Solicitation_Attachment_4_-_NCANG_C-17_SIM_B-3_DRAWINGS_Vol2of3_-_Final.pdf
PDF 16 MB Posted
- Attached to
- Construct C-17 Simulator Facility Federal contract opportunity
- Solicitation number
- W91242-19-B-5002
About this file
Drawings Vol 2 of 3
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
54321
D C
B A
/8
/2
:5
:5
P
M B
IM
/U
S
N o rt h C a ro lin a
A ir N a ti o n a l G u a rd
/N C
A N
G
C
F lig h t S im u la to r
A
R C
H
V
.r v t
NORTH CAROLINA AIR NATIONAL GUARD
C-17 FLIGHT SIMULATOR TRAINING FACILITY
145th AIRLIFT WING
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
CONTRACT NO.: W9133L-15-D-0002
TASK ORDER NO.: D303
PN: FJRP159062
B-3 FINAL DESIGN SUBMISSION
17 AUGUST 2018
VOLUME 2 OF 3
GENERAL, ARCHITECTURAL,
EQUIPMENT, MECHANICAL
DRAWING INDEX
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018
/1
/2
:4
:2
A
M B
IM
/U
S
N o rt h C a ro lin a
A ir N a ti o n a l G u a rd
/N C
A N
G
C
F lig h t S im u la to r
A
R C
H
V
.r v t
G-001
D. FLIPPEN
N. FREY
B. DYSON
GENERAL
DRAWING INDEX
FIRE SUPPRESSION
FX-001 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
FX-100 OVERALL SITE PLAN
FX-111 C-17 FLIGHT SIMULATOR FLOOR PLAN
FX-501 DETAILS
FX-502 ENLARGED PLANS AND DETAILS
FIRE ALARM
FA-001 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
FA-111 C-17 FLIGHT SIMULATOR FLOOR PLANS
FA-501 DETAILS AND RISER DIAGRAM
FA-503 SIM BUILDING MATRICES OF OPERATION
ELECTRICAL
E-001 ELECTRICAL SYMBOL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
ED101 C-17 FLIGHT SIMULATOR ELECTRICAL SITE DEMOLITION PLAN
ES111 C-17 FLIGHT SIMULATOR ELECTRICAL SITE PLAN
EL111 C-17 FLIGHT SIMULATOR LIGHTING PLANS
EP111 C-17 FLIGHT SIMULATOR POWER PLANS
EG111 C-17 FLIGHT SIMULATOR GROUNDING AND LIGHTNING PROTECTION PLAN
E-411 C-17 SIMULATOR BUILDING ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-611 C-17 FLIGHT SIMULATOR - ELECTRICAL SINGLE LINE DIAGRAM
E-612 C-17 FLIGHT SIMULATOR ELECTRICAL GROUNDING RISER DIAGRAM
E-701 LIGHTING FIXTURE SCHEDULE
E-702 FEEDER SCHEDULE
E-714 C-17 FLIGHT SIMULATOR PANEL SCHEDULES
E-715 C-17 FLIGHT SIMULATOR PANEL SCHEDULES
E-801 MECHANICAL EQUIPMENT SCHEDULE
E-802 PLUMBING AND ELECTRICAL EQUIPMENT SCHEDULES
TELECOMMUNICATIONS & SECURITY
T-001 TELECOM SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
TS101 SITE PLAN
T-111 TELECOM C-17 FLIGHT SIMULATOR TELECOM PLANS
T-211 TELECOM RACK ELEVATIONS
T-212 CONDUIT ELEVATIONS
T-411 ENLARGED TELECOM PLANS
TS401 ENLARGED COMM HUT 72 PLAN AND DETAILS
T-501 TELECOM OUTLET DETAILS
T-502 TELECOM DETAILS
T-503 SECURITY DETAILS
T-504 TELECOM SITE DETAILS
T-611 TELECOM ONE-LINE DIAGRAMS
T-612 SECURITY ONE LINE DIAGRAMS
ARCHITECTURAL
A-001 GENERAL NOTES
A-111 C-17 FLIGHT SIMULATOR FLOOR PLANS
A-131 C-17 FLIGHT SIMULATOR REFLECTED CEILING PLANS
A-151 C-17 FLIGHT SIMULATOR ROOF PLAN
A-211 C-17 FLIGHT SIMULATOR EXTERIOR ELEVATIONS
A-311 C-17 FLIGHT SIMULATOR BUILDING SECTIONS
A-411 C-17 FLIGHT SIMULATOR ENLARGED PLANS AND INTERIOR ELEVATIONS
A-422 C-17 FLIGHT SIMULATOR ENLARGED STAIR PLAN, SECTION, AND DETAILS
A-423 C-17 FLIGHT SIMULATOR LADDER DETAILS
A-504 C-17 FLIGHT SIMULATOR EXTERIOR WALL SECTIONS
A-505 C-17 FLIGHT SIMULATOR EXTERIOR WALL SECTIONS
A-511 EXTERIOR WALL DETAILS
A-531 EXTERIOR DETAILS
A-532 EXTERIOR DETAILS
A-571 INTERIOR DETAILS
A-572 INTERIOR DETAILS
A-573 INTERIOR DETAILS
A-601 MATERIAL LEGEND
A-602 ROOM FINISH AND DOOR SCHEDULES
A-606 WINDOW AND STRUCTURED POLYCARBONATE WALL PANEL TYPES
A-701 PARTITION TYPES
A-702 DOOR DETAILS
A-703 DOOR DETAILS
A-705 STOREFRONT AND CURTAINWALL DETAILS
A-706 LOUVER TYPES AND DETAILS
A-711 TYPICAL PARTITION DETAILS
EQUIPMENT
Q-111 C-17 FLIGHT SIMULATOR FLOOR PLAN, SECTIONS, AND EQUIPMENT SCHEDULE
MECHANICAL
M-001 HVAC GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
M-111 C-17 FLIGHT SIMULATOR HVAC PLANS
M-151 C-17 FLIGHT SIMULATOR HVAC ROOF PLAN
M-311 C-17 FLIGHT SIMULATOR HVAC SECTIONS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-603 C-17 FLIGHT SIMULATOR HVAC SCHEDULES
M-701 HVAC CONTROL DIAGRAMS
M-702 HVAC BAS POINT FUNCTION SCHEDULE
PLUMBING
P-001 PLUMBING GENERAL NOTES, LEGEND, AND ABBREVIATIONS
P-121 C-17 FLIGHT SIMULATOR SANITARY PIPING PLAN
P-122 C-17 FLIGHT SIMULATOR WATER AND GAS PIPING PLAN
P-401 C-17 FLIGHT SIMULATOR ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-905 C-17 FLIGHT SIMULATOR SANITARY RISER DIAGRAM
P-906 C-17 FLIGHT SIMULATOR DOMESTIC WATER AND GAS PIPING RISER DIAGRAM
GENERAL
G-000 COVER
G-001 DRAWING INDEX
G-002 NOTES, ABBREVIATIONS, AND SYMBOLS
LIFE SAFETY
LS-001 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
LS-002 CODE COMPLIANCE SITE PLAN
LS-111 C-17 FLIGHT SIMULATOR LIFE SAFETY FLOOR PLAN
CIVIL
C-001 NOTES, LEGENDS & ABBREVIATIONS
C-002 CONSTRUCTION PLAN
C-101 EXISTING CONDITIONS PLAN
CD-101 SITE DEMOLITION PLAN
CS-100 OVERALL SITE LAYOUT PLAN
CS-101 SITE LAYOUT PLAN
CG-101 SITE GRADING & DRAINAGE PLAN
CG-111 EROSION & SEDIMENT CONTROL PLAN - PHASE I
CG-121 EROSION & SEDIMENT CONTROL PLAN - PHASE II
CG-501 EROSION & SEDIMENT CONTROL NOTES AND DETAILS
CG-502 EROSION & SEDIMENT CONTROL NOTES AND DETAILS
CU-101 SITE UTILITY PLAN
CU-201 UTILITY PROFILES
CU-202 UTILITY PROFILES
CU-203 UTILITY PROFILES
CU-204 UTILITY PROFILES
C-501 CONSTRUCTION DETAILS
C-502 CONSTRUCTION DETAILS
C-503 CONSTRUCTION DETAILS
C-504 CONSTRUCTION DETAILS
C-505 CONSTRUCTION DETAILS
LANDSCAPE
L-101 LANDSCAPE PLANS
L-500 LANDSCAPE DETAILS
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 WIND LOAD DIAGRAMS & ABBREVIATIONS
S-101 C-17 FLIGHT SIMULATOR OVERALL FOUNDATION PLAN
S-111 C-17 FLIGHT SIMULATOR FOUNDATION PLAN
S-121 C-17 SIMULATOR - OVERALL ROOF FRAMING PLAN
S-131 C-17 FLIGHT SIMULATOR EQUIPMENT PLATFORM & ROOF FRAMING PLANS
S-213 C-17 FLIGHT SIMULATOR BRACED FRAME AND GIRT ELEVATIONS
S-214 C-17 FLIGHT SIMULATOR CMU WALL ELEVATIONS
S-215 C-17 FLIGHT SIMULATOR CMU WALL ELEVATIONS
S-501 TYPICAL DETAILS
S-502 TYPICAL DETAILS
S-503 TYPICAL DETAILS
S-504 TYPICAL DETAILS
S-505 TYPICAL DETAILS
S-512 SECTIONS & DETAILS
S-524 SECTIONS & DETAILS
S-525 SECTIONS & DETAILS
S-526 SECTIONS & DETAILS
GENERAL SYMBOLS
MATCH LINE
KEYED NOTE
DOOR TAG
PARTITION TYPE TAG
(FIRST DIGIT INDICATES HOURLY FIRE RATING)
ELEVATION TARGET
NORTH ARROW
REVISION CLOUD
REVISION DESIGNATION TAG
WINDOW / LOUVER TYPE TAG
COLUMN REFERENCE
BREAK LINE
INDICATES PLAN NORTH
INTERIOR ELEVATION DESIGNATION
EXTERIOR ELEVATION DESIGNATION
SECTION / DETAIL DESIGNATION
DETAIL DESIGNATION
DRAWING /DETAIL LOCATION DESIGNATION
DRAWING/DETAIL TITLE
DRAWING NUMBER DESIGNATION
WHERE FIRST REFERENCED
DRAWING/DETAIL LIMITS
DRAWING / DETAIL LOCATION
DESIGNATION
DRAWING NUMBER DESIGNATION
WHERE FIRST REFERENCED
DRAWING / DETAIL LOCATION DESIGNATION
DRAWING NUMBER DESIGNATION WHERE SHOWN
DRAWING/DETAIL LOCATION DESIGNATION
DRAWING NUMBER DESIGNATION WHERE SHOWN
DRAWING NUMBER DESIGNATION WHERE SHOWN
DRAWING/DETAIL LOCATION DESIGNATION
DRAWING SCALE
ROOM TAG
GLASS TAGG1
A1
A-100
A1
A-100
A1
A-200
A1A-400
W1
N
1A
MATCH LINE
A1 / A-101
A1
DRAWING NAME
1/8" = 1'-0"
A-123
DRAWING DESIGNATION
ROOM NAME
ROOM NUMBER
ROOM NAME
ELEMENT ELEVATED
EL:XX' - XX"
PROJECT GENERAL NOTES
1. THIS DRAWING HAS GENERAL INFORMATION, NOT ALL MAY APPLY TO THIS PROJECT.
2. THE "OWNER" IS THE NORTH CAROLINA AIR NATIONAL GUARD. THE "ARCHITECT/ENGINEER" IS
JACOBS.
3. IF, AT ANY TIME, THE CONTRACTOR DISCOVERS A CONDITION WHICH CONFLICTS WITH THE
DRAWINGS AND/OR SPECIFICATION OR IF THE CONTRACTOR DISCOVERS AN UNCLEAR OR
MISLEADING DIRECTIVE GIVEN IN THE DRAWINGS OR SPECIFICATIONS, THE CONTRACTOR SHALL
BRING THE ISSUE IMMEDIATELY TO THE ATTENTION OF THE COR.
4. DO NOT SCALE THE DRAWINGS - FOLLOW WRITTEN DIMENSIONS ONLY.
5. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO FABRICATION AND/OR
CONSTRUCTION.
6. ALL WORK INDICATED ON THE DRAWINGS IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
UNLESS OTHERWISE NOTED.
7. KEYED NOTES LISTED ON DRAWINGS REFER ONLY TO THOSE KEYED NOTE SYMBOLS ASSOCIATED
WITH THE PARTICULAR DRAWING WHERE THE KEYED NOTES ARE LISTED.
8. RESPECTIVE PLUMBING, MECHANICAL, ELECTRICAL AND FIRE PROTECTION SUBCONTRACTORS
SHALL PROVIDE GENERAL CONTRACTOR WITH ALL REQUIRED ACCESS PANELS FOR GENERAL
CONTRACTOR TO INSTALL IN THE BUILDING.
9. ALL EXPOSED STEEL SHALL BE PAINTED UNLESS OTHERWISE NOTED.
10. THERE ARE NO ASBESTOS CONTAINING MATERIALS SPECIFIED AND THEY SHALL NOT BE USED ON
THIS PROJECT.
11. COORDINATE THE WORK OF ALL TRADES AND CHECK ALL DIMENSIONS. ALL DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE COR AND SHALL BE RESOLVED BEFORE PROCEEDING WITH
THE WORK.
12. THE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, FIRE ALARM, ELECTRICAL, TELECOMMUNICATIONS, EQUIPMENT AND SECURITY DRAWINGS, ARE SUPPLEMENTARY TO THE
ARCHITECTURAL DRAWINGS. IF A DISCREPANCY EXISTS BETWEEN THE ARCHITECTURAL DRAWINGS AND ENGINEER'S DRAWINGS, SUCH DISCREPANCY SHALL BE BROUGHT TO THE COR'S ATTENTION IN WRITING PRIOR TO INSTALLATION OF SAID WORK. ANY WORK INSTALLED IN CONFLICT WITH THE
ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT CONTRACTOR'S
EXPENSE.
13. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED, BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR
DETAILS SHALL BE USED SUBJECT TO REVIEW BY THE ARCHITECT.
14. REFER TO FIRE SUPPRESSION AND ALARM DRAWINGS AND ELECTRICAL DRAWINGS FOR LOCATIONS
OF FIRE ALARM HORNS/STROBES, EXIT SIGNS, AND EMERGENCY LIGHTING.
15. RUBBER-TIRED EQUIPMENT SHALL BE USED FOR TRANSPORTING MATERIALS AND EQUIPMENT ON PAVED SURFACES AND WITHIN THE BUILDING. VEHICLES MOVING ON FLOOR SLABS SHALL HAVE TIRE
BOOTS. DUCT TAPE ON TIRES IS NOT ALLOWED.
16. EXPOSED CONCRETE FLOORS SHALL BE PROTECTED DURING CONSTRUCTION AND SHALL BE FREE OF ALL CONSTRUCTION MARKERS, STAINS, PAINTS, OIL, OR OTHER DEFECTS. PATCH, IF REQUIRED, PRIOR TO HARDENING AND SEALING.
17. CONFINE EQUIPMENT, STORAGE OF MATERIALS, AND OPERATIONS OF WORKERS TO LIMITS
INDICATED AND AS DIRECTED.
18. ALL TRUCKS HAULING DEBRIS FROM THE PROJECT SITE OR MATERIAL TO THE PROJECT SHALL BE
EQUIPPED WITH THE MEANS TO COVER LOADS AND WITH WATERPROOF TAILGATES WHICH SHUT
TIGHTLY AND DO NOT PERMIT THE DEBRIS TO SPILL FROM THE TAILGATE AREA. TRUCK BEDS SHALL BE SWEPT CLEAN AT THE TAILGATE BEFORE LEAVING FROM THE WORK AREA. SIDEBOARDS SHALL BE KEPT IN GOOD REPAIR. UNDER NO CIRCUMSTANCES WILL TRUCKS BE PERMITTED TO BE LOADED
GREATER THAN THE LEGAL LIMIT OR HIGHER THAN THE SIDEBOARDS.
19. OWNER WILL MAKE USE OF THE AREAS IN AND SURROUNDING THE CONSTRUCTION AREAS. EVERY EFFORT SHALL BE MADE TO MINIMIZE THE DISTURBANCE TO EMPLOYEES, PATRONS, AND TENANTS.
20. MANUFACTURER'S NAME AND/OR MODEL NUMBERS ARE BEING UTILIZED FOR BASIS OF DESIGN ONLY.
THE SPECIFICATION OUTLINES THE SPECIFIC CRITERIA FOR THE EQUIPMENT OR MATERIAL AND IS
NON-PROPRIETARY.
21. ALL UTILITY LINES IN PUBLIC AREAS SHALL BE ENCLOSED IN FLOOR, WALL OR CEILING
CONSTRUCTION UNLESS OTHERWISE NOTED.
22. MANUFACTURED MATERIALS, EQUIPMENT, ETC SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS, INSTRUCTIONS, AND ABA REQUIREMENTS UNLESS
OTHERWISE NOTED.
23. IF DRAWINGS IN THIS SET ARE NOT 30"x 42" THEY HAVE BEEN REVISED FROM THEIR ORIGINAL SIZE.
SCALES NOTED ON PLANS AND DETAILS ARE NO LONGER APPLICABLE.
24. PROVIDE A RED LINED "RECORD" CONSTRUCTION DOCUMENT SET AT THE SITE. THE OWNER
RESERVES THE RIGHT TO REVIEW THESE DOCUMENTS ON A DAILY BASIS.
25. LOCATE ALL UNDERGROUND UTILITIES, ETC. PRIOR TO THE START OF CONSTRUCTION.
26. KEEP MEANS OF EGRESS STAIRS AND CORRIDORS PROPERLY ILLUMINATED AND FREE OF
OBSTRUCTIONS AT ALL TIMES DURING CONSTRUCTION.
27. WORK SHALL CONFORM TO APPLICABLE CODES, REGULATIONS, AND ORDINANCES. CONTRACTOR
SHALL OBTAIN ALL REQUIRED BUILDING AND OCCUPANCY PERMITS.
28. ESTABLISH A SITE BENCHMARK FOR ALL SUBCONTRACTORS TO USE. ALL TRADES SHALL USE THE
SAME BENCHMARK
29. ITEMS INDICATED ON THE DRAWINGS AS "GFGI" MEANS GOVERNMENT FURNISHED AND GOVERNMENT
INSTALLED. COORDINATE WITH THE GOVERNMENT FOR THE REQUIRED POWER, PLUMBING, AND
OTHER REQUIRED UTILITIES AS APPLICABLE.
30. ITEMS INDICATED ON THE DRAWINGS AS "GFCI" MEANS GOVERNMENT FURNISHED AND CONTRACTOR
INSTALLED. COORDINATE WITH ALL SCOPE OF WORK.
31. ALL SUSPENDED ITEMS OF THE WORK EXCEEDING 31 POUNDS IN WEIGHT (EXCLUDING DISTRIBUTED SYSTEMS SUCH AS PIPING NETWORKS) SHALL BE ANCHORED TO RESIST A HORIZONTAL LOAD EQUAL TO 0.5 TIMES THE COMPONENT WEIGHT IN ACCORDANCE WITH UFC 4-010-01. THIS REQUIREMENT DOES NOT PRECLUDE REQUIREMENTS FOR SEISMIC ANCHORAGE IN ACCORDANCE WITH ASCE 7-05
AND THE PROJECT SPECIFICATIONS. FOR ADDITIONAL INFORMATION ON EQUIPMENT SUPPORT
FRAMING REFERENCE STRUCTURAL.
32. FOR LIFE SAFETY PLANS REFER TO LS-111.
33. FOR SIGNAGE SCHEDULE REFER TO SPECIFICATION SECTION 10 14 00 SIGNAGE. FOR TYPICAL SIGN
MOUNTING HEIGHTS REFER TO A-001.
34. DO NOT PAINT BUILDING GROUNDING CABLES.
35. PROVIDE SURFICIAL TERMITE TREATMENT UNDER ENTIRE FOOT PRINT OF THE C-17 FLIGHT
SIMULATOR FACILITY BUILDING.
36. ALL PENETRATIONS THROUGH SHEET METAL ROOF SHALL BE COORDINATED WITH THE SHEET METAL
ROOFING MANUFACTURER / INSTALLER TO ENSURE PENETRATIONS LAND BETWEEN
SEAMS/BATTENS. MOUNT ALL PIPING, EQUIPMENT, DUCTWORK, ETC. AS HIGH AS POSSIBLE IN ALL AREAS UNLESS OTHERWISE NOTED. ALL HANGER SUPPORTS SHALL BE ATTACHED TO STRUCTURAL
STEEL. NOTHING MAY BE SUPPORTED FROM ROOF DECK.
37. ANY OF THE SYMBOLS / MATERIAL REFERENCED ON THIS DRAWING MAY OR MAY NOT OCCUR AS A
PART OF THIS PROJECT AND ARE PROVIDED FOR REFERENCE ONLY.
GENERAL ABBREVIATIONS
ABA ARCHITECTURAL BARRIERS ACT
ACI AMERICAN CONCRETE INSTITUTE
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTURCITON
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION AND AIR
CONDITIONING ENGINEERS
ASTM AMERICAN SOCIETY OF TESTING AND
MATERIALS
AV AUDIO VISUAL
AWP ACOUSTIC WALL PANEL
BD BOARD
BLDG BUILDING
BM BEAM
BOT BOTTOM
CFCI CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPT CARPET TILE
DIA DIAMETER
DWG DRAWING
E EAST
EA EACH
EJ EXPANSION JOINT
EL REFERENCE ELEVATION
ELEC ELECTRIC OR ELECTRICAL
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXPAN EXPANSION
EXT EXTERIOR
EXTG EXISTING
FCO FLOOR CLEAN OUT
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES AND
EQUIPMENT
FIN FINISH
FLR FLOOR
FM FACTORY MANUAL
GA GAGE OR GAUGE
GALV GALVANIZED
GFGI GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
GFCI GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GL GLASS
GYP GYPSUM
OA OVERALL
OC ON CENTER
OFD OVERFLOW DRAIN
OH OPPOSITE HAND
OLI OPTIONAL LINE ITEM
OPNG OPENING
OPP OPPOSITE
PART PARTITION
PH PHASE
PLAM PLASTIC LAMINATE
PLAS PLASTIC OR PLASTER
PLBG PLUMBING
PLYWD PLYWOOD
PREFAB PREFABRICATED
PRESS PRESSURE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PTD PAINTED
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
R RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCED STEEL BAR
REF REFERENCE
REQ'D REQUIRED
RM ROOM
RO ROUGH OPENING
SCHED SCHEDULE
SHT SHEET
SIM SIMILAR
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SPEC SPECIFICATION(S)
SQ SQUARE
SF SQUARE FOOT
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
T TREAD
TELECOM TELECOMMUNICATIONS
THK THICK OR THICKNESS
TOC TOP OF CONCRETE
TBD TO BE DETERMINED
TCNA TILE COUNCIL OF NORTH
AMERICA
TOS TOP OF SLAB
TPO THERMOPLASTIC POLYOLEFIN
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
V VOLTS
VCT VINYL COMPOSITE TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
WD WOOD
WR WATER RESISTANT
WWF WELDED WIRE FABRIC
HD HEAD
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HT HEIGHT
HORIZ HORIZONTAL
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
IT INFORMATION TECHNOLOGY
JAN JANITOR
JT JOINT
LAM LAMINATE
MAX MAXIMUM
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MET METAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
N NORTH
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRIC
MANUFACTURERS ASSOCIATION
NGB NATIONAL GUARD BUREAU
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
MATERIAL LEGEND
STEEL
THERMAL INSULATION (BATT)
THERMAL INSULATION (RIGID)
GYPSUM BOARD
CONCRETE
EARTH
GRANULAR FILL
ACOUSTICAL PANEL CEILING
WOOD ROUGH
CMU
WOOD BLOCKING, SHIM
PARTICLEBOARD OR PLYWOOD
GLASS
CARPET
SOLID SURFACE MATERIAL
LOCATION MAP
PROJECT SITE
NOT TO SCALE
PROJECT SITE - C-17 SIMULATOR
NOT TO SCALE
PROJECT LOCATION
OPTIONAL LINE ITEMS (OLI) GENERAL NOTES
1. FLIGHT SIMULATOR BUILDING CRANE - REFER TO Q-111 FOR INFORMATION
2. DEMOUNTABLE PARTITIONS - REFER TO B1 / A-111 FOR INFORMATION
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018 12" = 1'-0"
/8
/2
:5
:1
P
M B
IM
/U
S
N o rt h C a ro lin a
A ir N a ti o n a l G u a rd
/N C
A N
G
C
F lig h t S im u la to r
A
R C
H
V
.r v t
G-002
D. FLIPPEN
N. FREY
B. DYSON
GENERAL
NOTES, ABBREVIATIONS,
AND SYMBOLS
N
N
1. THIS DRAWING HAS GENERAL INFORMATION, ALL OF WHICH MAY NOT APPLY TO THIS PROJECT.
2. DIFFERENT FLOOR FINISH MATERIALS SHALL MEET UNDER THE CENTERLINES OF DOORS UNLESS
OTHERWISE NOTED. REFER TO DETAILS ON A-572.
3. REFER TO STRUCTURAL FOR SHEAR WALLS, COLUMN SIZE, FOOTING AND FOUNDATION WALL
INFORMATION.
4. ALL BUILDING STEEL EXPOSED AT EXTERIOR SHALL BE HOT DIPPED GALVANIZED AND PAINTED
UNLESS OTHERWISE NOTED. EXTERIOR FRAMING MEMBERS SHALL BE HOT DIPPED GALVANIZED
AND COATED WITH A HIGH PERFORMANCE COATING.
5. ALL PARTITION / WALL MOUNTED EQUIPMENT NOT INDICATED ON THE DRAWINGS SHALL BE
COORDINATED WITH CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO INSTALLATION.
6. FLOOR ELEVATIONS REFERENCED ARE TO TOP OF CONCRETE SLABS. FINISH FLOORING IS
INSTALLED ON TOP OF THE FLOOR ELEVATION. FOR RECESSED FLOORS AND CURBS REFER TO
STRUCTURAL. ARCHITECTURAL FFE OF 100'-0" CORRESPONDS WITH CIVIL FFE OF 728.40. REFER TO
CIVIL DWGS FOR ADDITIONAL INFORMATION.
7. EQUIPMENT LOCATIONS INDICATED ON ARCHITECTURAL DRAWINGS ARE FOR REFERENCE ONLY.
EQUIPMENT LOCATIONS SHALL BE COORDINATED WITH UTILITIES INDICATED ON CIVIL,
MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL, AND EQUIPMENT DRAWINGS.
8. KEYED NOTES: KEYED NOTES ARE ORGANIZED INTO SEVERAL COMMON LISTS, EACH LIST IS
TAILORED TO APPLY TO A SPECIFIC DRAWING TYPE - ONE LIST FOR PLAN VIEWS, ONE FOR
BUILDING ELEVATIONS, ANOTHER FOR SECTION VIEWS, ETC. NOT ALL KEYED NOTES LISTED MAY
APPEAR ON THE SHEET ON WHICH THE LIST IS PLACED.
9. FOR MOUNTING HEIGHT OF AUTOMATIC EXTERNAL DEFIBRILLATOR REFER TO B2 / A-572.
ARCHITECTURAL GENERAL NOTES DIMENSIONING
UNLESS OTHERWISE NOTED ALL EXTERIOR
DIMENSION STRINGS ARE TO THE FINISH FACE
OF WALL (EITHER FROM COLUMN CENTER
LINES OR OPENINGS IN WALL)
UNLESS OTHERWISE NOTED LOCATE THE
EDGE OF DOOR JAMBS 4 INCHES OFF OF THE
FINISHED FACE OF ADJACENT GYPSUM
BOARD PARTITION AND 8" AT CMU PARTITION
UNLESS OTHERWISE NOTED ALL DIMENSION
STRINGS ARE TO THE FINISH FACE OF WALL
OR PARTITION
4. DO NOT SCALE DRAWINGS - FOLLOW WRITTEN DIMENSIONS ONLY.
5. TYPICALLY, DIMENSIONS ARE TO CENTER OF COLUMNS, FACES OF FINISHED WALL OR
PARTITION SURFACE OR TO EDGE OF OPENINGS.
6. COORDINATE DIMENSIONS INDICATED IN THESE DRAWINGS WITH FABRICATION OF ALL
SYSTEMS AND ASSEMBLIES. COORDINATE DIMENSIONS INDICATED WITH ACTUAL FIELD
CONDITIONS. REPORT ANY INCONSISTENCIES TO THE ARCHITECT PRIOR TO
PROCEEDING WITH WORK.
7. "NOM" AS USED IN THESE DOCUMENTS IS THE ABBREVIATION FOR "NOMINAL" -
MEANING THAT ACTUAL MANUFACTURED, ASSEMBLED FOR INSTALLED DIMENSIONS
MAY VARY SLIGHTLY FROM WHAT IS INDICATED.
8. "EQ" AS USED IN THESE DOCUMENTS IS THE ABBREVIATION FOR "EQUAL" - MEANING
THAT THE DIMENSIONS ON A STRING ARE INTENDED TO BE OF EQUAL LENGTH.
9. " +/- " OR "VERIFY" AS USED IN THESE DOCUMENTS MEANS THAT FOR EXISTING
CONDITIONS THE DIMENSIONS SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR
AND FOR NEW CONDITIONS THE ACTUAL DIMENSION AS CONSTRUCTED MAY BE
ADJUSTED SLIGHTLY TO ACCOMMODATE OTHER FACTORS.
10. "MIN" AS USED IN THESE DOCUMENTS IS THE ABBREVIATION FOR "MINIMUM" - MEANING
THAT THE CONDITION IS SLIGHTLY ADJUSTABLE BUT MAY NOT VARY TO A DIMENSION
OR QUALITY LESSER THAN THAT INDICATED.
11. "MAX" AS USED IN THESE DOCUMENTS IS THE ABBREVIATION FOR "MAXIMUM" -
MEANING THAT THE CONDITION IS SLIGHTLY ADJUSTABLE BUT MAY NOT VARY TO A
DIMENSION OR QUALITY GREATER THAN THAT INDICATED.
12. "ALIGN" AS USED IN THESE DOCUMENTS SHALL MEAN TO ACCURATELY LOCATE THE
FINISHED FACES TO BE IN THE SAME PLANE.
13. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION OR
DIMENSION IS THE SAME OR REPRESENTATIVE FOR SIMILAR CONDITIONS
THROUGHOUT.
14. "SIMILAR" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION OR
DIMENSION ISTHE SAME OR REPRESENTATIVE FOR SIMILAR CONDITIONS
THROUGHOUT.
15. "CLEAR" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE DIMENSION IS NOT
ADJUSTABLE WITHOUT THE APPROVAL OF THE COR. CLEAR DIMENSIONS ARE
TYPICALLY TO FINISHED FACE.
16. ROUGH OPENING ("RO") DIMENSIONS SHOWN ON THESE DRAWINGS ARE NOMINAL OR
MODULAR DIMENSIONS. ACTUAL DIMENSIONS MAY VARY DEPENDING ON THE TYPE OF
BUILDING ELEMENT BEING DIMENSIONED.
17. MASONRY OPENING (M.O.) DIMENSIONS SHOWN ON THESE DRAWINGS ARE NOMINAL
OR MODULAR DIMENSIONS.
1.
2.
3.
DOOR FRAME
SIGNAGE - REFER TO
SPECIFICATIONS
SIGNS CONTAINING TACTILE
CHARACTERS SHALL BE
LOCATED SO THAT A CLEAR
FLOOR SPACE OF 18" x 18"
MINIMUM, CENTERED ON THE
TACTILE CHARACTERS,
IS PROVIDED BEYOND THE
ARC OF ANY DOOR SWING
BETWEEN THE CLOSED
POSITION AND 45 DEGREE
OPEN POSITION.
PUSH PLATE OR LEVER
6" AT NON-ACCESSIBLE
LOCATIONS
FLOOR SPACE
1' - 6" CLEAR
T O
B O
T T
O M
O F
H
IG
H E
S T
R A
IS
E
D C
H A
R A
C T
E R
5' -0
M
A X
IM
U
M
CENTER
9"
XXXXXX
XXXX
T O
B O
T T
O M
O F
L O
W E
S T
R A
IS
E
D C
H A
R A
C T
E R
4' -0
M
IN
IM
U M
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018As indicated
/8
/2
:4
:5
P
M B
IM
/U
S
N o rt h C a ro lin a
A ir N a ti o n a l G u a rd
/N C
A N
G
C
F lig h t S im u la to r
A
R C
H
V
.r v t
A-001
B. DYSON
N. FREY
A. TESTA
ARCHITECTURAL
GENERAL NOTES
3/4" = 1'-0"B4
TYPICAL SIGNAGE MOUNTING LOCATION AT DOOR
G-002
UP
MM
C1 A-311
A1 A-311
A3 A-311
VESTIBULE
S101
LOBBY
S102
CORRIDOR
S103
ADMIN / INSTRUCTORS
S105
SITE MANAGER
S106
CBT LEARNING CENTER
S107
MULTI-PURPOSE ROOM
S111
TER
S112
BRIEFING ROOM
S115
CLASSIFIED BRIEFING
S117
CLASSIFIED BRIEFING
S118
B-CER
S128
SECURITY CHECK POINT
S116
VTRAT
S119
HIGH VALUE STORAGE
S123
MAINTENANCE WORKROOM
S121
WEAPON SYSTEM COMPUTER ROOM
S124
LOADMASTER STATION
S129
FIRE RISER ROOM
S126
WEAPON SYSTEM TRAINER BAY
S127
17' - 4"
MO
18' - 0" 17' - 0" 21' - 8"
MO
11' - 4" 4' - 8" 5' - 4" 4' - 8"
MO
5' - 4" 4' - 8"
MO
5' - 4" 4' - 8"
4' - 0"
MO
6' - 4"
MO5'
- 4
4'
- 8
MO5'
- 4
4'
- 8
S1
S1
S106
S1
S112
S116S127A
S128
S111
S129
S123
S1
S1
S118
0E
0H
0E 0E
0E
0E
0E
0E
0E
0F
0F
0F
0H
0J
0F
A-211 C3
A-211 C1
A-211 A1
A-211 A3
16' - 1 7/8" 21' - 7 5/8" 21' - 7 1/4" 12' - 9 1/8" 7' - 0"
50' - 0" 10' - 9"
5'
- 0
7 7
/8"
8"
5'
- 7
7/ 8"
10' - 9" 12' - 11 1/2"
2' - 0"
1' - 0"
9'
- 6
2 1
/8"
0"
120' - 0" (OVERALL)
S1
MO
6' - 5" 20' - 0"
MO
5' - 4" 4' - 8"
MO
5' - 4" 4' - 8"
4" (O
VE
RA
LL
4'
- 8
MO5'
- 4
4'
- 8
MO5'
- 4
4'
- 8
MO5'
- 4
AL
IG
N
12' - 7 1/4"
5' - 0" 9' - 3 1/2"
A-411B1
S1
MEN
S110
WOMEN
S108
A-411 A2
S105
S107
0E
S1
AL
IG
N
7 1 /4"
7 1 /4"
5'
- 0
8'
- 6
1/ 2"
7 1 /2"
5'
- 7
1/ 4"
4'
- 0
8'
- 4 1/
8"
0E
0J
0F
0E
0E0E
3'
- 4
MO3'
- 4
0"
MO10
0"
S127B
S1
C
S2
S2
S1
S5 S4 S3
S1.7
S6
S6
SF
SE
SD
SC
SB
SA
A-422 B2
A-531 C1
A-411 A1
8"11
8'
- 9
7 1 /4"
AL
IG
N
5' - 9" 5' - 0"
0F
0H
0H
0E
0E
S110
S109
S108
1'
- 4
4"
0"
8"
8" 1'
- 4
1' - 4" 49' - 4" 22' - 6 3/4" 45' - 5 1/4" 1' - 4"
0E
PT
-3
PT
-3
PT
-3
PT
-3
COPIER
(GFGI)
21 22
0H
5' - 9 5/8"
1420 10
0F
0HA
0GA
0HA S1210HA
FLOOR PLAN KEYED NOTES
OPEN TO BELOW
C1 A-311
A1 A-311
A3 A-311
MECHANICAL / ELECTRICAL
S201
WEAPON SYSTEM TRAINER BAY
S127
A-211 C3
A-211 C1
A-211 A1
A-211 A3
52' - 8" 67' - 4"
5/
8"
4 1
/2"
4"
50' - 0"
120' - 0"
0"
0G
0G
S2
S2
S1
S5 S4 S3
S1.7
S6
S6
SF
SE
SD
SC
SB
SA
17' - 4" 18' - 0" 17' - 0"
4 4
11 1120
0G
16' - 0"
6' - 8" 14' - 0"
DEMOUNTABLE PARTITION GENERAL NOTES
OLI - DEMOUNTABLE PARTITIONS
1. PARTITIONS INDICATED BY GRAY HATCH ( ) SHALL BE DEMOUNTABLE. REFER TO
A1/A-111 FOR BASE BID WORK NOT RELATED TO DEMOUNTABLE PARTITIONS.
2. DIMENSIONS SHOWN ARE TO CONVEY DESIGN INTENT AND SHALL BE VERIFIED WITH FINAL
DELEGATED DESIGN AND COORDINATED WITH DEMOUNTABLE PARTITION MANUFACTURER.
S1S1.7
SF
SE
SA
VESTIBULE
S101
LOBBY
S102
CORRIDOR
S103
ADMIN / INSTRUCTORS
S105
SITE MANAGER
S106
CBT LEARNING CENTER
S107
MULTI-PURPOSE ROOM
S111
TER
S112
BRIEFING ROOM
S115
B-CER
S128
HIGH VALUE STORAGE
S123
LOADMASTER STATION
S129
S106
0E
12' - 11 1/2"
2' - 0"
1' - 0"
12' - 7 1/4"
MEN
S110
WOMEN
S108
S105
S107
7 1 /4"
8'
- 6
1/ 2"
7 1 /2"
5'
- 7
1/ 4"
4'
- 0
8'
- 4 1/
8"
7 1 /4"
IAINNFCOQUEIAEENTSCI
GEOGR APH I A E PENE TR AM
US
A I R
N A T I ON A L
GU AR
D
C I V I L
E N G I N E E R I N G
N
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018As indicated
1/
/2
3:
:4
PM
BI
M
U
S
- N or th
C ar ol in a Ai r N at io na l G ua rd /N
C
AN
G
C
F lig ht S im ul at or
AR
C H
V1
7.
rv t
A-111
D. FLIPPEN
N. FREY
B. DYSON
ARCHITECTURAL
C-17 FLIGHT SIMULATOR
FLOOR PLANS
1/8" = 1'-0"A1 FLOOR PLAN
1/8" = 1'-0"
24'4' 8' 16'
1/8" = 1'-0"C1 MECHANICAL EQUIPMENT PLATFORM PLAN
1/8" = 1'-0"
N
16 STANDING SEAM METAL ROOF SYSTEM
17 VTR PIPE PENETRATION - REFER TO C3/A532
18 PREFINISHED GUTTER AND DOWNSPOUT SYSTEM
19 FIRE DEPARTMENT CONNECTION - REFER TO A2, B2 / A-532 AND FIRE PROTECTION
20 FIRE PROTECTION EQUIPMENT - REFER TO FIRE PROTECTION
21 FLIGHT SIMULATOR EXCURSION ENVELOPE
22 CONCRETE BASE AND TRENCHES FOR FLIGHT SIMULATOR EQUIPMENT - REFER TO
STRUCTURAL
23 FLOOR DRAIN / CLEANOUT. FLOOR SLOPES TO DRAIN - REFER TO PLUMBING
24 ROOF ACCESS LADDER, REFER TO C2 / A-423
1 FIRE EXTINGUISHER CABINET - REFER TO B1/A-572
2 FIRE EXTINGUISHER BRACKET - REFER TO A1/A-572
3 AUTOMATIC EXTERNAL DEFIBRILATOR BY OWNER. PROVIDE SIGN - REFER TO B2/A-572
4 6" PREFINISHED METAL DOWNSPOUT TO BOOT - REFER TO D3/A-531 AND CIVIL DRAWINGS
5 SHIPS LADDER - REFER TO A4 / A-423
6 ACCESS LADDER AND ROOF HATCH ABOVE, REFER TO A2/A-423
7 PROVIDE BLOCKING AS REQUIRED FOR MOUNTING MONITORS - REFER TO A3, A4 / A-571
8 EXTERIOR BOLLARD - REFER TO C5/A-531
9 FIRE DEPARTMENT ENTRY KEY LOCK BOX. MOUNT 4'-0" AFF
10 MECHANICAL EQUIPMENT - REFER TO MECHANICAL
11 EXPOSED STEEL BRACING - PAINT PT-5
12 LINE OF CANOPY
13 PLUMBING EQUIPMENT - REFER TO PLUMBING
14 ELECTRICAL EQUIPMENT - REFER TO ELECTRICAL
15 WALK OFF MAT - REFER TO MATERIAL LEGEND ON A-601
N
1/8" = 1'-0"B1 PARTIAL FLOOR PLAN - OLI - DEMOUNTABLE PARTITIONS
NOTE: FOR FLIGHT SIMULATOR DEMOUNTABLE PARTITIONS OLI REFER TO B1/A-111
G-002
VS
VS
VS
VS
VS
VS
PC
PC
PC
PC
S2
S2 S1
S1
S5 S4 S3 S1.7S6
S6
SF
SE
SD
SC
SB
SA
A-411 A3
A1 A-531
A2 A-531
A1 A-531
A2 A-531
7' - 10 3/4" 16' - 8" 16' - 8"
0"
0 7
/8"
4'
- 9
1/ 4"
1'
- 8
1/ 8"
4' - 11 3/8" 5' - 11 1/2" 5' - 9 5/8" 4' - 0 3/8"
EQ
EQ
3'
- 6
6' - 8 1/4"
REFLECTED CEILING PLAN LEGEND
GYPSUM BOARD CEILING
APC-1
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
LINEAR SUPPLY AIR DIFFUSER
LINEAR RETURN AIR DIFFUSER
EXHAUST AIR GRILL
EXHAUST FAN
EXIT SIGN (DARKENED AREA DENOTES LIGHTED FACE, TRIANGLES INDICATE
EMERGENCY LIGHTS)
OCCUPANCY SENSOR, CEILING MOUNTED, MULTI DIRECTIONAL
LIGHTING FIXTURES,
REFER TO ELECTRICAL
ACCESS PANEL
FIRE SUPPRESSION -
SIDEWALL SPRINKLER
FIRE ALARM - CEILING SPEAKER
VS
OCCUPANCY SENSOR, CEILING MOUNTEDOS OS
PHOTOCELL SENSOR, CEILING MOUNTEDPC
REFLECTED CEILING PLAN GENERAL NOTES
1. REFER TO PLUMBING, MECHANICAL, ELECTRICAL, FIRE SUPPRESSION, FIRE ALARM AND
TELECOMMUNICATION DRAWINGS FOR ALL VENTS, SPRINKLER HEADS, GRILLES, REGISTERS,
DIFFUSERS, DUCTS, LIGHTS, DETECTORS, ETC AND COORDINATE SAME AS REQUIRED.
2. COORDINATE ALL STRUCTURAL, PLUMBING, MECHANICAL, FIRE SUPPRESSION, AND ELECTRICAL WORK WITH CEILING HEIGHTS AND ARCHITECTURAL WORK. WHERE CONFLICTS IN DEVICES OCCUR, COORDINATE FINAL LOCATIONS WITH CONTRACTING OFFICER'S REPRESENTATIVE.
3. REFER TO ROOM FINISH SCHEDULES ON A-602 FOR CEILING MATERIALS, FINISHES, AND HEIGHTS.
4. ALL CEILING MOUNTED OR RECESSED ITEMS SHOWN OR NOT, ON REFLECTED CEILING PLANS, SUCH AS SPRINKLER HEADS, SPEAKER, GRILLES, LIGHTS, ETC. SHALL BE CENTERED IN THE LAY-IN PANELS.
AT GYPSUM BOARD CEILINGS, INSTALL IN A CONSISTENT PATTERN.
5. LOCATE SPRINKLER HEADS IN CEILING PANELS IN CONSISTENT PATTERNS AS INDICATED. REFER TO B1 / A-571.
6. NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE OF ALL ITEMS NOT SHOWN ON REFLECTED
CEILING PLAN AND LOCATE PER CONTRACTING OFFICER'S REPRESENTATIVE DIRECTION.
7. REFER TO TELECOM DRAWINGS FOR CAMERA LOCATIONS.
8. WHERE CONFLICT IN CEILING DEVICES OCCURS, COORDINATE WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
9. FOR MECHANICAL / ELECTRICAL / PLUMBING ACCESS PANELS IN A GYPSUM BOARD CEILING - REFER
TO B2 & B3 / A-571.
10. GRID LAYOUT AND LOCATION OF LIGHT FIXTURES AND DIFFUSERS ON THE REFLECTED CEILING
PLANS GOVERN OVER ELECTRICAL AND MECHANICAL DRAWINGS.
11. REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURES TYPE AND SIZE. REFER TO SPECIAL
SYSTEMS DRAWINGS FOR SPEAKERS, CAMERA, ETC. TYPE AND SIZE.
12. ALL CEILING PENETRATIONS SHALL BE TREATED AS PERIMETER CLOSURES AND SHALL ALLOW A
MINIMUM OF 3/8" CLEARANCE BY USE OF SUITABLE ESCUTCHEONS OR CLOSURE DETAILS.
13. REFER TO A1 / A-571 FOR DIAGRAMMATIC ACOUSTICAL PANEL CEILING LAYOUT.
14. REFER TO D3 / A-571 FOR TYPICAL CEILING PERIMETER DETAIL. REFER TO C3 / A-571 FOR
ACOUSTICAL CEILING PERIMETER DETAIL.
S2
S2S5 S4 S3
S6
SF
SE
0"
0"
4'
- 9
3/ 8"
10' - 0" 10' - 0" 7' - 11"
3'
- 0
4 1/8" 4' - 3 7/8"
7' - 10 7/8"
2' - 3 7/8"
6'
- 6
5/ 8"
2'
- 1
0"
2"
16' - 3"
IAINNFCOQUEIAEENTSCI
GEOGR APH I A E PENE TR AM
US
A I R
N A T I ON A L
GU AR
D
C I V I L
E N G I N E E R I N G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018As indicated
1/
/2
3:
:0
PM
BI
M
U
S
- N or th
C ar ol in a Ai r N at io na l G ua rd /N
C
AN
G
C
F lig ht S im ul at or
AR
C H
V1
7.
rv t
A-131
D. FLIPPEN
N. FREY
B. DYSON
ARCHITECTURAL
C-17 FLIGHT SIMULATOR
REFLECTED CEILING PLANS
1/8" = 1'-0"A1 REFLECTED CEILING PLAN
1/8" = 1'-0"
24'4' 8' 16'
N
1/8" = 1'-0"D1
PARTIAL REFLECTED CEILING PLAN -
MECHANICAL MEZZANINE
N
1 EXPOSED STRUCTURE
2 GYPSUM BULKHEAD - REFER TO C2/A-571, AT EL 9'-0" AFF UNLESS OTHERWISE NOTED
3 GYPSUM SOFFIT - REFER TO D2/A-571, AT EL 9'-0" AFF UNLESS OTHERWISE NOTED
4 LADDER - REFER TO A2/A-423
5 MECHANICAL EQUIPMENT - REFER TO MECHANICAL DRAWINGS
6 METAL PANEL SOFFIT
7 SHIPS LADDER - REFER TO A4/A-423
8 BRIDGE CRANE - REFER TO Q-111
REFLECTED CEILING PLAN KEYED NOTES
C1 A-311
A1 A-311
A3 A-311
1 1/2" / 12" 1 1/2" / 12"
1 1
12 12
1/2
SLOPESLOPE
SL
OP
E
S2
S2
S1
S5 S4 S3
S1.7
S6
S6
SF
SE
SD
SC
SB
SA
1' - 8 1/4" 23' - 3 1/2" 1' - 0 1/8"
5 1 /8"
TYPICAL
A1 A-531
A2 A-531
2' - 0 3/8" 8' - 9 7/8"
3' - 0 3/8" 15' - 1 7/8"2'
- 1
1 3 /8"
2'
- 9
7/ 8"
3 3
TO ROOF EDGE
3' - 0" TYPICAL
TO ROOF EDGE
3' - 0" TYPICAL
4'
- 2
3/ 4"
ROOF PLAN KEYED NOTES
ROOF PLAN GENERAL NOTES
1. NOT ALL PLUMBING, MECHANICAL, ELECTRICAL, ETC. ITEMS MOUNTED ON OR PENETRATING ROOF MAY BE SHOWN. REFER TO RESPECTIVE PLANS FOR LOCATIONS. PENETRATIONS, ETC. THROUGH
ROOF SYSTEM SHALL COMPLY WITH ROOF MANUFACTURER'S PRINTED INSTRUCTIONS AND
STANDARDS.
2. FOR TYPICAL ROOF DETAILS REFER TO SHEET A-532.
3. ALL WORK AND MATERIALS BELONGING TO AND ADJACENT TO ROOF SHALL BE IN FULL COMPLIANCE
WITH ROOF MANUFACTURER'S STANDARD INSTALLATION DETAILS AND WARRANTY.
4. STAGGER ALL ROOF INSULATION JOINTS. ALL INSULATION JOINTS GREATER THAN 1/4" SHALL BE
FILLER WITH INSULATION STRIPS.
5. AT ALL ROOF PENETRATIONS, FILL AIR GAPS WITH SPRAY FOAM INSULATION TO MAINTAIN AIR
TIGHTNESS.
6. ROOF SHALL HAVE A CONTINUOUS MINIMUM VALUE OF R-25 INSULATION.
7. ALL SHEET METAL ROOF AREAS SHALL SLOPE 1 1/2:12 UNLESS OTHERWISE NOTED.
8. PROVIDE CRICKET ADJACENT TO ROOFTOP EQUIPMENT (TYPICAL, WHETHER SHOWN OR NOT).
9. FOR LIGHTNING PROTECTION AIR TERMINAL LOCATIONS AND DETAILS,REFER TO ELECTRICAL
DRAWINGS.
10. FOR ROOF PENETRATIONS OF LIGHTNING PROTECTION CABLE, REFER TO C1, C2 / A-532 AND
ELECTRICAL.
11. REFER TO PLUMBING FOR LOCATION OF VENT THROUGH ROOF. REFER TO C3 / A-532.
12. ALL SHEET METAL ROOFING IS 3" BATTEN SEAM - REFER TO A5 / A-532 FOR TYPICAL COMPOSITION OF
SHEET METAL ROOFING SYSTEM.
13. NO WORK, INCLUDING STAGING OR ACCESS TO OTHER PORTIONS OF THE WORK SHALL BE
PERMITTED ON THE SHEET METAL ROOFS.
14. IF STAGING ACCESS OR WORK IS REQUIRED ON THE FINISHED MEMBRANE, THE CONTRACTOR SHALL
PROVIDE PROTECTION ALONG THE ACCESS PATH AND UNDER THE WORK EXTENDING 48" BEYOND
THE REQUIRED WORK AREA. PROTECTION SHALL CONSIST OF 3/4" PLYWOOD OVER A HEAVY CANVAS
TARP WITH SAND BAG BALLASTS AS REQUIRED TO PREVENT THE PLYWOOD FROM BECOMING
AIRBORNE DURING STRONG WINDS.
15. ALL CLARIFICATIONS OR ADDITIONAL INFORMATION REQUIRED SHALL BE IN ACCORDANCE WITH CRITERIA AND DETAILS OF THE NRCA ROOFING AND WATER PROOFING MANUAL. ANY DEVIATION FROM THE SPECIFIED OR INDICATED REQUIREMENTS SHALL BE SUBMITTED FOR APPROVAL BY COR
PRIOR TO INSTALLATION.
16. LAYOUT OF ROOFTOP FALL ARREST SYSTEMS IS CONCEPTUAL. MANUFACTURER / INSTALLER SHALL
DESIGN AND INSTALL A SYSTEM INCLUDING PERSONNEL FULL-BODY HARNESS, LANYARDS,
DECELERATION DEVICES, LIFELINE CONNECTORS AND ALL COMPONENTS NECESSARY TO PROVIDE ADEQUATE PROTECTION IN ACCORDANCE WITH OSHA/ANSI STANDARDS AND THAT ALLOWS OWNER'S TRAINED PERSONNEL TO INSPECT ALL PORTIONS OF ALL ROOFS INCLUDING PERIMETER DRAINAGE SYSTEM. MANUFACTURER / INSTALLER SHALL COORDINATE WITH MANUFACTURER OF SHEET METAL
ROOF TO VERIFY THAT SHEET METAL ROOF ASSEMBLY WILL TRANSFER LOADS TO ROOF DECK.
IAINNFCOQUEIAEENTSCI
GEOGR APH I A E PENE TR AM
US
A I R
N A T I ON A L
GU AR
D
C I V I L
E N G I N E E R I N G
N
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018As indicated
1/
/2
3:
:1
PM
BI
M
U
S
- N or th
C ar ol in a Ai r N at io na l G ua rd /N
C
AN
G
C
F lig ht S im ul at or
AR
C H
V1
7.
rv t
A-151
D. FLIPPEN
N. FREY
B. DYSON
ARCHITECTURAL
C-17 FLIGHT SIMULATOR
ROOF PLAN
1/8" = 1'-0"A1 ROOF PLAN
1/8" = 1'-0"
24'4' 8' 16'
1 STANDING SEAM METAL ROOF SYSTEM
2 ANTENNA RAIL - REFER TO STRUCTURAL
3 CRICKET OF TAPERED INSULATION - 1"/12" SLOPE MINUMUM
4 PREFINSHED GUTTER AND DOWNSPOUT SYSTEM
5 3'-0" x 3'-0" ROOF HATCH - REFER TO B4/A532
6 WALKWAY PADS
7 PREFINISHED METAL COPING
8 PIPE PENETRATION - REFER TO C3/A-532
9 ROOFTOP FALL ARREST SYSTEM - REFER TO D5/A-532 FOR ANCHOR DETAIL
10 ROOF ACCESS HATCH SAFETY RAIL - REFER TO C5/A-532
11 PVC MEMBRANE ROOF SYSTEM - REFER TO A4 / A-532
12 THROUGH-WALL SCUPPER WITH DOWNSPOUT - REFER TO D1, D2/A-532
13 MECHANICAL EQUIPMENT - REFER TO MECHANICAL DRAWINGS, FOR CURB DETAIL REFER
TO B3 / A-532
14 ROOF ACCESS LADDER - REFER TO A1 / A-423
15 PARAPET LADDER - REFER TO C2 / A-423
16 CANOPY BELOW
17 TELECOM EQUIPMENT - REFER TO TELECOM DRAWINGS, FOR CURB DETAIL REFER TO
B3/A-532
18 SNOW GUARDS - REFER TO D3 / A-532
EXTERIOR ELEVATION KEYED NOTESEXTERIOR FINISH SCHEDULE REMARKS
1. REFER TO A-607 FOR STRUCTURAL POLYCARBONTE PANEL ELEVATIONS AND DETAILS.
EXTERIOR COLOR SCHEDULE
FINISH FLOOR
EL: 100' - 0"
MECH MEZZANINE
EL: 114' - 0"
W1 W1 W1 W1 W1
25 11
SFSESDSCSBSA
16 TYP
TYP
TYP
T.O. WALL
EL:130' - 0"
B.O. DECK
EL: REFER TO
STRUCTURAL
TYPICAL
343434 18
TYPICAL
19 34 19
34 34 34
FINISH FLOOR
EL: 100' - 0"
MECH MEZZANINE
EL: 114' - 0"
W1 W1 W11
9 134
8 2598 7
S2S1 S5S4S3S1.7 S6
TYPICAL
TYPICAL
T.O. WALL
EL:130' - 0"
T.O. STEEL
L9
11 11
19 34 19341318
TYPICAL
30 3034 34 11
FINISH FLOOR
EL: 100' - 0"
MECH MEZZANINE
EL: 114' - 0"
P4 W10
W1 W1
3 49 7
8 25W1
S2 S1S5 S4 S3 S1.7S6
BEYOND
TYP
TYPBEYOND
T.O. WALL
EL:130' - 0"
B.O. DECK
EL: REFER TO
STRUCTURAL
1414 3418
TYPICAL
W1
BEYOND
TYPICAL
19 347
FINISH FLOOR
EL: 100' - 0"
MECH MEZZANINE
EL: 114' - 0"
9 7
SF SE SD SC SB SA
TYP
14 14 121931
TYP
T.O. WALL
EL:130' - 0"
B.O. DECK
EL:REFER TO STRUCTURAL
TYPICAL
24 21 34 34 34
23 23
2' - 0"2' - 0"
IAINNFCOQUEIAEENTSCI
GEOGR APH I A E PENE TR AM
US
A I R
N A T I ON A L
GU AR
D
C I V I L
E N G I N E E R I N G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018As indicated
1/
/2
3:
:2
PM
BI
M
U
S
- N or th
C ar ol in a Ai r N at io na l G ua rd /N
C
AN
G
C
F lig ht S im ul at or
AR
C H
V1
7.
rv t
A-211
D. FLIPPEN
N. FREY
B. DYSON
ARCHITECTURAL
C-17 FLIGHT SIMULATOR
EXTERIOR ELEVATIONS
ELEVATION
KEYED NOTE PRODUCT FINISH COLOR REMARKS
16 MECHANICAL EQUIPMENT PREFINISHED AS SELECTED
17 VTR PIPE PENETRATION PREFINISHED REFER TO MECHANICAL / PLUMBING
18 BUILDING SIGNAGE PREFINISHED AS SELECTED
19 CAST STONE SILL PREFINISHED MATCH ADAMS: ECHELON OLDCASTLE 9317
20 ELECTRICAL RECEPTACLE PREFINISHED CLEAR ANODIZED
21 WALL HYDRANT PREFINISHED CHROME
22 FIRE DEPARTMENT CONNECTION PREFINISHED CHROME
23 AIR TERMINALS PREFINISHED AS SELECTED
24 CCTV CAMERA LOCATION PREFINISHED AS SELECTED
25 BOLLARD FINISH IN FIELD SAFETY YELLOW
26 MORTAR FINISH IN FIELD SPEC MIX: SM330 BURLEYWOOD
ELEVATION
KEYED NOTE PRODUCT FINISH COLOR REMARKS
1 INSULATED METAL WALL PANEL (MWP-1) PREFINISHED CENTRIA: 993 OFF-WHITE
2 COMPOSITE METAL WALL PANEL (MWP-3) PREFINISHED CENTRIA: 9922 STEEL GRAY
3 STRUCTURAL POLYCARBONATE PANEL PREFINISHED WHITE (EXTERIOR) / ICE WHITE MATTE (INTERIOR) 1
4 GLAZED ALUMINUM STOREFRONT SYSTEM PREFINISHED MATCH CENTRIA: 993 OFF-WHITE
5 GLAZED ALUMINUM CURTAINWALL SYSTEM PREFINISHED MATCH CENTRIA: 993 OFF-WHITE
6 STANDING SEAM METAL ROOFING SYSTEM PREFINISHED CENTRIA: 993 OFF-WHITE
7 BRICK VENEER ( BV-1) - RECESSED 1/2" PREFINISHED GENERAL SHALE: FULL RANGE WIRECUT 6035
8 SPLIT FACE CMU VENEER (MV-1) PREFINISHED ADAMS: ECHELON OLDCASTLE 9317
9 GROUND FACE CMU VENEER ( MV-3) PREFINISHED ADAMS: ECHELON OLDCASTLE 9317
10 GUTTER PREFINISHED MATCH CENTRIA: 993 OFF-WHITE
11 DOWNSPOUT AND DOWNSPOUT SUPPORT STRAPS PREFINISHED MATCH CENTRIA: 993 OFF-WHITE
12 HOLLOW METAL DOOR AND FRAME FINISH IN FIELD MATCH CENTRIA: 993 OFF-WHITE
13 LOUVER PREFINISHED MATCH CENTRIA: 993 OFF-WHITE
14 WALL MOUNTED LIGHT FIXTURE PREFINISHED MATCH CENTRIA: 993 OFF-WHITE
15 EXHAUST WALL PENETRATIONS PREFINISHED AS SELECTED
1/8" = 1'-0"
24'4' 8' 16'
1 INSULATED METAL WALL PANEL (MWP-1)
2 COMPOSITE METAL WALL PANEL (MWP-3)
3 STRUCTURAL POLYCARBONATE PANEL - REFER TO A-606
4 GLAZED ALUMINUM STOREFRONT DOOR
5 GLAZED ALUMINUM CURTAINWALL SYSTEM
6 STANDING SEAM METAL ROOFING SYSTEM
7 BRICK VENEER (BV-1) - RECESSED 1/2"
8 SPLIT CMU VENEER (MV-1)
9 GROUND FACE CMU VENEER (MV-3)
10 8"x8" STYLE-G METAL GUTTER
11 DOWNSPOUT, REFER TO C3 / D3 / A-531
12 HOLLOW METAL DOOR AND FRAME
13 LOUVER - REFER TO A-706
14 WALL-MOUNTED LIGHT FIXTURE
15 MECHANICAL EQUIPMENT
16 VTR PIPE PENETRATION
17 BUILDING SIGNAGE
18 CAST STONE SILL
19 ELECTRICAL RECEPTACLE
20 WALL HYDRANT
21 FIRE DEPARTMENT CONNECTION
22 AIR TERMINALS - REFER TO ELECTRICAL DRAWINGS
23 CCTV CAMERA LOCATION - REFER TO SECURITY
24 BOLLARD - REFER TO C5 / A-531
25 FINISH GRADE - REFER TO CIVIL
26 FIRE DEPARTMENT ENTRY KEY LOCKBOX - MOUNT AT 4'-0" AFF
27 SCUPPER / CONDUCTOR HEAD - REFER TO D1 & D2 / A-532
28 SPRINKLER SYSTEM AUXILIARY DRAIN - REFER TO FIRE PROTECTION
29 GAS METER
30 SECURITY ACCESS CARD READER - REFER TO TELECOMMUNICATIONS
31 COILING OVERHEAD DOOR
32 ROOF ACCESS LADDER - REFER TO PLAN FOR TYPE AND INFORMATION
33 PREFINISHED METAL COPING
34 CONTROL JOINT - REFER TO D1 / A-531
1/8" = 1'-0"
A-111
C3 EAST ELEVATION
1/8" = 1'-0"
A-111
C1 NORTH ELEVATION
1/8" = 1'-0"
A-111
A1 SOUTH ELEVATION
1/8" = 1'-0"
A-111
A3 WEST ELEVATION
1/8" = 1'-0"
FINISH FLOOR
EL: 100' - 0"
MECH MEZZANINE
EL: 114' - 0"
A-505
A41 1/2"
12"
A-505
A2
S2 S1S1.7S6
VTRAT
S119
WEAPON SYSTEM COMPUTER ROOM
S124
MAINTENANCE WORKROOM
S121
HIGH VALUE STORAGE
S123
CORRIDOR
S103
MEN
S110
MULTI-PURPOSE ROOM
S111
MECHANICAL / ELECTRICAL
S201
T.O. WALL
EL:130' - 0"
FINISH FLOOR
EL: 100' - 0"
MECH MEZZANINE
EL: 114' - 0"
A-504
A1
A-504
A2
1 1/2"
12"
1 1/2"
12"
S2 S1S5 S4 S3 S1.7S6
WEAPON SYSTEM TRAINER BAY
S127
CLASSIFIED BRIEFING
S117
BRIEFING ROOM
S115
LOBBY
S102
ADMIN / INSTRUCTORS
S105
T.O. WALL
EL:130' - 0"
B.O. DECK
EL:REFER TO STRUCTURAL
A-505
A3
FINISH FLOOR
EL: 100' - 0"
MECH MEZZANINE
EL: 114' - 0"
A-504
A3
A-504
A4
SFSESDSCSBSA
WEAPON SYSTEM TRAINER BAY
S127
MECHANICAL / ELECTRICAL
S201
WEAPON SYSTEM COMPUTER ROOM
S124
A-423
A1
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018 1/8" = 1'-0"
/8
/2
:5
:4
P
M B
IM
/U
S
N o rt h C a ro lin a
A ir N a ti o n a l G u a rd
/N C
A N
G
C
F lig h t S im u la to r
A
R C
H
V
.r v t
A-311
D. FLIPPEN
N. FREY
B. DYSON
ARCHITECTURAL
C-17 FLIGHT SIMULATOR
BUILDING SECTIONS
1/8" = 1'-0"
24'4' 8' 16'
1/8" = 1'-0"
A-111
C1
BUILDING SECTION
1/8" = 1'-0"
A-111
A1
BUILDING SECTION
1/8" = 1'-0"
A-111
A3
BUILDING SECTION
ENLARGED FLOOR PLAN AND INTERIOR ELEVATION KEYED NOTESTOILET ACCESSORIES SCHEDULE
ITEM ACCESSORY DESCRIPTION MANUFACTURER PRODUCT NO.
MOUNTING
HEIGHT AFF
ELECTRIC
POWER (Y / N) REMARKS
FOLDING SHOWER SEAT BOBRICK B-5181 18" (TOP) NFSS
GRAB BAR - 42" BOBRICK B-5086-42 34" (CTRLINE) NGB-1
GRAB BAR - 36" BOBRICK B-5086-36 NGB-2
SOAP DISH BOBRICK B-4390 NRSD
MIRROR BOBRICK B-165 2436 NMR
PAPER TOWEL DISPENSER GFCI -- 54" (TOP) NPTD
SHOWER CURTAIN BOBRICK B-204-2 SEE SCR NSC
SHOWER CURTAIN ROD BOBRICK B-207 78" (TOP) NSCR
TOILET TISSUE DISPENSER GFCI -- 28" (TOP) NTTD
NWASTE RECEPTACLE GFCI -- 42" - 46" (TOP)
N
WR
UTILITY SHELF BOBRICK B-223 36 72" (TOP)US
ROBE HOOK BOBRICK B-672 40" (TOP) NRH
34" (CTRLINE)
MIRROR - FULL LENGTH BOBRICK B-165 2460 NMR2
40" (BOTTOM)
24" (BOTTOM)
42" (BOTTOM)
ABA
GRAB BAR - 18" BOBRICK B-5086-18 42" (CTRLINE) NGB-3
GRAB BAR - SHOWER BOBRICK B-5837 NGB-4 34" (CTRLINE)
VERTICAL
B4 / A-572
FINISH FLOOR
EL: 100' - 0"
A3 A-572
B3 A-572
A2 A-572
3' - 2" 3' - 6"
PT-2PT-2PT-5 PT-2
1' - 9" 1' - 9" 3' - 0" 1' - 9" 1' - 9"
RECYCLING
(GFGI)
MEN
S110
WOMEN
S108
JANITOR
S109
S108
S109
S110
A-411
B4
B3
A-411
C4
C3
0E
0E0E
0E
0D
0E
0E
0E
5' - 0" 9' - 3 1/2"
8'
- 0
1/ 4"
9'
- 8
2' - 6" 1' - 10"
CL
EA
R
5'
- 0
" T
YP
IC
AL
1'
- 6
2 3
/4"
4'
- 0
4'
- 0
0E
0E
0E
2'
- 1
0"
(PTD)
(WR)
(PTD)
(WR)
(US)
FINISH FLOOR
EL: 100' - 0"
CWT-1
CWT-2
CWB-1
(MR)
2' - 0"1' - 10"2' - 2"
PT-1
3'
- 4
8 3
(PTD)
1' - 10"2' - 6"
(WR)
FINISH FLOOR
EL: 100' - 0"
CWT-1
CWT-2
CWB-1
(GB-2)
(GB-1)
3'
- 4
PT-7
PT-1
3' - 6" 3' - 0 5/8"
CLEAR, TYPICAL
5' - 0"
TYP, CLR
3' - 0"
TTD-1
NOTE: PROVIDE FULL HEIGHT CERAMIC WALL
TILE AT PARTITIONS WITH TOILETS AND URINALS.
THE REMAINING PARTITIONS IN THE RESTROOM
TO RECEIVE CERAMIC WALL TILE WAINSCOT.
FINISH FLOOR
EL: 100' - 0"
CWT-1
CWT-2
CWB-1
(GB-2)
(GB-1)
PT-7
3'
- 4
PT-1
3' - 1" 3' - 6"
TYPICAL, CLEAR
5' - 0"
TYP, CLR
3' - 0"
(TTD)
NOTE: PROVIDE FULL HEIGHT CERAMIC WALL
TILE AT PARTITIONS WITH TOILETS. THE
REMAINING PARTITIONS IN THE RESTROOM
TO RECEIVE CERAMIC WALL TILE WAINSCOT.
FINISH FLOOR
EL: 100' - 0"
CWT-1
CWT-2
CWB-1
(MR)
2' - 2"1' - 10"2' - 0"
PT-1
3'
- 4
(PTD)
(WR)
2' - 6"1' - 10"
S4 S3
SF
SE
WEAPON SYSTEM COMPUTER ROOM
S124
D1 A-411
D1 A-411
D3 A-411
D1 A-411
0G
0G
0H
S1
START POINT
1' - 0"
6"
0H
1' - 6 1/2" 4' - 0 1/2"
EQ EQ
2'
- 1
0"
2'
- 6
1/ 2"
1' - 6" 4' - 0 1/2"
8" 2'
- 1 0"
EQ EQ
2' - 6"
3'
- 8
1/ 2"
2'
- 6
1/ 2"
GAPS NOT TO EXCEED MARGIN
SET BY WIDTH OF WALL BASE
OR THRESHOLD MOLDING (TYP.)
STRINGER WITH COATING
RAISED ACCESS FLOOR PANEL -
FULL SIZE OR CUT AGAINST WALL.
USE WOOD SHIM IF NECESSARY
TO ARREST SHIFTING.
PERIMETER PEDESTAL
ASSEMBLY
CONCRETE SLAB, REFER TO
STRUCTURAL DRAWINGS
PERIMETER WALL
CONTINUOUS ACOUSTICAL SEALANT
PERIMETER HEAD ASSEMBLY
24" STRINGER CUT BACK ON
SITE TO SUIT PERIMETER DIMENSIONS
PEDESTAL ASSEMBLY, REFER
TO DETAIL THIS DRAWING
RAISED ACCESS FLOOR PANEL
FIELD CUT
CONCRETE SLAB, REFER TO
STRUCTURAL DRAWINGS
CONTINUOUS ACOUSTICAL SEALANT
GAPS NOT TO EXCEED MARGIN
SET BY WIDTH OF WALL BASE
OR THRESHOLD MOLDING (TYP.)
FLOOR FINISH, REFER TO
ROOM FINISH SCHEDULE
PERIMETER WALL
MAX
4"
6"
6" 6"
5” (NOMINAL) GROMMETS WITH COVERS
RAISED ACCESS FLOORING PANEL
NOTE:
GROMMETS SHALL BE ROTARY LID WITH
INTEGRAL FOAM INSERTS
COORDINATE CUT-OUT PANEL
LOCATION WITH TELECOMM,
ELECTRICAL AND MECHANICAL
EQUIPMENT
1.
2.
REFLECTED CEILING PLAN LEGEND
GYPSUM BOARD CEILING
APC-1
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
LINEAR SUPPLY AIR DIFFUSER
LINEAR RETURN AIR DIFFUSER
EXHAUST AIR GRILL
EXHAUST FAN
EXIT SIGN (DARKENED AREA DENOTES LIGHTED FACE, TRIANGLES INDICATE
EMERGENCY LIGHTS)
OCCUPANCY SENSOR, CEILING MOUNTED, MULTI DIRECTIONAL
LIGHTING FIXTURES,
REFER TO ELECTRICAL
ACCESS PANEL
FIRE SUPPRESSION -
SIDEWALL SPRINKLER
FIRE ALARM - CEILING SPEAKER
VS
OCCUPANCY SENSOR, CEILING MOUNTEDOS OS
PHOTOCELL SENSOR, CEILING MOUNTEDPC
5'
- 0
" M
IN
IM
UM
(C
LE
AR
(G B -
2)
3'
- 0
" M
IN
1'
- 6
" C
LE
AR
6" M
AX
3" M
AX
3' - 6" MIN (CLEAR)
2'
- 0
" M
IN
2'
- 8
" M
IN
2'-0" MIN
GRAB BAR
3' - 4" TO VERTICAL
(GB-1)
3' - 6" MINIMUM1' - 0" MAX
4' - 4" MINIMUM
56" MINIMUM (WALL HUNG)
59" MINIMUM (FLOOR MOUNTED)
TISSUE DISPENSER
2' - 10" TO TOILET
(TTD)
(GB-3)
IAINNFCOQUEIAEENTSCI
GEOGR APH I A E PENE TR AM
US
A I R
N A T I ON A L
GU AR
D
C I V I L
E N G I N E E R I N G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018As indicated
1/
/2
3:
:4
PM
BI
M
U
S
- N or th
C ar ol in a Ai r N at io na l G ua rd /N
C
AN
G
C
F lig ht S im ul at or
AR
C H
V1
7.
rv t
A-411
D. FLIPPEN
N. FREY
B. DYSON
ARCHITECTURAL
C-17 FLIGHT SIMULATOR
ENLARGED PLANS AND INTERIOR ELEVATIONS
1/4" = 1'-0"
2' 4' 8' 12'
1 MOP SINK WITH PLASTIC PANELING - REFER TO A3 / A-573
2 FLOOR DRAIN / CLEANOUT. FLOOR SLOPES TO DRAIN - REFER TO PLUMBING
3 WALL MOUNTED SINK WITH INTEGRAL APRON, REFER TO PLUMBING
4 REFRIGERATOR (GFGI)
5 TOILET PARTITION - TP-1
6 BASE AS SCHEDULED
7 FIRE ALARM EQUIPMENT - REFER TO FIRE ALARM DRAWINGS
8 GFCI RECEPTACLE - REFER TO ELECTRICAL.
9 CONTROL JOINT - REFER TO B4 / A-571
10 ACCESSIBLE TOILET STALL - REFER TO A4 / A-411
11 ACCESS PANEL - REFER TO B3 / A-571
1/4" = 1'-0"
A-111
B1 INTERIOR ELEVATION - ADMIN / INSTRUCTORS S104
1/4" = 1'-0"
A-111
A2 ENLARGED FLOOR PLAN
1/4" = 1'-0"
A-411
B4 INTERIOR ELEVATION - MEN S110
1/4" = 1'-0"
A-411
B3 INTERIOR ELEVATION - MEN S110
1/4" = 1'-0"
A-411
C3 INTERIOR ELEVATION - WOMEN S108
1/4" = 1'-0"
A-411
C4 INTERIOR ELEVATION - WOMEN S108
1/4" = 1'-0"
A-111
A1 ENLARGED FLOOR PLAN - RAISED ACCESS FLOOR
N
N
1/4" = 1'-0"
A-131
A3 ENLARGED REFLECTED CEILING PLAN
N
NOT TO SCALE
A-411
D3 RAISED ACCESS FLOORING AT PERIMETER
NOT TO SCALE
A-411
D1 RAF AT PERIMETER CANTILEVER
NOT TO SCALEC1 PANEL GROMMET CUT-OUT
A-411
1/2" = 1'-0"A4 ACCESSIBLE TOILET STALL
S3
SE
5' - 10" 3' - 0" 15 TREADS AT 11" = 13' - 9"
/8
3'
4" 8"
A2
A-422
1' - 0"
DRAWBRIDGE
PLATFORM BY
OTHERS
/8
B3
A-422
SIMILAR
1' - 0"5 1/4" 3' - 8" 3'
4"
FINISH FLOOR
EL: 100' - 0"
MECH MEZZANINE
EL: 114' - 0"
S3
R
IS
E
R S
A T
/8
8'
/2
EXPOSED STRUCTURAL
CROSS-BRACING BEYOND
SIMULATOR AIR
CONDITION UNIT
RAIL
A-422
B5
A-422
A5
A-422
A3
A-422
B3
SIMILAR
REFER TO D2 / S-131
FOR STRUCTURAL
DETAILS
STEEL POSTS,
REFER TO
STRUCTURAL
PLATFORM STRUCTURAL
FRAMING MEMBER
1"
TYP TREAD
11"
4"
2" SQUARE STEEL TUBE
AT VERTICAL SUPPORTS,
TOP AND BOTTOM RAILS
METAL GRATE
PLATFORM - REFER TO
STRUCTURAL
METAL GRATE
TREADS
2"
4" 3"
3'
0" H
A N
D R
A
IL
HANDRAIL 1 1/2" DIA.
PIPE
3'
6" G
U A
R D
R A
IL
3/4" DIA. PIPE
PICKETS AT 4" O.C.
4"
3'
6" G
U A
R D
R A
IL
KICK PLATE
3' - 3"
SLOT POST,WELDED EACH
SIDE TO STEEL PLATE,
REFER TO STRUCTURAL
3/4" DIA. PIPE PICKETS
AT 4" O.C.
STRINGER
HANDRAIL 1 1/2" DIA. PIPE
PROVIDE WELDED CLOSURE
PLATE FLUSH WITH STRINGER
3"
4"
M
AX
3/
4"
2" SQUARE STEEL TUBE AT
VERTICAL SUPPORTS, TOP
AND BOTTOM RAILS
1' - 0"
METAL GRATE TREAD
1' - 0"
2" SQUARE STEEL TUBE
AT VERTICAL SUPPORTS,
TOP AND BOTTOM RAILS
5'-0" MAX.
BETWEEN VERTICAL SUPPORTS
3'
0"
H A
N D
R A
IL
M
AX3
3/ 4"
4"
METAL GRATE TREAD
C 12" STRINGER
HANDRAIL, 1/2" DIA. PIPE
3/4" DIA. PIPE PICKETS
AT 4" O.C.
1" 11"
3'
6" G
U A
R D
R A
IL
CONTINUOUS STEEL
EDGE ANGLE
FLOOR SLAB ON
METAL DECK
2" SQUARE STEEL TUBE AT
VERTICAL SUPPORTS,
TOP AND BOTTOM RAILS
STRINGER
3/4" DIA. PIPE PICKETS
AT 4" O.C.
G U
A R
D R
A
IL
3'
6"
2"
M A
X
3/
4" 6"
HANDRAIL WHERE
OCCURS
1 1/2" MINIMUM CLEAR
4 7/8"
IAINNFCOQUEIAEENTSCI
G E
O G
R A
PH
I AE PENE T
R A
M U
S
A I
R
N A T I O N A L
G
U A
R D
C I
V
I L
E N G I N E E R
I N
G
FJRP
159062
145TH AIRLIFT WING
NORTH CAROLINA AIR NATIONAL GUARD
CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA
SCALE
DESIGNED BY
REVIEWED BY
DATE
AE PROJ. NO.
DRAWN BY
SHEET
PROJECT NO.
NCANG CIVIL ENGINEERING
REVISIONS
INITIALDESCRIPTIONDATEREV
CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA
F6W71900
C-17 FLIGHT SIMULATOR TRAINING FACILITY
54321
D C
B A
08/17/2018As indicated
/8
/2
:5
:0
P
M B
IM
/U
S
N o rt h C a ro lin a
A ir N a ti o n a l G u a rd
/N C
A N
G
C
F lig h t S im u la to r
A
R C
H
V
.r v t
A-422
D. FLIPPEN
N. FREY
B. DYSON
ARCHITECTURAL
C-17 FLIGHT SIMULATOR
ENLARGED STAIR PLAN, SECTIONS, AND DETAILS
1/4" = 1'-0"
A-111
B2
ENLARGED PLAN - STAIR S127
1/4" = 1'-0"
A-422
A2
SECTION - STAIR S127
1 1/2" = 1'-0"
A-421
A5
METAL GRATE TREAD/RISER DETAIL
1 1/2" = 1'-0"
A-421
B5
METAL GRATE TREAD/RISER DETAIL
1 1/2" = 1'-0"
A-421
A3
METAL GRATE TREAD/RISER WITH INTERMEDIATE POST
1 1/2" = 1'-0"B3
SECTION AT GUARDRAIL
A-422
60.00°
4" x 1 1/4" ALUM.
SERRATED TREAD, TYP.
2" x 6" x 1/8" ALUM.
EXTRUDED CHANNEL
LADDER STRINGERS
FRONT ELEVATION SIDE ELEVATION
1 1/2" ALUM. SCHEDULE
40 PIPE HANDRAIL
EQ
UA
L S
PA
CE
S
AT
FINISH FLOOR
MA
X
VA
RI
ES
2'
- 6
VA
RI
ES
2" x 6" x 1/8" ALUM.
EXTRUDED CHANNEL
LADDER STRINGERS
4" x 1 3/8" x 3/16" 2" LONG
ALUM. ANGLE FLOOR
BRACKET BY LADDER MFR.
CONCRETE DECK -
REFER TO STRUCTURAL
SAFETY END CAP
CLEAR
2' - 0"
3'
- 6
1 1/2" ALUM. SCHEDULE
40 PIPE HANDRAIL
UPPER LEVEL
(MECH. MEZZANINE)
EL: 114' - 0"
LOWER LEVEL
EL: 100' - 0"
ATTACHMENT BY
LADDER
MANUFACTURER
8" (NOM.) CMU1/2"8"
7"
SAFETY POST
SAFETY RAIL
ALUMINUM FLOOR BRACKET
BY LADDER MFR.
FINISH FLOOR
EL: 114'-0"
1'
- 0
1'- 0"
M
AX
IM
UM
ALUMINUM BRACKET BY
LADDER MFR., TYPICAL
A-532 B4
1 1/4" ALUMINUM
SERRATED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.