLES SURROUNDING THE PROJECT SITE SHALL BE INSPECTED AND
ACCUMULATED SEDIMENT SHALL BE REMOVED. FLUSHING INTO THE CBs AND DMHs ARE PROHIBITED.
7. THE FINAL LIFT OF EACH DAY'S WORK SHALL BE COMPACTED TO
PREVENT EROSION OF FILL MATERIAL.
8. CONTRACTOR SHALL ENSURE ROADWAYS WILL BE PROTECTED FROM
MUD, DIRT, AND DEBRIS.
9. ALL BEST MANAGEMENT PRACTICES (BMPs) SHALL NOT BE REMOVED
UNTIL PROJECT COMPLETION.
10. WASHWATER FROM WASHDOWNS OF CONSTRUCTION EQUIPMENT,
VEHICLES AND CONCRETE TRUCK DRUMS SHALL NOT BE DISCHARGED
INTO DRAINAGE SYSTEMS NOR STATE WATERS.
11. THE CONTRACTOR SHALL ENSURE THAT ALL TIRES OF CONSTRUCTION
VEHICLES ARE SUFFICIENTLY CLEANED OFF SO THAT DIRT OR DEBRIS IS
NOT TRACKED OFF THE CONSTRUCTION SITE. WASHING OFF TIRES WITH
WATER WILL NOT BE ACCEPTABLE UNLESS THE RUNOFF IS CONTAINED
AND DOES NOT ENTER THE STORM DRAIN SYSTEM.
12. AT THE CONCLUSION OF ALL PROJECT WORK, ALL BEST MANAGEMENT
PRACTICES SHALL BE REMOVED AND THE AREA SHALL BE RESTORED TO
ITS ORIGINAL CONDITION, OR BETTER, UPON ACCEPTANCE OF THE
PROJECT BY THE CONTRACTING OFFICER.
13. ALL DISTURBED AREAS SHALL RECEIVE TEMPORARY STABILIZATION
WITHIN 14 CALENDAR DAYS OF INITIAL DISTURBANCE. THE CONTRACTOR
SHALL KEEP A DAILY GRADING LOG AND MAP IDENTIFYING DATES OF
AREAS WHEN MAJOR GRADING ACTIVITIES ARE OCCURRING. THE DAILY
LOG AND MAP SHALL BE USED TO IDENTIFY AREAS THAT SHALL BE
TEMPORARILY STABILIZED.
14. FOR SLOPES STEEPER THAN 3:1 (HORIZONTAL:VERTICAL), EROSION
CONTROL MATTING SHALL BE INSTALLED.
15. ALL EARTH BASINS, TRAPS, BERMS, DIVERSIONS, WATERWAYS, SWALES,
DITCHES AND RELATED STRUCTURES SHOULD BE STABILIZED
IMMEDIATELY AFTER THEY ARE BUILT. BEFORE A STORMWATER
CONVEYANCE STRUCTURE IS MADE OPERATIONAL, ADEQUATE OUTLET
PROTECTION AND ANY REQUIRED LINING SHALL BE INSTALLED OR
ESTABLISHED.
16. THE PROJECT SITE IS ON SLOPING GROUND AND MAY RECEIVE LARGE
STORMWATER FLOWS, THE CONTRACTOR IS RESPONSIBLE TO MANAGE
OFFISTE STORMWATER TO MEET LOCAL, STATE, AND FEDERAL
REGULATIONS AND TO SPECIFICATION REQUIREMENTS.
17. ALL GRADING AND CONSTRUCTION WORK SHALL IMPLEMENT MEASURES
TO ENSURE THAT THE DISCHARGE OF POLLUTANTS FROM THE
CONSTRUCTION SITE WILL BE REDUCED TO THE MAXIMUM EXTENT
PRACTICABLE AND WILL NOT CAUSE OR CONTRIBUTE TO AN EXCEEDANCE
OF WATER QUALITY STANDARDS.
EROSION & SEDIMENT CONTROL NOTES:
1. SITE 5341 - KAHAUIKI ROCK SHELTER IS A HISTORICAL SITE THAT HAS
BEEN LOCATED BY GARRISON'S ARCHAEOLOGIST WITH A 100' RADIUS
TAPED OFF AREA. THIS AREA WILL BE POSTED TO KEEP OUT AND WILL
REMAIN IN PLACE THROUGHOUT THE PROJECT. SEE SHEET C003 FOR
GENERAL LOCATION OF HISTORIC SITE.
2. CONTRACTOR TO REPAIR EXISTING SECONDARY FENCE AS REQUIRED
TO MAINTAIN FENCE LINE.
3. CONTRACTOR TO NOTIFY GOVERNMENT IF GOVERNMENT'S FENCE
NEEDS TO BE REPAIRED.
4. CONTRACTOR TO REMOVE SECONDARY FENCE AT END OF
CONSTRUCTION.
5. ALL FENCING, INCLUDING GOVERNMENT FENCE, TO REMAIN IN PLACE
UNTIL END OF CONSTRUCTION.
6. CONTRACTOR SHALL RESTORE 10-FOOT AREA BETWEEN
GOVERNMENT'S AND GENERAL CONTRACTOR'S REMOVED FENCES WITH
GRASS AND NON-DESCRIPT LANDSCAPING TO BLEND WITH EXISTING
LANDSCAPING.
7. ONCE CONTRACTOR HAS RESTORED AREA, THEY SHALL INFORM
RESIDENT ENGINEER IMMEDIATELY.
HISTORIC SITE NOTES:GRADING, CLEARING & GRUBBING AND DEMO NOTES:
1. NO CONTRACTOR SHALL PERFORM ANY GRADING, CLEARING & GRUBBING
AND DEMO OPERATION SO AS TO CAUSE FALLING ROCKS, SOIL OR
DEBRIS IN ANY FORM TO FALL, SLIDE OR FLOW ONTO ADJOINING
PROPERTIES, STREETS OR NATURAL WATERCOURSES. SHOULD SUCH
VIOLATIONS OCCUR, THE CONTRACTOR SHALL IMMEDIATELY MAKE ALL
REMEDIAL ACTIONS NECESSARY.
2. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT
AREA AND SURROUNDING AREA FREE FROM DUST NUISANCE.
3. ALL VOIDS AND CAVITIES CREATED BY THE REMOVAL SHALL BE
BACKFILLED AND COMPACTED IN MAXIMUM 8-INCH LIFTS WITH FILL
MATERIAL TO MATCH EXISTING SURROUNDING SOILS AND GRADES. THIS
TYPE OF ACTION SHALL BE PAID FOR BY THE CONTRACTOR.
4. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATERS
FROM DAMAGING THE CUT FACE OF AN EXCAVATION OR THE SLOPED
SURFACES OF A FILL. FURTHERMORE, ADEQUATE PROVISIONS SHALL BE
MADE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE SITE.
5. ALL SLOPES AND EXPOSED AREAS SHALL BE SODDED OR PLANTED AS
SOON AS FINAL GRADES HAVE BEEN ESTABLISHED. PLANTING SHALL NOT
BE DELAYED UNTIL ALL GRADING WORK HAS BEEN COMPLETED.
GRADING TO FINAL GRADE SHALL BE CONTINUOUS AND ANY AREA WITHIN
WHICH WORK HAS BEEN INTERRUPTED OR DELAYED, SHALL BE PLANTED.
6. FILLS ON SLOPES STEEPER THAN 5:1 SHALL BE KEYED.
7. THE LIMITS OF THE AREA TO BE GRADED, CLEARED AND DEMOLISHED
SHALL BE FLAGGED BEFORE THE COMMENCEMENT OF THE WORK.
8. ALL GRADING, CLEARING & GRUBBING AND DEMO OPERATIONS SHALL BE
PERFORMED IN CONFORMANCE WITH THE APPLICABLE PROVISIONS OF
THE STATE DEPARTMENT OF HEALTH, WATER POLLUTION CONTROL AND
WATER QUALITY STANDARDS.
9. TEMPORARY EROSION CONTROLS SHALL NOT BE REMOVED BEFORE
PERMANENT EROSION CONTROLS ARE IN-PLACE AND ESTABLISHED.
10. IF CONTAMINATED SOILS ARE ENCOUNTERED, THE CONTRACTOR SHALL
IMMEDIATELY INFORM THE CONTRACTING OFFICER.
11. THE CONTRACTOR SHALL NOT START CONSTRUCTION NOR MOBILIZE TO
THE SITE UNTIL APPLICABLE REQUIREMENTS STATED IN THE APPROVED
CONDITIONAL NGPC (FILE NO. H1R10D343) HAVE BEEN MET.
12. NON-COMPLIANCE TO ANY OF THE ABOVE REQUIREMENTS IN NOTES 1
THROUGH 11 SHALL MEAN IMMEDIATE SUSPENSION OF ALL WORK, AND
REMEDIAL WORK SHOULD COMMENCE IMMEDIATELY. ALL COSTS
INCURRED SHALL BE BILLED TO THE VIOLATOR. FURTHERMORE,
VIOLATORS SHALL BE SUBJECTED TO ADMINISTRATIVE, CIVIL AND/OR
CRIMINAL PENALTIES.
13. THE ITEMS TO BE REMOVED SHALL BE VERIFIED WITH THE
CONTRACTING OFFICER BEFORE THE COMMENCEMENT OF DEMOLITION
WORK. ITEMS INDICATED TO BE DEMOLISHED AND REMOVED SHALL BE
REMOVED TO THEIR FULL EXTENT, UNLESS OTHERWISE ACCEPTED BY
THE CONTRACTING OFFICER.
14. THE UNDERGROUND PIPES, CABLES OR DUCTLINES KNOWN TO EXIST BY
THE ENGINEER FROM HIS RESEARCH OF EXISTING RECORDS ARE
INDICATED ON THE PLANS. THE CONTRACTOR SHALL VERIFY THE
LOCATIONS AND DEPTHS OF THE FACILITIES AND EXERCISE PROPER
CARE IN EXCAVATING IN THE AREA. WHEREVER CONNECTIONS OF NEW
UTILITIES ARE SHOWN ON THE PLANS, THE CONTRACTOR SHALL EXPOSE
THE EXISTING LINES AT THE PROPOSED CONNECTIONS TO VERIFY THEIR
LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR THE NEW LINES.
1. ALL PROJECTS THAT INVOLVE A NEW CONNECTION TO THE EXISTING
COLLECTION SYSTEM SHALL REQUIRE SUBMITTAL OF THE ASSOCIATED
PERMIT. THE CONTRACTOR SHALL SUBMIT THE PERMIT TO AQUA
ENGINEERS PRIOR TO CONSTRUCTION. CONSTRUCTION MAY NOT BEGIN
UNTIL THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL OF THE
SUBMITTED PERMIT APPLICATION. AQUA ENGINEERS SHALL REVIEW AND
PROVIDE THE CONTRACTOR A WRITTEN RESPONSE TO THE PERMIT
APPLICATION WITHIN FOURTEEN (14) CALENDAR DAYS AFTER RECEIPT OF
THE APPLICATION.
2. PRIOR TO ACCEPTANCE OF ANY SANITARY SEWER LINE AND SEWER
MANHOLE, THE SAID LINE SHALL BE INTEGRITY TESTED AS SPECIFIED IN
THE AQUA ENGINEERS CONSTRUCTION PROTOCOL WITH AN AQUA
ENGINEERS REPRESENTATIVE PRESENT. MINIMUM 72 HOUR ADVANCE
NOTICE REQUIRED FOR ALL INSPECTIONS AND TESTS. AT LEAST ONE
PRECONSTRUCTION MEETING WITH AQUA ENGINEERS WILL BE HELD
PRIOR TO COMMENCEMENT OF CONSTRUCTION.
AQUA ENGINEERS SANITARY SEWER NOTES:
GRAPHIC SCALES
es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
L E G E N DA B B R E V I A T I O N S
C002
C
IV
IL
L
E G
E N
D
A B
B R
E V
IA
TI
O N
S
TJ
/G
N /K
R
A F/
JM
/N
P M
D
C 2F
_P H
2- C
-0
A pr il
, 2
ABA ARCHITECTURAL BARRIERS ACT
AC, A.C. ASPHALT CONCRETE
ACP ASPHALT CONCRETE PAVEMENT
ADA AMERICANS WITH DISABILITIES ACT
ADD ADDITIONAL
AL, ALUM ALUMINUM
APPROX APPROXIMATELY
ARV AIR RELEASE VALVE
AWWA AMERICAN WATERWORKS
ASSOCIATION
BB BOTTOM OF BANK
BC BOTTOM OF CURB
B COR BUILDING CORNER
BDY BOUNDARY
BL BASE LINE
BLDG BUILDING
BLK BLOCK
BM BENCH MARK
BMP BEST MANAGEMENT PRACTICE
BOT BOTTOM
BV BOTTOM VERTICAL BEND
BVC BEGIN VERTICAL CURVE
BW BOTTOM OF WALL
BWS BOARD OF WATER SUPPLY
C CHORD
CA CENTRAL ANGLE
CB CATCH BASIN
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
COMM COMMUNICATION
CONT CONTINUOUS
CL CENTER LINE/CURVE LENGTH/CLASS
CLR CLEARANCE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CNO "CANNOT OPEN"
CONC CONCRETE
CONN CONNECT
CONSTR CONSTRUCTION
COSA CONTRACTOR'S OPERATIONS
AND STORAGE AREA
COTG CLEAN OUT TO GRADE
CP CONTROL POINT
CRM CEMENT RUBBLE MASONRY
CSA CONTRACTOR'S STAGING AREA
CSP CORRUGATED STEEL PIPE
CU COPPER
CHWS CHILLED WATER SYSTEM
CHWR CHILLED WATER RETURN
CY CUBIC YARD
D DIAMETER, DRAIN
DEMO DEMOLISH
DET / DTL DETAIL
DI DRAIN INLET
DIA DIAMETER
DIAG DIAGONAL
DIP DUCTILE IRON PIPE
DIST DISTANCE
DMH DRAIN MANHOLE
DL DRAINLINE
DLX EXISTING DRAINLINE
DPW DIRECTORATE OF PUBLIC WORKS
DW, D/W, DWY DRIVEWAY
DWG(S) DRAWING(S)
E ELECTRICAL, EAST
EA EACH
EC END CURVE
ECM EROSION CONTROL MATTING
ECP EDGE OF CONCRETE PAVEMENT
EG EXISTING GRADE
ELEC ELECTRIC, ELECTRICAL
EL, ELV, ELEV ELEVATION
EMB EMBANKMENT
EMH ELECTRIC MANHOLE
ENCL ENCLOSURE
EP EDGE OF PAVEMENT
EPB ELECTRIC PULLBOX
EQ EQUAL DISTANCE
ER EDGE OF ROAD
ES EDGE OF SHOULDER
ESMT EASEMENT
EVC END VERTICAL CURVE
EXC EXCAVATION
EXP EXPANSION
EXP JT EXPANSION JOINT
EXST, EXIST,
EXT'G, EX
EXISTING
EW EACH WAY
FG FINISH GRADE
FH FIRE HYDRANT
FI FIELD INLET
FIN FINISHED
FL FLOW LINE
FLR FLOOR
FS FINISHED SURFACE
FT FEET
G, GR, GRD GRADE, GROUND
GAL GALLON
GB GRADE BREAK
g1 GRADE IN (%) g2 GRADE OUT (%)
GALV GALVANIZED
GEN GENERAL
GDI GRATED DROP INLET
GDR GUARDRAIL
GMH GAS MANHOLE
GP GATE POST
GRND GROUND
GRVL GRAVEL
GRP GROUTED RUBBLE PAVING
GS GALVANIZED STEEL
GUY GUY WIRE ANCHOR
GV GATE VALVE
H HEIGHT
HDPE HIGH DENSITY POLYETHYLENE
HDWL HEADWALL
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
ID INSIDE DIAMETER
IN INCH(ES)
INV INVERT
K RATE OF CURVATURE
KV KILO-VOLT
L, LG LENGTH
LBS POUNDS
LC LENGTH OF CURVE
LF LINEAR FEET
LIN LINEAR
LOG LIMITS OF GRADING
LOGT LIMITS OF GROUND TOPO
LP LOW POINT
LT LEFT, CURVE LENGTH
M&O MAINTENANCE AND OPERATION
MAINT MAINTENANCE
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MON MONUMENT
MSL MEAN SEA LEVEL
N NORTHING
NIC NOT IN CONTRACT
NTS NOT TO SCALE
O/S OFFSET
OC ON CENTER
OD OUTSIDE DIAMETER
OH, O/H OVERHEAD
OPS OPERATIONS
PAV'T, PVMT PAVEMENT
PRKG PARKING
PC, POC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE,
PORTLAND CEMENT CONCRETE
PCF POUNDS PER CUBIC FOOT
PERF PERFORATED
PH PHASE
PI POINT OF INTERSECTION
PL PLATE
PP POWER POLE
PRC POINT OF REVERSE CURVATURE
PRV PRESSURE REDUCE VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
Q FLOW RATE
R RADIUS/ REINFORCED
RC REINFORCED CONCRETE
RCJ REINFORCED CONCRETE JACKET
RCP REINFORCED CONCRETE PIPE
RD ROAD
REINF REINFORCEMENT
REF REFERENCE
REQD, REQ'D REQUIRED
RIB ROCKFALL IMPACT BARRIER
RPM RAISED PAVEMENT MARKER
RT RIGHT
R/W, ROW RIGHT OF WAY
S SLOPE, SEWER, CANOPY SHADE
SC STREAM CROSSING
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SF SILT FENCE, SQUARE FOOT (FEET)
SHLDR SHOULDER
SHT(S) SHEET(S)
SL SEWERLINE
SMH SEWER MANHOLE
SPECS SPECIFICATIONS
SQ SQUARE
SS SANITARY SEWER
STA STATION
STD STANDARD
STL STEEL
SUBGR SUBGRADE
ST STREET
T TANGENT
TB TOP OF BANK
TC TOP OF CURB
TCP TRAFFIC CONTROL PLAN
THK THICK
TL TEST LEVEL
TP TOP OF PAVEMENT
TRANS TRANSITION
TV TOP OF VALVE/TOP VERTICAL BEND
TYP TYPICAL
UP UTILITY POLE
V VERTICAL/VELOCITY
VC VERTICAL CURVE
VERT VERTICAL
VIF VERIFY IN FIELD
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF INFLECTION
VPT VERTICAL POINT OF TANGENCY
W, WTR WATER
WF WATER FEATURE, WATER FOUNTAIN
WL WATER LINE
WMH WATER MANHOLE
WWM WELDED WIRE MESH
WV WATER VALVE
W/ WITH
W/O WITHOUT
YD YARD
EXISTING GAS
EXISTING ELECTRIC
EXISTING SEWER
EXISTING WATER
EXISTING STORM DRAIN
Gx
Ex
SSx
Wx
SDx
Ex
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X X
X
X X
X X
SD
S D
SD
SD
SS
SD
S D
X X
X X
X
X
X
X
X
X
X X
X
X X
X X
X
X
X
X
X
X
X
X
X X
X X
C H A P P L E A R
SD
SS
SD
S D
X
X
X
X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X X
X X
SD
S D
SD
SD
SS
SD
S D
X X
X X
X
X
X
X
X
X X
X
X X
X X
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
EXIST
ARRIVAL
(PH 1)
COMMAND
(PH 3B)
SECURE
OPS
(PH 3A)
MAIN
OPS
(PH 2)
EXIST
CENTRAL PLANT
(PH 1)
EXIST
GENERATOR
YARD
(PH 1)
EX
IS
T A
C P
AV
EM
EN
T
BL
DG
SU
BS
TA
(P
H 3A
ANTENNA
FARM
(PH 3A)
BELO
W
G R
AD
E
ELEC
AR
EA
(PH
2)
S U
P P
O R
T O
P S
(P H
A
W I S S E R
R O A D
F U
N S
T O
N
R
CHAMBERLAIN
P A
R K
S
A R T Y H I L L R D.
A R T
Y H I L
L R
D
A U
S T
I N
T
H
R
E E
T
P I E R C E S T R E E T
R O
A D
RD.
BELO
W
G R
AD
E
ELEC
AR
EA
(PH
4A)
COURTYARD
(PH 4A)
DR
IV
EW
AY
(P H
3A
SEE INSET THIS SHEET
W I S S E R R O A D
F U
N S
T
P
A R
R D.
R D
A U
S T
I
R
E E
T
P I E R C E S T R E E T
R D
SIMPSON-WISSER
FAMILY HOUSING
AREA
DEVELOPMENT
CHILD
DEVELOPMENT
CENTER
H A
E
BOWLING
ALLEY
CHILD
DEVELOPMENT
CENTER
EXPANSION
C2F MAIN
FACILITY
B U R R R O A D
LIBRARY
PHYSICAL
FITNESS
CENTER
COMMUNITY
CENTER
SUBSTATION
(BY HECO)
PLAYGROUND
EXIST
UTILITY
TUNNEL
(PH 1)
UTILITY
TUNNEL
(PH 2)
UTILITY
TUNNEL
(PH 3A)
PROJECT
LIMITS
PROJECT
LIMITS
EXIST
SWITCH
BUILDING
(PH 1)
SCALE: 1"=100'
0 100' 200'
SCALE: 1"=200'
0 200 400
EXIST
COMM HUB
(PH 1)
C H A M B E R L A I N R D.
A1 C003
GENERAL PLAN
1" = 200'
A3 C003
INSET
1" = 100'
1. SEE SHEET C001 & C002 FOR GENERAL CIVIL NOTES, LEGEND, AND
ABBREVIATIONS.
2. THE CONTRACTOR SHALL FOLLOW THE PROJECT LIMITS 18
MONTHS AFTER NTP AS SHOWN BELOW. ALL WORK OUTSIDE OF
THESE LIMITS SHALL BE COMPLETED WITHIN 18 MONTHS AFTER
NTP. ACCESS TO THE SITE AND STAGING AREAS SHALL BE WITHIN
THE PROJECT LIMITS SHOWN BELOW.
NOTES THIS SHEET:
HISTORIC SITE
(100' RADIUS)
SEE NOTES ON
SHEET C001
HISTORIC SITE
(100' RADIUS)
SEE NOTES ON
SHEET C001
C 2F
_P H
2- C
-0
A pr il
, 2
C003
G E
N E
R A
L P
LA
N
G N
/T J/
K R
A F/
JM
/N
P M
D
BARRACKS
(502, 503A, 503 B)
PARKING
STRUCTURE
(PH 4B)
RICHARDSON
THEATER
JOE
TAKATA
FIELD
C O
N C
R E
TE
P
A V
E M
E N
T (P
H
NEW SEWERLINE
NEW STORM DRAIN
NEW FUEL LINE
PROJECT LIMITS
NEW AC
NEW CONCRETE
NEW BUILDINGS
NEW UTILITY TUNNEL
EXIST PHASE WORK
EXIST UTILITY TUNNEL
FUTURE PHASE WORK
FUTURE UTILITY TUNNEL
LEGEND:
SS
EXISTING
MECHANICAL YARD
(PH 1)
EXISTINGGOVERNMENT
TRAILERS
EXISTING
GOVERNMENT
TRAILERS
CONTRACTOR
STAGING AREA
CONTRACTOR
STAGING AREA
(PH 2)
M I
D D
L
K A U A S T
B E
N N
SD
EXISTING
AC PAVEMENT
(PH1)
F
CONTRACTOR
TRAILERS
(PH 2)
CONTRACTOR
TRAILERS
FUEL
UNLOADING
CONTAINMENT
AREA (PH 3A)
A R T Y H I L L
A R T
Y H I L
L
PROJECT LIMITS
(SEE GENERAL
CONSTRUCTION
NOTE 21)
EXIST
ARRIVAL
(PH 1)
MAIN
OPS
(PH 2)
EXIST
CENTRAL PLANT
(PH 1)
EXIST
GENERATOR
YARD
(PH 1)
BELO
W
G R
AD
E
ELEC
AR
EA
(PH
2)
S U
P P
O R
T O
P S
(P H
A
R
E E
T
BELO
W
G R
AD
E
ELEC
AR
EA
(PH
4A)
COURTYARD
(PH 4A)
EXIST
UTILITY
TUNNEL
(PH 1)
UTILITY
TUNNEL
(PH 2)
PROJECT LIMITS
18 MONTHS AFTER
NTP (SEE NOTE 2,
THIS SHEET)
EXIST
COMM HUB
(PH 1)
C O
N C
R E
TE
P
A V
E M
E N
T (P
H
EXISTING
AC PAVEMENT
(PH1)
CONTRACTOR
TRAILERS
(PH 2)
B5 C003
PHASED PROJECT LIMITS
1" = 100'
X
X
X X
X X
PARKING
STRUCTURE
(PH 4B)
A U
S T
A
D
R
E E
T
C H A
P P
L E
A R
R O A
D
U
N S
T
P A
R
A R T
Y
P I E R C E S T
H A
SEE INSET AT RIGHT
°3
8'2 7"
3.
°2 8'
9.
°5
1'5 9"
4.8
°5
3'
.5
129°11'48" 171.02
200°58'29"
240.13
BENCHMARK:
BM-33
65,343.842 N 1,681,335.198 E
ELEV=132.07 FT.
Shaft-69 65,289.384 N 1,681,202.805 E
ELEV=125.06 FT.
Shaft-68 65,119.909 N 1,681,063.245 E
ELEV=114.06 FT.
Shaft-67 (12" Pipe w/Plug) 64,961.651 N 1,680,807.569 E
ELEV=102.65 FT.
Shaft-56 (12" Pipe w/Plug) 65,691.358 N 1,680,539.392 E
ELEV=133.03 FT.
Shaft-55 (12" Pipe w/Plug) 65,887.356 N 1,680,789.254 E
ELEV=137.06 FT.
SHAFT-54
66,003.494 N 1,681,007.747 E
ELEV=145.85 FT.
Shaft-62 65,596.492 N 1,681,044.223 E
ELEV=151.70 FT.
Shaft-58 (BM-29) (31
2" Pipe w/Plug) 65,280.029 N 1,680,205.463 E
ELEV=93.15 FT.
Shaft-77 (12" Pipe w/Plug) 65,239.690 N 1,679,883.140 E
ELEV=85.74 FT.
203°22'43"
194.08
Shaft-65 65,774.639 N 1,681,121.236 E
ELEV=169.99 FT.
Shaft-87 ("Y" Cut on TC) 63,740.270 N 1,680,389.710 E
ELEV=77.14 FT.
Shaft-88 (Magnail on AC) 63,441.413 N 1,680,436.840 E
ELEV=78.80 FT.
Shaft-52
65,779.275 N 1,680,921.790 E
ELEV=171.47 FT.
110°56'53" 344.42
9°
'2
8"
1.
1°
'58
5.
Shaft-59 (12" Pipe w/Plug) 65,156.891 N 1,680,527.121 E
ELEV=114.04 FT.
Shaft-61 ("12"Pipe w/Plug) 65,421.561' N 1,680,900.939' E
ELEV=135.68 FT.
Shaft-60 ("12"Pipe w/Plug) 65,265.458 N 1,680,751.531 E
ELEV=122.26 FT.
°1
0'
9.
°4
4'
6.
08 151°43'02"342.55
271° 1 9' 54"
199.50
277° 20' 34"
649.17
Shaft-4 (12" Pipe w/Plug) 63,640.81 N 1,680,283.12 E
ELEV=73.37 FT
Shaft-90 (Magnail on AC) 63,376.32 N 1,680,267.7 E
ELEV=73.48 FT
23°52'27"
170.46
132°11'27" 135.17
6°
'0
0"
5.
219° 19' 14" 226.12
A R T Y
H I L L R D.
211°59'44" 254.99
W A R N E R R D
H I L
L R
D
X
X
X
X
X X
X X
X
X
X
X
X
X
X X
X
X X
X X
X
X
X
X
X
X
X
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
SCALE: 1"=100'
0 100' 200'
U
N S
T
P A
A R T
Y H I L
L R
D
P I E R C E S T
H A S E D R.
UTILITY
TUNNEL
(PH 2)
UTILITY
TUNNEL
(PH 3A)
33.00' AT/FP
SETBACK LINE
82.00' AT/FP
SETBACK LINE
A R T Y H I L L R D.
COMMAND
CENTER
(PH 3B) ARRIVAL
(PH 1)
SECURE
OPS
(PH 3A)
ANTENNA
FARM
(PH 3A)
DR
IV
EW
AY
(P
3A
BL
DG
SU
BS
TA
(P
H 3A
MAIN OPS
(PH 2)
S U
P P
O R
T O
P
(P
A
PRIMARY
SWITCH GEAR
(PH 1)
CONCRETE
WALKWAY (PH 1)
CS101
O V
E R
A
LL
S
IT
E P
LA
N
G N
/T J/
K R
A F/
JM
/N
P M
D
PARKING
(PH 1)
GENERATOR
YARD (PH 1)
CENTRAL PLANT
(PH 1)
COMM.
HUB (PH 1)
R E
E T
A U
S T
A.C. PAVEMENT
(PH 1)
CONCRETE PAVEMENT
(PH 2)
UTILITY
TUNNEL
(PH 1)
COURTYARD
(PHASE 4A)
BELOW GRADE
ELEC AREA
(PH 2)
CONC.
WALKWAY
(PH 2)
A.C.
(PH 2)
CONC.
(PH 2)
SCALE: 1"=200'
0 200 400
LEGEND:
CONC.
SIDEWALK
(PH 2)
PROJECT LIMITS
C H A M B E R L A I N R
D.
C H A M B E R L A I N R D.
A1
CS101
OVERALL SITE PLAN
1" = 200'
A3
CS101
INSET
1" = 100'
C 2F
_P H
2- C
S
A pr il
, 2
1. EXISTING TOPOGRAPHIC INFORMATION SHOWN ON THE
DRAWINGS ARE FROM TOPOGRAPHIC SURVEY/MAPPING FOR THE
FY11 MCA PN 065650 USARPAC, COMMAND AND CONTROL
FACILITY, FORT SHAFTER, OAHU, BY SAM O. HIROTA, INC., JUNE
2010, AND FROM PREVIOUS PHASE'S DESIGN DRAWINGS.
2. COORDINATES AND AZIMUTHS ARE REFERRED TO HAWAII STATE
PLANE COORDINATE SYSTEM ZONE 3, NAD83 HARN (1993)
ADJUSTED BY THE NATIONAL GEODETIC SURVEY IN DEC. 1998.
3. ELEVATIONS ARE BASED ON CORPS OF ENGINEERS BM-29 (BRASS
DISK) ELEV.=93.15 FT. MEAN SEA LEVEL (MSL) 1983-2001 TIDAL
EPOCH. BM-29, SEE C1 THIS SHEET.
4. AZIMUTHS ARE MEASURED CLOCKWISE FROM TRUE SOUTH.
DISTANCES IN U.S. SURVEY FEET
5. CONTRACTOR SHALL RE-ESTABLISH ALL SHAFTS AND
BENCHMARKS SHOWN THAT WERE DISTURBED DURING PHASE 2
CONSTRUCTION. CONTRACTOR SHALL FOLLOW THE
REQUIREMENTS IN SPECIFICATION SECTION 31 00 00 PARAGRAPH
3.21 RESTORATION OF CONTROLS.
6. CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO RESTORE
ANY MISSING CONTROLS NECESSARY FOR CONSTRUCTION AND
VERIFY ALL TIES PROVIDED ON THIS SHEET.
NOTES THIS SHEET:
PROJECT LIMITS
NEW AC
NEW CONCRETE
NEW BUILDINGS
NEW UTILITY TUNNEL
EXIST PHASE WORK
EXIST UTILITY TUNNEL
FUTURE PHASE WORK
FUTURE UTILITY TUNNEL
EXISTINGGOVERNMENTTRAILERS
CONTRACTOR
TRAILERS
(PH 2)
FUEL UNLOADING
CONTAINMENT
AREA (PH 3A)
CONTRACTOR
STAGING AREA
(PH 2)
PROJECT LIMITS
(SEE GENERAL
CONSTRUCTION
NOTE 21)
X X
X X
X X
X
X X X X X X X X X X X
2+88.73
1+00
2+00
MAIN OPS (PH 2),
SEE ARCHITECTURAL
PLANS
CENTRAL PLANT
(EXIST PH1)
DRIVEWAY
(EXIST PH1)
UTILITY TUNNEL (PH2),
SEE STRUCTURAL PLANS
SITE WALL, SEE
S125 FOR
TIE-DOWN
INFORMATION.
FOR PROFILE,
SEE SHT CG201
CONCRETE
WALKWAY
CONCRETE
WALKWAY
STEEL PLATE
CULVERT
CONCRETE
WALKWAY
BL DW-1
FOR PROFILE,
SEE CS201
P T:
+4
8.
PC: 1+12.53
093° 0 0' 00"
69.69
L
D1
CS501
PARKING
(EXIST PH1)
129° 00' 00"140.07
5.00'
203° 00' 00"
67.49
A2
CS501
5.00'
5.00'
D1
CS501
D1
CS501
UTILITY TUNNEL
(EXIST PH1)
9.00'
7.00'
SOLID WHITE
STOP BAR
C3
CS502
NEW CONCRETE
PAVEMENT
B3
CS501
16.00'
REINFORCED
CONCRETE
PAVEMENT
B4
CS501
GUARD
POSTS
C2
CS501
GUARD POSTS,
FINAL LOCATION TO
BE DETERMINED
PER EQUIPMENT
MANUFACTURERS
RECOMMENDATION
C2
CS501
AC
PAVEMENT
C1
CS501
33.00' AT/FP
SETBACK LINE
82.00' AT/FP
SETBACK LINE
TIE TO EDGE OF
EXIST DRIVEWAY
COMPACTOR
STRUCTURAL PAD SEE
A471 AND S123 FOR
INFORMATION
BL DW-1 STA
1+08.95
TRANSITION
CONCRETE
PAVEMENT
SECTION TO
AC SECTION
8.00'20.28'8.00'18.97'
1.
G E
N E
R A
TO
R
Y A
R D
(E X
IS
T
P H
1)
NEW
CONCRETE
HEADERS
℄ GRASS
SWALE
D4
CS501
D3
CS501
166° 00' 00"
33.66'
BELOW GRADE ELEC
AREA (PH2), SEE S124
FOR INFORMATION
38° 45' 00" 148.19'
A
B
C
D
E
F
038° 57' 36" 27.02
' 0
0"
.9 2'
311° 19' 07" 20.39
G H
I
J K
L
M
N
O
P
Q
R
S
T
113° 02' 37" 21.15'
023° 00' 22"
65.08 ℄ GRASS
SWALE
D4
CS501
B1
CS501
.1
2'
8.
.2
5'
℄ GRASS
SWALE
8.
8.
8.
REMOVABLE
B0LLARDS
(EXIST PH1)
A3
CS501
CENTERLINE
GRASS SWALE
CATCH BASIN
(EXIST PH1)
CONC CURB
(EXIST PH1)
34.00'20.50'
106°01'19"
01.41
(TIE FROM "BM-33" TO COLUMN
GRID WORKING POINT)
COLUMN GRID
WORKING POINT
65,399.434 N 1,681,141.607 E
°0
0' (C
O
LU
M N
G R
ID
W
O R
K
IN
G P
O
IN
T
LI
N E
R=25.0'
R=25.0'
15.05'
16.00'
°3
8'2 7"
.1
STA 0+54.37
STA 0+32.00
75.31'
70.50'
CONC
HEADER
(EXIST PH1)
COLD PLANE EXIST
PAVEMENT
001° 07' 22" 15.08
010° 46' 10" 22.32
038° 37' 48" 2.54
X X
X X
X X
X X
X
X X X X X X X X X X X
P
A N
E
LS
(6 0.
3 PANELS (34.00')
6 PANELS (70.50')
P
A N
E
LS
(9 7.
G E
N E
R A
TO
R
Y A
R D
(E X
IS
T
P H
1)
8.50'
CURVE DATA
NO.
Δ
39°31'53"
74°00'00"
88°59'27"
29°04'14"
82°31'48"
48°00'24"
90°00'00"
90°00'00"
32°37'15"
Δ/2
19°45'57"
37°00'00"
44°29'44"
14°32'07"
41°15'54"
24°00'12"
45°00'00"
45°00'00"
16°18'38"
R
29.619'
27.968'
11.564'
39.419'
22.000'
59.254'
20.000'
6.000'
25.000'
T
10.644'
21.076'
11.362'
10.220'
19.304'
26.386'
20.000'
6.000'
7.315'
C
20.033'
33.663'
16.209'
19.787'
29.020'
48.208'
28.284'
8.485'
14.042'
LC
20.436'
36.122'
17.961'
20.000'
31.689'
49.647'
31.416'
9.425'
14.234'
C O O R D I N A T E T A B L E
POINT
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
NORTHING
65242.5589
65168.9317
65162.5203
65160.0330
65165.2843
65157.4726
65393.8653
65393.0212
65372.0083
65354.2661
65345.9720
65290.0823
65261.0851
65247.6257
65201.4665
65286.9625
65162.4730
65154.1740
65124.8077
65133.0855
EASTING
1680972.1092
1681088.8527
1681083.6608
1681086.6849
1681158.4509
1681176.8982
1681215.7582
1681199.5708
1681182.5792
1681173.8202
1681191.6046
1681146.3460
1681147.4929
1681162.8033
1681176.7069
1681256.3158
1681170.6535
1681163.9928
1681075.3296
1681055.8693
D E S C R I P T I O N
END BASELINE DW-1, STA 2+88.73
CORNER WALKWAY
CORNER WALKWAY
CORNER WALKWAY
END WALKWAY CURVE NO. 1
BEGIN CURVE NO. 1/CORNER
WALKWAY
BEGIN CURVE NO. 3/BEGIN CL
GRASS SWALE
END CURVE NO. 3
BEGIN CURVE NO. 4
END CURVE NO. 4
BEGIN CL GRASS SWALE
BEGIN CL GRASS CURVE NO. 5
END CL GRASS CURVE NO. 5
BEGIN CL GRASS CURVE NO. 6
END CL GRASS CURVE NO. 6
BEGIN CL GRASS SWALE
END CL GRASS SWALE
BEGIN CL GRASS SWALE
BEGIN CL GRASS SWALE
CORNER GRASS SWALE
2 PANELS
(16.0')9.0'
7.
.1
2'
6 PANELS
(43.9')
2 PANELS
(12.8')
8.
6.3'
E Q
E
Q
. 3 PANELS
(32.5')5 PANELS
(40.1')9.0'
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
CS102
S
IT
E P
LA
N
G N
/T J/
K R
A F/
JM
/N
P M
D
1. FOR BENCHMARK, CONTROL POINTS, AND AZIMUTH & DISTANCES,
SEE SHEET CS101.
2. BUILDING TIE-DOWNS ON THIS SHEET ARE TO OUTSIDE CORNER
OF CMU WALL. SEE ARCHITECTURAL PLANS FOR BUILDING
DIMENSIONS..
3. ALL TRAFFIC SIGN AND PAVEMENT MARKING INSTALLATIONS
SHALL BE DONE IN ACCORDANCE WITH THE "MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND
HIGHWAYS," 2009 EDITION, AS AMENDED, AND AS SHOWN ON THE
PLANS.
4. CONTRACTOR SHALL RE-ESTABLISH ALL BENCHMARKS SHOWN
THAT WERE DISTURBED DURING PHASE 2 CONSTRUCTION, OR
FROM CONSTRUCTION OF PREVIOUS PHASES.
NOTES THIS SHEET:
A3
CS102
SITE PLAN - 1
1" = 20'
PROJECT LIMITS
AT/FP (ANTI-TERRORISM / FORCE
PROTECTION) SETBACK LINE
NEW CONCRETE
NEW AC
NEW BUILDINGS
NEW UTILITY TUNNEL
EXIST BUILDING/TUNNEL
REINFORCED
CONCRETE PAVEMENT
LEGEND:
KEY PLAN
PIERCE ST
WISSER RD
7T
TR
E E
T
ARTY H
ILL
R D.
WISSER
ROAD
P A
R
AU
ST
IN
R
D
C 2F
_P H
2- C
S
A pr il
, 2
TRANSVERSE
CONTRACTION
JOINT (TYP.)
ISOLATION
JOINT
D3
CS502
D3
CS502
C1
CS102
JOINTING PLAN
1" = 20'
JOINTING PLAN,
SEE INSET C1
SCALE: 1"=20'
0 20' 40'10'
MATCHLINE
SEE SHT CS103
CS102
CS103
COMPACTOR
STRUCTURAL
PAD SEE A471
AND S123 FOR
INFORMATION
D3
CS502
ISOLATION
JOINT
LONGITUDINAL
CONSTRUCTION/
CONTRACTION
JOINT (TYP.)
D3
CS502
R R R
R
R B4
CS501
R
REINFORCED
CONCRETE
PAVEMENT
B4
CS501
CURVE NUMBER
COORDINATE POINTA
A1
CS102
JOINTING PLAN
1" = 20'
JOINTING PLAN,
SEE INSET A1
R
R
R
R
R
ISOLATION JOINT, SEE
DTL D3, SHT CS502
ISOLATION JOINT, SEE
DTL D3, SHT CS502LONGITUDINAL
CONTRACTION
JOINT (TYP.)
D3
CS502
TRANSVERSE
CONTRACTION JOINT (TYP.)
D3
CS502
RRRR
RRR
X X X X
0+00
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
ARRIVAL
(EXIST PH1)
UTILITY
TUNNEL
(EXIST PH1)
CONCRETE
D/W APRON
CONCRETE
WALKWAY
PT: 0+46.10
CONNECT & PROVIDE
SMOOTH TRANSITION TO
DRIVEWAY
P C
: 0 +0
8.
27± LF CONCRETE
CURB & GUTTER
A1
CS502
D1
CS501
C4
CS501
STEEL PLATE
CULVERT
A2
CS501
16.00'
5.00'
7.00'
AC PAVEMENT
C1
CS501
203° 00' 00" 67.486
33.00' AT/FP
SETBACK LINE
82.00' AT/FP
SETBACK
LINE
BELOW GRADE ELEC
AREA (PH2), SEE S124
166° 05' 31"
33.63'
BL DW-1
FOR PROFILE,
SEE CS201
℄ GRASS SWALE
D3
CS501
℄ GRASS SWALE D4
CS501
℄ GRASS SWALE
D4
CS501
337° 06' 43"
36.40'
23° 00' 22"
65.08'
38° 45' 00" 26.65'
TIE TO EXIST
SIDEWALK
A
B C
E
D
F
A1
CS501
129° 01' 17" 8.97'
PROJECT LIMITS
D5
CS501
G
H
38° 45' 00" 148.19'
CU x
CU x
CU x
CU x
SD
x
E x
E x
E x
Ex
E x
E x
E x
E x
E x
E x
E x
Ex
E x
E x
E x
E x
CURVE DATA
NO.
Δ
37°44'56"
75°51'43"
Δ/2
18°52'28"
37°55'52"
R
21.249'
28.040'
T
7.265'
21.853'
C
13.748'
34.473'
LC
14.000'
37.127'
C O O R D I N A T E T A B L E
POINT
A
B
C
D
E
F
G
H
NORTHING
65073.1863
65059.4381
65021.3312
65025.6536
65004.8699
64886.8414
64879.6320
64877.8948
EASTING
1681030.4359
1681030.4759
1681077.7948
1681060.8443
1681044.1636
1680959.6936
1680958.5840
1680965.5923
D E S C R I P T I O N
BEGIN CURVE NO. 1
END CURVE NO. 1
BEGIN BL DW-1, STA 0+00
BEGIN CL GRASS SWALE
END CL GRASS SWALE
CORNER SIDEWALK
TIE TO EXIST SIDEWALK
CORNER GUTTER
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
CS103
S
IT
E P
LA
N
G N
/T J/
K R
A F/
JM
/N
P M
D
1. FOR BENCHMARK, CONTROL POINTS, AND AZIMUTH & DISTANCES,
SEE SHEET CS101.
2. ALL TRAFFIC SIGN AND PAVEMENT MARKING INSTALLATIONS
SHALL BE DONE IN ACCORDANCE WITH THE "MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND
HIGHWAYS," 2009 EDITION, AS AMENDED, AND AS SHOWN ON THE
PLANS.
3. CONTRACTOR SHALL RE-ESTABLISH ALL BENCHMARKS SHOWN
THAT WERE DISTURBED DURING PHASE 2 CONSTRUCTION, OR
FROM CONSTRUCTION OF PREVIOUS PHASES.
NOTES THIS SHEET:
A1
CS103
SITE PLAN - 2
1" = 20'
PROJECT LIMITS
AT/FP (ANTI-TERRORISM / FORCE
PROTECTION) SETBACK LINE
NEW CONCRETE
NEW AC
EXIST BUILDING/UTILITY TUNNEL
LEGEND:
KEY PLAN
CS102
PIERCE ST
WISSER RD
7T
TR
E E
T
ARTY H
ILL
R D.
WISSER
ROAD
P A
R
AU
ST
IN
R
D
C 2F
_P H
2- C
S
A pr il
, 2
SCALE: 1"=20'
0 20'10' 40'
MATCHLINE
SEE SHT CS102
CS103
CURVE NUMBER
COORDINATE POINTA
X X
X
X
X
X
X X X
X X
X
W I S S E R R O A D
O A D
F U
N S
T
C H A M B E R L A I N R
D.
H A
A R T Y H I L L R D.
A R T
Y H I L
L R
D
A U
S T
I N
R
E E
T
P I E R C E S T R E E T
PROJECT
LIMITS
EXISTING
DRAINAGE
DITCH
DUST SCREEN &
SILT FENCE
ARRIVAL
(EXIST PH1)
AC PAVEMENT (PH1)
C O
N C
R E
TE
P
A V
E M
E N
T
MAIN OPS
(PH 2)
UTILITY
TUNNEL
(EXIST PH1)
UTILITY
TUNNEL
(PH 2)
CENTRAL PLANT
(EXIST PH1)
COMM HUB
(EXIST PH1)
GENERATOR YARD
(EXIST PH1)
EROSION CONTROL
ROLL (TYP)
0 12
EXISTING STABILIZED
CONSTRUCTION
INGRESS/EGRESS
EROSION CONTROL
ROLL (TYP)
S F
S F
S F12
SF
SF
SF
SF
SF
SF
SF
SF
SF
X
X
VEHICLE WASHDOWN,
SEE NOTE 8
EXISTING DOUBLE SWING
CONSTRUCTION GATE
INGRESS/EGRESS
CONCRETE TRUCK
WASHDOWN, SEE NOTE 8
SF
x
SFx
SF
x
SF
x
SF x
SF x
SF x
SF x
SF x
SFx
SFx
SF
x
EXISTING 7' HIGH
FE6 CONSTRUCTION FENCE
WITHOUT BARBED-WIRE AND
EXTENSION ARMS
3 EXISTING REMOVABLE BOLLARDS
WITH CHAIN AND PADLOCK
3 EXISTING REMOVABLE
BOLLARDS WITH CHAIN
AND PADLOCK
EXISTING 24' WIDE x 7'
HIGH DOUBLE SWING
CONSTRUCTION GATE
EXISTING DUST
SCREEN & SILT FENCE
SF
SF
S
F
S F
S F
SF
S F
S F
DUST SCREEN &
SILT FENCE
CONTRACTOR
TRAILERS, SEE
NOTE 10
R O
A D
STAGING
AREA
SF
X
X
EXISTING 24' WIDE x 7'
HIGH DOUBLE SWING
CONSTRUCTION GATE
INGRESS/EGRESS
EXISTING STABILIZED
CONSTRUCTION
INGRESS/EGRESS
EXISTING 24' WIDE x 7'
HIGH DOUBLE SWING
CONSTRUCTION GATE
EXISTING GRAVEL ROAD
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
0 80' 160'40'
SCALE: 1"=80'
CG101
O V
E R
A
LL
E R
O S
IO
N
S
E D
IM
E
N T
C O
N
TR
O L
P
LA
N
TJ
/G
N /K
R
A F/
JM
/N
P M
D
NOTES THIS SHEET:
STABILIZED CONSTRUCTION
INGRESS/EGRESS
GRATED DRAIN INLET
PROTECTION
CATCH BASIN
FILTER
NEW SILT FENCE / DUST SCREEN
EXIST SILT FENCE / DUST SCREEN
EROSION CONTROL ROLL
TEMPORARY EROSION
CONTROL MATTING
W/HYDROMULCH
PROPOSED NEW
BUILDING/STRUCTURE
EXIST BUILDING/STRUCTURE
PROJECT LIMITS
EXISTING CONTOURS
NEW CONTOURS
LIMITS OF GRADING
SWALE CENTERLINE
LEGEND:
SF
SF
B1
CG501
A1
CG501
B2
CG501
1. SEE SHEET C001, "EROSION & SEDIMENT CONTROL NOTES"
& SHEET CG501 FOR NOTES & DETAILS.
2. DISTURBED AREA = 6.9 ACRES.
3. THE CONTRACTOR SHALL IMPLEMENT A SWPP IN
COMPLIANCE WITH THE REQUIREMENTS OF THE STATE
DOH'S STORMWATER POLLUTION PREVENTION PROGRAM.
THE SWPP SHALL INCORPORATE, AT A MINIMUM, THE
EROSION AND SEDIMENT CONTROL PLAN SHOWN ON THIS
SHEET.
4. DUST SCREEN SHALL MEET THE FOLLOWING CRITERIA AS A
RECOMMENDED MINIMUM: 15' TALL, 4" STEEL POSTS WITH 8'
SPACING, CLOTH BARRIER MADE OF "WOVEN GEOTEXTILE".
CLOTH BARRIER SHALL BE INSTALLED ON CONSTRUCTION
FENCE AND GATES. DUST SCREEN MAY BE USED AS SILT
FENCE IF CLOTH BARRIER MATERIAL MEETS THE SILT
FENCE REQUIREMENTS PER DETAIL
5. DURING CONSTRUCTION, ADDITIONAL PREVENTIVE
MEASURES SHALL BE INSTALLED BY THE CONTRACTOR AS
NEEDED TO CONTROL DUST AND/OR EROSION AND
SEDIMENT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MANAGING
OFFSITE STORM WATER THAT ENTERS THE PROJECT
LIMITS.
7. EROSION CONTROL MATTING WITH SEED SHALL HAVE A
MINIMUM 36-MONTH LIFE SPAN. TEMPORARY EROSION
CONTROL MATTING WITH HYDROMULCH SHALL HAVE A
MINIMUM 24-MONTH LIFE SPAN.
8. CONTRACTOR TO PROVIDE SITE SPECIFIC BEST
MANAGEMENT PRACTICES FOR VEHICLE & CONCRETE
TRUCK WASHDOWN AREA TO PREVENT CONTAMINATED
WASHDOWN WATER FROM ENTERING THE STORM DRAIN
SYSTEM.
9. THE CONTRACTOR SHALL PLACE EROSION CONTROL
MATTING WITH HYDROMULCH ALONG THE BOTTOM OF THE
SWALE AND ALONG THE ENTIRE LENGTH OF THE SWALE.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING
THE UNDERGROUND PERFORATED PIPE SYSTEM AND
SHALL BE LIABLE FOR ANY DAMAGE CAUSED TO THE
SYSTEM DURING CONSTRUCTION.
D1
CG501
C 2F
_P H
2- C
G
A pr il
, 2
A1
CG101
OVERALL EROSION & SEDIMENT CONTROL PLAN
1" = 80'
HISTORIC SITE
(100' RADIUS)
SEE NOTES ON
SHEET C001
A5
CG501
SF
SFx
S E
E S
H E
E T
C G
C2
CG501
PROJECT
LIMITS
X X
X X X X
X
X
X X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X X
X X
W I S S E R R O A D
R E
E T
EXISTING
DRAINAGE DITCH
DUST SCREEN &
SILT FENCE
ARRIVAL
(EXIST PH1)
AC PAVEMENT
C O
N C
R E
TE
P
A V
E M
E N
T
MAIN OPS
(PH 2)
UTILITY
TUNNEL
(EXIST PH1)
UTILITY
TUNNEL
(PH 2)
CENTRAL PLANT
(EXIST PH1)
COMM HUB
(EXIST PH1)
GENERATOR YARD
(EXIST PH1)
EROSION CONTROL
ROLL (TYP)
EROSION CONTROL ROLL (TYP)
B2
CG501
GRASSED
SWALE
TEMPORARY EROSION
CONTROL MATTING W/
HYDROMULCHING
C2
CG501
D3
CS501
B2
CG501
UNDERGROUND
PERFORATED PIPE SYSTEM
(EXIST PH1)
S F
S F
S F
S F
S F
S F
SF x
SF x
SF
xSFx
DRIVEWAY
(EXIST PH1)
EXISTING STABILIZED
CONSTRUCTION
INGRESS/EGRESS
VEHICLE WASHDOWN,
SEE NOTE 8
CONCRETE TRUCK
WASHDOWN, SEE NOTE 8
EXISTING DUST SCREEN
& SILT FENCE
DUST SCREEN &
SILT FENCE
CONTRACTOR TRAILERS,
SEE NOTE 10
EXISTING GRAVEL ROAD
X
X X
X
SF
SF
SF
SF
S
F S
F
S F
S F
S F
S F
SF
SF
SF
S
F S
F
S F
S F
S F
SF
x
SFx SFx SFx SFx
EXISTING DOUBLE SWING
CONSTRUCTION GATE
INGRESS/EGRESS
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
CG102
E R
O S
IO
N
S
E D
IM
E
N T
C O
N
TR
O L
P
LA
N
TJ
/G
N /K
R
A F/
JM
/N
P M
D
NOTES THIS SHEET:
C 2F
_P H
2- C
G
A pr il
, 2
A1
CG102
EROSION & SEDIMENT CONTROL PLAN
1" = 40'
0 40' 80'20'
SCALE: 1"=40'
STABILIZED CONSTRUCTION
INGRESS/EGRESS
GRATED DRAIN INLET
PROTECTION
CATCH BASIN
FILTER
NEW SILT FENCE / DUST SCREEN
EXIST SILT FENCE / DUST SCREEN
EROSION CONTROL ROLL
TEMPORARY EROSION
CONTROL MATTING
W/HYDROMULCH
PROPOSED NEW
BUILDING/STRUCTURE
EXIST BUILDING/STRUCTURE
PROJECT LIMITS
EXISTING CONTOURS
NEW CONTOURS
LIMITS OF GRADING
SWALE CENTERLINE
LEGEND:
SF
SF
B1
CG501
A1
CG501
B2
CG501
A5
CG501
SF
SFx
C2
CG501
NOTES THIS SHEET:
1. SEE EROSION & SEDIMENT CONTROL NOTES & DETAILS ,
SHEET CG501 FOR NOTES & DETAILS.
2. DISTURBED AREA = 6.9 ACRES.
3. THE CONTRACTOR SHALL IMPLEMENT A SWPP IN
COMPLIANCE WITH THE REQUIREMENTS OF THE STATE
DOH'S STORMWATER POLLUTION PREVENTION PROGRAM.
THE SWPP SHALL INCORPORATE, AT A MINIMUM, THE
EROSION AND SEDIMENT CONTROL PLAN SHOWN ON THIS
SHEET.
4. DUST SCREEN SHALL MEET THE FOLLOWING CRITERIA AS A
RECOMMENDED MINIMUM: 15' TALL, 4" STEEL POSTS WITH 8'
SPACING, CLOTH BARRIER MADE OF "WOVEN GEOTEXTILE".
CLOTH BARRIER SHALL BE INSTALLED ON CONSTRUCTION
FENCE AND GATES. DUST SCREEN MAY BE USED AS SILT
FENCE IF CLOTH BARRIER MATERIAL MEETS THE SILT
FENCE REQUIREMENTS PER DETAIL
5. DURING CONSTRUCTION, ADDITIONAL PREVENTIVE
MEASURES SHALL BE INSTALLED BY THE CONTRACTOR AS
NEEDED TO CONTROL DUST AND/OR EROSION AND
SEDIMENT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MANAGING
OFFSITE STORM WATER THAT ENTERS THE PROJECT
LIMITS.
7. EROSION CONTROL MATTING WITH SEED SHALL HAVE A
MINIMUM 36-MONTH LIFE SPAN. TEMPORARY EROSION
CONTROL MATTING WITH HYDROMULCH SHALL HAVE A
MINIMUM 24-MONTH LIFE SPAN.
8. CONTRACTOR TO PROVIDE SITE SPECIFIC BEST
MANAGEMENT PRACTICES FOR VEHICLE & CONCRETE
TRUCK WASHDOWN AREA TO PREVENT CONTAMINATED
WASHDOWN WATER FROM ENTERING THE STORM DRAIN
SYSTEM.
9. THE CONTRACTOR SHALL PLACE EROSION CONTROL
MATTING WITH HYDROMULCH ALONG THE BOTTOM OF THE
SWALE AND ALONG THE ENTIRE LENGTH OF THE SWALE.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING
THE UNDERGROUND PERFORATED PIPE SYSTEM AND
SHALL BE LIABLE FOR ANY DAMAGE CAUSED TO THE
SYSTEM DURING CONSTRUCTION.
D1
CG501
SD x
SDx
SD
x
SD
x
SD
x
SD
x
121.50
1.
1.
MAIN OPS
FF EL=122',
SEE ARCHITECTURAL PLANS
UTILITY TUNNEL,
SEE STRUCTURAL PLANS
130132
EXIST UNDERGROUND
PERFORATED PIPE
DETENTION CHAMBERS
NEW
GRASS
SWALE
B ROADWAY "DW-1"
BELOW GRADE ELEC
AREA, SEE S124
STEEL PLATE CULVERT
INV IN=117.46
INV OUT=117.35
A2
CS501
SITE WALL
SEE S125
AND CG201
S D x S
D x
S D x S
D x
S D x S
D x
S D x S
D x
S D x
SDx
SDx
SDx SDxSDx
SDx SDx
SD
SDSDSD
S S x S
S x
S S x S
S x
S S x S
S x
S S x S
S x
S S x
SSxSSxSSxSSxSSxSSxSSxSSxSSxSSxS S x
SS
x
SS
x
SS
x
SSxSSx
SSx
SSx
S D x S
D x
S D x S
D x
S D x
SD x
SDxSDxSDxSDxSDx
S D x
SDxSDxSDxSDxSDx
S D
S D
S D
SD
x
SD
x
SD
x
SD
x
SD
x
SDxSDxSDxSDx
SDx
SDx
SD
x
SD
x
SD
x
SDx
SDxSDx
SDx SDx
SDx
SDx
SDx
SDx
A1
CG201
L
NEW
GRASS
SWALE
NEW
GRASS
SWALE
D4
CS501
D4
CS501
D3
CS501
8.0
8.0
-47.41%
8.0
8.0
18.1
18.8
6.8
20' TYP.
A3
CU503
A3
CU503
C1
CU503
A3
CU503
A3
CU503
A3
CU503
A3
CU503
A3
CU503
C3
CU503
C3
CU503
A3
CU503
FOR DRIVEWAY
GRADING PLAN,
SEE CG401
ADJUST EXIST GDI-E1
INV=116.06
EXIST RIM=125.44±
NEW RIM=127.13
EXIST GDI-A1
TOP=126.77
INV=117.00
EXIST CB-A2
TOP=128.91
INV=117.26
EXIST GDI-J2
TOP=122.21
INV=117.79
12"x12" AREA DRAIN-P2
TOP=121.84, LOW POINT
INV=118.05
12"x12" AREA DRAIN-P1
TOP=121.84, LOW POINT
INV=117.95
EXIST GDI-J1
TOP=121.02
INV=117.26
12"x12" AREA DRAIN-P3
TOP=121.84, LOW POINT
INV=118.16
DMH-M3
TOP = 119.27
INV IN = 114.19 (D12)
INV IN = 114.19 (D12)
INV OUT = 114.19 (D12)
COTG & WYE-M1
TOP = 119.64
INV IN = 113.99 (D4)
INV IN = 113.99 (D12)
INV OUT = 113.99 (D18)
ADJUST EXIST DMH-B1-DROP
INV IN = 112.00 (D18)
INV IN = 113.46 (D18)
INV IN = 116.16 (D12)
INV OUT = 112.00 (D18)
EXIST RIM=120.33±
NEW RIM=120.61
122.00
121.12 120.05
121.91
121.80
121.80
122.00
122.00
122.00
121.12 116.16 115.81
120.05 117.79
117.58
118.13
118.31
116.00 116.00 114.48
114.75
113.23
113.51
122.00
130.11
128.64
127.41
126.34
125.24
124.10
123.00
121.91
120.78
119.63
117.29
116.30
115.32
114.33
113.33 112.36
118.47 118.61
118.79
119.09
119.27
119.57
119.75
119.77
120.05
122.00 122.00
122.00
120.84
122.00
122.00
122.00
118.03
129.94
128.72
127.47
126.40
125.31
124.17
123.07
121.98
120.84
119.69
118.48
117.39
116.40
115.43
114.43
113.43
112.45
122.00
122.00
119.96119.79
121.00
120.90
121.20
122.00
122.00
122.00
122.00
122.00
121.74 121.83
126.14 126.19
125.80
124.50
123.58
122.65
121.79
121.16
119.89
119.49
118.37
119.13
126.57
121.51
119.00
117.94
115.80
114.86
113.93
112.93
111.93
ADJUST EXIST DMH
NEW RIM = 126.61
EXIST RIM=124.00±
ADJUST EXIST DMH
NEW RIM = 126.56
EXIST RIM=123.95±
ADJUST EXIST DMH
NEW RIM = 122.89
EXIST RIM=121.33±
ADJUST EXIST DMH
NEW RIM = 124.06
EXIST RIM=121.54±
ADJUST EXIST DMH
NEW RIM = 121.57
EXIST RIM=121.45±
ADJUST EXIST DMH
NEW RIM = 123.05
EXIST RIM=122.94±
ADJUST EXIST DMH
NEW RIM = 112.70
EXIST RIM=112.33±
ADJUST EXIST SMH
NEW RIM = 121.68
EXIST RIM=121.38±
ADJUST EXIST SMH
NEW RIM = 122.00
EXIST RIM=121.84±
121.96
119.30
121.23
120.15
122.31
123.37
124.44 126.00
20' TYP
119.68
8" DRAINLINE "DL-P"
12" DRAINLINE "DL-P"
12" DRAINLINE "DL-P"
12" DRAINLINE
"DL-M"
18" DRAINLINE "DL-M"
X X
X X
X X X X X X
0+00 0+50
1+
1+
1+
.2
CG103
G R
A D
IN
G
P
LA
N
TJ
/G
N /K
R
A F/
JM
/N
P M
D
SCALE: 1"=20'
0 20' 40'10'
7T H
S T
AU
ST
IN
R
D
WISSER RD
KEY PLAN
NOTES THIS SHEET:
MATCHLINE
SEE SHT CG104
AU
ST
IN
R
D
COMM. HUB
FF EL=139'
C G
C G
R E
E T
C 2F
_P H
2- C
G
A pr il
, 2
1. SEE UTILITY PLAN FOR NEW STORM DRAIN .
2. SEE UTILITY PLAN FOR STORM DRAIN MANHOLE INFORMATION.
3. ALL SPOT ELEVATIONS SHOWN ARE BC/BW GRADES UNLESS
OTHERWISE NOTED IN PLAN.
4. ALL CURB HEIGHTS ARE 6" UNLESS OTHERWISE NOTED IN PLAN.
5. FOR DW-1 ROADWAY PROFILE SEE SHT CS201.
6. REFER TO SHEET C001 FOR GENERAL CIVIL NOTES.
7. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE AWAY
FROM ALL BUILDINGS.
8. TOP ELEVATIONS OF DRAINAGE STRUCTURES ARE TO MATCH
EXISTING GRADES OF SURROUNDING AREAS.
9. SEE EROSION & SEDIMENT CONTROL PLANS FOR PERMANENT
EROSION CONTROL MATTING.
10. FOR CONCRETE DRIVEWAY JOINTING PLAN, SEE CS102. FOR
FUEL UNLOADING CONTAINMENT AREA JOINTING PLAN, SEE
A1
CG103
GRADING PLAN - 1
1" = 20'
SEE CG401
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
LEGEND:
PROJECT LIMITS
LIMITS OF GRADING
PH1 DESIGN GRADING LIMITS
NEW GRASS SWALE CENTERLINE
NEW BUILDING
NEW CONCRETE
NEW AC
NEW UNDERGROUND TUNNEL
NEW CONCRETE PAVING
EXIST BUILDING/TUNNEL
NEW CONTOUR
EXISTING CONTOUR
NEW DRAINLINE/MH
EXIST DRAINLINE/MH
EXIST GRATED DRAIN INLET
FINISHED SPOT ELEVATION
EXISTING SPOT ELEVATION
FINISHED FLOOR ELEVATION
ADJUSTED UTILITY
FF EL
SD
SDx
SDx
D
D
CB
122.00
CENTRAL
PLANT
FF EL=122'
GENERATOR
YARD
D CBS
SD
x
SD
x
SD
x
SD
x
SDx
SD x
SD x
SD x
SD x
S D x S
D x
S D x S
D x
S D x S
D x
S D x
SDx
SDx
SDx
SD
SD
SD
SD
SD
NEW GRASS
SWALE
D3
CS501 8.00'
8 11
113.51
111.51
112.26
109.43
109.11
0.
112.00
112.00
0.
110.56
111.47 111.37
110.49
109.21
108.48
108.56
107.82
107.92
107.12
107.22
106.42
106.52
105.66
105.76
104.75
104.85
109.98±
109.10±
109.78BC
108.56
112.08
111.02
110.31
109.56
103.67
103.61
103.85
103.75
COTG & WYE-GG1
TOP = 108.56
110.91
109.81
108.87
109.19BC
6" DRAINLINE "DL-GG"
6" DRAINLINE "DL-GG"
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
SD
x
SD
x
SD
x
SD
x
SD
x
110.32TC
110.32BC
109.73TC
109.73BC
109.83TC
109.33BC
109.69TC
109.19BC
110.43TC
109.93BC
109.83
110.42
109.43
109.72
109.64TC
110.46TC
9.
9.
110.28TC
109.78BC
109.57TC
109.48BC
110.03
109.62
A1
CG104
GRADING PLAN - 2
1" = 20'
CG104
G R
A D
IN
G
P
LA
N
TJ
/G
N /K
R
A F/
JM
/N
P M
D
SCALE: 1"=20'
0 20' 40'10'
7T H
S T
AU
ST
IN
R
D
WISSER RD
KEY PLAN
NOTES THIS SHEET:MATCHLINE
SEE SHT CG103
AU
ST
IN
R
D
C G
C G
ARRIVAL
FF EL=105'
LEGEND:
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
STEEL PLATE CULVERT
INV IN = 109.51
INV OUT = 109.19
BELOW GRADE ELEC
AREA, SEE S124
A2
CS501
PROJECT LIMITS
LIMITS OF GRADING
PH1 DESIGN GRADING LIMITS
NEW GRASS SWALE CENTERLINE
NEW BUILDING
NEW CONCRETE
NEW AC
NEW UNDERGROUND TUNNEL
NEW CONCRETE PAVING
EXIST BUILDING/TUNNEL
NEW CONTOUR
EXISTING CONTOUR
NEW DRAINLINE/MH
EXIST DRAINLINE/MH
EXIST GRATED DRAIN INLET
FINISHED SPOT ELEVATION
EXISTING SPOT ELEVATION
FINISHED FLOOR ELEVATION
FF EL
SD
SDx
SDx
122.00
1. SEE UTILITY PLAN FOR NEW STORM DRAIN .
2. SEE UTILITY PLAN FOR STORM DRAIN MANHOLE INFORMATION.
3. ALL SPOT ELEVATIONS SHOWN ARE BC/BW GRADES UNLESS
OTHERWISE NOTED IN PLAN.
4. ALL CURB HEIGHTS ARE 6" UNLESS OTHERWISE NOTED IN PLAN.
5. FOR DW-1 ROADWAY PROFILE SEE SHT CS201.
6. REFER TO SHEET C001 FOR GENERAL CIVIL NOTES.
7. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE AWAY
FROM ALL BUILDINGS.
8. TOP ELEVATIONS OF DRAINAGE STRUCTURES ARE TO MATCH
EXISTING GRADES OF SURROUNDING AREAS.
9. SEE EROSION & SEDIMENT CONTROL PLANS FOR PERMANENT
EROSION CONTROL MATTING.
C 2F
_P H
2- C
G
A pr il
, 2
EXISTING UTILITY TUNNEL
(PH 1)
D
D
CB
C1
CG104
INSET
1" = 5'
SEE IN
SET
CU x
Wx
Wx
Wx
W x
W x
Wx
W x
W
Wx
Wx Wx
W x
W x
Wx
W x
W x
W x
W x
Wx
Wx
SS
x
S D x
SS
x
X
X
X
SD
x
E x
Ex
SS x
SD
x
SSx
SS
x
SS
x
SS
x
S S x S
S x SSx
SS
x
SS
x
SS x
SS
x
SS
x
SS
x
G x
G x
G x
Gx
Gx
G x
G x
G x
G x
G x
G x
G x
G x
G x
Gx Gx
Gx
Gx
E
E x Ex
Ex
E x
E x
E xE x W I S S E R R O A D
W I S S E R
R D.
F U
N S
T
C H A M B E R L A I N
R D.
A
R
C H A P P L
E A R
A D
C A R T E R D R.
H A
P A
R
A R T Y H I L L R D.
A R T
Y H I L
L R
D
A U
S T
I N
P I E R C E S T R E E T
ARRIVAL(PH1)
COMM HUB(PH1)
DRIVEWAY
(PH1)
D R
IV
E
W A
Y (P
H 1)
BELO
W
G R
AD
E
ELEC
TR
IC
AL AR
EA
(PH
2)
MAIN OPS
(PH 2)
M
EC
H
AN
IC
AL
Y
AR
D (P
H 1)
U
TI
LI
TY
T U
N N
E L
(P H
1)
GENERATOR
YARD
(PH 1)
CENTRAL
PLANT
(PH 1)
UTILITY
TUNNEL
(PH 2)
NEW DRAINLINE "DL-M"
PERFORATED
PIPE
(PH 1)
NEW DRAINLINE "DL-P"
SDS
S
S
S
S
S
S
S
S
SD
S D
S D
S D
SD
SD
SD
SS
SS
S S
S S
S S
S S
SSSS
S S
W
W
W
W
W W
W W
W
WW
W W
W
W W
W
SS
S D x
SD
W
SD
W
W
W
W W
W
W
W
W
SD
SD
SD
SD
W
W
W
W
W
W
W
SD
NEW DRAINLINE "DL-GG"
R O
A D
S D
SS
NEW SEWERLINE "SL-F"
X
X
X
X
X X
X X
CU x
Wx
Wx
Wx
W x
W x
Wx
W x
W
Wx
Wx Wx
W x
W x
Wx
W x
W x
W x
W x
Wx
Wx
SS
x
S D x
SS
x
X
X
X
SD
x
E x
Ex
SS x
SD
x
SSx
SS
x
SS
x
SS
x
S S x S
S x SSx
SS
x
SS
x
SS x
SS
x
SS
x
SS
x
G x
G x
G x
Gx
Gx
G x
G x
G x
G x
G x
G x
G x
G x
G x
Gx Gx
Gx
Gx
E
E x Ex
Ex
E x
E x
E xE x W I S S E R R O A D
W I S S E R
R D.
F U
N S
T
C H A M B E R L A I N
R D.
A
R
C H A P P L
E A R
A D
C A R T E R D R.
H A
P A
R
A R T Y H I L L R D.
A R T
Y H I L
L R
D
A U
S T
I N
P I E R C E S T R E E T
ARRIVAL(PH1)
COMM HUB(PH1)
DRIVEWAY
(PH1)
D R
IV
E
W A
Y (P
H 1)
BELO
W
G R
AD
E
ELEC
TR
IC
AL AR
EA
(PH
2)
MAIN OPS
(PH 2)
M
EC
H
AN
IC
AL
Y
AR
D (P
H 1)
U
TI
LI
TY
T U
N N
E L
(P H
1)
GENERATOR
YARD
(PH 1)
CENTRAL
PLANT
(PH 1)
UTILITY
TUNNEL
(PH 2)
NEW DRAINLINE "DL-M"
PERFORATED
PIPE
(PH 1)
NEW DRAINLINE "DL-P"
SDS
S
S
S
S
S
S
S
S
SD
S D
S D
S D
SD
SD
SD
SS
SS
S S
S S
S S
S S
SSSS
S S
W
W
W
W
W W
W W
W
WW
W W
W
W W
W
SS
S D x
SD
W
SD
W
W
W
W W
W
W
W
W
SD
SD
SD
SD
W
W
W
W
W
W
W
SD
NEW DRAINLINE "DL-GG"
R O
A D
S D
SS
NEW SEWERLINE "SL-F"
X
X
X
X
X X
X X
GRAPHIC SCALES
D es ig ne d by
D at e:
R ev
S ub m itt ed b y:
Fi le n am e:
C hi ef
D ra w in g co de
P lo t d at e:
P lo t s ca le
Sheet number:
Location code:
Drawing no.
C he ck ed b y:
R O
A N
O K
E , V
A
H O
N O
LU
LU
, H I w w w .a ec om
.c om
A E
C O
M
PHASE 2
D ra w n by
P H
A S
E
M
A
IN
O P
E R
A
TI
O N
S
M R
B
/1
3/
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
THIS WORK WAS PREPARED BY
ME OR UNDER MY SUPERVISION.
of 114SHEET
S H
E E
T C
U
A1
CU101
O…
This is the start of the file's text. The full file is on GovTribe.