The Dalles Oil Accountability Contract Drawings.pdf

PDF 135 MB Posted

Attached to
THE DALLES OIL ACCOUNTABILITY MEASURES
Solicitation number
W9127N26RA004
Issued by

About this file

The file is a PDF containing engineering drawings related to the Dalles Dam Oil Accountability Measures contract, issued by the U.S. Army Corps of Engineers (USACE) Portland District. The project is a competitive, firm-fixed price contract aimed at improving oil monitoring and minimizing potential oil releases at The Dalles Dam, located on the Columbia River in Oregon. The primary objectives include developing an Oil Accountability Plan (OAP) to track approximately 400,000 gallons of oil in the powerhouse, replacing current manual monitoring methods with automated instrumentation systems that can more accurately track oil levels in equipment, bulk storage containers, and high-risk areas.

The contract stems from a 2014 settlement agreement with Columbia Riverkeepers and is designed to fulfill the Portland District's Standing Environmental Policy 200-1 on Oil Accountability. The solicitation is set for 14 November 2025, with 13 total drawing files attached as of 18 November 2025. The project seeks to enhance oil leak detection, improve monitoring timeliness, and reduce operations and maintenance (O&M) costs by implementing more sophisticated tracking and measurement technologies across the dam's critical oil-containing infrastructure.

View the file

Other files

File Type Posted
260218 Amended Sheets TDA OA Contract Drawings.pdf PDF
TDOAM25_SPECS_AMD0008.pdf PDF
Solicitation Amendment W9127N26RA0040008 SF 30.pdf PDF
Solicitation Amendment W9127N26RA0040007 SF 30.pdf PDF
Solicitation Amendment W9127N26RA0040006 SF 30.pdf PDF
Solicitation Amendment W9127N26RA0040006 SF 30.pdf PDF
A.03 TDOAM25_SPECS_AMD0006_TECHNICALSECTIONS.pdf PDF
A.03 Plans-Drawings - M-202 Amendment 0006.pdf PDF
Solicitation Amendment W9127N26RA0040005 SF 30.pdf PDF
WAGE DETERMINATION - OR20260079 Heavy Construction Wasco County Oregon (01-01-2026).pdf PDF
Solicitation Amendment W9127N26RA0040004 SF 30.pdf PDF
WAGE DETERMINATION - WA20260050 Heavy Construction Klickitat County Washington (01-01-2026).pdf PDF
Solicitation Amendment W9127N26RA00040003 - TDOAM25_SPECS_AMD0003.pdf PDF
WAGE DETERMINATION - WA20250050 Heavy Construction Klickitat County Washington (12-12-2025).pdf PDF
WAGE DETERMINATION - OR20250079 Heavy Construction Wasco County Oregon (12-12-2025).pdf PDF
Solicitation Amendment W9127N26RA0040002 SF 30.pdf PDF
B.07 Site Visit Roster - 7N26RA004.pdf PDF
Solicitation Amendment W9127N26RA0040001 SF 30.pdf PDF
Attachment K.pdf PDF
FINAL Active Reference Drawings.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 2a of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 3 of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1e of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1d of 4.pdf PDF
TDA Oil Accountability Reference Drawings.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1f of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 4 of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1b of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 2b of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 2c of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1a of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1c of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 2d of 4.pdf PDF
Solicitation - W9127N26RA004 - TDOAM25_ADVERT.pdf PDF
Solicitation - W9127N26RA004.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .