CG-101_-_SITE_GRADING_&_DRAINAGE_PLAN_SIM_BLDG_Amendment_003.pdf

PDF 487 KB Posted

Attached to
Construct C-17 Simulator Facility Federal contract opportunity
Solicitation number
W91242-19-B-5002
Issued by
Department of the Army North Carolina Army National Guard

About this file

CG-101

View the file

Other files for this federal contract opportunity

Other files attached to Construct C-17 Simulator Facility, newest first.
File Type Posted
Bid_Opening_Sign_in_sheet.pdf PDF
OF_1419_-_Bid_Opening_Abstract.pdf PDF
A-504_-_EXTERIOR_WALL_SECTIONS_SIM_BLDG_Amendment_003.pdf PDF
A-505_-_EXTERIOR_WALL_SECTIONS_SIM_BLDG-Amendment_003.pdf PDF
S-505_-_STRUCTURAL_TYPICAL_DETAILS_SIM_BLDG_Amendment_003.pdf PDF
W91242-19-B-5002-0003.pdf PDF
Q&A__3.pdf PDF
A-411_-_ENLARGED_PLANS_AND_INTERIOR_ELEVATIONS_SIM_BLDG_Amendment_003.pdf PDF
A-705_-_STOREFRONT_AND_CURTAINWALL_DETAILS_SIM_BLDG_Amendment_003.pdf PDF
A-511_-_EXTERIOR_WALL_DETAILS_SIM_BLDG_Amendment_003.pdf PDF
M-111-_HVAC_PLANS_SIM_BLDG_Amendment_003.pdf PDF
A-606_-_WINDOW_AND_STRUCTURED_POLYCARBONATE_WALL_PANEL_TYPES_SIM_BLDG_Amendment_003.pdf PDF
08_04_00_-_Blast_Resistance_SIM_BLDG_Amendment_002.pdf PDF
Q&A__2.pdf PDF
08_45_13_-_Structured-Polycarbonate-Panel_Assemblies_SIM_BLDG_Amendment_002.pdf PDF
W91242-19-B-5002-0002.pdf PDF
S-001_-_STRUCTURAL_GENERAL_NOTES_SIM_BLDG_Amendment_002.pdf PDF
CS-101_-_SITE_LAYOUT_PLAN_SIM_BLDG_Amendment_002.pdf PDF
A-601_-_Amendment_0001.pdf PDF
C-502_-_Amendment_0001.pdf PDF
Q&A__1,_29_April_2019.pdf PDF
W91242-19-B-5002-0001.pdf PDF
PreBidSlides_W91242-19-B-5002.ppt PPT presentation
Pre-Bid_Sign-in_Sheet.pdf PDF
Solicitation_Attachment_11_-_Q&A_Simulator_Building_-_Previous_Solicitation.pdf PDF
Solicitation_Attachment_10_-_Visitor_Request_Worksheet.pdf PDF
Solicitation_Attachment_4_-_NCANG_C-17_SIM_B-3_DRAWINGS_Vol2of3_-_Final.pdf PDF
W91242-19-B-5002.pdf PDF
Solicitation_Attachment_8_-_Brand_Name_Justification_MONACO_Redacted.pdf PDF
Solicitation_Attachment_3_-_NCANG_C-17_SIM_B-3_DRAWINGS_Vol1of3_-_Final.pdf PDF
Solicitation_Attachment_12_-_SOW_C-17_Sim_Facility.pdf PDF
Solicitation_Attachment_7_-_Brand_Name_Justification_ALERTON_Redacted.pdf PDF
Solicitation_Attachment_1_-_NCANG_C-17_SIM_B-3_SPECS_Vol_1of2_17-Aug-2018_-_Final.pdf PDF
Solicitation_Attachment_5_-_NCANG_C-17_SIM_B-3_DRAWINGS_Vol3of3_-_Final.pdf PDF
Solicitation_Attachment_9_-_Pre-Bid_Conference_and_Site_Visit,_Bid_Drop-Off_Map1.pdf PDF
Solicitation_Attachment_2_-_NCANG_C-17_SIM_B-3_SPECS_Vol_2of2_17-Aug-2018_-_Final.pdf PDF
Solicitation_Attachment_6_-_NCANG_C-17_SIM_B-3_SUPPLEMENTAL_INFO_17-Aug-2018.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A1

SITE GRADING & DRAINAGE PLAN

N

SHEET NOTES

KEY NOTES

DRAINAGE STRUCTURE SCHEDULE

1. PROVIDE 90° VERTICAL BENDS 24-INCHES BELOW GRADE AND

CONNECT TO CAST IRON DOWNSPOUT BOOT. PROVIDE TRANSITION

FITTING TO CONNECT PVC PIPE TO CAST IRON BOOT. REFER TO

ARCHITECTURAL PLANS FOR DOWNSPOUT LOCATIONS.

2. BRANCH LINES CONNECTING TO DOWNSPOUTS SHALL BE 8-INCH PVC

SLOPED AT 0.50% MINIMUM, UNLESS NOTED OTHERWISE. CONNECT AT

24 INCHES BELOW FINISHED GRADE AND INSTALL AN IN-LINE CLEANOUT

5 FEET FROM BUILDING ON THE BRANCH LINE.

3. ALL HORIZONTAL BENDS ON PVC STORM SEWER PIPING SHALL BE 45°,

UNLESS NOTED OTHERWISE.

4. MEET EXISTING PAVEMENT IN LINE AND AT GRADE.

CG-101

S. LEARN

R. CROWLEY

D. DEIBLE

1" = 30'

0 30 60

STRUCTURE ID

STMH 5

DI 11

DI 12

DETAIL REF.

1/C503

7/C504

10/C503

RIM ELEV.

701.07

702.75

703.60

INVERT IN

697.50

699.80

698.90

INVERT OUT

697.40

699.70

698.80

FLARED END SECTION. SEE DETAIL 6 ON SHEET C504

NYLOPLAST 24" DIAM. DRAIN BASIN. SEE DETAIL 7 ON SHEET C504

EXTEND RIP RAP DOWN TO TOE OF SLOPE

5 LF 8" PVC (TYP OF 3) CONNECT ROOF DRAIN TO STORM DRAIN.

SEE SHEET NOTE 1.

12 LF 8" PVC (TYP OF 2) CONNECT ROOF DRAIN TO STORM DRAIN.

SEE SHEET NOTE 1.

IAINNFCOQUEIAEE NTSCI

GEO

GR APH I A E P ENE T RAM

U S

A I R

N A T I O N A L

GU AR

D

C I V I L

E N G I N E E R

I N G

FJRP

159062

145TH AIRLIFT WING

NORTH CAROLINA AIR NATIONAL GUARD

CHARLOTTE-DOUGLAS IAP, NORTH CAROLINA

SCALE

DESIGNED BY

REVIEWED BY

DATE

AE PROJ. NO.

DRAWN BY

SHEET

PROJECT NO.

NCANG CIVIL ENGINEERING

INITIALDESCRIPTIONDATEREV

CHARLOTTE-DOUGLAS IAP CHARLOTTE, NORTH CAROLINA

F6W71900

54321

D C

B A

/1

6/

1:

:4

PM

C :\p w w or ki ng \g bn a\ cr ow le ra

\d

1\ C

G -1

-S

IM

.d w g

08/17/2018

1 5/06/19 AMENDMENT 003 RAC

CG-101 - SIM
Layout1

File details come from the government source that posted it.