TDA Oil Accountability Contract Drawings - Vol 2d of 4.pdf

PDF 69 MB Posted

Attached to
THE DALLES OIL ACCOUNTABILITY MEASURES
Solicitation number
W9127N26RA004
Issued by

About this file

The document is a technical drawing file (Volume 2d of 4) related to the U.S. Army Corps of Engineers' The Dalles Dam Oil Accountability Measures contract. The project involves improving oil monitoring and accountability at The Dalles Dam, located on the Columbia River in Oregon, with the primary objectives of minimizing potential oil releases and enhancing environmental tracking. There are approximately 400,000 gallons of oil at the dam's powerhouse, and the current contract aims to replace manual visual monitoring with automated instrumentation systems to more accurately track oil levels in equipment, bulk storage containers, and high-risk areas.

The solicitation is for a competitive, firm-fixed price (FFP) contract, stemming from a 2014 settlement agreement with Columbia Riverkeepers. The project will help the Portland District fulfill its Standing Environmental Policy 200-1 on Oil Accountability while reducing operations and maintenance costs. The contract seeks to implement an Oil Accountability Plan (OAP) that comprehensively tracks oils and greases used in turbines, wicket gate bearings, and fishway equipment, with a goal of early leak identification and improved environmental monitoring.

View the file

Other files

File Type Posted
260218 Amended Sheets TDA OA Contract Drawings.pdf PDF
TDOAM25_SPECS_AMD0008.pdf PDF
Solicitation Amendment W9127N26RA0040008 SF 30.pdf PDF
Solicitation Amendment W9127N26RA0040007 SF 30.pdf PDF
Solicitation Amendment W9127N26RA0040006 SF 30.pdf PDF
Solicitation Amendment W9127N26RA0040006 SF 30.pdf PDF
A.03 TDOAM25_SPECS_AMD0006_TECHNICALSECTIONS.pdf PDF
A.03 Plans-Drawings - M-202 Amendment 0006.pdf PDF
Solicitation Amendment W9127N26RA0040005 SF 30.pdf PDF
WAGE DETERMINATION - OR20260079 Heavy Construction Wasco County Oregon (01-01-2026).pdf PDF
Solicitation Amendment W9127N26RA0040004 SF 30.pdf PDF
WAGE DETERMINATION - WA20260050 Heavy Construction Klickitat County Washington (01-01-2026).pdf PDF
Solicitation Amendment W9127N26RA00040003 - TDOAM25_SPECS_AMD0003.pdf PDF
WAGE DETERMINATION - WA20250050 Heavy Construction Klickitat County Washington (12-12-2025).pdf PDF
WAGE DETERMINATION - OR20250079 Heavy Construction Wasco County Oregon (12-12-2025).pdf PDF
Solicitation Amendment W9127N26RA0040002 SF 30.pdf PDF
B.07 Site Visit Roster - 7N26RA004.pdf PDF
Solicitation Amendment W9127N26RA0040001 SF 30.pdf PDF
Attachment K.pdf PDF
FINAL Active Reference Drawings.pdf PDF
The Dalles Oil Accountability Contract Drawings.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 2a of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 3 of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1e of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1d of 4.pdf PDF
TDA Oil Accountability Reference Drawings.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1f of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 4 of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1b of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 2b of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 2c of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1a of 4.pdf PDF
TDA Oil Accountability Contract Drawings - Vol 1c of 4.pdf PDF
Solicitation - W9127N26RA004 - TDOAM25_ADVERT.pdf PDF
Solicitation - W9127N26RA004.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .