15b1_am5_3june15.pdf
PDF 151 KB Posted
- Attached to
- FY14 MCA PN67157 USARPAC Command and Control Facility (C2F) Phase 2, Fort Shafter, Oahu, Hawaii
- Solicitation number
- W9128A-15-B-0001
About this file
W9128A-15-B-0001 AM-0005
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0005 03 June 15
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CECT – Contracting Division USACE, Honolulu District Bldg 230, Room 103 Ft Shafter, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
W9128A-15-B-0001 X
9B. DATED (SEE ITEM 11)
05/11/2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY14 MCA PN67157 USARPAC Command and Control Facility (C2F) Phase 2, Fort Shafter, Oahu, Hawaii
See Page 2 of 2 Pages
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Am-0005 Standard Form 30 RFP No. W9128A-15-B-0001 Page 2 of 2 Pages Item No. 14 (Continued)
1. CHANGES TO SPECIFICATIONS. Attached are new and revised sections to the specifications. The revision mark “(Am-0005)” is shown on each page.
New Section: The following section is added to the specification:
Section 00 60 00, Appendix D – Requests for Information #15 – 21
REVISED SECTION: The following are revised paragraphs to the specifications. Changes are underlined or lined-out.
Section 08 34 73 – Sound Control Door Assemblies Paragraph 2.4.1 Paragraph 3.3.1
Section 09 69 13 – Rigid Grid Access Flooring Paragraph 2.1.2.1 Paragraph 2.1.3.1.a, b, c, d Paragraph 2.1.3.2 Paragraph 2.1.3.3
2. CHANGES TO DRAWINGS
REVISED DRAWINGS (ISSUED). The following revised drawings replace like-numbered drawings and are issued herewith:
SHEET NO. VOLUME SHEET MARK REVISION DATE
A621 II 129 1 6/03/2015
A622 II 130 1 6/03/2015
A655 II 135 1 6/03/2015
IN601 II 184 1 6/03/2015
ES110 IV 18 1 6/01/2015
EP702 IV 101 1 6/01/2015
3. The proposal due date remains unchanged (See SF 1442, Page 1, Block 13A).
Request for Information
Section 00 60 00 Appendix D (RFIs)
(AM-0005)
RFI # Question Response
Please verify that EM shielded doors are not required. If required, please provide specification and locations.
See AM-0005, Section 08 34 73 and Sheets A621, A622 and A655.
Section 09 65 00 paragraph 2.2 describes flooring LINO-1 as a field installed sheet good. Section 09 69 13 paragraph 2.1.3.2 calls out linoleum flooring over Type 2 access floor panels. Please verify that at the designated locations, field installed sheet linoleum is to be installed over the raised access floor system.
See AM-0005, Section 09 69 13 and Sheet IN601.
Drawing ES110 shows a new 46kV HECO Riser Pole ‘P3X’, but does not indicate who is responsible for providing this pole. Please clarify if providing this new riser pole is in the electrical contractor’s scope of work. If so, please provide a detail and additional information for this pole.
See AM-0005, Sheet ES110.
According to note #3 on the panel schedules ‘E2MH1’ & ‘E2ML1’, shown on drawing EP702, there is work associated with a bid option #2 regarding GFGI equipment. The bid form included with the Solicitation only has a bid option #1. Please clarify if there is work associated with a Bid Option #2. Please define the Scope of Option #1 HECO Requirements.
See AM-0005, Sheet EP702. See Electrical Site and Telecommunications Site sheets for Option #1 scope.
Specification Section 26 20 00 Interior Distribution paragraph 2.14.4 calls for watt hour and digital meters for the panel boards, but the riser diagram shown on drawing EP603 only shows digital meters located in SUS #2. The riser diagram for the phase 1 work, shown on drawing EP602, does have digital meters located in some of the panel boards. Please clarify if there are any digital meters required to be located in the panel boards for the phase 2 work.
No meters are required in Phase 2 panelboards. The only meter not located in SUS#2 is the meter indicated for Elevator N1 on EP603.
Reference: Insurance. Will "All-Risk" / "Builders Risk" be by Owner or by Contractor? Are there provisions in regards to min/max deductibles, coverages etc?
The awardee must comply with all requirements (including insurance) as specified in the solicitaiton.
Request for Information
Section 00 60 00 Appendix D (RFIs)
(AM-0005)
Reference Spec Section 11 24 23 – Building Maintenance Equipment.
There are various types of equipment, such as Davit socket system, Roof cars and etc. Please specify what type of Building Maintenance Equipment is required and what is its intended function other than window cleaning. Specification calls for this system to be designed.
Plans and specs do not provide sufficient information for the Contractor to design the system. Please clarify.
Roof anchors to be designed to comply with performance criteria identified in specification section 11 24 23 Building Maintenance Equipment, paragraphs 2.2.1 and 2.2.1.2.
| sf30-15b1-am5 |
| 15b1_00 60 00 Appendix D (RFIs)_am5 |
| Sheet1 |