About this file

W9128A-15-B-0001 AM-0006

View the file

Other files

File Type Posted
15b1-bid_abstract.pdf PDF
C2F-am8__27_10_00.pdf PDF
15b1_am8_10june15.pdf PDF
C2F_am7_S-123.pdf PDF
15b1_am7_9june15.pdf PDF
C2F_am7_IG202.pdf PDF
C2F-am7_01_45_00.pdf PDF
C2F-am7_09_69_13.pdf PDF
C2F_am7_A-433.pdf PDF
C2F_am7_A-431.pdf PDF
C2F_am7_IN601.pdf PDF
C2F_am7_IG601.pdf PDF
C2F_am7_EP_Plans.pdf PDF
C2F_am7_10_21_13.pdf PDF
C2F-am7__09_90_00.pdf PDF
C2F_am6_A-122.pdf PDF
C2F_am6_TS101.pdf PDF
C2F_am6_A-421.pdf PDF
C2F_am6_A-416.pdf PDF
C2F_am6_A-422.pdf PDF
C2F_am5_ES110.pdf PDF
C2F_am5_EP702.pdf PDF
C2F_am5__09_69_13.pdf PDF
C2F_am5_A-622.pdf PDF
C2F_am5_A-621.pdf PDF
15b1_am5_3june15.pdf PDF
C2F_am5_IN601.pdf PDF
C2F_am5_08_34_73.pdf PDF
C2F_am5_A-655.pdf PDF
15b1_am4_29may15.pdf PDF
15b1_am3_22may15.pdf PDF
15b1_am2_21may15.pdf PDF
Amend_2_-_PH2_-_Civil_Site_Sheets.pdf PDF
Amend_2_-_PH2_-_Electrical_Sheet.pdf PDF
Amend_2_-_01_90_00.pdf PDF
Amend_2_-_01_57_20.pdf PDF
15b1_am1_13may15.pdf PDF
Dwgs_V3_a2.pdf PDF
Dwgs_V2_a10.pdf PDF
Dwgs_V2_a11.pdf PDF
Dwgs_V2_a12.pdf PDF
Dwgs_V1_a13.pdf PDF
Dwgs_V2_a2.pdf PDF
Dwgs_V1_a4.pdf PDF
Dwgs_V4_a3.pdf PDF
Dwgs_V2_a3.pdf PDF
Dwgs_V2_a7.pdf PDF
Specs_V2.pdf PDF
Dwgs_V1_a3.pdf PDF
Dwgs_V3_a6.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0006 05 June 15

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CECT – Contracting Division USACE, Honolulu District Bldg 230, Room 103 Ft Shafter, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A-15-B-0001 X

9B. DATED (SEE ITEM 11)

05/11/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY14 MCA PN67157 USARPAC Command and Control Facility (C2F) Phase 2, Fort Shafter, Oahu, Hawaii

See Page 2 of 2 Pages

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0006 Standard Form 30 RFP No. W9128A-15-B-0001 Page 2 of 2 Pages Item No. 14 (Continued)

1. CHANGES TO SPECIFICATIONS. Attached is a new section to the specifications. The revision mark “(Am-0006)” is shown on each page.

New Section: The following section is added to the specification:

Section 00 60 00, Appendix D – Requests for Information #21-25

2. CHANGES TO DRAWINGS

DELETED DRAWINGS. The following drawings previously issued are deleted in their entirety:

SHEET NO. VOLUME SHEET

S126 I 55

REVISED DRAWINGS (ISSUED). The following revised drawings replace like-numbered drawings and are issued herewith:

SHEET NO. VOLUME SHEET MARK REVISION DATE

A122 II 21 1 6/03/2015

A416 II 74 1 6/03/2015

A421 II 76 1 6/03/2015

A422 II 77 1 6/03/2015

TS101 IV 92 1 6/02/2015

3. The proposal due date remains unchanged (See SF 1442, Page 1, Block 13A).

W9128A-15-B-0001 FY14 MCA PN67157 USARPAC Command and Control Facility (C2F) Phase 2, Fort Shafter, Oahu, Hawaii

Request for Information

Section 00 60 00 Appendix D (RFIs)

(AM-0006)

RFI # Question Response

Drawing TS101 shows a 4”C from pole #503 to a CATV hand hole. This hand hole looks to be existing, but there are no notes saying that this is the case. Please confirm if this hand hole is new or existing.

See AM-0006, Sheet TS101.

Drawing S126 Note 4. Says "Bid Option 1 is the provision of Emergency Power Equipment for Phase 2. The Equipment pads are bid option 1 items.” What EXACTLY are the bid option 1 requirements and are the generators #1 thru #4 & Switchgear 10 thru 16 part of Phase 2 bid as shown on Drawing Sheet S126?

Sheet Deleted. See AM-0006, SF30.

Drawings S126 through S130 Plan Notes reference Bid Option 1 as Provision for Emergency Power to Phase 2. The Bid Form as provided in Section 00 10 00 page 6 describes CLIN 0002 Option 1 as “HECO Requirements will be paid for at the contract price, complete in place and ready for use, for electrical ductbanks in Areas 5,6,7,8 & 9 and HECO required telecommunications ductbank in Area 5, including all demolition, excavation, concrete, reinforcing, conduit, warning tape, properly compacted backfill, manholes, handholes, pavement repair to match existing conditions, maintenance of traffic, HECO required inspections, protective bollards; testing; final connections;

cleanup; as-builts and all incidental items necessary to complete the work.” Please clarify if worked noted as Bid Option 1 on S126 through S130 is to be included in CLIN 0002 Option 1. Please note that the mechanical and electrical work required for emergency power to Phase 2 is not included on the Mechanical and Electrical drawings or within the specifications.

Sheet Deleted. See AM-0006, SF30.

Drawing ES110 shows a new 46kV HECO Riser Pole ‘P3X’, but does not indicate who is responsible for providing this pole. Please clarify if providing this new riser pole is in the electrical contractor’s scope of work. If so, please provide a detail and additional information for this pole.

See AM-005, Sheet ES110.

sf30-15b1-am6
15b1_00 60 00 Appendix D (RFIs)_am6
Sheet1

File details come from the government source that posted it. Updated .