SpecTOC_Amd03.pdf
PDF 118 KB Posted
- Attached to
- C-17 Refueling Hydrant System Ramp Expansion Federal contract opportunity
- Solicitation number
- W91242-18-R-0002
View the file
Other files for this federal contract opportunity
Show all 50
C-17 Refueling Hydrant System Ramp Expansion has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073 145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 16. 00 20 PROJECT CONSTRUCTI ON PROGRESS SCHEDULES
01 33 00 SUBMI TTAL PROCEDURES
01 33 23. 33 AVI ATI ON FUEL SYSTEM SPECI FI C SUBMI TTAL REQUI REMENTS
01 33 29 SUSTAI NABI LI TY REPORTI NG
01 35 13 SPECI AL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 35 29. 13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMI NATED SI TES
01 45 00. 00 20 QUALI TY CONTROL
01 45 35 SPECI AL I NSPECTI ONS
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 78 23. 33 OPERATI ON AND MAI NTENANCE MANUALS FOR AVI ATI ON FUEL
SYSTEMS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 61 13 EXCAVATI ON AND HANDLI NG OF CONTAMI NATED MATERI AL
02 81 00 TRANSPORTATI ON AND DI SPOSAL OF HAZARDOUS MATERI ALS
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 40 00 COLD- FORMED METAL FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
05 59 10 ROLLI NG COVER FOR AVI ATI ON REFUELI NG VAULTS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 11 13 BI TUMI NOUS DAMPPROOFI NG
07 21 13 BOARD AND BLOCK I NSULATI ON
07 27 26 FLUI D- APPLI ED AI R AND VAPOR BARRI ERS
07 60 00 FLASHI NG AND SHEET METAL
07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG
07 84 00 FIRESTOPPING
PROJECT TABLE OF CONTENTS Page 1
07 92 00 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 51 13 ALUMI NUM WI NDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTI CAL CEI LI NGS
09 65 00 RESI LI ENT FLOORI NG
09 77 20 DECORATI VE FI BERGLASS REI NFORCED WALL PANELS
09 90 00 PAI NTS AND COATI NGS
09 96 00 HI GH- PERFORMANCE COATI NGS
09 97 13. 17 THREE COAT EPOXY I NTERI OR COATI NG OF WELDED STEEL
PETROLEUM FUEL TANKS
09 97 13. 27 EXTERI OR COATI NG OF STEEL STRUCTURES
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 20 I NTERI OR/ EXTERI OR SI GNAGE
10 28 13 TOI LET ACCESSORI ES
10 44 16 FI RE EXTI NGUI SHERS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 19 METAL BUI LDI NG SYSTEMS
13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT
13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT
13 73 19 JET BLAST DEFLECTOR FENCE FOR HI GH POWER RUN- UP VELOCI TI ES
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 82 02. 00 10 UNI TARY HEATI NG AND COOLI NG EQUI PMENT
23 82 46. 00 40 ELECTRI C UNI T HEATERS
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 13 SWITCHBOARDS
26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON
26 32 15. 00 10 DI ESEL- GENERATOR SET STATI ONARY 100- 2500 KW, WI TH
AUXILIARIES
PROJECT TABLE OF CONTENTS Page 2
26 36 00. 00 10 AUTOMATI C TRANSFER SWI TCH AND BY- PASS/ I SOLATI ON SWI TCH
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
26 42 19. 00 10 CATHODI C PROTECTI ON BY I MPRESSED CURRENT
26 51 00 I NTERI OR LI GHTI NG
26 56 00 EXTERI OR LI GHTI NG
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 64. 00 10 FI RE DETECTI ON AND ALARM SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARI NG AND GRUBBI NG
31 24 00 SETTLEMENT MONI TORI NG
31 32 11 SOI L SURFACE EROSI ON CONTROL
31 36 00 WI RE MESH GABI ONS
31 63 26 DRI LLED SHAFTS
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 16. 71 COLD MI LLI NG ASPHALT PAVI NG
32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D
PAVEMENTS
32 05 33 LANDSCAPE ESTABLI SHMENT
32 11 23 GRADED- CRUSHED AGGREGATE BASE COURSE
32 12 10 BI TUMI NOUS TACK AND PRI ME COATS
32 12 15. 13 HOT- MI X ASPHALT AI RFI ELD PAVI NG
32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS
32 13 11 CONCRETE PAVEMENT FOR AI RFI ELDS AND OTHER HEAVY- DUTY
PAVEMENTS
32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKI NGS
32 31 13 CHAI N LI NK FENCES AND GATES
32 32 23 MECHANI CALLY STABI LI ZED EARTH RETAI NI NG WALL
32 92 19 SEEDING
DI VI SI ON 33 - UTI LI TI ES
33 08 53 AVI ATI ON FUEL DI STRI BUTI ON SYSTEM START- UP
33 09 53 AVI ATI ON FUEL PUMP CONTROL AND ANNUNCI ATI ON SYSTEM
33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG
33 30 00 SANI TARY SEWERS AND CONTAI NMENT DRAI NS
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 52 43. 11 AVI ATI ON FUEL MECHANI CAL EQUI PMENT
33 52 43. 13 AVI ATI ON FUEL PI PI NG
33 52 43. 14 AVI ATI ON FUEL CONTROL VALVES
33 52 43. 23 AVI ATI ON FUEL PUMPS
33 52 43. 28 FI LTER SEPARATOR, AVI ATI ON FUELI NG SYSTEM
33 52 80 LI QUI D FUELS PI PELI NE COATI NG SYSTEMS
33 52 90. 00 20 WELDI NG FOR POL SERVI CE PI PI NG
33 56 10 FACTORY- FABRI CATED FUEL STORAGE TANKS
33 56 13. 13 STEEL TANKS WI TH FI XED ROOFS
33 56 19 FUEL I MPERMEABLE LI NER SYSTEM
33 65 00 CLEANI NG PETROLEUM STORAGE TANKS
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
DI VI SI ON 34 - TRANSPORTATI ON
PROJECT TABLE OF CONTENTS Page 3
34 73 16 JET BLAST DEFLECTOR FENCE FOR HI GH POWER RUN- UP VELOCI TI ES
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 4
File details come from the government source that posted it.