These documents are engineering design drawings for the Dalles Lock and Dam Powerhouse project by the U.S. Army Corps of Engineers Portland District. The drawings provide detailed technical specifications for the powerhouse, including a comprehensive index of reference drawings, electrical wiring diagrams, nomenclature legends, and schematic representations of the facility's layout and equipment. The powerhouse features 24 bays spanning 2,064 feet, with 22 main units (divided into "old end units" MU01-MU14 and "new end units" MU15-MU22), a fish unit, and a station service unit. The drawings include plan views, elevations, and technical details of the hydraulic turbine generators, with specific focus on electrical systems, conduit routing, grounding, and wire identification methods. The project is dated May 2025 and involves detailed technical documentation for the hydroelectric facility's design and infrastructure.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C H
E C
K E
D B
Y
®of Engineers
US Army Corps ®of Engineers
US Army Corps
D R
A W
IN
G
N O
F
IL
E N
A M
E
P O
R T
L A
N D
O
R E
G O
N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P O
R T
L A
N D
O
R E
G O
N
P O
R T
L A
N D
D
IS
T R
IC
T
M A
Y
D D
P -1
.0 -0
/4
C
S T
O K
M A
N
P .E
U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
D D
P -1
.0
G -0
X X
X .d g n
F
IN
A L
G-004
T H
E D
A L
L E
S L
O C
K A
N D
D A
M
C O
L U
M B
IA
R
IV
E
R
P O
W E
R H
O U
S E
O
IL
A C
C O
U N
T A
B
IL
IT
Y
C
C A
M P
B E
L L
P
.E
P
A
G U
A Y
O
ORANGE
GREEN
GREEN
BLACK
RED
WHITE
BLACK
REDWHITE
RED
RED
ORANGE
GREEN
RED
WHITE
BLACK
BLUE
ORANGE
GREEN
RED
WHITE
BLACK
ORANGE
RED
BLUE
ORANGE
WHITE
BLACK
BLUE
GREEN
TRACER
SECONDFIRST
* CONTINUE NEMA-WC3-COLOR SEQUENCE
WIRING E1
HINGE WIRE NOT COLOR CODED
WHITE
BLACK
NONE
TRACER
RED
BLACK
BLUE
ORANGE
GREEN
RED
WHITE
BLUE
ORANGE
GREEN
RED
WHITE
BLACK
BASE
NO.
SINGLE & MULTI-CONDUCTOR CONTROL
CIRCUIT AND ROUTING IDENTIFICATION
1. ELECTRICAL CIRCUITS AND CONDUITS ARE IDENTIFIED AS FOLLOWS:
A. BETWEEN MAJOR ITEMS OF EQUIPMENT, A THREE PART NUMBER IS USED
CIRCUITS; IE., THE "END OF RUN" IS OMITTED.
B. A TWO-PART NUMBER IS USED FOR MOST LIGHTING AND SOME POWER DISTRIBUTION
C. CONTROL CIRCUIT NUMBERS CORRESPOND TO THE NUMBER OF THE CONTROLLED
POWER CIRCUIT; EG., CQ1-c1-K WOULD CONTROL CQ1-q1-K.
E. CIRCUITS TO DEVICES FORMING AN INTEGRAL PART OF TERMINAL EQUIPMENT
RECEIVE THE TERMINAL EQUIPMENT DESIGNATION (E.G. THE CIRCUIT TO CT'S IN
CIRCUIT BREAKER XW1 COULD BE DESIGNATED SJ4-a1-XW1). CIRCUIT TO CT'S IN
IS A CIRCUIT GOING TO FLOWMETER NO. 2).
CIRCUIT DEVICES RECEIVE THE DESIGNATION ASSIGNED TO DEVICE (I.E. SJ4-c1-FM2
CONTAINED WITHIN THE CONDUIT.
D. CONDUIT NUMBERS ARE GENERALLY IDENTICAL TO THE FIRST CIRCUIT
WIRING E2
BROWN
YELLOW
ORANGE
BLUE
RED
BLACK
BASE
NO.
L E
G E
N D
A N
D N
O M
E N
C L
A T
U R
E
NOMENCLATURE
A. TERMINAL EQUIPMENT
1. SWITCHBOARDS AND SWITCHGEAR
DOC - DIGITAL OPERATION CONTROLLER
OD - OPERATOR'S DESK
SQ - 480 V. SWGR (ADD NO)
ST - STATUS BOARD
TF - TELEPHONE FRAME
EG - ENGINE GENERATOR
MCC - MOTOR CONTROL CENTER
ROC - REMOTE OPERATIONS CONTROLLER
2. LOAD CENTERS
3. APPARATUS
FDT - DAY TANK LEVELS
ELPP - ENGINE LUBE OIL PRELUBE PUMP
EPX - ENGINE PUMP CONTROL PANEL
FTPX - FUEL OIL SUPPLY PUMP
FTP6 - GEN. FUEL SUPPLY PUMP
FUP - FUEL OIL UNLOADING PUMP
(SIX, OTHER 5 ARE FTP1-5)
GW - BOOSTER PUMP
QPF - ENGINE LUBE OIL FILTER PUMP
QPT - LUBE OIL TRANSFER PUMP (CLEAN)
RW - RAW WATER PUMP
RWT2- RAW WATER TRASH SCREEN WASH
RWV - RAW WATER VALVE (TO JACKET)
SP - SUMP PUMP
SF - SUPPLY FAN
T - TRANSFORMER (POWER)
TRSH - TRASH RAKE SYSTEM
UW - UNWATERING PUMP
V - VOLTAGE TRANSFORMER
VMB - VACUUM MAKE/BREAK PANEL
MCP - MANUAL CONTROL PANEL
CQ - 480 V
CR - 120/240V (120/208V)
B - BATTERY
CT - CURRENT TRANSFORMER
K - CRANE
M - MOTOR
PT - POTENTIAL TRANSFORMER
RWT1 - RAW WATER TRASH SCREEN
BF - BACKFLOW GATE
EF - EXHAUST FAN
GLPP - GEAR LUBE OIL PRELUBE PUMP
GLP - GEAR LUBE OIL PUMP
QPF - LUBE OIL FILTER HEATER
VPSOL - VACUUM PRIME SOLENOID
FV - FRONT VIEW
DP - DRAINAGE PUMP
DS - DECK STATION
DT - DIFFERENTIAL TRANSMITTER
DWP - DOMESTIC WATER PUMP
EH - ELECTRIC HEATER
EL - ELEVATOR
EHQ - ELECTRIC OIL HEATER
ETM - ELAPSED TIME METER
EV - ELECTRICALLY OPERATED VALVE
FM - FLOW METER
XA - AIR COMPRESSORS
( SFX, X = UNIT NO.)
LETTER)
(SINGLE FEEDER)
4.
BOXES OR STRUCTURES
MISC. TERM. EQUIPMENT,
SCHEMATIC DIAGRAMS
SUFFIXES FOR DEVICES ON
ARE USED ONLY AS MODIFYING
TERMINALS, BUT A MAJORITY
USED FOR CABLE AND CONDUIT
SOME ITEMS IN THIS LIST ARE
FS - FLOAT SWITCH
FW - FLOAT WELL
GI - GROUND INSERT
GP - GREASE PUMP
GCW - GENERATOR COOLING WATER
HC - HEAD COVER SUMP PUMP
HP - HIGH PRESS.THR. BRG. OIL PUMP
HV - AIR COND. SYSTEM
HY - HYPOCHLORINATOR
IG - INTAKE GATE
IS - INTRUDER DETECTOR SYSTEM
JB - JUNCTION BOX
LT - LIGHTING OUTSIDE
LTH - LIGHTING, HIGH BAY
MMD - MONITORING AND METERING DEVICE
OR - OPERATIONS RECORDER
PA - STATION (PLANT) AIR COMPRESSOR
PC - PROGRAM CONTROLLER
PB - PULL BOX ALSO PUSHBUTTON
Z_ - DISC. SWITCH (ADD VOLTAGE
FWG - FOREBAY WATER LEVEL GAGE
VP - VACUUM PUMP
X_ - BREAKER (ADD VOLTAGE LETTER)
AC - AIR CONDITIONER
AN - ANNUNCIATOR
AR - ANNUNCIATOR RESET
AS - AMMETER SWITCH
BC - BATTERY CHARGER
BP - BY-PASS VALVE
PR - PROJECT BLDG.
PS - POTENTIAL SELECTOR OR
PRESSURE SWITCH
PT - PRESSURE TANK
QP - OIL TRANSFER PUMP (MODIFIED)
BY D-DIRTY, L-LUBE, T-TRANSIL)
RW - RAW WATER PUMP
RF - RECIRCULATING FAN
SD - SERVO OR SHAFT OIL CATCHER
DRAIN PUMP
SF - SUPPLY FAN
SV - SPHERICAL VALVE
TB - TELEPHONE BOX OR TEST BLOCK
TBA - TURBINE BRG. OIL PUMP A-C
TBD - TURBINE BRG. OIL PUMP D-C
TC - TERMINAL CABINET OR TIME CLOCK
TE - THERMOSTAT
TWG - TAILWATER LEVEL GAGE
UW - UNWATERING PUMP
VS - VOLTMETER SWITCH
WH - WATER HEATER
WP - GATEWASH PUMP-DECK WASH
PUMP
OMS - OIL MEASUREMENT SYSTEM
PV - PENSTOCK VALVE
REMOTE (UNIT #)
- OIL MEASUREMENT SYSTEM xOMSR
REMOTE FISH
OMSRF - OIL MEASUREMENT SYSTEM
SOC - SYSTEMS OPERATION CONTROLLER
FW1 - INTAKE STILLING WELL
FW2 - DISCHARGE STILLING WELL
FWB1-5 - INTAKE BAY 1-5
HPS - STATION HORN SYSTEM
PA - STATION AIR
PAPS - STATION AIR COMPRESSOR SWITCH
PG1-5 - PUMP GEAR 1-5
PU1-5 - PUMP1-5
QPF1-5 - ENGINE LUBE OIL PUMP 1-5
TR - TRASH RAKE
TC1 - TELEMETRY TERMINAL CABINET
FST - FUEL STORAGE TANKS B. SERVICE CLASSIFICATION
SECONDARY LEADS-SHUNT LEADS
a - CURRENT TRANSFORMER
ACTUATOR CONTROL CIR.
CIRCUITS, GOVERNOR AND
REGULATOR AND RHEOSTAT CONTROL
BREAKER CONTROL CIRCUITS,
CONTROL CIRCUITS; EG CIRCUIT
c -d - 0-48 V D-C e - POWER CIRCUIT, 125 V D-C f - POWER CIRCUIT, 250 V D-C h - 120V PREFERRED A-C j - POWER CIRCUIT, 138KV A-C m - POWER CIRCUIT, 230KV A-C
2400 V A-C p - POWER CIRCUIT, 4160 V OR q - POWER CIRCUIT 480 V A-C
120/240 V OR 120/208 V A-C
r - POWER CIRCUIT (LIGHTING) s - SPARE CONDUIT tr - RADIO CIRCUIT
CIRCUIT
t - TELEPHONE CIRCUITS, INTERCOM u uc - CODE CALL CIRCUITS ut - CARRIER OR PILOT WIRE CIRCUIT v -x - EXCITATION CIRCUITS
LEADS
SECONDARIES AND D-C VOLTAGE
VOLTAGE (POTENTIAL) TRANSFORMER
LOW-LEVEL SIGNAL CIRCUITS
OUTPUT CIRCUITS RECORDER, OTHER
CIRCUITS, RTD AND TRANSDUCER
SELF-SYNCHRONOUS INDICATING
ALARM CIRCUITS ANNUNCIATOR CIRCUITS
TERMINAL NO
WIRE FUNCTION
RELATED COLOR
WIRE NUMBER INDICATING
CQ07-c1-PBR
THIS INFORMATION APPEARS IN THE "NO. COND. COLUMN.
THREE CONDUCTOR CABLE WHILE A NUMBER 3 INDICATES THREE CONDUCTORS.
2. MULTI-CONDUCTOR CABLES ARE IDENTIFIED BY SUFFIX "C"; IE., 3c INDICATES A
START OF RUN
SERVICE OR VOLTAGE CODE CIRCUIT NUMBER
END OF RUN
A N
S I
D
J O
R D
A N
S F
IN
K
P
.E
REMOTE STATION SERVICE
OMSRSS - OIL MEASUREMENT SYSTEM
VIEW STATION SERVICE
OMSVSS - OIL MEASUREMENT SYSTEM
CABLE TRAY TURNED TOWARD OBSERVER
CABLE TRAY TURNED AWAY FROM OBSERVER
CONDUIT TURNED TOWARD OBSERVER
CONDUIT TURNED AWAY FROM OBSERVER
GROUND CONDUCTOR (SIZE AS INDICATED)
GROUND INSERT IN FLOOR
GROUND INSERT IN WALL
CONDUIT AND GROUNDING LEGEND
EMBEDDED CONDUIT (EXISTING)
EXPOSED CONDUIT (NEW) SHOWN BOLD
1. FIBER OPTIC CIRCUITS AND CONDUITS ARE IDENTIFIED AS FOLLOWS:
A. BETWEEN MAJOR ITEMS OF EQUIPMENT, A THREE PART NUMBER IS USED
START OF RUN END OF RUN
FIBER OPTIC CABLE IDENTIFICATION
SJ3.1C-12/fo-MM-PLCC
NO. OF FIBER STRANDS
MM FOR MULTIMODE)
MODE (SM FOR SINGLE MODE,
AQ-1(S51)
BB-6PCC2
1 PCCWH
AS SHOWN ON DRAWING
PCC
PCC
PCC/BB-6
PCC/AQ-1(S51)
WIRE LABELS
TERMINAL BLOCK
WIRE LABEL
(A1)BB-7/PCC
AS SHOWN ON DRAWING
PC5/F5(S5R2)
PC5/BC-18
1 2
PC5/F5(S5R2)
PC5/BC-18
WIRE LABELSDEVICE
WIRE LABEL
WIRES INTERNAL TO A PANEL DO NOT INCLUDE THE PANEL IN PARENTHESIS.
TO BE LABELED.
SHORT JUMPERS WHERE THE JUMPERS ARE ENTIRELY VISIBLE ARE NOT REQUIRED
(S5R2)AA-B16/PC5
(S5R2)AA-B16/PC5
WIRE NAME
DESTINATION PANEL
DESTINATION DEVICE OR TERMINAL BLOCK
TERMINAL NUMBER
WIRES LANDED ON TERMINAL BLOCK:
WIRES LANDED ON DEVICE:
WIRES LANDED ON TERMINAL BLOCK:
REQUIRED WIRE LABELING
UGB - UPPER GUIDE BEARING
LGB - LOWER GUIDE BEARING
TGB - TURBINE GUIDE BEARING
TB - THRUST BEARING
GA - GOVERNOR ACCUMULATOR
GS - GOVERNOR SUMP
UGTB - UPPER GUIDE/THRUST BEARING
MC - MEDIA CONVERTER
FI - FIELD INDICATOR
PM - PANEL METER
FI - FIELD INDICATOR
VIEW EAST WEST
OMSVEW - OIL MEASUREMENT SYSTEM
VIEW OIL PURIFICATION
OMSVOP - OIL MEASUREMENT SYSTEM
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C H
E C
K E
D B
Y
24 BAYS @ 86'-0" = 2064'-0"
SLUICEWAY
ICE & TRASH
NON OVERFLOW
FISH
TURBINE
UNITS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
STA SERVICE
UNITS
F1
116'-0"
C O
N T
J T
S T
A
9MAIN UNITS MAIN UNITS
GENERATOR FLOOR EL 111.5
FISH UNIT 01 ("FU01") STATION SERVICE UNIT 01 ("SS01")
MAIN UNIT 10 ("MU10") MAIN UNIT 16 ("MU16")
CONTRACTOR LAYDOWN AREA
®of Engineers
US Army Corps ®of Engineers
US Army Corps
D R
A W
IN
G
N O
F
IL
E N
A M
E
P O
R T
L A
N D
O
R E
G O
N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P O
R T
L A
N D
O
R E
G O
N
P O
R T
L A
N D
D
IS
T R
Y
D D
P -1
.0 -0
/5
C
S T
O K
M A
N
P .E
U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
D D
P -1
.0
G -1
X X
X .d g n
F
IN
A L
G-101
T H
E D
A L
L E
S L
O C
K A
N D
D A
M
C O
L U
M B
IA
R
IV
E
R
P O
W E
R H
O U
S E
O
IL
A C
C O
U N
T A
B
IL
IT
Y
C
C A
M P
B E
L L
P
.E
P
W E
R H
O U
S E
D
H O
W D
E N
DDP-1-0-0/7 KEY PLAN'S EL 185.0, EL 111.5 & EL 90.0
RESOURCE DRAWINGS:
3. CONTRACTOR TO VERIFY LAYDOWN AREA WITH COR.
ALL CONDITIONS.
2. VERIFY ALL DIMENSIONS AND FIELD CHECK
ALSO REFERRED TO AS "NEW - END UNITS".
"OLD END UNITS", AND MAIN UNITS 15 - 22 ARE
1. MAIN UNITS 1 - 14 ARE ALSO REFERRED TO AS
DRAWING NUMBER TITLE
A N
S I
D
J O
R D
A N
S F
IN
K
P
.E
N
F L
O W
P L
A N
V
IE
W
E L
.5
GENERAL NOTES:
C1
PLAN - POWERHOUSE EL 111.50
SCALE: 1" = 100'
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
C H
E C
K E
D B
Y
C L
T U
R B
IN
E
C L
EL 111.5
®of Engineers
US Army Corps ®of Engineers
US Army Corps
D R
A W
IN
G
N O
F
IL
E N
A M
E
P O
R T
L A
N D
O
R E
G O
N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P O
R T
L A
N D
O
R E
G O
N
P O
R T
L A
N D
D
IS
T R
Y
D D
P -1
.0 -0
/6
C
S T
O K
M A
N
P .E
U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
D D
P -1
.0
G -2
X X
X .d g n
F
IN
A L
G-201
T H
E D
A L
L E
S L
O C
K A
N D
D A
M
C O
L U
M B
IA
R
IV
E
R
P O
W E
R H
O U
S E
O
IL
A C
C O
U N
T A
B
IL
IT
Y
C
C A
M P
B E
L L
P
.E
M T
H O
M P
S O
N
G E
N E
R A
L T
U R
B
IN
E O
V E
R V
IE
W
E L
E V
A T
IO
N
TITLEDRAWING NMBER
DDP-57-191-95
GENERATOR
ASSEMBLY HYDRAULIC TURBINE DRIVEN
A N
S I
D
J O
R D
A N
S F
IN
K
P
.E
GENERAL NOTES:
RESOURCE DRAWINGS:
2. VIEW B7 IS THE UNIT 1-14 LOWER GUIDE BEARING. SEE M-103.
1. VIEW B3 IS THE UNIT 1-14 THRUST BEARING. SEE M-103.
T H
IS
I
S T
H E
T O
P O
F T
H E
U N
IT
B
M -1
B
M -1
MAIN "OLD END" UNIT OVERVIEW (MU01 - MU14)
NOT TO SCALE
A2