TE-DPW_021_Point-Source_Discharges_Final_DEP_05Nov2014_Update.pdf

PDF 3 MB Posted

Attached to
BASE OPERATIONS SUPPORT SERVICES, U. S. ARMY GARRISON KWAJALEIN ATOLL (USAG-KA)
Solicitation number
W9124J_16_R_KWAJALEIN
Issued by

About this file

Point Source Discharges Final DEP

View the file

Other files

File Type Posted
TE_CA_06-30 _OS_Appendix_U_-_PIP_Action_Plan_(2_Mar_15).xlsx XLSX spreadsheet
TE-KWAJ_006_Kwaj_Financial_Requirements_Manual_ver_5_0__6_Apr_2016.docx DOCX document
TE_CA_06-37 _OS_Appendix_V-7_-_Annex_F_-_BIC_Criteria_and_Nomination_Packet.docx DOCX document
TE_CA_04-00 _ACRRO_2.0_Baseline_Standstandards_Resource_Driver.pdf PDF
TE_CA_06-08 _OS_Appendix_D-3_Golf_Internal_Control.xls XLS spreadsheet
TE_CA_03-01_IMCOM_PR_G9_Internal_Controls_-_Cash_Management_Updated_11.04.15.docx DOCX document
TE-DOL_005_Annex_A_Appendix_1_to_OPORD_16-060.docx DOCX document
TE_CA_06-17 _OS_Appendix_J_-_Golf_Course_Dashboard_on_Golf_Initiatives.xlsx XLSX spreadsheet
TE_CA_06-33 _OS_Appendix_V-3_-_Annex_B_-_Award_Categories.docx DOCX document
TE_CYS-40_MDTI_Training_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CA_03-03 _IMCOM_PR_G9_-_Safe_Security_Updated_06.24.15.docx DOCX document
TE_CA_06-19 _OS_Appendix_L_-_Management_Control_Checklist_for_Nonappropriated_Fund_Projects.docx DOCX document
TE_CA_06-34 _OS_Appendix_V-4_-_Annex_C_-_Timeline.docx DOCX document
TE-DPW_003_Mission_Critical_Facilities.pdf PDF
TE_CA_06-05 _OS_Appendix_C_-_Program_Scorecards__5_Mar_15_v3.xlsx XLSX spreadsheet
TE_CA_06-06 _OS_Appendix_D-1_FBE_Internal_Control.xls XLS spreadsheet
TE-DPW_005_Master_USAG-KA_Meter_Inventory.pdf PDF
TE_CA_06-27 _OS_Appendix_S-2_-_Labor_Model_Template.xlsx XLSX spreadsheet
TE_CYS-41_MDTI_Parent_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CYS-10_Annex_I_ArmyFamilyAssistanceFamilyHandbook_Oct_14.pdf PDF
TE_CYS-37_MDTI_Financial_Management_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CYS-48_AHHInspectionCriteriaforCY15Inspections_v4_20150507.xls XLS spreadsheet
TE-DPW_018_KMISS_Final_DEP_Effective_9_Jul_14.pdf PDF
TE_CA_06-25 _OS_Appendix_R_-_Example_-_Client_Contact_Report.docx DOCX document
TE_CA_02-00 _Pacific_Region_Business_Plan_Format.xlsx XLSX spreadsheet
TE_CA_06-31 _OS_Appendix_V-1_-_EIM_Awards_Explanation_and_Process.docx DOCX document
TE_CYS-46_MDTI_Command_Rep_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CYS-21_CY15_Facility_Comprehensive_v_15_1_.xlsx XLSX spreadsheet
TE_CYS-04_AnnexC_REPORTSUSPENSELIST_v19_2015SEP29_(2).xlsx XLSX spreadsheet
TE-DPW_024_SO_BACKLOG_April_2016.xlsx XLSX spreadsheet
TE_CA__06-38 _Equipment_Rental_Items.xlsx XLSX spreadsheet
TE-FES_004_Annex_M_to_OPORD_16-001.docx DOCX document
TE_CA_06-22 _OS_Appendix_O_-__Example_-_Catering_General_Rules.pdf PDF
TE_CA_08-00__420-10_PM_Control_and_Maintenance_of_Private_Boats_and_Boat_Storage_Lots_on_USAG-KA.pdf PDF
TE_CA_12-00_Examples_of_Food_Menus.xlsx XLSX spreadsheet
TE_CA_01-00 _FMWR-DS_HB_Nov15.pdf PDF
TE_CA_06-03 _OS_Appendix_B-1_Pricing_Methodology.doc DOC document
TE_CA_06-20 _OS_Appendix_M_-_Action_Plan_Template.xlsx XLSX spreadsheet
TE_CA_06-07 _OS_Appendix_D-2_Bowling_Internal_Control.xls XLS spreadsheet
TE_CYS-35_MDTI_Facility_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CYS-12_GenericBleachSolutionRecommendations_v1_20150417.pdf PDF
TE_CYS-36_MDTI_Fire_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CA_06-04 _OS_Appendix_B-2_Pricing_Methodology_Worksheet.xls XLS spreadsheet
TE_CA_06-32 _OS_Appendix_V-2_-_Annex_A_-_Awards_Implementing_Instructions.docx DOCX document
TE_CYS-06_Annex_E_MoreaboutthetopicFireDrills_v1_20150421.pdf PDF
TE-GFP_001_GFP_-_CAP_list.xlsx XLSX spreadsheet
TE_CA_06-29 _OS_Appendix_T-2_-_m-NEAT_Tool.xlsx XLSX spreadsheet
TE_CYS-15_AR40_562_Immunnizations.pdf PDF
TE_CA_07-00_DoD_MWR_Library_Standards.pdf PDF
TE-DOL_009_Annex_D_to_OPORD_16-060.docx DOCX document
Show 40 more

Latest 50 of 155 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT OF ENVIRONMENTAL PROTECTION

(DEP)

ACTIVITY:

POINT-SOURCE DISCHARGES

CONTROL NUMBER DEP-12-002.0

U.S. ARMY GARRISON - KWAJALEIN ATOLL/

RONALD REAGAN BALLISTIC MISSILE DEFENSE TEST SITE

IN THE

REPUBLIC OF THE MARSHALL ISLANDS

PREPARED BY TELEDYNE BROWN ENGINEERING, INC.

HUNTSVILLE, ALABAMA

July 2014

Effective Date: November 4, 2014

DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.

CONTROL NO. DEP-12-002.0

POINT-SOURCE DISCHARGES DEP

THIS PAGE LEFT BLANK INTENTIONALLY

FINAL DOCUMENT OF ENVIRONMENTAL PROTECTION

FOR

POINT SOURCE DISHARGES

DEP-12-002.0

JULY 2014

SHALL TAKE EFFECT UPON SIGNATURE

FOR THE U.S. ARMY KWAJALEIN ATOLL

. 1

CERTIFICATION OF CONSULTATION

AGREE WITH FINAL DOCUMENT OF ENVIRONMENTAL PROTECTION

DEP-12-002.0

JULY 2014

FOR THE REPUBLIC OF THE MARSHALL ISLANDS

______________________________ 17 th of October 2014

LOWELL ALIK DATE

General Manager

Environmental Protection Authority

Republic of the Marshall Islands

AGREE WITH DOCUMENT OF ENVIRONMENTAL PROTECTION

POINT-SOURCE DISCHARGES

DEP-12.002.0

APRIL 2014

Agency

See Attachment 1 for further comments.

1 \ jvM- 2.01L3 Date

POINT-SOURCE DISCHARGES

DEP-12.002.0

APRIL 2014

U.S. EPA

Agency

Norwood Scott 5/9/2014 Name Date

POINT-SOURCE DISCHARGES

DEP-12.002.0

APRIL 2014

U.S. Army Corps of Engineers, Honolulu District

Agency

Digitally signed by

TAKEMOTO.HEL TAKEMOTO.HELENE.12311"0'2

DN: c::U5, o=U.s. Government, ou=DoD, EN E.1231191 042 ~~:;:~:~~~z:.HELENE.12311'1O'2 April 30, 2014 Date: 2014,04 29 15:34:52 -10'00'

Name Date i

POINT-SOURCE DISCHARGES DEP

Point-Source Discharges DEP July 2014

Revisions to the Final DEP Reflected Herein

p. 3 § 1.3, last line added, “In response to comments on the Final DEP received in June 2014 from the US Fish and Wildlife Service, “annual” or “at DEP renewal” PCB monitoring was added to the Kwajalein industrial stormwater outfalls, with one outfall, KISW02, adding “Biennial” PCB monitoring.”

p. 8 § 1.3.3, 3rd para, line 6, following “Remediation efforts are underway”, added, “and additional PCB monitoring points were added.”

p. 9 § 1.3.3.1, added, “1.3.3.1.7 USAG-KA shall sample and analyze annually, at DEP renewal, or biennially for PCBs from all industrial stormwater discharge locations until such time as there are consecutive stormwater laboratory analyses results indicating an outfall is not a source of PCBs.”

p. 12 Table 1.3.2, Discharge Numbers KISW01, KISW01A, KISW03, added “PCBs” as a monitoring parameter at DEP renewal.

p. 12 Table 1.3.2, Discharge Numbers KISW02, “PCBs” as a monitoring parameter at a “Biennial” frequency.

p. 13 Table 1.3.2 (Continued), Discharge Numbers KISW04, KISW06, KISW07, KISW08, KISW09, KISW10, KISW11, KISW12, KISW13, KISW15, KISW16, KISW20, added “PCBs” as a monitoring parameter at DEP renewal.

p. 13, Table 1.3.2 (Continued), Row KISW05, added “PCBs” , added “PCBs” as a monitoring parameter at an “Annual” frequency.

p. 21 Section 1.4.5.2, is re-written as, “Dried sewage sludge from the Roi-Namur WWTP shall be sampled and analyzed for dieldrin, heptachlor, and endosulfan prior to land application.”

p. 39 An additional section, “ENVIRONMENTAL COMMENTS AND

RECOMMENDATIONS RECEIVED ON THE FINAL DEP AND USAKA'S RESPONSES”,

was added to incorporate the U.S. Fish and Wildlife Service comments on the Final Point-Source Discharges DEP and USAG-KA responses.

Appendix B, NCA, pp. 21-22, PCB sampling was added to Table 8 as per DEP Table 1.3.2.

iii

POINT-SOURCE DISCHARGES DEP

DOCUMENT OF ENVIRONMENTAL PROTECTION

(DEP)

ACTIVITY:

DATE SUBMITTED: July 2014 DEP EFFECTIVE DATE: November 4, 2014 DEP EXPIRES: November 4, 2019

REFERENCES

• Kwajalein Range Services. Stormwater Pollution Prevention Plan; U.S. Army Kwajalein Atoll/Reagan Test Site. 14 September 2011

• Kwajalein Range Services. Sewage Sludge Disposal Report for Calendar Year 2011.

01 June 2012

• Kwajalein Range Services. Industrial Wastewater Pretreatment Program; Standard Practice Instruction No. 1532 R2. 28 June 2012

• Kwajalein Range Services. Annual Compliance Progress Report for Point-Source Discharges; USAKA/Ronald Reagan Ballistic Missile Defense Test Site. 2006-2011

• U.S. Army Center for Health Promotion and Preventive Medicine. Unreasonable Degradation Evaluation for Point-Source Discharges with High Potential for Adverse Effects, USAKA. December 2008

• U.S. Army Kwajalein Atoll/Ronald Reagan Ballistic Missile Defense Test Site.

Document of Environmental Protection: Point-Source Discharges at USAKA (Control Number DEP-06-002.1) June 2007, Modified August 2008

• U.S. Army Public Health Command. Review of Special Monitoring Data for Point- Source Discharge DEP Renewal U.S. Army Kwajalein Atoll Republic of the Marshall Islands. USAPHC Project No. S-0002775-12. July 2012

• U.S. Army Space and Missile Defense Command/Army Forces Strategic Command.

Roi-Namur Wastewater Treatment Plant Outfall Repair Environmental Assessment.

December 2012.

• U.S. Army Space and Missile Defense Command. Second Marine Biological Re-Survey Roi-Namur Outfall, U.S. Army at Kwajalein Atoll Republic of the Marshall Islands.

December 2009

• U.S. Army Space and Missile Defense Command. Environmental Standards and Procedures for United States Army Kwajalein Atoll Activities in the Republic of the Marshall Islands. Twelfth Edition. August 2011

• U.S. Environmental Protection Agency. CWA Section 403: Procedural and Monitoring Guidance, Ocean Discharge Criteria. March 1994 iv

TECHNICAL DESCRIPTION OF ACTIVITY

The continuing activity described in this Document of Environmental Protection (DEP) is the point-source discharge of stormwater, cooling water, and wastewater from United States Army Garrison-Kwajalein Atoll (USAG-KA) domestic and industrial operations to the waters of the Republic of the Marshall Islands (RMI). A total of 44 discharges enter the lagoon and ocean waters through 41 outfall structures located on the three islands of Kwajalein, Roi-Namur, and Meck. The other eight USAKA islands do not have point-source discharges. Discharges that were eliminated continue to be shown in DEP Tables I and II for compliance tracking purposes, but due to space constraints are no longer shown on Figures 1 through 3 provided in Appendix A of this DEP and in the U.S. Army Public Health Command (USAPHC) five year review of special monitoring data.

The types of discharges at USAKA are domestic wastewater, industrial wastewater, cooling water, and residential and industrial stormwater. The majority of the discharges are intermittent, being associated with rainfall or intermittent operations. Kwajalein, Roi-Namur and Meck have unlined soil drainage ditches and swales for control of stormwater runoff. Kwajalein and Meck also have piping systems for stormwater collection and release.

The eight continuous discharges covered by this DEP result from power plant cooling (one: Kwajalein), radar cooling (two: Roi-Namur), domestic wastewater treatment (one:

Kwajalein; one: Roi-Namur), and swimming pool overflow (three: Kwajalein). The Roi-Namur Wastewater Treatment Plant (WWTP) does not receive chlorinated overflow water from the saltwater swimming pool. The Roi-Namur wastewater effluent combines with the islands swimming pool overflow prior to ocean discharge.

The numbering and naming convention that is used throughout this DEP for the point-source discharges is shown in Tables I and II. The discharge number is composed of three groups. The first letters (K, R, M, E, or OM) refer to the first letters of the island name where the discharge is located. The second two or three letters refer to the type of discharge (CW for cooling water; DWW for domestic wastewater; RSW for residential stormwater; ISW for industrial stormwater; and IWW for industrial wastewater). The 2-digit number at the end refers to a specific discharge of a certain type on a certain island. In Table 1.3.1, the letters “ROW” and 2-digit number identify the Roi-Namur Ocean Water monitoring locations associated with discharge RDWW01.

v

HISTORICAL PERSPECTIVE

The original 1997 Point-Sources Discharges Notice of Continuing Activity (NCA) and 2000 DEP were created as required by the USAKA Environmental Standards and Procedures (UES) newly adopted 1995 water quality standards and discharge limitations. The UES standards were based on the National Pollutant Discharge Elimination System (NPDES) Program and related methodologies. Due to the scarcity of data, a three-year study was conducted to characterize the USAG-KA point-source discharges and evaluate associated mixing zones. A team consisting of scientists and engineers from the United States Fish and Wildlife Service (USFWS), Honolulu Office; the National Marine Fisheries Service (NMFS), Pacific Area Office; the United States Environmental Protection Agency (USEPA) Region 9; United States Army Center for Public Health Promotion and Preventive Medicine (USACHPPM)(currently known as U.S. Army Public Health Command (USAPHC)); USAKA;

and United States Army Strategic Defense Command (USASDC) reviewed data and maps for over sixty discharges. The requirements and limitations in the 2000 DEP were based on the final determinations by the team. The 1997 Point-Source Discharges NCA listed several discharges located on Kwajalein and Meck that were not considered significant because of their lack of pollutant sources. The companion 2000 DEP specified the discharges requiring DEP coverage.

LOCATION OF ACTIVITY

Specified point-source discharges are located in the lagoon and ocean waters surrounding Kwajalein, Roi-Namur, and Meck, USAKA, RMI. The geographical coordinates, expressed as latitude and longitude, for each outfall structure are listed in Tables I and II. Maps of the referenced islands showing the locations of point-source discharges are included in Appendix A of this DEP and in the USAPHC special monitoring report, provided as Chapter 1 of the NCA.

COMPLIANCE STATUS

The special monitoring compliance status of point-source discharges is shown in Tables I and II. The implementation of this DEP will bring the majority of the discharges into compliance with the UES. Resolution of noncompliant areas is discussed in Section 7.0 of this

DEP.

vi

POINT-SOURCE DISCHARGES DEP

TABLE I. COMPLIANCE STATUS: CONTINUOUS POINT-SOURCE DISCHARGE SPECIAL MONITORING

DISCHARGE

NUMBER

DISCHARGE NAME

LATITUDE / LONGITUDE

(Deg Min Sec: North / East)

UES

COMPLIANT

RESOLUTION

ACTION

KWAJALEIN - Cooling Water KCW01 Power Plant 1A/1B 008 43 30 / 167 44 01 Yes None required KWAJALEIN - Domestic Wastewater KDWW01 Wastewater Treatment Plant, Fuel Pier Outfall 008 43 45 / 167 44 00 Yes None required

KDWW02 Wastewater Treatment Plant, Stormwater Channel Outfall

008 43 40 / 167 44 06 Discharge Eliminated 1997

None required

ROI-NAMUR - Domestic Wastewater RDWW01 Wastewater Treatment Plant

Outfall 009 24 07.0 / 167 27 43.0 No (for Dieldrin)

Implement additional BMPs

KWAJALEIN - Industrial Wastewater KIWW05A Adult Swim Pool - North 008 43 51 / 167 44 30 Yes None required KIWW05B Adult Swim Pool - South 008 43 50 / 167 44 30 Discharge Eliminated 2004 None required

KIWW06A Family Swim Pool - North 008 44 16 / 167 44 22 Yes None required KIWW06B Family Swim Pool - South 008 44 15 / 167 44 22 Yes None required ROI-NAMUR - Cooling Water RCW01 Power Plant 009 23 35.8 / 167 28 31.0 Discharge Eliminated 2001 None required

RCW02 ALTAIR Radar 009 23 33.1 / 167 28 40.1 Yes None required

RCW03 ALCOR Radar 009 23 57.0 / 167 28 59.0 Discharge Eliminated 1999 None required

RCW04 TRADEX - 12” Outfall 009 23 56.6 / 167 28 53.1 Yes None required

RCW05 TRADEX – 4” Outfall 009 23 55.8 / 167 28 52.5 Discharge Eliminated 1999 None required

RCW06 (New Discharge 1997)

TRADEX - 2" Outfall 009 23 56.4 / 167 28 53.4 Discharge Eliminated 1999 None required

ENNYLABEGAN - Cooling Water ECW01 Power Plant 008 47 54 / 167 37 10 Discharge Eliminated 1999 None Required vii

POINT-SOURCE DISCHARGES DEP

TABLE II. COMPLIANCE STATUS: INTERMITTENT POINT-SOURCE DISCHARGE SPECIAL MONITORING

(Deg Min Sec: North / East)

UES

COMPLIANT

RESOLUTION

ACTION

KWAJALEIN - Residential Stormwater

KRSW01 North Residential Outfall 008 44 34.6 / 167 44 06.7 Yes None required

KRSW02 Un-named Residential Outfall 008 44 31.0 / 167 44 07.1 Yes None required

KRSW03 Un-named Residential Outfall 008 44 21.3 / 167 44 06.1 Yes None required

KRSW04 Un-named Residential Outfall 008 44 16.9 / 167 44 07.0 Yes None required

KRSW05 Un-named Residential Outfall 008 44 12.3 / 167 44 07.9 Yes None required

KRSW06 Un-named Residential Outfall 008 44 08.6 / 167 44 08.9 Yes None required

KRSW07 Un-named Residential Outfall 008 44 04.7 / 167 44 09.7 Yes None required

KRSW08 South Residential Outfall 008 44 00.4 / 167 44 11.2 Yes None required

KRSW09 Un-named Residential Outfall 008 44 40.8 / 167 44 11.3 Yes None required

KRSW10 Un-named Residential Outfall 008 44 36.7 / 167 44 17.6 Yes None required

KRSW11 Un-named Residential Outfall 008 44 33.1 / 167 44 17.8 Yes None required

KRSW12 Un-named Residential Outfall 008 44 26.4 / 167 44 18.5 Yes None required

KWAJALEIN - Industrial Stormwater

KISW01

Dry Dock, Marine Maintenance, Warehouse - 36" Outfall

008 43 52.5 / 167 44 10.9

Yes

KISW01A (New Discharge 1998)

Dry Dock, Marine Maintenance

- 12" Outfall

008 43 53 / 167 44 11

KISW02 Utilities Maintenance Shops 008 43 48.9 / 167 44 11.8 No (for copper) Implement additional BMPs viii

POINT-SOURCE DISCHARGES DEP

TABLE II. COMPLIANCE STATUS: INTERMITTENT POINT-SOURCE DISCHARGE SPECIAL MONITORING (Continued)

DISCHARGE

NUMBER

DISCHARGE NAME LATITUDE / LONGITUDE

(Deg Min Sec: North / East)

UES

COMPLIANT

RESOLUTION

ACTION

KISW03

North of Abrasive Blasting Area

008 43 47.0 / 167 44 10.7

Yes None required

KISW04

South of Abrasive Blasting Area

008 43 45.9 / 167 44 09.5

KISW05

Vehicle Maintenance, Fuel Farm Northside

008 43 41.8 / 167 44 07.1

KISW06 Water Storage Tank Areas 008 43 40.9 / 167 44 06.4 Yes None required

KISW07

Fuel Farm Southside, Aircraft Maintenance

008 43 40.3 / 167 44 06.3

KISW08 Sewage Sludge Drying Beds 008 43 35 / 167 44 03 Yes None required KISW09 Power Plant 1A/1B Fuel

Storage 008 43 32 / 167 44 03 Yes None required

KISW10 Helicopter Maintenance, Power Plant 1A/1B

008 43 28 / 167 44 00 Yes None required

KISW11 East Side Range Control Bldg 008 43 21 / 167 43 43 Yes None required KISW12 West Side Range Control Bldg 008 43 41 / 167 43 41 Yes None required KISW13 Power Plant 2 and Fuel Storage

(FN 1045)

008 43 21.8 / 167 43 20.7

KISW14

Kwajalein Landfill Main Cut

008 43 18.2 / 167 42 58.1 Discharge Eliminated

KISW14A (New Discharge 1999)

Kwajalein Landfill Westside Cut

008 43 24 / 167 42 56

Discharge Eliminated ix

POINT-SOURCE DISCHARGES DEP

TABLE II. COMPLIANCE STATUS: INTERMITTENT POINT-SOURCE DISCHARGE SPECIAL MONITORING (Continued)

(Deg Min Sec: North / East)

UES

COMPLIANT

RESOLUTION

ACTION

KWAJALEIN - Industrial Stormwater (Continued) KISW15 Photo Lab, West End of Runway 008 43 12.5 / 167 43 04.3 Yes None required KISW16 West End of Runway 008 43 02.3 / 167 43 18.3 Yes None required KISW17 DSCS Bldg 845 Drainage Cut

008 43 29 / 167 43 58 Discharge

Eliminated 2000

KISW18 Camp Hamilton Bldg 878 Drainage

Swale

008 43 27 / 167 43 56

Eliminated 1999

KISW19

COE Bldg 894 Drainage Swale

008 43 26 / 167 43 54

KISW20

Aircraft Refueling Area – Building 901

008 43 35.5 / 167 44 33.1 Yes None required

KIWW01

Aircraft Washing Area, Bldg 898

008 43 38 / 167 44 06

Eliminated 1999

KIWW02

Raw Water Storage Tank Bottom Water

008 43 39 / 167 44 06

Eliminated 1997

KIWW03

Raw Water Storage Tank Bottom Water

008 43 32 / 167 44 03

Eliminated 1997

KIWW04

Motorpool Vehicle Washrack

008 43 39 / 167 44 07

KIWW07 Fuel Farm Containment Area 008 43 39 / 167 44 07 Yes None required

KIWW08A

RO Concentrated Effluent (New drinking water treatment process added 2004)

008 43 45 / 167 44 00 x

POINT-SOURCE DISCHARGES DEP

TABLE II. COMPLIANCE STATUS INTERMITTENT POINT-SOURCE DISCHARGE SPECIAL MONITORING (Continued)

DISCHARGE

NUMBER

DISCHARGE NAME LATITUDE / LONGITUDE

(Deg Min Sec: North / East)

UES

COMPLIANT

RESOLUTION

ACTION

ROI-NAMUR - Industrial Wastewater

RIWW01

Drinking Water Treatment Plant - Raw Water Storage Tank Overflow

009 23 47 / 167 28 35

RIWW02 (New Discharge 1998)

Fuel Farm Containment Area Oil/Water Separator

009 23 36 / 167 28 31

MECK - Industrial Stormwater

MISW01 North of Power Plant 009 00 06 / 167 43 15 Yes None required

MISW02 South of Power Plant 009 00 04 / 167 43 15 Yes None required

MECK - Industrial Wastewater

MIWW01

Power Plant - Oil/Water Separator

009 00 06 / 167 43 15

No (for Phosphorus)

Implement BMPs to reduce phosphorus input

MIWW02 (New Discharge 2000)

Power Plant Fuel Storage Area Oil/Water Separator

009 00 04 / 167 43 15

Eliminated 2004

OMELEK – Industrial Wastewater

OMIWW01 RO Concentrated Effluent (Non-potable system; 2005)

009 02 53.7 / 167 44 32 Discharge Eliminated 2010 xi

POINT-SOURCE DISCHARGES DEP

TABLE OF CONTENTS

1.0 REQUIREMENTS AND LIMITATIONS

1.1 General Requirements

1.1.1 General Discharge Criteria

1.1.2 Treatment Requirements

1.1.3 Creation of New Point-Source Discharges Not Included In This DEP

1.2 Routine Monitoring Requirements

1.2.1 Continuous Discharge Limitations

1.2.2 Intermittent Discharge Limitations

1.3 Special Monitoring Requirements

1.3.1 Continuous Discharge Monitoring Parameters and Frequency

1.3.2 Intermittent Discharge Monitoring Parameters and Frequency

1.3.3 Kwajalein Harbor Unreasonable Degradation Evaluation

1.3.4 Roi-Namur WWTP Receiving Water Monitoring

1.3.5 Roi-Namur WWTP Outfall Biological Monitoring

1.3.6 Roi-Namur WWTP Outfall Pipe Inspection

1.4 Special DEP Requirements

1.4.1 Stormwater Pollution Prevention Plan

1.4.2 Discontinued Discharges to Surface Waters

1.4.3 Discharges Not Subject to Provisions of the DEP

1.4.4 Industrial Wastewater Pretreatment Program

1.4.5 Sewage Sludge Use and Disposal

1.4.6 Sewage Screenings and Grit Disposal

1.4.7 Septage from USAG-KA Septic Tanks

1.5 Operation and Maintenance

1.6 Personnel

1.7 Discharge Location Identification Markers

2.0 MONITORING PROCEDURES

2.1 Sampling and Analysis

2.2 Monitoring Locations

2.2.1 Continuous Discharges

2.2.2 Intermittent Discharges

2.3 Whole Effluent Toxicity (WET) Test Procedures

2.4 Point-Source Discharge Monitoring Program Evaluation

3.0 MINOR DEP MODIFICATIONS

4.0 REPORTING PROCEDURES

4.1 Routine Monitoring Reports

4.2 Special Monitoring Reports

4.3 Sewage Sludge Disposal Report

4.4 Compliance Progress Report

5.0 NOTIFICATION PROCEDURES

5.1 Emergency Notifications

5.2 Public Notifications

6.0 RECORDS KEEPING

7.0 RESOLUTION OF NONCOMPLIANT AREAS

7.1 Roi-Namur Wastewater Treatment Plant RDWW01

7.1.1 Reason for Noncompliance

xii

POINT-SOURCE DISCHARGES DEP

7.1.2 Corrective Action

7.1.3 Compliance Schedule

7.2 Meck Power Plant Oil/Water Separator Discharge Number MIWW01

7.2.1 Reason for Noncompliance

7.2.2 Corrective Action

7.2.3 Compliance Schedule

7.3 Kwajalein Utilities Maintenance Shops Discharge Number KISW02

7.3.1 Reason for Noncompliance

7.3.2 Corrective Action

7.3.3 Compliance Schedule

8.0 ENVIRONMENTAL COMMENTS AND RECOMMENDATIONS RECEIVED ON

THE FINAL DEP AND USAKA'S RESPONSES

8.1 U.S. Fish and Wildlife Service

9.0 ENVIRONMENTAL COMMENTS AND RECOMMENDATIONS RECEIVED ON

THE DRAFT DEP AND USAKA'S RESPONSES

9.1 U.S. Army Corps of Engineers, Honolulu District

9.2 U.S. National Marine Fisheries Service

9.3 U.S. Fish and Wildlife Service

9.4 U.S. Environmental Protection Agency

9.5 Republic of the Marshall Islands Environmental Protection Authority

10.0 ENVIRONMENTAL COMMENTS AND RECOMMENDATIONS RECEIVED ON

THE NCA AND USAKA'S RESPONSES

10.1 U.S. Army Corps of Engineers, Honolulu District

10.2 National Marine Fisheries Service

10.3 Republic of the Marshall Islands Environmental Protection Authority

10.4 U.S. Fish and Wildlife Service

10.5 U.S. Environmental Protection Agency

TABLES

Table I Compliance Status: Continuous Point-Source Discharge Special Monitoring .......... v Table II Compliance Status: Intermittent Point-Source Discharge Special Monitoring ........ vi Table of Contents ............................................................................................................................ x Table 1.2.1 Kwajalein Wastewater Treatment Plant (KDWW01) Table 1.2.2 Cooling Water Continuous Discharge Limitations Table 1.2.3 Kwajalein Swimming Pool Continuous Discharge Limitations Table 1.2.4 Roi-Namur Wastewater Treatment Plant (RDWW01) Table 1.3.1 Special Monitoring Requirements For Continuous Point-Source Discharges Table 1.3.2 Special Monitoring Requirements For Intermittent Point-Source Discharges Table 1.4.1 Discontinued Discharges To Surface Waters Table 1.4.2 Stormwater Discharges Not Subject To Provisions Of The DEP

Table 2.2.1 Monitoring Locations For Continuous Point-Source Discharges Table 2.2.2 Monitoring Locations For Intermittent Point-Source Discharges

Table 4.1.1 U.S. Army Kwajalein Atoll - Example Monthly Discharge Monitoring Report Table 4.1.2 U.S. Army Kwajalein Atoll - Example Monthly Discharge Monitoring Report Table 4.1.3 U.S. Army Kwajalein Atoll - Example Monthly Discharge Monitoring Report Table 4.1.4 U.S. Army Kwajalein Atoll - Example Monthly Discharge Monitoring Report xiii

POINT-SOURCE DISCHARGES DEP

APPENDICES

Appendix A Point-Source Discharges Maps ..................................................................... A-1 Appendix B Notice of Continuing Activity: Point-Source Discharges, Control Number NCA-12-002.0, July 2012 ..................................................B-1 xiv

ABBREVIATIONS AND ACRONYMS

Ag Silver As Arsenic BMP Best Management Practice BOD Biochemical Oxygen Demand C Centigrade Cd Cadmium Col/100 ml Coliform per 100 milliliter CFR Code of Federal Regulations Cr Chromium Cu Copper DEP Document of Environmental Protection Fe Iron HDD Horizontal Directional Drilling Hg Mercury LC50 Lethal Concentration - 50 percent MG million gallons mgd million gallons per day mg/L milligrams per liter ml/L milliliters per liter Mn Manganese NCA Notice of Continuing Activity Ni Nickel NMFS National Marine Fisheries Service NPDES National Pollutant Discharge Elimination System NTU Nephelometric Turbidity Unit O&G Oil and Grease O&M Operation and Maintenance Pb Lead PCB Polychlorinated biphenyl ppt parts per thousand RMI Republic of the Marshall Islands RMIEPA Republic of the Marshall Islands Environmental Protection

Authority RTS Reagan Test Site xv

ABBREVIATIONS AND ACRONYMS (Continued)

Se Selenium SPI Standard Practice Instruction SS Suspended Solids SWPPP Stormwater Pollution Prevention Plan T-N Total nitrogen (TKN + nitrite/nitrate) T-P Total phosphorous UES USAKA Environmental Standards and Procedures µg/L micrograms per liter U.S. United States USACHPPM United States Army Center for Health Promotion and Preventive Medicine USAG-KA United States Army Garrison - Kwajalein Atoll USAPHC United States Army Public Health Command (formerly

USACHPPM)

USASDC United States Army Strategic Defense Command USASMDC/ARSTRAT United States Army Space and Missile Defense Command/ Army Forces Strategic Command USAKA United States Army Kwajalein Atoll USEPA United States Environmental Protection Agency USFWS United States Fish and Wildlife Service VOC Volatile Organic Compounds WET Whole Effluent Toxicity WWTP Wastewater Treatment Plant ZID Zone of Initial Dilution Zn Zinc xvi

POINT-SOURCE DISCHARGES DEP

1.0 REQUIREMENTS AND LIMITATIONS

1.1 General Requirements

1.1.1 General Discharge Criteria

These requirements are applied directly at the point of discharge.

1.1.1.1 All discharges shall be free of visible floating material, oil, grease, scum, and other floating matter attributable to the activities of humans [UES § 3-2.6.3(a)(2)].

1.1.1.2 All discharges shall be free of material attributable to sewage, industrial waste, or other products of human activity that produce visible turbidity or that settle out to form deposits [UES § 3-2.6.3(a)(2)].

1.1.1.3 All discharges shall be free of materials attributable to sewage, industrial waste, or other products of human activity that produce objectionable color, odor, or taste directly or by chemical or biological action in the water or the biota [UES § 3-2.6.3(a)(2)].

1.1.2 Treatment Requirements

The following requirements apply to the wastewater treatment plants located on Kwajalein and Roi-Namur.

1.1.2.1 The discharge from the Kwajalein domestic WWTP shall receive a minimum of secondary treatment [UES § 3-2.7.1(c)].

1.1.2.2 The Roi-Namur WWTP shall provide primary treatment of domestic wastewater from sinks, showers, toilets, laundries, garbage disposals, and septage.

1.1.2.3 The Roi-Namur WWTP shall comply with the alternative treatment criteria set forth in UES § 3-2.7.1(e)(1)-(6).

1.1.2.4 The Roi-Namur WWTP is required to remove no less than 30 percent of the influent biochemical oxygen demanding material and suspended solids (SS).

1.1.3 Creation of New Point-Source Discharges Not Included In This DEP

No new point-source shall be constructed or shall begin discharging to the waters of the RMI unless the action has been documented in a DEP [UES § 3-2.7.1(b)]. Modifications to structures or operations associated with discharges included in this DEP shall be accomplished as a minor DEP modification in accordance with the procedures in Section 3.0.

1.2 Routine Monitoring Requirements

1.2.1 Continuous Discharge Limitations

1.2.1.1 Kwajalein Wastewater Treatment Plant Effluent

The routine monitoring requirements and associated influent and effluent discharge limitations for the Kwajalein WWTP shall be as shown in Table 1.2.1.

POINT-SOURCE DISCHARGES DEP

1.2.1.2 Cooling Water Discharges

The routine monitoring requirements and associated discharge limitations for the cooling water discharges shall be as shown in Table 1.2.2.

1.2.1.3 Kwajalein Swimming Pool Discharges

The routine monitoring requirements and associated discharge limitations for the swimming pool discharges shall be as shown in Table 1.2.3. The total chlorine concentration in the discharges and the discharge flow rates shall be measured once per month on a day when chlorine is added to the pools. The total chlorine concentration reported shall be the highest concentration measured after the addition of chlorine. The discharge flow rate shall be measured by inline flow meter or shall be estimated based upon the depth of flow in the outfall pipe using a gravity-flow equation.

1.2.1.4 Roi-Namur Wastewater Treatment Plant

Construction of a secondary sewage treatment plant for Roi-Namur was authorized in the

Final EIS for Proposed Actions at USAKA, 1989, and budgeted to begin in 1990. Construction was delayed due to concerns of excessive cost of a secondary sewage treatment plant for the relatively small population of Roi-Namur. Based on Section 301(h) of the 1977 Clean Water Act that allows for less-than-secondary treatment in certain instances, the decision was made to construct a primary WWTP. The Roi-Namur WWTP was completed in 1997.

The routine monitoring requirements, and associated influent and effluent discharge limitations for the Roi-Namur WWTP shall be as shown in Table 1.2.4. The derivation for the effluent limitations is described in U.S. Army Kwajalein Atoll/Kwajalein Missile Range Document of Environmental Protection: Operation of Sewage Treatment Plant, Roi-Namur, DEP-97-001.0 August 1997. Although DEP-97-001.0 is retired, the basis for effluent limitations is still valid and is thus referenced herein.

The Roi-Namur WWTP effluent will not receive chlorination upon discharge from the wet well; therefore, the effluent discharge microbiological contaminant level will be too-numerous-to-count. Microbiological contaminant levels will be monitored in the receiving water. Effluent discharges will be controlled to the extent necessary to meet the standards established for Class B water at the boundary of the mixing zone/zone of initial dilution (except for fecal coliform and enterococci) [UES § 3-2.4.1(c)(2)].

1.2.2 Intermittent Discharge Limitations

Routine monitoring discharge limitations are not established for the intermittent discharges. Limitations may be added as a DEP minor modification if evaluation of the results from special monitoring indicates the need for routine monitoring. The primary mechanism for controlling the quality of intermittent discharges shall be the implementation and annual effectiveness evaluation of the best management practices (BMPs) contained in the Stormwater Pollution Prevention Plan (SWPPP) required in Section 1.4.1.

POINT-SOURCE DISCHARGES DEP

1.3 Special Monitoring Requirements

The following special monitoring and special study requirements shall be completed to provide additional data concerning specific discharges that have a “high”, “moderate” or “unknown” potential to cause adverse effects on the receiving water or biota. The discharge assessment shall be based upon the pollutant mixing zone sizes, the number and type of toxic pollutants, the biological resources exposed to the pollutants, the potential bioavailability of the pollutants, and additional data needs. The monitoring frequencies specified shall be "annual" for "high potential" discharges; "biennial" for "moderate potential" discharges; and "at DEP renewal" for "low or none potential" discharges. Following four quarters of monitoring, "high potential" discharges are to be monitored annually until the potential for adverse effect is reduced. It is anticipated that as the factors responsible for potential adverse effect are mitigated, the monitoring frequencies for the "high and moderate potential" discharges will be reduced.

USAG-KA shall propose revisions to special monitoring requirements as a DEP minor modification in accordance with Section 3.0. An unreasonable degradation evaluation shall be performed on all discharges determined to have a “high” potential to cause adverse effects, as required by UES 3-2.6.3(b)(4).

A USAPHC study of special discharge monitoring from 2006-2011 was published in July 2012. The results of the special monitoring were used to evaluate compliance with the water quality criteria, and to determine the need for additional pollutant controls such as discharge limitations or best management practices. The conclusions of the study are reflected in the modifications to monitoring requirements for continuous and intermittent discharges highlighted on the respective DEP tables.

In response to comments on the Final DEP received in June 2014 from the US Fish and Wildlife Service, “annual” or “at DEP renewal” PCB monitoring was added to the Kwajalein industrial stormwater outfalls, with one outfall, KISW02, adding “Biennial” PCB monitoring.

POINT-SOURCE DISCHARGES DEP

TABLE 1.2.1 KWAJALEIN WASTEWATER TREATMENT PLANT (KDWW01)

CONTINUOUS DISCHARGE EFFLUENT LIMITATIONS AND ROUTINE MONITORING REQUIREMENTS

Parameter (units)

Effluent Limitation Monitoring Sample

Monthly Average Maximum Frequency Type

Discharged Flow (MGD) .450 .600 (Daily) Continuous Measurement

Recycled Effluent Flow (MGD) None None Continuous Measurement

Influent 5-day BOD (mg/L) None None 1/week Composite

Effluent 5-day BOD (mg/L) 30 45 (Weekly) 1/week Composite

Minimum Percent Removal – 5-day BOD 85 None 1/week Composite

Influent Suspended Solids (mg/L) None None 1/week Composite

Effluent Suspended Solids (mg/L) 30 45 (Weekly) 1/week Composite

Minimum Percent Removal - Suspended Solids 85 None 1/week Composite

Effluent Settleable Solids (ml/L) 1.0 2.0 (Daily) 1/day Grab

Effluent Total Kjeldahl Nitrogen (mg/L) None None 1/month Composite

Effluent Nitrate-Nitrogen (mg/L) None None 1/month Composite

Effluent Total Nitrogen (mg/L) 37.1 51.0 1/month Composite

Effluent Ammonia-Nitrogen (mg/L) 11.8 16.2 1/month Composite

Effluent Total Phosphorous (mg/L) 22.2 30.5 1/month Composite

Effluent Fecal Coliform Bacteria (col/100ml) 200 400 (Weekly) 1/week Grab

Effluent Total Residual Chlorine (mg/L) Minimum To Achieve Bacteria Limitation 1/day Grab

Effluent pH (std units) 6.0-9.0 1/day Grab

Effluent Minimum Dissolved Oxygen (mg/L) 4.5 or higher at all times 1/day Grab

Effluent Salinity (ppt) None None 1/month Grab

POINT-SOURCE DISCHARGES DEP

TABLE 1.2.2 COOLING WATER CONTINUOUS DISCHARGE LIMITATIONS

AND ROUTINE MONITORING REQUIREMENTS

Parameter (units) - Applicable Discharge

Maximum

Discharge

Limitation

Running

12 Month

Discharge

Limitation

Monitoring

Frequency

Sample

Type

Flow (MGD) – Discharge No. KCW01 16.44 None 1/month Measurement

Temperature (degrees C) - Discharge No. KCW01 38 None 1/month Measurement

Flow (MGD) - Discharge No. RCW02 5.83 None 1/month Measurement

Temperature (degrees C) - Discharge No. RCW02 33.3 None 1/month Measurement

Flow (MGD) - Discharge No. RCW04 10.7 None 1/month Measurement

Temperature (degrees C) - Discharge No. RCW04 32.7 None 1/month Measurement

Ambient Water Temperature (degrees C) - Ends of Kwajalein and Roi-Namur Fuel Piers; and Namur North Reef Flat None None

1/month

Measurement

Oil and Grease (mg/L) - All Discharges 15 None 1/month Grab

Suspended Solids (mg/L) - All Discharges 100 30* 1/month Grab

Turbidity (NTU) - All Discharges TBD TBD 1/month Grab pH (standard units) - All Discharges 6.5-8.5 None 1/month Grab

Salinity (ppt) - All Discharges and All Ambient Water Temperature Locations None None 1/month Grab

* The maximum discharge limit for suspended solids changed from 30 mg/L to 100 mg/L. The 12 month average discharge concentration is established at 30 mg/L. The 12 month average discharge concentration should be calculated as a running average based on results from 12 months. Additionally turbidity should be used as the monitoring parameter to be consistent with the use of turbidity criteria in the UES. There are no receiving water criteria in the UES for suspended solids. A correlation between turbidity and suspended solids should be determined by measuring both parameters on 12 monthly samples. If a correlation is established, the monitored parameter should be changed to turbidity with equivalent discharge limits expressed in appropriate turbidity units

(NTU).

POINT-SOURCE DISCHARGES DEP

TABLE 1.2.3 KWAJALEIN SWIMMING POOL CONTINUOUS DISCHARGE LIMITATIONS

AND ROUTINE MONITORING REQUIREMENTS

Limitation

Monitoring

Frequency

Sample

Type

Flow (MGD) - Discharge No. KIWW05A (Adult Pool, North) 2.13 1/month Measurement

Total Chlorine (mg/L) - Discharge No. KIWW05A (Adult Pool, North) 2.0 1/month Grab

Flow (MGD) - Discharge No. KIWW06A (Family Pool, North) 1.04 1/month Measurement

Total Chlorine (mg/L) - Discharge No. KIWW06A (Family Pool, North) 2.2 1/month Grab

Flow (MGD) - Discharge No. KIWW06B (Family Pool, South) 1.03 1/month Measurement

Total Chlorine (mg/L) - Discharge No. KIWW06B (Family Pool, South) 2.2 1/month Grab

POINT-SOURCE DISCHARGES DEP

TABLE 1.2.4 ROI-NAMUR WASTEWATER TREATMENT PLANT (RDWW01)

CONTINUOUS DISCHARGE EFFLUENT LIMITATIONS AND ROUTINE MONITORING REQUIREMENTS

Effluent

Parameter (units)

Limitation Monitoring

Frequency

Sample

Type Monthly Average* Maximum Daily

Allowable

Influent Flow (Continuous) None None Continuous Measurement

Effluent Flow (Continuous) 0.062 MGD 0.089 MGD Continuous Measurement

Influent 5-day BOD (Concentration) None None 1/week Composite

Effluent 5-day BOD (Concentration) 152 mg/L 175 mg/L 1/week Composite

Influent 5-day BOD (Loading) None None 1/week Composite

Effluent 5-day BOD (Loading) 80 lbs/day 130 lbs/ day 1/week Composite

Influent Suspended Solids (Concentration) None None 1/week Composite

Effluent Suspended Solids (Concentration) 140 mg/L 175 mg/L 1/week Composite

Influent Suspended Solids (Loading) None None 1/week Composite

Effluent Suspended Solids (Loading) 73 lbs/day 130 lbs/day 1/week Composite

Effluent pH 6.0 - 9.0 1/week Grab *The primary WWTP is required to remove no less than 30 percent of the 5-day (biological oxygen demand) BOD material and suspended solids

POINT-SOURCE DISCHARGES DEP

1.3.1 Continuous Discharge Monitoring Parameters and Frequency The continuous discharges shall be monitored for the parameters and at the frequencies shown in Table 1.3.1. The required monitoring shall be performed in addition to the routine monitoring required in Section 1.2.

1.3.2 Intermittent Discharge Monitoring Parameters and Frequency

The intermittent discharges shall be monitored for the parameters and at the frequencies shown in Table 1.3.2.

1.3.3 Kwajalein Harbor Unreasonable Degradation Evaluation

The initial Point-Source Discharges DEP required USAKA to conduct an unreasonable degradation evaluation of discharges KISW01, KISW01A, KISW03, and KISW04, which had a “high” potential to cause adverse effects on receiving waters. The evaluation was to include sediment and bioaccumulation testing to determine the extent of pollutant deposition and bioavailability in the receiving waters near the discharges. The Unreasonable Degradation Evaluation Report was completed in December 2008, with follow-on studies in 2008 and 2011.

The evaluation report concluded that the discharges were not causing unreasonable degradation of the marine environment and recommended continuing to monitor Kwajalein Harbor discharges, determination of chlordane and copper sources with implemented BMPs, and completion of the harbor sediment study. The 2008 Kwajalein Harbor Release Area Preliminary Assessment/Site Inspection and the 2011 Kwajalein Harbor Ecological Effects Investigation evaluated the human health and ecological risks associated with the existing contamination in the Kwajalein Harbor. These studies determined that metals contamination in the sediment was not migrating through the food chain, was not bioavailable, and was not a driver for human health or ecological risk. However, pesticides and polychlorinated biphenyl (PCBs) were found in some fish tissues.

Although contaminants are being discharged into the Kwajalein Harbor in concentrations that exceed water quality criteria, most mixing zones do not extend into Class A waters.

However, these discharges contain persistent toxic pollutants (metals, PCBs, pesticides).

Investigations into the source of PCBs and pesticides indicate that some of the PCB contamination is likely associated with sediment in storm drains adjacent building 803.

Remediation efforts are underway and additional PCB monitoring points were added. Copper levels within the harbor show a downward trend following implementation of advanced BMPs associated with sandblasting operations. USAG-KA shall take additional measures to further reduce or eliminate copper from entering the harbor.

POINT-SOURCE DISCHARGES DEP

1.3.3.1 Specific Requirements

1.3.3.1.1 USAG-KA shall determine the sources of copper contamination.

1.3.3.1.2 USAG-KA shall establish mitgation measures and prevent copper from entering the harbor.

1.3.3.1.3 USAG-KA shall continue to monitor contamination as the ongoing sources are mitigated.

1.3.3.1.4 Best management practices and pollution prevention measures shall be used to reduce harbor contamination.

1.3.3.1.5 USAG-KA shall complete a follow-on study to determine if PCB and pesticide contamination in fish tissue is localized to the harbor.

1.3.3.1.6 USAG-KA shall complete the PCBs contamination cleanup action associated with building 803.

1.3.3.1.7 USAG-KA shall sample and analyze annually, at DEP renewal, or biennially for PCBs from all industrial stormwater discharge locations until such time as there are consecutive stormwater laboratory analyses results indicating an outfall is not a source of PCBs.

1.3.4 Roi-Namur WWTP Receiving Water Monitoring

Receiving waters for the Roi-Namur WWTP discharge shall be monitored to demonstrate compliance of the primary WWTP with surface water quality standards of UES § 3-2.7.1(e).

The broken Roi-Namur WWTP outfall pipe was repaired and returned to service on February 14, 2014 (see Point-Source Discharges NCA for details). Receiving waters shall be monitored relative to the new outfall discharge location.

1.3.4.1 Receiving waters samples shall be collected from approximately three (3) feet below the water surface at:

1.3.4.1.1 Zone of Initial Dilution (ZID) boundaries (both up-current and down-current);

1.3.4.1.2 Control (i.e., background) stations along the primary axis of the longshore component (both up-current and down-current)

1.3.4.1.3 Intermediate up-current stations between the ZID boundary and the up-current control station; and

1.3.4.1.4 Roi-Namur northwestern reef-flat in the vicinity of the outfall pipe, at least 25 feet from shore.

1.3.4.2 Receiving waters shall be monitored for the parameters and at the frequency shown in Table 1.3.1.

1.3.5 Roi-Namur WWTP Outfall Biological Monitoring

UES Section 3-2.7.1(e)(3) requires that a balanced indigenous population of aquatic life be maintained outside the zone of initial dilution for point-source discharges. Baseline Biological Survey was required in the initial Point-Source Discharges DEP to be performed in the vicinity of the discharge end of the Roi-Namur WWTP outfall pipe. The survey was required to focus on conspicuous, diurnally active benthic macroinvertebrates and demersal fishes, with particular emphasis on corals, giant clams, sea turtles and their known preferential food items, POINT-SOURCE DISCHARGES DEP and demersal fishes known to possess fisheries value. The occurrence of any rare or notably valuable species at each station is to be recorded. Special habitat characteristics of each station are to be documented. The Baseline Biological Survey was completed in 1997. Future “monitoring surveys” are to be compared to the baseline to evaluate the affect of the outfall on the marine environment.

1.3.5.1 Biological Monitoring Location

The impact area to be monitored is the ZID. An up-current control area outside the influence of the outfall effluent or other pollutants is to be surveyed. Three replicate stations shall be surveyed within each area. Samples from all stations shall be at a water depth of approximately 35 feet.

1.3.5.2 Biological Monitoring Frequency

Monitoring shall be performed one year prior to each DEP renewal.

1.3.5.3 Biological Monitoring Methodology

All surveys shall be performed by a recognized team of aquatic biologists who are physically able and equipped to evaluate all areas. Species composition and relative abundances shall be quantified using a standard rapid ecological assessment technique. A point-transect method shall be used to estimate the percentage of large-scale reef substrate coverage provided by corals and other organisms at each station. A quadrant-transect method shall be used to estimate the small-scale density of algae, corals, and other benthic macroinvertebrates at each station.

1.3.6 Roi-Namur WWTP Outfall Pipe Inspection

The broken Roi-Namur WWTP outfall pipe was repaired using horizontal directional drilling through the coral reef flat with partial trenching across the tidal flat. The outfall exits the coral reef at a depth of 30 to 40 feet, in the vicinity of the former outfall pipe location.

Inspection is not required for the replacement pipe.

POINT-SOURCE DISCHARGES DEP

TABLE 1.3.1 SPECIAL MONITORING REQUIREMENTS FOR CONTINUOUS POINT-SOURCE DISCHARGES

*Salinity shall be measured in all discharges. **Metals: Ag, As, Cd, Cr, Cu, Fe, Mn, Ni, Pb, Se, Zn. ***PCBs/Pesticides and Organic Compounds: All compounds shown in UES Table 3-2C.2 (less 2,3,7,8-TCDD Dioxin); and any compounds shown in UES Table 3-2C.3, which are believed to be present based upon use by USAG-KA.

POTENTIAL FOR

ADVERSE EFFECT

MONITORING

FREQUENCY

PARAMETERS TO BE MONITORED*

KWAJALEIN - Cooling Water KCW01 Power Plant 1A/1B Low At DEP Renewal T-N, T-P, Metals** KWAJALEIN - Domestic Wastewater

KDWW01

Wastewater Treatment Plant, Fuel Pier Outfall

Low

Annual

Metals**/Hg, PCBs/Pesticides, Volatile/Semi- Volatile Organic Compounds***

ROI-NAMUR - Domestic Wastewater

RDWW01

Wastewater Treatment Plant Outfall

Moderate Annual Metals**, PCBs/Pesticides, Volatile/Semi- Volatile Organic Compounds***

ROW01 through

ROW06

Receiving Water for Roi- Namur WWTP Discharge

Not Applicable

Enterococci, pH, T-P, T-N, DO, Ocean Current Direction, Temperature, Turbidity, Oil and Grease, Metals** Pesticides/PCBs***

At DEP Renewal Receiving Water Biological Monitoring

KIWW05A

Adult Swim Pool - North

At DEP Renewal Using Latest Biennial Natural

Resources Inventory

Chlorine effect on biota

KIWW06A

Family Swim Pool - North

KIWW06B

Family Swim Pool - South

ROI-NAMUR - Cooling Water RCW02 ALTAIR Radar Low At DEP Renewal T-N, T-P, Metals**

RCW04 TRADEX - 12” Outfall Low At DEP Renewal T-N, T-P, Metals**

POINT-SOURCE DISCHARGES DEP

TABLE 1.3.2 SPECIAL MONITORING REQUIREMENTS FOR INTERMITTENT POINT-SOURCE DISCHARGES

ADVERSE EFFECT

MONITORING

FREQUENCY

PARAMETERS TO BE MONITORED*

KWAJALEIN - Residential Stormwater KRSW01 North Residential Outfall Low At DEP Renewal Flow, pH, T-N, T-P, Metals** KRSW02 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW03 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW04 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW05 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW06 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW07 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW08 South Residential Outfall Low At DEP Renewal Flow, pH, T-N, T-P, Metals** KRSW09 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW10 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW11 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KRSW12 Un-named Residential Outfall Low None (KRSW01 and KRSW08 are representative) KWAJALEIN - Industrial Stormwater

KISW01

Dry Dock, Marine Maintenance, Warehouse, 36" Outfall

Moderate

Flow, pH, T-N, T-P, Metals**, SS, Semi-Volatile Organic Compounds, PCBs/Pesticides****

At DEP Renewal WET***, PCBs

KISW01A

Dry Dock, Marine Maintenance, 12" Outfall

Organic Compounds, PCBs/Pesticides****

KISW02 Utilities Maintenance Shops Moderate Biennial Flow, pH, T-N, T-P, Metals**, PCBs

KISW03

North of Abrasive Blasting Area

Organic Compounds, PCBs/Pesticides****

At DEP Renewal WET***, PCBs *Salinity shall be measured in all discharges. **Metals: Ag, As, Cd, Cr, Cu, Fe, Mn, Ni, Pb, Se, Zn. ***Acute WET Tests shall be performed in accordance with the test procedures in DEP section 2.3. ****PCBs/Pesticides and Organic Compounds: All compounds shown in UES Table 3-2C.2 (less 2,3,7,8-TCDD Dioxin);

and any compounds shown in UES Table 3-2C.3, which are believed to be present based upon use by USAG-KA.

POINT-SOURCE DISCHARGES DEP

TABLE 1.3.2 SPECIAL MONITORING REQUIREMENTS FOR INTERMITTENT POINT-SOURCE DISCHARGES (Continued)

*Salinity shall be measured in all discharges. **Metals: Ag, As, Cd, Cr, Cu, Fe, Mn, Ni, Pb, Se, Zn. ***Acute WET Tests shall be performed in accordance with the test procedures in DEP section 2.3. ****PCBs/Pesticides and Organic Compounds: All compounds shown in UES Table 3-2C.2 (less 2,3,7,8-TCDD Dioxin);

and any compounds shown in UES Table 3-2C.3, which are believed to be present based upon use by USAG-KA.

ADVERSE EFFECT

MONITORING

FREQUENCY

PARAMETERS TO BE MONITORED*

KWAJALEIN - Industrial Stormwater (Continued)

KISW04

South of Abrasive Blasting Area

Organic Compounds, PCBs/Pesticides****

KISW05

Vehicle Maintenance, Fuel Farm Northside

Flow, pH, T-N, T-P, Metals**, O&G, PCBs

KISW06 Water Storage Tank Areas Low At DEP Renewal Flow, pH, T-N, T-P, Metals**, PCBs

KISW07

Fuel Farm Southside, Aircraft Maintenance

At DEP Renewal

KISW08 Sewage Sludge Drying Beds Low At DEP Renewal Flow, pH, T-N, T-P, Metals**, PCBs KISW09 Power Plant 1A/1B Fuel Storage Low At DEP Renewal Flow, pH, T-N, T-P, Metals**, O&G, PCBs

KISW10

Helicopter Maintenance, Power Plant 1A/1B

KISW11 East Side Range Control Bldg Low At DEP Renewal Flow, pH, T-N, T-P, Metals**, PCBs KISW12 West Side Range Control Bldg Low At DEP Renewal Flow, pH, T-N, T-P, Metals**, PCBs KISW13 Power Plant 2 and Fuel Storage

(FN 1045)

Low At DEP Renewal Flow, pH, T-N, T-P, Metals**, O&G, PCBs

KISW15 Photo Lab, West End of Runway Low At DEP Renewal Flow, pH, T-N, T-P, Metals**, PCBs KISW16 West End of Runway None At DEP Renewal Flow, pH, T-N, T-P, Metals**, PCBs

KISW20

Aircraft Refueling Area – Building 901

Flow, pH, T-N, T-P, Metals**, Volatile/Semi-Volatile Organic Compounds****, O&G, Turbidity, PCBs

POINT-SOURCE DISCHARGES DEP

TABLE 1.3.2 SPECIAL MONITORING REQUIREMENTS FOR INTERMITTENT POINT-SOURCE DISCHARGES (Continued)

ADVERSE EFFECT

MONITORING

FREQUENCY

PARAMETERS TO BE

MONITORED*

KIWW07

Fuel Farm Containment Area Oil/Water

Flow, pH, T-N, T-P, Metals**, Volatile/Semi-Volatile Organic Compounds***, O&G

KIWW08A

RO Concentrated Effluent (New drinking water treatment process added 2004)

Volatile/Semi-Volatile Organic Compounds, PCBs/Pesticides***

ROI-NAMUR - Industrial Wastewater

RIWW01

Drinking Water Treatment Plant Raw Water Storage Tank Overflow

None

At DEP Renewal, or during tank cleaning

Flow, pH, T-N, T-P, Metals**

RIWW02

Fuel Farm Containment Area Oil/Water

Volatile/Semi-Volatile Organic Compounds***, O&G

MECK - Industrial Stormwater

MISW01 North of Power Plant Low At DEP Renewal Flow, pH, T-N, T-P Metals**

MISW02 South of Power Plant Low At DEP Renewal Flow, pH, T-N, T-P, Metals**

MECK - Industrial Wastewater

MIWW01

Power Plant - Oil/Water Separator

Biennial

Volatile/Semi-Volatile Organic Compounds***, O&G

*Salinity shall be measured in all discharges. **Metals: Ag, As, Cd, Cr, Cu, Fe, Mn, Ni, Pb, Se, Zn. ***PCBs/Pesticides and Organic Compounds are those shown in UES Table 3-2C.2 (less 2,3,7,8-TCDD Dioxin); and any compounds shown in UES Table 3-2C.3, which are believed to be present based upon use by

USAG-KA.

POINT-SOURCE DISCHARGES DEP

1.4 Special DEP Requirements

1.4.1 Stormwater Pollution Prevention Plan

USAG-KA shall prepare and maintain a SWPPP as a tool to identify, implement, and evaluate site-specific BMPs to reduce the pollutants in stormwater discharges. The SWPPP shall be reviewed and updated, if warranted, every two years.

The SWPPP is to facilitate the control and improvement of the quality of intermittent discharges, rather than impose discharge limitations. The SWPPP includes all residential and industrial stormwater discharges listed in Table 1.4.2. Point-source discharges that require additional pollution reduction beyond the basic BMPs shall have advanced BMPs within the SWPPP.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .