About this file

W9128A-15-B-0001 AM-0008

View the file

Other files

File Type Posted
15b1-bid_abstract.pdf PDF
C2F-am8__27_10_00.pdf PDF
C2F_am7_S-123.pdf PDF
15b1_am7_9june15.pdf PDF
C2F_am7_IG202.pdf PDF
C2F-am7_01_45_00.pdf PDF
C2F-am7_09_69_13.pdf PDF
C2F_am7_A-433.pdf PDF
C2F_am7_A-431.pdf PDF
C2F_am7_IN601.pdf PDF
C2F_am7_IG601.pdf PDF
C2F_am7_EP_Plans.pdf PDF
C2F_am7_10_21_13.pdf PDF
C2F-am7__09_90_00.pdf PDF
C2F_am6_A-122.pdf PDF
C2F_am6_TS101.pdf PDF
C2F_am6_A-421.pdf PDF
C2F_am6_A-416.pdf PDF
C2F_am6_A-422.pdf PDF
15b1_am6_5june15.pdf PDF
C2F_am5_ES110.pdf PDF
C2F_am5_EP702.pdf PDF
C2F_am5__09_69_13.pdf PDF
C2F_am5_A-622.pdf PDF
C2F_am5_A-621.pdf PDF
15b1_am5_3june15.pdf PDF
C2F_am5_IN601.pdf PDF
C2F_am5_08_34_73.pdf PDF
C2F_am5_A-655.pdf PDF
15b1_am4_29may15.pdf PDF
15b1_am3_22may15.pdf PDF
15b1_am2_21may15.pdf PDF
Amend_2_-_PH2_-_Civil_Site_Sheets.pdf PDF
Amend_2_-_PH2_-_Electrical_Sheet.pdf PDF
Amend_2_-_01_90_00.pdf PDF
Amend_2_-_01_57_20.pdf PDF
15b1_am1_13may15.pdf PDF
Dwgs_V3_a2.pdf PDF
Dwgs_V2_a10.pdf PDF
Dwgs_V2_a11.pdf PDF
Dwgs_V2_a12.pdf PDF
Dwgs_V1_a13.pdf PDF
Dwgs_V2_a2.pdf PDF
Dwgs_V1_a4.pdf PDF
Dwgs_V4_a3.pdf PDF
Dwgs_V2_a3.pdf PDF
Dwgs_V2_a7.pdf PDF
Specs_V2.pdf PDF
Dwgs_V1_a3.pdf PDF
Dwgs_V3_a6.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0008 10 June 15

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CECT – Contracting Division USACE, Honolulu District Bldg 230, Room 103 Ft Shafter, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A-15-B-0001 X

9B. DATED (SEE ITEM 11)

05/11/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FY14 MCA PN67157 USARPAC Command and Control Facility (C2F) Phase 2, Fort Shafter, Oahu, Hawaii

See Page 2 of 2 Pages

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0008 Standard Form 30 RFP No. W9128A-15-B-0001 Page 2 of 2 Pages Item No. 14 (Continued)

1. CHANGES TO SPECIFICATIONS. Attached are new and revised sections to the specifications. The revision mark “(Am-0008)” is shown on each page.

New Section: The following section is added to the specification:

Section 00 60 00, Appendix D – Requests for Information #43 – 44 Section 00 60 00, Appendix H – Photos, Pages 26 – 27

REVISED SECTION: The following are revised paragraphs to the specifications. Changes are underlined or lined-out.

Section 27 10 00 – Building Telecommunications Cabling System Paragraph 3.5.1.3

2. CHANGES TO DRAWINGS

DELETED DRAWINGS. The following drawings previously issued are deleted in their entirety:

SHEET NO. VOLUME SHEET

S127 I 56 S128 I 57 S129 I 58 S130 I 59

3. The bid due date remains unchanged (See SF 1442, Page 1, Block 13A).

W9128A-15-B-0001 FY14 MCA PN67157 USARPAC Command and Control Facility (C2F) Phase 2, Fort Shafter, Oahu, Hawaii

Request for Information

Section 00 60 00 Appendix D (RFIs)

(AM-0008)

RFI # Question Response

Section 31 00 00, Boring Logs dated 8/18/2009: Please provide extent (location and depth) of backfill during Phase 1 at Tunnel structure locations. Use by Phase 1 contractor of shoring versus lay-back method for excavation and backfill of Tunnel structure will impact Phase 2 contractor excavation in native soils per Boring Logs versus engineered fill.

For Phase 1, both shoring and lay-back method were used in the vicinity of the tunnel at the Comm Hub. See AM-0008 for photos taken during the Phase 1 construction in these areas.

Detail C1/S128 states “subgrade preparation per geotechnical engineer Yogi Kwong Engineers LLC: provide 36” min non-expansive granular select borrow material.” As the Mechanical Yard was constructed under Phase 1, please verify that Phase 1 contractor performed the required over-excavation and backfill with select material within the boundaries of the Mechanical Yard. If not, then verify that existing foundations/pad for the (e) chilled water concrete tank (phase 1) will not be undermined during the over-excavation of the new fuel tank slabs.

See AM-0008, deleted sheets S127, S128, S129, S130.

Section 00 60 00 Appendix H - Photos

W9128A-15-B-0001

(AM-0008)

j3pp9lld Typewritten Text

COMM HUB FOOTING/STAIRS/TUNNEL

j3pp9lld Typewritten Text

FUTURE TUNNEL PHASE 2

j3pp9lld Typewritten Text

CONNECTION TO PHASE 1 TUNNEL

Section 00 60 00 Appendix H - Photos

W9128A-15-B-0001

(AM-0008)

j3pp9lld Typewritten Text

FUTURE TUNNEL PHASE 2

j3pp9lld Typewritten Text

CONNECTION TO PHASE 1 TUNNEL

sf30-15b1-am8
15b1_00 60 00 Appendix D (RFIs)_am8
Sheet1

15b1_00 60 00 Appendix H_am8

File details come from the government source that posted it. Updated .