TE-DPW_007__Custodial_Standards.docx

DOCX document 39 KB Posted

Attached to
BASE OPERATIONS SUPPORT SERVICES, U. S. ARMY GARRISON KWAJALEIN ATOLL (USAG-KA)
Solicitation number
W9124J_16_R_KWAJALEIN
Issued by

About this file

Custodial Standards

View the file

Other files

File Type Posted
TE_CA_06-30 _OS_Appendix_U_-_PIP_Action_Plan_(2_Mar_15).xlsx XLSX spreadsheet
TE-KWAJ_006_Kwaj_Financial_Requirements_Manual_ver_5_0__6_Apr_2016.docx DOCX document
TE_CA_06-37 _OS_Appendix_V-7_-_Annex_F_-_BIC_Criteria_and_Nomination_Packet.docx DOCX document
TE_CA_04-00 _ACRRO_2.0_Baseline_Standstandards_Resource_Driver.pdf PDF
TE_CA_06-08 _OS_Appendix_D-3_Golf_Internal_Control.xls XLS spreadsheet
TE_CA_03-01_IMCOM_PR_G9_Internal_Controls_-_Cash_Management_Updated_11.04.15.docx DOCX document
TE-DOL_005_Annex_A_Appendix_1_to_OPORD_16-060.docx DOCX document
TE_CA_06-17 _OS_Appendix_J_-_Golf_Course_Dashboard_on_Golf_Initiatives.xlsx XLSX spreadsheet
TE_CA_06-33 _OS_Appendix_V-3_-_Annex_B_-_Award_Categories.docx DOCX document
TE_CYS-40_MDTI_Training_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CA_03-03 _IMCOM_PR_G9_-_Safe_Security_Updated_06.24.15.docx DOCX document
TE_CA_06-19 _OS_Appendix_L_-_Management_Control_Checklist_for_Nonappropriated_Fund_Projects.docx DOCX document
TE_CA_06-34 _OS_Appendix_V-4_-_Annex_C_-_Timeline.docx DOCX document
TE-DPW_003_Mission_Critical_Facilities.pdf PDF
TE_CA_06-05 _OS_Appendix_C_-_Program_Scorecards__5_Mar_15_v3.xlsx XLSX spreadsheet
TE_CA_06-06 _OS_Appendix_D-1_FBE_Internal_Control.xls XLS spreadsheet
TE-DPW_005_Master_USAG-KA_Meter_Inventory.pdf PDF
TE_CA_06-27 _OS_Appendix_S-2_-_Labor_Model_Template.xlsx XLSX spreadsheet
TE_CYS-41_MDTI_Parent_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CYS-10_Annex_I_ArmyFamilyAssistanceFamilyHandbook_Oct_14.pdf PDF
TE_CYS-37_MDTI_Financial_Management_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CYS-48_AHHInspectionCriteriaforCY15Inspections_v4_20150507.xls XLS spreadsheet
TE-DPW_018_KMISS_Final_DEP_Effective_9_Jul_14.pdf PDF
TE_CA_06-25 _OS_Appendix_R_-_Example_-_Client_Contact_Report.docx DOCX document
TE_CA_02-00 _Pacific_Region_Business_Plan_Format.xlsx XLSX spreadsheet
TE_CA_06-31 _OS_Appendix_V-1_-_EIM_Awards_Explanation_and_Process.docx DOCX document
TE_CYS-46_MDTI_Command_Rep_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CYS-21_CY15_Facility_Comprehensive_v_15_1_.xlsx XLSX spreadsheet
TE_CYS-04_AnnexC_REPORTSUSPENSELIST_v19_2015SEP29_(2).xlsx XLSX spreadsheet
TE-DPW_024_SO_BACKLOG_April_2016.xlsx XLSX spreadsheet
TE_CA__06-38 _Equipment_Rental_Items.xlsx XLSX spreadsheet
TE-FES_004_Annex_M_to_OPORD_16-001.docx DOCX document
TE_CA_06-22 _OS_Appendix_O_-__Example_-_Catering_General_Rules.pdf PDF
TE_CA_08-00__420-10_PM_Control_and_Maintenance_of_Private_Boats_and_Boat_Storage_Lots_on_USAG-KA.pdf PDF
TE_CA_12-00_Examples_of_Food_Menus.xlsx XLSX spreadsheet
TE_CA_01-00 _FMWR-DS_HB_Nov15.pdf PDF
TE_CA_06-03 _OS_Appendix_B-1_Pricing_Methodology.doc DOC document
TE_CA_06-20 _OS_Appendix_M_-_Action_Plan_Template.xlsx XLSX spreadsheet
TE_CA_06-07 _OS_Appendix_D-2_Bowling_Internal_Control.xls XLS spreadsheet
TE_CYS-35_MDTI_Facility_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CYS-12_GenericBleachSolutionRecommendations_v1_20150417.pdf PDF
TE_CYS-36_MDTI_Fire_CY15_Checklist_v1_20140224.xls XLS spreadsheet
TE_CA_06-04 _OS_Appendix_B-2_Pricing_Methodology_Worksheet.xls XLS spreadsheet
TE_CA_06-32 _OS_Appendix_V-2_-_Annex_A_-_Awards_Implementing_Instructions.docx DOCX document
TE_CYS-06_Annex_E_MoreaboutthetopicFireDrills_v1_20150421.pdf PDF
TE-GFP_001_GFP_-_CAP_list.xlsx XLSX spreadsheet
TE_CA_06-29 _OS_Appendix_T-2_-_m-NEAT_Tool.xlsx XLSX spreadsheet
TE_CYS-15_AR40_562_Immunnizations.pdf PDF
TE_CA_07-00_DoD_MWR_Library_Standards.pdf PDF
TE-DOL_009_Annex_D_to_OPORD_16-060.docx DOCX document
Show 40 more

Latest 50 of 155 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2.0 Performance Requirements and Standards.

2.1 High Level Objectives. The Contractor shall provide all management, tools, equipment, and labor necessary to ensure that custodial services are performed at (Name of GarrisonAll work performed by the Contractor shall be performed in accordance with all applicable laws, regulations, Army standards, instructions, and commercial practices. Contractor shall display the appropriate caution signs when cleaning floors or any other surface that might pose a risk to injury for any personnel that are present.

2.2 Perform Special Event Cleanings (i.e. VIP and/or event cleaning). The Contractor shall provide Custodial Services for special events, which shall be outside of the established frequencies for custodial services as directed by the KO or KO designated official. These events include, but are not limited to, VIP visits, Inspector General (IG) Team visits, etc. The KO or KO-designated official will notify the Contractor of the requirement as soon as it is known, but no less than seventy-two (72) hours prior to the event. The Contractor shall complete all cleaning tasks (4) hours prior to each event.

2.3 FACILITY CLEANING SERVICES

3.3.1 Facility Cleaning Services: Accessible floor surfaces shall be cleaned. Moveable items (chairs, trash receptacles, any and all easily moved item) shall be moved to access the floor surface (to sweep, damp mop, and vacuum) underneath these items. Moved items shall be returned to their original position after cleaning. Grout on wall and floor tiles shall be free of dirt, scum, mildew, and residue.

3.3.2 Non-Carpeted Floors (Hard Floors: Vinyl Tile, Ceramic Tile, Wood, Concrete, etc.). Hard floors shall be maintained free of grit, soil, dust, scuff and heel marks, stains, spills, debris, litter, and other foreign matter by effective routine cleaning. Cleaning shall be accomplished by the most appropriate method (vacuum, sweep, dust mop, damp mop, spot clean, etc.) and with cleaning solutions, if applicable, for the specific floor type. After cleaning, floor surfaces to include grout shall have a uniform, clean appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water. Baseboards, corners, and wall/floor edges shall also be clean. Chairs, trash receptacles, and other easily moveable items shall be moved to maintain floors underneath these items and returned to their original and proper position after cleaning.

3.3.2.1 Spray Buff. Spray and buff all floors receiving floor maintenance.

3.3.2.2 Stripping/Finishing. Strip, scrub, seal, and wax floors as necessary to maintain a uniform glossy appearance. Non-skid wax must be approved by DPW prior to use. Chairs, trash receptacles, and other items shall be moved to strip, scrub, and seal and was underneath, and returned to their original location. Remove all stripping solution, sealant, and waxy residue for floor drains immediately upon completion of service.

3.3.2.3 Spot Cleaning Floors/Carpets. Spot clean floor surfaces to remove spots 2 square feet or less. Spots removal shall be included during normal service schedule. Areas that are embedded to the point of non removal and have been treated during 2 consecutive cleanings and resists removal shall be annotated to the KO for resolution.

3.3.3 Carpeted Floors. Carpets shall be maintained free of soil, dirt, debris, litter, and other foreign matter by effective routine vacuuming. The Contractor shall use efficient vacuum cleaners that offer high airflow, high efficiency filtration, and an adjustable rotating brush agitation for more effective soil removal. Any spots and/or spills shall be removed by the Contractor without permanent damage to the carpet. All tears, burns, and raveling shall be brought to the attention of the COR. Chairs, trash receptacles, and other easily moveable items shall be moved to maintain floors underneath these items and returned to their original and proper position after cleaning.

3.3.3.1 Removable (Area and Throw) rugs. Area and throw rugs shall also receive the same service as annotated above.

3.3.3.2 Carpet Cleaning/Shampoo. All carpets shall be cleaned in accordance with standard commercial practices that have been approved by DPW. A heavy-duty spot remover may be required in heavily soiled areas. Stains which are not easily removed by the normal cleaning process shall be treated using an alternate method approved by the COR. Chairs, trash receptacles, and other items shall be moved to clean carpets underneath, and returned to their original location.

3.3.3.3 Annual Carpet Restorative Cleaning. Carpets shall be deep cleaned in order to remove embedded soil from carpet fibers. Deep cleaning shall employ an effective technique and/or method to address soil suspension, soil extraction and drying. After deep cleaning, the carpeted area shall show an improvement in visible appearance. All cleaning solutions shall be removed from baseboards, furniture, trash receptacles, chairs, and other similar items. Movable items shall be returned to their original location after the carpet has dried.

3.4 Stairways/Elevators/Handicap Lifts. All floor surfaces shall be cleaned in accordance with the non-carpeted and carpeted requirements as appropriate. Stair guards, handrails, wall caps and baseboards shall be free from grease and grime. The Contractor shall remove all marks, dirt, smudges, scuffs, and other foreign matter from adjoining stairwell walls, up to 72 inches height from stair tread level, to provide or maintain a clean, uniform appearance.

3.5 Clean Floor (Walk-Off) Mats. Vacuum and/or clean interior and exterior floor mats. Mats shall be free of all visible lint, litter, debris, soil and other foreign matter. Soil and moisture underneath mats shall be removed and mats returned to their normal location. Area and throw rugs shall receive the same service.

3.6 Trash Collection/Removal. The Contractor shall collect and dispose of all trash from all waste receptacles, to include wastebaskets and other trash containers (exterior waste baskets, trash receptacles, and smoking urns are included in the scope of trash removal). Any trash boxes or debris stacked near the waste receptacles shall be removed daily. The contractor is responsible for replacement of plastic trash bags/can liners as needed.

3.6.1 Recycle Trash Collection/Removal. The contractor shall collect, pickup, and dispose of all recycle paper from the appropriate recycle bins located at each office and shall dispose of to the nearest recycle dumpster located outside at each building.

3.7 Clean and Supply Restrooms/Toilet Areas/Locker Rooms:

3.7.1 Clean and Disinfect. All surfaces of sinks, toilets, urinals, lavatories, showers, shower mats, dispensers, plumbing fixtures, drinking fountains, saunas, partitions, dispensers, doors, walls, partitions, stalls, stall doors, entry doors (including handle, kick plates, ventilation grates, metal guards), walls, and other such surfaces shall be cleaned and disinfected using a germicidal agent and free from water and scale deposits, soil, streaks, and other removable matter. Restrooms shall be left with a clean, pleasant scent/fragrance or no odor at all. Showers, toilets, and urinals will be free of spots, water spots, scale buildup, soap scum, odors, and any other deposits. Mirrors shall be clean and have no streaks or other removable matter. Partitions shall be smudge, stain free. Vents (within 72 inches of the floor) shall be clean. Walls and grout shall be free of all firm, spots, and detergent buildup. No abrasive and/or bowl cleaners are to be used to clean the drinking fountains.

3.7.2 Floor Care. All floor surfaces shall be maintained in accordance with original equipment manufacturer instructions and commercial practices.

3.7.3 Supplies Restockage. Contractor shall ensure restrooms are stocked sufficiently with provided supplies including toilet tissue, paper towels, and hand soap. Supplies shall be stored in designated areas. Stock shall be in sufficient quantities so supplies do not run out before next service date. If supplies run out prior to the next service date, the contractor shall refill within two hours of notification. Contractor shall purchase and furnish items approved by the KO prior to use.

3.8. Trash Removal. All trash containers in restrooms and locker rooms shall be emptied, trash disposed, and containers returned to their original locations. Trash receptacles shall be left clean, free of foreign matter and free of odors. The contractor shall replace any obviously soiled, worn or torn plastic trash can liners. (Collection of recycled refuse (paper, plastic, glass, etc.) according to local policy and host country law/regulations)

3.9. Drinking Fountains. Contractor shall clean all facility drinking fountains. All porcelain and polished metal surfaces, including the orifices and drain, as well as exterior surfaces of fountains shall be cleaned and disinfected. Drinking fountains shall be free of streaks, stains, spots, smudges, scale, and other obvious soil.

3.10. Dusting. Regular dusting includes surfaces within 6 feet of the floor and must be free of dust, lint, cobwebs, and litter. High dusting includes surfaces above 6 feet up to 10 feet. Surfaces could include items such as tables, shelves, bookcases, storage lockers, window sills, hand rails, pictures, clocks, window blinds, ceiling fans, etc.

3.10.1. Light Dusting, Low (under 6 feet). Dust all furniture, equipment, Venetian blinds, and all horizontal surfaces from the floor level to a height of six feet above the top of the floor surface. Contractor is not to move personal items in the course dusting.

3.10.11. Heavy Dusting, Low (over 6 feet). Dust using a dust removing agent all visible surfaces to include cabinets/millwork/tops of low walls, window frames, drapes, equipment to include vending machines and other materials.

3.11. Clean Interior Glass. Clean exposed interior glass surfaces including windows and mirrors. Lucite, plastic or any other transparent material shall be treated as glass. Clean adjacent trim where spillage or smears occur during the glass cleaning operation. The Contractor shall clean trophy and display cases, directory boards and other interior glass.

3.11.1 Windows (exterior/interior wash). Clean exterior/interior glass windows surfaces. Lucite, plastic or any other transparent material shall be treated as glass. Contractor shall clean adjacent trim where spillage or smears occur during the glass cleaning operation.

3.12 PERIODIC CLEANING SERVICES: (Services typically performed on a monthly, quarterly, semi-annual, annual basis.)

3.12.1. Periodic Hard Floor Maintenance. Hard floors shall be cleaned, scrubbed, sealed, polished, waxed, and stripped as required for the appropriate surface to maintain, protect, and ease normal routine floor cleanings. After periodic maintenance, floor surfaces to include grout shall have a uniform, clean appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film, or standing water.

3.12.2. Periodic Carpet Restorative Cleaning. Carpets shall be deep cleaned in order to remove embedded soil from carpet fibers. Deep cleaning shall employ an effective technique and/or method to address soil suspension, soil extraction, and drying. After deep cleaning, the carpeted area shall show an improvement in visible appearance. All cleaning solutions shall be removed from baseboards, furniture, trash receptacles, chairs, and other similar items. Chairs, trash receptacles, and other items shall be moved to clean carpets underneath and returned to their original location after the carpet has dried.

3.13. Child, Youth and School Services (CYS)

3.13.1. Child Development Center (CDC), Youth Centers and Gymnasiums. Designated facilities shall be maintained in accordance with AR-608-10. Kitchen areas are not part of the Contractor’s responsibility for cleaning. The Contractor shall provide additional cleaning after normal operating hours to ensure facilities are in a state of cleanliness prior to opening the following day.

3.13.2 Age groups defined as follows:

(a) Child Development Center – Ages 6 weeks – 5 years
(b) School Age – Ages 6-10 years
(c) Middle School and Teen – 11 – 18 years

3.13.4. CDC Hours of Operation Other Than Normal. There will be mission situations that require the contractor to work other than normal hours. Some of these situations are military exercises, contingency operations, or weather emergencies. Operational hours during these events shall be as identified in the pre-performance conference and provided on a cost reimbursement (hourly), not to exceed, basis in accordance with bid schedule contract line item number. Days of service could include weekends. The Facility Manager or Supervisor shall notify the QAP at least one week prior to a scheduled exercise requesting service for hours of operation other than normal.

3.14. Supplies/Solutions. All solutions, chemicals and other potentially dangerous products (except bleach water solution) and cleaning supplies (Trash, mops, brooms, and cleaning buckets, etc.) must be stored in their original, labeled container in a locked closet inaccessible to children and kept out of children’s reach at all times. Supplies/Solutions shall be stored in designated areas.

3.14.1 Cleaning and Sanitizing. The Contractor may use a cleaner/disinfectant and water solution of chlorine bleach, and water in child care centers. The cleaner/disinfectant and water are to be changed after cleaning of each facility.

3.14.2. Cleaning Products Approval. The Contractor shall provide a list of all cleaning products to be used in CDCs and Youth Activity Centers to the directors of those facilities to ensure that the cleaning products are suitable for use in a child care environment. Not permitted are products that include warnings not suitable for use in areas occupied by children. Chemical air fresheners are not permitted. Cleaning products for use in the CYS facilities shall be approved by local preventative medicine manager and KO.

3.15 Youth Gymnasiums. All CYS multi-purpose area rooms to include youth gymnasiums are to be maintained to the same cleaning frequencies as in CYS facilities OPORD 13-153 Annex A.

File details come from the government source that posted it. Updated .