Solicitation_Attachment_11_-_Q&A_Simulator_Building_-_Previous_Solicitation.pdf

PDF 175 KB Posted

Attached to
Construct C-17 Simulator Facility Federal contract opportunity
Solicitation number
W91242-19-B-5002
Issued by
Department of the Army North Carolina Army National Guard

About this file

Q&A from previous solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Construct C-17 Simulator Facility, newest first.
File Type Posted
Bid_Opening_Sign_in_sheet.pdf PDF
OF_1419_-_Bid_Opening_Abstract.pdf PDF
A-504_-_EXTERIOR_WALL_SECTIONS_SIM_BLDG_Amendment_003.pdf PDF
A-505_-_EXTERIOR_WALL_SECTIONS_SIM_BLDG-Amendment_003.pdf PDF
S-505_-_STRUCTURAL_TYPICAL_DETAILS_SIM_BLDG_Amendment_003.pdf PDF
W91242-19-B-5002-0003.pdf PDF
Q&A__3.pdf PDF
CG-101_-_SITE_GRADING_&_DRAINAGE_PLAN_SIM_BLDG_Amendment_003.pdf PDF
M-111-_HVAC_PLANS_SIM_BLDG_Amendment_003.pdf PDF
A-606_-_WINDOW_AND_STRUCTURED_POLYCARBONATE_WALL_PANEL_TYPES_SIM_BLDG_Amendment_003.pdf PDF
A-411_-_ENLARGED_PLANS_AND_INTERIOR_ELEVATIONS_SIM_BLDG_Amendment_003.pdf PDF
A-705_-_STOREFRONT_AND_CURTAINWALL_DETAILS_SIM_BLDG_Amendment_003.pdf PDF
A-511_-_EXTERIOR_WALL_DETAILS_SIM_BLDG_Amendment_003.pdf PDF
08_04_00_-_Blast_Resistance_SIM_BLDG_Amendment_002.pdf PDF
Q&A__2.pdf PDF
CS-101_-_SITE_LAYOUT_PLAN_SIM_BLDG_Amendment_002.pdf PDF
08_45_13_-_Structured-Polycarbonate-Panel_Assemblies_SIM_BLDG_Amendment_002.pdf PDF
W91242-19-B-5002-0002.pdf PDF
S-001_-_STRUCTURAL_GENERAL_NOTES_SIM_BLDG_Amendment_002.pdf PDF
A-601_-_Amendment_0001.pdf PDF
C-502_-_Amendment_0001.pdf PDF
Q&A__1,_29_April_2019.pdf PDF
W91242-19-B-5002-0001.pdf PDF
PreBidSlides_W91242-19-B-5002.ppt PPT presentation
Pre-Bid_Sign-in_Sheet.pdf PDF
Solicitation_Attachment_10_-_Visitor_Request_Worksheet.pdf PDF
Solicitation_Attachment_4_-_NCANG_C-17_SIM_B-3_DRAWINGS_Vol2of3_-_Final.pdf PDF
W91242-19-B-5002.pdf PDF
Solicitation_Attachment_8_-_Brand_Name_Justification_MONACO_Redacted.pdf PDF
Solicitation_Attachment_3_-_NCANG_C-17_SIM_B-3_DRAWINGS_Vol1of3_-_Final.pdf PDF
Solicitation_Attachment_9_-_Pre-Bid_Conference_and_Site_Visit,_Bid_Drop-Off_Map1.pdf PDF
Solicitation_Attachment_2_-_NCANG_C-17_SIM_B-3_SPECS_Vol_2of2_17-Aug-2018_-_Final.pdf PDF
Solicitation_Attachment_6_-_NCANG_C-17_SIM_B-3_SUPPLEMENTAL_INFO_17-Aug-2018.pdf PDF
Solicitation_Attachment_12_-_SOW_C-17_Sim_Facility.pdf PDF
Solicitation_Attachment_7_-_Brand_Name_Justification_ALERTON_Redacted.pdf PDF
Solicitation_Attachment_1_-_NCANG_C-17_SIM_B-3_SPECS_Vol_1of2_17-Aug-2018_-_Final.pdf PDF
Solicitation_Attachment_5_-_NCANG_C-17_SIM_B-3_DRAWINGS_Vol3of3_-_Final.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Previous C-17 Corrosion Control and Fuel Cell Hangar Solicitation

Solicitation Number W91242-18-R-0001

Question: Pre-bid substitution requests

Answer: See Section 01 60 00 paragraph 2.2. Contracting Officer will consider requests for substitution if received within 60 days after the Notice to Proceed. Proposals shall be based on the contract plans and specifications as posted. After award, the awarded General Contractor (GC) may submit a substitution request, but only per the substitution request process as defined in the Division 1 Specification Section (01 60 00) describing that process.

Question: Provide the seismic analysis of the site, the seismic design category, and the seismic coefficient to be utilized for the project.

Answer: Seismic design parameters are shown on drawing Sheet S-001. Refer to Structural General Note 1.6.B.7.

Question: Specification section 08 4513 – Structured Polycarbonate Panel Assemblies

Window schedule per drawing A607 for Polycarbonate Panels

08 4513 /2.1/E. Windborne Debris Impact Resistance Testing for Large and Small Missile when tested according to ASTM E1886 and ASTM E 1996.

Is this a requirement for this scope and project?

Answer: Yes, the project location has experienced hurricanes in the past.

Question: Will the contractor be required to secure DOT permits for this project?

Answer: This project does not require permit approval from the North Carolina Department of Transportation.

Question: Who is the utility supplier for the project location? I.E. electrical, water, telephone, internet

Answer:

• Water & Sewer: North Carolina Air National Guard

• Natural Gas: Piedmont Natural Gas.

• Electricity: Duke Power

• Telephone/Internet: North Carolina Air National Guard

Question: Will the owner supply CAD files of the project drawings to the contractor?

Answer: Yes. Refer to Specification Section 01 33 00, Section 1.3.B.

Question: To eliminate an inferior single panel system from providing system that does not meet the span and air infiltration performance, suggest replacing specification 084513 section 2.3 A with the following: Translucent, Multiwall Cellular Polycarbonate Panel Thermally Broken Assembly: Consisting of two independent, multiwall cellular cross-section, polycarbonate glazing panels with air- insulated spaces and coextruded UV protection, integrated into a panel assembly with concealed metal connecters. Design panels for exterior panel replacement, independent of interior single panel and without exposing the interior, or compromising weather-tightness, or interfering with the normal working functions of the building Panel Thickness: Overall assembly minimum 4 inch (102 mm)

Answer: Non-Concur. The multiwall panel system requirements for the STRUCTURED-POLYCARBONATE- PANEL ASSEMBLIES are clearly defined in specification section 08 45 13 - STRUCTURED-

POLYCARBONATE- PANEL ASSEMBLIES.

Question: Is the contractor required to provide Terrorism coverage for this project?

Answer: No, the contractor is not to provide security, and the project site is outside the restricted area for aircraft

Question: Will there be any designated trailer, laydown, or storage areas to be used for this project? If so, where would they be located?

Answer: Please refer to sheet C-002 ‘Construction Plan’ for location of contractor staging/laydown area.

Question: Section 01000, Section 14.1 references a contractor's designated on-site parking area.

There is a laydown yard shown on C-002 for materials, but no parking. Is the contractor to use the two existing lots north of the simulator building for lay down and/or parking, or is there more temporary parking for workers available on base?

Answer: Contractor shall utilize the laydown area, as shown on sheet C-002, or the project site for on-site parking.

Question: Section 011000, 1.5. Please confirm that Personal Property items are to be Gov't Furnished, Gov't Installed.

Answer: Items furnished by the government (personal property [PP]) are to be 'incorporated into the Contractors work' which is to be installed by the GC.

Question: Section 011416, 1.5.B. This section reads all site access must be through a security gate. Detail A2 on C-002 appears to show site access directly from the North along 1st Flight Drive. There is no current access to the site from this location. Is the contractor to create an opening in the fence line and add a security trailer and temporary road? Who will provide the security guard for vetting workers access (the contractor or the gov't)?

Answer: An opening in the fence and a temporary road have been constructed under a separate project, allowing for construction vehicle access on to the installation. Security at the construction entrance will be provided by the North Carolina Air National Guard (NCANG). Further clarification will be provided by local NCANG installation POC's at project kick off meeting.

Question: Section 013100, 1.4.A. The specs are calling for coordination drawings. The drawings issued have title blocks that indicate that the drawings were created in BIM 360 in a native Revit format.

Please confirm if the Revit model can be provided to the contractor after award for coordination modeling.

Answer: BIM model is not available. CAD files of the project drawings will be provided to the contractor in accordance with Specification Section 01 33 00, Section 1.3.B.

Question: Section 015000, 2.1.A. Can temporary fence posts be driven into soil (in lieu of using concrete bases)?

Answer: Concrete blocks are to be used for all fence posts associated with the temporary construction fencing.

Question: Section 015000, Section 2.2.B calls for a fully furnished Gov't field office. Specification 01 10 00, 1.3.D notes that a Gov't field office is not required. Please confirm if the contractor is to provide the Gov't field office in 2.2.B.

Answer: Specification Section 01 10 00, 1.3.D does not refer to government field office. It states 'temporary office swing space' of which it states it is not required. Specification Section 0150 00, Section 2.2.B is correct and shall be provided as defined.

Question: Section 230923, 3.9.C. Please confirm the two year warranty on the direct digital controls is provided by the installer and/or manufacturer of the system (for the parts and labor as noted).

Answer: Provide a 2-year warranty parts and labor as specified in documents, including calibration and adjustment of system.

Question: A-602. The finish schedule calls for a "SC-1" sealed concrete in many rooms throughout the project. The material legend on A-601 gives specific product details for every other flooring type except SC-1. Please provide details on the SC-1 concrete sealer (Mfr, Color, etc).

Answer: Refer to specification section 03 30 00 - CAST-IN-PLACE CONCRETE, Paragraph 2.8, A for sealed concrete requirements.

Question: S-504. Detail C1 on S-504 notes to shore cantilevers but does not indicate a distance. Are we to assume any cantilevers over 12" should be shored?

Answer: Per note 3 on C1/S-504, cantilevers over 6” shall be shored until concrete has attained 3000 psi compressive strength.

Question: 01 10 00. Section 1.8.H reads that the Contractor is responsible for Permit and Tapping Fees (Both temporary and final hook-up) for utilities. This is also mentioned in 01 50 00 1.3.D. Please confirm if the Authority Having Jurisdiction for this project is the City of Charlotte. In addition, please confirm the contractor is to pay the tap and capacity fees for the temporary and permanent utilities as this is a substantial project cost.

Answer: The following is the list of AHJs for each utility service:

• Water& Sewer: North Carolina Air National Guard

• Natural Gas: Piedmont Natural Gas.

• Electricity: Duke Power

• Telephone/Internet: North Carolina Air National Guard

Yes, provide in accordance with 01 10 00, 1.8.H and coordinate with AHJ on all applicable permit fees.

Question: 01 81 13. Please confirm the contractor is responsible for paying all LEED Registration fees and for obtaining the project certificates/plaques at project completion.

Answer: Yes as stated in Specification Section 01 81 13 - SUSTAINABLEDESIGN REQUIREMENTS, Section 1.1.A

Question: Are the prime contractors to include builder’s risk insurance in the base price?

Answer: See clause 52.228-1 and also section 01000 paragraph 1 for insurance requirements.

Question: Compressed air piping diagram schematic shows a pressure transmitter and control valve that appears to be connected to BAS. No points are listed in the function schedules or is a diagram included in the mechanical drawings. What alarm functions are needed, i.e. strobe, horn for breathing air? Should CO monitor also provide alarm? Please explain what HMI stands for in same diagram.

Answer: See Specification Section 23 09 23 – DIRECT DIGITIAL CONTROL FOR HVAC SYSTEM, and Sheets M-703 and M-705.

Question: There is a conflict in the specs and the FP drawings as to what piping to utilize. Is the following piping acceptable? If not please clarify piping to be provided. 2” and Smaller – Black Schedule 40 Grade A ASTM A53, ERW pipe. 2 ½” and larger – Black Schedule 10 Grade A ASTM A53, ERW pipe.

Answer: Yes, the pipe schedules identified in note L on drawing FX-001 and as stated in this question are acceptable. Refer to Specification 21 13 25.

Question: There is a conflict in the specs and the FP drawings in regards to the mesh size on the strainer. What mesh size is required?

Answer: The basket strainer mesh size should be in accordance with UFC 4-021-01 section 3-6.8.3. This section permits mesh size to be no greater than 1/4 in. Refer to Specification 21 13 25.

Question: 08 45 13 /2.3/A.1. Cell insulation: Fill cellular cross sections with aerogel. Is this a requirement for this scope and project? The performance values listed within the specifications do not reflect an aerogel filled panel.

Answer: Specification section 08 45 13 - STRUCTURED-POLYCARBONATE-PANEL ASSEMBLIES has been revised to removal aerogel requirements.

Question: Are there any blast requirements for the project such as UFC 4-010-01? This is a requirement in the curtain wall specification 084413 but not called out in the polycarbonate section.

Answer: The exterior building envelope shall be designed in accordance with UFC 4-010-01 for the blast requirements defined in Specification SECTION 08 04 00 BLAST RESISTANCE. See Specification section 08 45 13 - STRUCTURED-POLYCARBONATE-PANEL ASSEMBLIES has been revised to reference blast requirements.

Question: Is there a fee associated with the obtaining of the FAA Badges, required by specification 01 10 00 – 4 paragraph 1.7 I.

Answer: See Specification 01 10 00, paragraph 1.7. FAA badges are not required in order to perform work on the flight line.

Question: Specification section 2.1 I 2. Calls for a SHGC of 0.6 however per IECC requirements of North Carolina the SHGC for vertical fenestration per table 502.3 is 0.40 aluminum finish. Please Change SHGC min requirement to 0.40

Answer: The minimum SHGC requirement of 0.40 has been revised in specification section

08 45 13 - STRUCTURED-POLYCARBONATE-PANEL ASSEMBLIES.

Question: Specification 084513 makes no mention of any UFC 04-010-01 blast requirements for the polycarbonate systems. Design criteria note 1.6 C on plan page S-001 lists the C17 hangar as low occupancy and the C17 Simulator building as inhabited. Please clarify if any polycarbonate units have to be designed to meet UFC blast. If so, what is the blast load to be designed to? If this is required, a redesign of steel support structure may be required to accommodate loads.

Answer: The exterior building envelope shall be designed in accordance with UFC 4-010-01 for the blast requirements defined in Specification SECTION 08 04 00 BLAST RESISTANCE. See Specification section 08 45 13 - STRUCTURED-POLYCARBONATE-PANEL ASSEMBLIES has been revised to reference blast requirements. Backing structural steel elements to which the Basis of Design polycarbonate system will attach have been designed for the appropriate blast resistance.

Question: Please verify the uneven grade utility pad is to have only two support walls per detail 1 on C-505

Answer: Yes, the Uneven Grade Utility Pad is intended to support a transformer being located on an embankment. The pad detail shall have four walls, supporting the square/rectangular pad on all four sides with step down footing on sides. See drawing C-505.

Question: One section of the concrete stairs is provided on C-502, but a section of the stair wall is not provided. Please provide and also indicate if a finish or precast cap is required.

Answer: Wall is to be 20-inch wide reinforced concrete, 18-inches high, with brick veneer to match building material. Provide a 40”x22”x3” stone coping with 1-inch overhang with drip edge. See detail of wall section has been added on Sheet C-502.

Question: Section 011000, 1.2.C. The LEED summary notes that the GC will hire an independent Commissioning Agent. However, 1.3.B and 01 91 13, 1.1.B says the Gov't will hire the CxA. Please confirm who will hire and pay for the services of the CxA.

Answer: See specification Section 01 10 00, 1.2.C

Question: Section 084513, Specification section 2.1.I.2. calls for a SHGC < 0.6; however North Carolina IECC requirements for vertical fenestrations require a SHGC of 0.40 for aluminum finishes (per Table 502.3). Please clarify.

Answer: The minimum SHGC requirement of 0.40 has been revised in specification section

08 45 13 - STRUCTURED-POLYCARBONATE-PANEL ASSEMBLIES.

Question: Neither spec 080400 nor spec 084513 makes mention of the blast requirements for the polycarbonate panels. Please clarify if the panels are to be blast rated and if so, to what load they are to be designed to.

Answer: The exterior building envelope shall be designed in accordance with UFC 4-010-01 for the blast requirements defined in Specification SECTION 08 04 00 BLAST RESISTANCE. Specification section 08 45 13 - STRUCTURED-POLYCARBONATE-PANEL ASSEMBLIES has been revised to reference blast requirements.

Question: A-701 and A-711. Drawing A-701, masonry partitions have a reference to see B5/A-711 for top of wall or underside of deck condition. The detail B5 on A-711 references a stud wall only.

Please provide a detail for CMU, we are assuming clip angles may be required. Please provide size, spacing and anchorage preference.

Answer: Drawing A-701 has been revised. Refer to C2/S-504 for typical detail at top of CMU partitions

Question: Specification 01 10 00 – 5 para. 1.8 H. requires the contractor to pay all applicable permit fees and tap fees. Who has inspection jurisdiction? Who has permit issuance authority? What are the applicable TAP fees?

Answer: Contractor shall be responsible for obtaining the following permits (and payment of all fees) to include but not limited to:

• Storm water General Permit (NCG01) for Construction Related Activities – Obtained from the North Carolina Department of Environmental Quality

• Soil Erosion & Sedimentation – Obtained from the North Carolina Department of Environmental Quality

• FAA Form 7460-1: Notice of Proposed Construction or Alteration (Required for use of cranes are on- site. As clarification, Hangar and SIM buildings have already obtained FAA approval) – Obtained through the FAA/Obstruction Evaluation/Airport Airspace Analysis (OE/AAA) Office

• Water & Sewer: North Carolina Air National Guard

• Natural Gas: Piedmont Natural Gas.

• Electricity: Duke Power

• Telephone/Internet: North Carolina Air National Guard

This list is being provided as a courtesy only and that it is still the responsibility of the general contractor to identify all required permits IAW Section 01 10 00, Section 1.8 H.

Question: Will the contractor be required to secure FAA permits for this project?

Answer: Per Spec Section 01 10 00, 1.8.H and 01 14 16, 1.4.B, Contractor shall be responsible for submitting FAA Form 7460-1: Notice of Proposed Construction or Alteration to FAA OE/AAA and obtaining approval prior to the commencement of construction for the use of a crane on site.

This information is being provided as a courtesy only and that it is still the responsibility of the general contractor to identify all required permits IAW Section 01 10 00, Section 1.8 H.

Question: Does the contractor have any requirements or possible cost with the securing of Storm water permits, nitrogen buy-down costs or other erosion control permitting?

Answer: Yes. Contractor is responsible for obtaining all environmental permits to include but not limited to the Storm water General Permit (NCG01) for Construction Related Activities and Erosion and Sediment Control through the North Carolina Department of Environmental Quality and payment of all associated fees.

This information is being provided as a courtesy only and that it is still the responsibilIty of the general contractor to identify all required permits IAW Section 01 10 00, Section 1.8 H.

Question: Reference S-510 through S-512, Is it permissible to drill and epoxy the CMU reinforcing dowels verse casting the dowels as shown with the concrete pours? If so, please provide a detail for the drilling and epoxy requirements.

Answer: CMU wall dowels shall be cast-in. Drilled and epoxied dowels are not permitted.

Question: Section 00110, 2.5.1.4. Please confirm if the breakdown for communications support should include Division 27. Please confirm if the site electrical work should go in Division 26 under Comm Support or the Site Utilities line item.

Answer: Communications support should include division 27 and electrical site work should go in division 26.

Question: Section 01000, Section 22.2 notes that asbestos containing materials may be encountered. Please confirm if any unknown hazardous materials are encountered, and the contractor is given a change order to properly dispose of them, that the Gov't will be listed as the generator of the pre-existing hazardous materials on the shipping manifests

Answer: No known asbestos containing materials are known at this time.

Question: Section 011000, 1.8H. This section (and 01 14 16 1.2.A) reads that the GC is responsible for all General and Utility Permits. Most Federal projects are not subject to building permits as they are on Federal property. Please confirm what permits are required for this project.

Answer: Contractor shall be responsible for obtaining the following permits (and payment of all fees) to include but not limited to:

• Storm water General Permit (NCG01) for Construction Related Activities – Obtained from the North Carolina Department of Environmental Quality

• Soil Erosion & Sedimentation – Obtained from the North Carolina Department of Environmental Quality

• FAA Form 7460-1: Notice of Proposed Construction or Alteration (Required for use of cranes are on- site. As clarification, Hangar and SIM buildings have already obtained FAA approval) – Obtained through the FAA/Obstruction Evaluation/Airport Airspace Analysis (OE/AAA) Office.

This list is being provided as a courtesy only and that it is still the responsibility of the general contractor to identify all required permits IAW Section 01 10 00, Section 1.8 H.

Question: Section 014000, 1.5.G. If the contractor submits the qualifications for a testing agency after award and they are acceptable, is there a need to submit a list of 3 firms?

Answer: Three must be submitted for approval.

Question: Clause 52.211-10. Please confirm if any of the items in 01 77 00 can be completed after 540 CD (i.e. Final Punch list or Gov't Training), or if everything in 01 77 00 needs to be completed prior to the 540 CD deadline.

Answer: Everything needs to be completed prior to the 540 CD deadline.

Question: Detail A2 on C-002 shows the main construction entrance coming in from the North where 1st Flight Drive and Minuteman Way meet. Is the contractor expected to install a temporary security booth at this location? Who will provide the security guards for screening workers entering the site at this location?

Answer: An opening in the fence and a temporary road have been constructed under a separate project, allowing for construction vehicle access on to the installation. Security at the construction entrance will be provided by the North Carolina Air National Guard (NCANG). Further clarification will be provided by local NCANG installation POC's at project kick off meeting.

Question: Reference Article 17 of 01000:

a. Please confirm if the Contractor is responsible for performing background checks and badging for all tradesmen, or if background checks and badging are required for foreman and supervisors only.

b. Article 17.3 references HSPD12 and FIPS PUB Number 201. Article 17.5 states that Contractors shall follow instructions provided by the Security Forces of the 145th Airlift Wing. Please provide additional specific instructions that are anticipated for security, background checks, and badging.

Answer: An employee qualified to perform work on the Charlotte-Douglas Air National Guard Base (ANGB) shall either be a US citizen or legal alien resident without a prior felony conviction within the past 10 years per AFI 31-101, Section 4.12 - 4.12.2.9 and the 145 AW Construction Handbook requirements. Further clarification will be provided by local NCANG installation POC's at project kick off meeting.

Question: Are the water and sanitary sewer utilities owned by Charlotte Water? If so, are the very large water and sewer connection and capacity costs to be included by the prime contractor for the multiple water and sanitary sewer utility connections? These costs could be in excess of $100,000 each.

Answer: Water & Sewer utilities are owned and maintained by the North Carolina Air National Guard.

The Contractor is responsible for the identification, obtaining, and payment of all Construction Permit and tapping fees (both temporary and final hook-up) that may be required for the construction of the project (per Section 01 10 00, 1.8.H)

Question: 03 30 00-2.5.H notes Color Pigment for concrete materials. Please clarify this is not required. If so, please indicate what concrete is required to receive this admixture.

Answer: Color pigment is not required. Refer to revised specification section 03 30 00 - CAST-IN-PLACE

CONCRETE.

Question: Drawing S-001, Div 01-1.2.A notes all walls are to be braced/shored until floors and roofs are in place. Please provide requirements on the bracing as the masonry specification does not clarify the requirements.

Answer: Per note 1.2.C. Shoring shall be designed by the Contractor. Per Note 1.1.F., all temporary bracing and shoring shall be designed by structural engineers licensed in the State of North Carolina employed by and working on behalf of the Contractor. Temporary bracing and shoring are part of the means and methods of construction, and are therefore the sole responsibility of the Contractor.

Question: Drawing C-001, under "Survey Notes", there is a note of a field survey completed by LDSI Dated March 2017. Please provide this survey.

Answer: The topographic survey performed by LDSI is depicted on sheet C-101 'Existing Conditions Plan'.

Electronic files of the topographic survey will be made available to the contractor after award.

Question: On Structural drawing S-001 under foundation general note 2.1.C it is saying that undocumented fill under the Hangar site is to be removed and replaced at a depth ranging from 3 to 5-1/2 feet, and depths from 5-1/2 feet to 12 feet at the C17 Simulator building. These ranges are very wide and will have a significant amount of cost increases depending on how much material to be over excavated. Please indicate the amount of material or the depth of over excavation that will be required at each building.

Answer: Per Specification Section 01 10 00 –Summary, 1.8.I a Geotechnical Report has been made available under separate cover and represents all known subsurface soil conditions information. Provide as noted on Sheet S-001 and in accordance with all excavation requirements within Spec Section 31 20 00 – Earth Moving.

Question: Reference Tiling - 093000 specification. 3.3 calls for bullnose tile pieces at tile transitions.

The tile that is specified is a 4x8 tile, and the bullnose pieces only come in 2x8 or 4x12. A 2x8 can be utilized, but will bring the overall height of the wainscot down. An option is to use a Schluter product to give the tile a clean edge at the height shown on the elevations. Please confirm what should be done at these areas.

Answer: Provide wall tile as specified.

Question: The glass specifications do not list values in which to base a product on. We need the Winter and Summer U-Values, the Solar Heat Gain Coefficient, Visible Light Transmittance, Shading Coefficient, etc. What are the performance values?

Answer: Provide glazing to meet thermal and optical performance criteria as specified per specification section 08 80 00 - GLAZING, paragraph 2.2,D. See updated Specification Section 08 80 00.

Question: Is the architect willing to accept a glass make up, with regards to what panes are to be tempered and laminated, and the thickness of the laminated interlayer, as recommended by the curtain wall supplier to meet the specified blast loads?

Answer: Provide glazing to meet blast criteria as specified per Specification sections 08 04 00 - BLAST RESISTANCE, 08 05 00 - COMMON WORK RESULTS FOR OPENINGS, and 08 80 00 - GLAZING.

Question: Spec 075419 sections 3.4.C.1.h & 3.5.A.4 read that the base layer of insulation and cover board, respectively, need to be mechanically attached. This puts the manufacturer's warranty in jeopardy, that is specified 1.10.A

Answer: Provide base layer of insulation and cover board as specified.

Question: On dwg FA-111, room TER S112 is missing a smoke detector. Please verify this is correct.

Answer: Yes, a smoke detector should be provided in TER S112. See sheet FA-111.

Question: On dwg FA-111, vestibule S101 has a symbol for GAP. Please indicate what this is.

Answer: The "GAP" referenced in Vestibule S101 on drawing FA-111 should be a "ANN". This is a remote LCD type annunciator. See sheet FA-111.

Question: On EP111, key note 23 is used for various areas with demountable partitions. However, there is no A-111A architectural drawing do not indicating demountable partitions for the Simulator building.

We assume key note 23 does not apply. Please verify.

Answer: Key note 23 on Sheet EP111 shall apply as part of the OLI. Refer to updated Architectural drawing that reflect the demountable partition OLI requirements. See revised Sheet A-111.

Question: Dwg TS401, detail B1 shows new ductbank from the pullbox merging into esisting conduits running south from Hut 72. We assume that is is incorrect and we are to install a new concrete encased ductbank as shown on TS101. Please verify.

Answer: TS401 with indicated conduits and termination is correct and does not conflict wih TS101.

TS401 provides additional details on the connection at B72.

Question: Regarding the BAS requirements in Spec section 23-09-23 Part 1. General 1.1 Summary A. it calls for the new building’s BAS to be an addition to the existing Alerton base-wide BAS (server).

The existing server has several branded controls systems tied into it. Some are directly integrated into the Alerton server via branded software (Basically all of the Alerton building BAS’s) and some other brands like Schneider are accessible through the Alerton server via a hyperlink to that particular Schneider building BAS. A representative at the pre-bid meeting from the National Guard said that the intent was to provide a native BACnet controls system at the building that would be accessible through the Alerton server. Basically the only true integration (for the purpose of control from the Alerton server) to the Alerton server would be via an Alerton building BAS. However, this approach would eliminate any other controls vendor from submitting a bid, thus disallowing a competitive environment for this part of the project, unless the use of hyperlinking to the Alerton server is acceptable. It appears that the owner’s intent is to have a vibrant field of competitors for this project and to allow open-source, nonproprietary equipment. Will the owner accept server access in the form of a hyperlink to the new building BAS (which would be BACnet with specifically a Tridium JACE front end), similar to the link to the Schneider system?

Answer: Ascent Compass by Alerton is the standard for the base-wide BAS and the new control system provided for this project shall be fully compatible with and integrated into the existing Alerton system as specified in Section 230923, Par. 1.1.A and Par. 2.1.A. Using a third party front-end, gateway or network interface that utilizes non-Alerton software, tools or additional licenses is acceptable provided the GC offers O&M training on the new software to base facility personnel and that the all software to include but not limited to, smart meters, dash boards, points, etc. intergrate seamlessly with the Alerton system. See Specification Section 01 79 00 para. 3.3.A, the contractor is to provide demonstration and training for HVAC controls listed in specification section 23 09 23 per the training schedule provided in this section.

Question: Reference A-701. Wall types OG and 1G on A-701 are noted to be a STC 55 wall type. In order to get this rating, the wall needs to be fully grouted or use of sand in non-reinforced cells. Please verify these wall types need to be STC 55 and should be fully grouted or sand used to meet the STC rating.

Answer: Refer to revised drawings A-111 and A-701 for partition clarifications requiring an STC 55 rating.

Question: Are we required to paint the exposed Roof and Floor decks? These decks are specified as factory primed with manufacturer’s standard baked-on, rust-inhibitive primer (see section 05 31 00 Para. 2.2 & 2.3). Generally, baked-on paints are not required to be painted. The finish of a bake-on paint surface is slick and glossy and it would have to be primed with a Bond Primer that is not included in the specs. If exposed decks are to be painted, can you provide specs for this bond primer?

Answer: See updated drawing A-602 for exposed structural steel to be painted.

Question : Exterior Painting Spec. Section 09 91 13, Paragraph 3.3E indicates to paint exposed MEP Items but it doesn’t list the ductwork. Are we supposed to paint the ductwork?

Answer: There is no exterior ductwork. However, (Interior) exposed ductwork that is insulated/double walled shall be provided with an integral PVC outer surface as indicated in documents.

Question: Interior Painting Spec. Section 09 91 23 doesn’t indicate to paint the Exposed MEP items.

Is this correct?

Answer: Interior Painting Spec 09 91 23 references substrates/surfaces that define painting requirements which include applicable MEP items. See revised Sheet A-602.

Question: Are Overhead Coiling Doors field finish Painted? Spec. Section 08 33 23 indicates Factory Prime Finish with Manufacturer’s standard color. Manufacturer’s standard paints are generally finish paint and not only primed paint.

Answer: Overhead Coiling Doors are to be factory finished. Refer to updated Spec section 08 33 23 - OVERHEAD COILING DOORS for finish requirements.

Question: Please confirm all the exposed structural steel in the hangar is to be painted. Does this include the metal deck as well?

Answer: See revised drawing A-602 for exposed structural steel to be painted.

Question: Please verify below grade foundation wall construction joints will be approved at avg 100' spacing. Drawing S-001, Div 03, 3.1.H says construction joints in walls shall be keyed and placed at approved locations. 3.1.F. says 10-15' intervals, but these are for joints in retaining walls, not foundations. Please verify 100' will be approved.

Answer: CONTROL joints shall be provided at 10 FT to 15 FT intervals in walls per the General Notes.

CONSTRUCTION joint locations shall be determined by the contractor per his means & methods, and the location shall be per the requirements of the plans and specifications, as approved by the Contracting Officer’s Representative. See B4/S-501 “CJ AT WALLS” for control joint detail and “CSJ AT WALLS” for construction joint detail.

Question: Discipline: General Requirements. Inquiry: Has the government registered the C-17 Fuel Cell Hanger and the Flight Simulator Facility with USGBC under LEED Version 2009? If not, registration for projects after Oct. 31, 2016 will need to be under LEED Version 4; please confirm.

Answer: Yes, the projects have been registered with the GBCI/USGBC, and yes the projects shall comply with Version 2009 as stated in Specification Section 01 10 00, Section 1.2.C, and Section 01 81 13, Section 1.1.A.

Question: Pre-bid substitution requests
Question: Provide the seismic analysis of the site, the seismic design category, and the seismic coefficient to be utilized for the project.
Answer: Seismic design parameters are shown on drawing Sheet S-001. Refer to Structural General Note 1.6.B.7.
Question: Specification section 08 4513 – Structured Polycarbonate Panel Assemblies Window schedule per drawing A607 for Polycarbonate Panels
Question: Will the contractor be required to secure DOT permits for this project?
Question: Who is the utility supplier for the project location? I.E. electrical, water, telephone, internet
Question: Will the owner supply CAD files of the project drawings to the contractor?
Question: To eliminate an inferior single panel system from providing system that does not meet the span and air infiltration performance, suggest replacing specification 084513 section 2.3 A with the following: Translucent, Multiwall Cellular Polycar...
Question: Is the contractor required to provide Terrorism coverage for this project?
Question: Will there be any designated trailer, laydown, or storage areas to be used for this project? If so, where would they be located?
Question: Section 01000, Section 14.1 references a contractor's designated on-site parking area. There is a laydown yard shown on C-002 for materials, but no parking. Is the contractor to use the two existing lots north of the simulator building for l...
Question: Section 011000, 1.5. Please confirm that Personal Property items are to be Gov't Furnished, Gov't Installed.
Question: Section 011416, 1.5.B. This section reads all site access must be through a security gate. Detail A2 on C-002 appears to show site access directly from the North along 1st Flight Drive. There is no current access to the site from this locati...
Question: Section 013100, 1.4.A. The specs are calling for coordination drawings. The drawings issued have title blocks that indicate that the drawings were created in BIM 360 in a native Revit format. Please confirm if the Revit model can be provided...
Question: Section 015000, Section 2.2.B calls for a fully furnished Gov't field office. Specification 01 10 00, 1.3.D notes that a Gov't field office is not required. Please confirm if the contractor is to provide the Gov't field office in 2.2.B.
Question: Section 230923, 3.9.C. Please confirm the two year warranty on the direct digital controls is provided by the installer and/or manufacturer of the system (for the parts and labor as noted).
Question: A-602. The finish schedule calls for a "SC-1" sealed concrete in many rooms throughout the project. The material legend on A-601 gives specific product details for every other flooring type except SC-1. Please provide details on the SC-1 co...
Question: S-504. Detail C1 on S-504 notes to shore cantilevers but does not indicate a distance. Are we to assume any cantilevers over 12" should be shored?
Question: 01 10 00. Section 1.8.H reads that the Contractor is responsible for Permit and Tapping Fees (Both temporary and final hook-up) for utilities. This is also mentioned in 01 50 00 1.3.D. Please confirm if the Authority Having Jurisdiction fo...
Question: 01 81 13. Please confirm the contractor is responsible for paying all LEED Registration fees and for obtaining the project certificates/plaques at project completion.
Question: Are the prime contractors to include builder’s risk insurance in the base price?
Question: Compressed air piping diagram schematic shows a pressure transmitter and control valve that appears to be connected to BAS. No points are listed in the function schedules or is a diagram included in the mechanical drawings. What alarm functi...
Question: There is a conflict in the specs and the FP drawings as to what piping to utilize. Is the following piping acceptable? If not please clarify piping to be provided. 2” and Smaller – Black Schedule 40 Grade A ASTM A53, ERW pipe. 2 ½” and large...
Question: There is a conflict in the specs and the FP drawings in regards to the mesh size on the strainer. What mesh size is required?
Question: 08 45 13 /2.3/A.1. Cell insulation: Fill cellular cross sections with aerogel. Is this a requirement for this scope and project? The performance values listed within the specifications do not reflect an aerogel filled panel.
Question: Are there any blast requirements for the project such as UFC 4‐010‐01? This is a requirement in the curtain wall specification 084413 but not called out in the polycarbonate section.
Question: Is there a fee associated with the obtaining of the FAA Badges, required by specification 01 10 00 – 4 paragraph 1.7 I.
Question: Specification section 2.1 I 2. Calls for a SHGC of 0.6 however per IECC requirements of North Carolina the SHGC for vertical fenestration per table 502.3 is 0.40 aluminum finish. Please Change SHGC min requirement to 0.40
Question: Please verify the uneven grade utility pad is to have only two support walls per detail 1 on C‐505
Question: One section of the concrete stairs is provided on C‐502, but a section of the stair wall is not provided. Please provide and also indicate if a finish or precast cap is required.
Question: Section 011000, 1.2.C. The LEED summary notes that the GC will hire an independent Commissioning Agent. However, 1.3.B and 01 91 13, 1.1.B says the Gov't will hire the CxA. Please confirm who will hire and pay for the services of the CxA.
Question: Section 084513, Specification section 2.1.I.2. calls for a SHGC < 0.6; however North Carolina IECC requirements for vertical fenestrations require a SHGC of 0.40 for aluminum finishes (per Table 502.3). Please clarify.
Question: Neither spec 080400 nor spec 084513 makes mention of the blast requirements for the polycarbonate panels. Please clarify if the panels are to be blast rated and if so, to what load they are to be designed to.
Question: A‐701 and A‐711. Drawing A‐701, masonry partitions have a reference to see B5/A‐711 for top of wall or underside of deck condition. The detail B5 on A‐711 references a stud wall only.
Question: Specification 01 10 00 – 5 para. 1.8 H. requires the contractor to pay all applicable permit fees and tap fees. Who has inspection jurisdiction? Who has permit issuance authority? What are the applicable TAP fees?
Question: Will the contractor be required to secure FAA permits for this project?
Question: Does the contractor have any requirements or possible cost with the securing of Storm water permits, nitrogen buy‐down costs or other erosion control permitting?
Question: Reference S‐510 through S‐512, Is it permissible to drill and epoxy the CMU reinforcing dowels verse casting the dowels as shown with the concrete pours? If so, please provide a detail for the drilling and epoxy requirements.
Question: Section 00110, 2.5.1.4. Please confirm if the breakdown for communications support should include Division 27. Please confirm if the site electrical work should go in Division 26 under Comm Support or the Site Utilities line item.
Question: Section 01000, Section 22.2 notes that asbestos containing materials may be encountered. Please confirm if any unknown hazardous materials are encountered, and the contractor is given a change order to properly dispose of them, that the Gov'...
Question: Section 011000, 1.8H. This section (and 01 14 16 1.2.A) reads that the GC is responsible for all General and Utility Permits. Most Federal projects are not subject to building permits as they are on Federal property. Please confirm what perm...
Question: Section 014000, 1.5.G. If the contractor submits the qualifications for a testing agency after award and they are acceptable, is there a need to submit a list of 3 firms?
Question: Clause 52.211‐10. Please confirm if any of the items in 01 77 00 can be completed after 540 CD (i.e. Final Punch list or Gov't Training), or if everything in 01 77 00 needs to be completed prior to the 540 CD deadline.
Question: Detail A2 on C‐002 shows the main construction entrance coming in from the North where 1st Flight Drive and Minuteman Way meet. Is the contractor expected to install a temporary security booth at this location? Who will provide the security ...
Question: Reference Article 17 of 01000:
Question: Are the water and sanitary sewer utilities owned by Charlotte Water? If so, are the very large water and sewer connection and capacity costs to be included by the prime contractor for the multiple water and sanitary sewer utility connection...
Question: 03 30 00‐2.5.H notes Color Pigment for concrete materials. Please clarify this is not required. If so, please indicate what concrete is required to receive this admixture.
Question: Drawing S‐001, Div 01‐1.2.A notes all walls are to be braced/shored until floors and roofs are in place. Please provide requirements on the bracing as the masonry specification does not clarify the requirements.
Question: Drawing C‐001, under "Survey Notes", there is a note of a field survey completed by LDSI Dated March 2017. Please provide this survey.
Question: On Structural drawing S‐001 under foundation general note 2.1.C it is saying that undocumented fill under the Hangar site is to be removed and replaced at a depth ranging from 3 to 5‐1/2 feet, and depths from 5‐1/2 feet to 12 feet at the C17...
Question: Reference Tiling ‐ 093000 specification. 3.3 calls for bullnose tile pieces at tile transitions. The tile that is specified is a 4x8 tile, and the bullnose pieces only come in 2x8 or 4x12. A 2x8 can be utilized, but will bring the overall he...
Question: The glass specifications do not list values in which to base a product on. We need the Winter and Summer U‐Values, the Solar Heat Gain Coefficient, Visible Light Transmittance, Shading Coefficient, etc. What are the performance values?
Question: Is the architect willing to accept a glass make up, with regards to what panes are to be tempered and laminated, and the thickness of the laminated interlayer, as recommended by the curtain wall supplier to meet the specified blast loads?
Question: Spec 075419 sections 3.4.C.1.h & 3.5.A.4 read that the base layer of insulation and cover board, respectively, need to be mechanically attached. This puts the manufacturer's warranty in jeopardy, that is specified 1.10.A
Question: On dwg FA‐111, room TER S112 is missing a smoke detector. Please verify this is correct.
Question: On dwg FA‐111, vestibule S101 has a symbol for GAP. Please indicate what this is.
Question: On EP111, key note 23 is used for various areas with demountable partitions. However, there is no A‐111A architectural drawing do not indicating demountable partitions for the Simulator building. We assume key note 23 does not apply. Please ...
Question: Dwg TS401, detail B1 shows new ductbank from the pullbox merging into esisting conduits running south from Hut 72. We assume that is is incorrect and we are to install a new concrete encased ductbank as shown on TS101. Please verify.
Question: Regarding the BAS requirements in Spec section 23‐09‐23 Part 1. General 1.1 Summary
Question: Reference A-701. Wall types OG and 1G on A-701 are noted to be a STC 55 wall type. In order to get this rating, the wall needs to be fully grouted or use of sand in non-reinforced cells. Please verify these wall types need to be STC 55 and s...