SpecTOC_Amd03.pdf

PDF 118 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion Federal contract opportunity
Solicitation number
W91242-18-R-0002
Issued by
Department of the Army North Carolina Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to C-17 Refueling Hydrant System Ramp Expansion, newest first.
File Type Posted
FJRP159073-CG104-Amendment_0007.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
FJRP159073-M-604-Amd03.pdf PDF
Amendment_0003_Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
FJRP159073-ES-502-Amd03.pdf PDF
FJRP159073-M-302-Amd03.pdf PDF
FJRP159073-M-513-Amd03.pdf PDF
1.1_Drawings-INDEX_SHEET_(1).pdf PDF
FJRP159073-M-501-Amd03.pdf PDF
01_50_00_Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-M-003-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
W91242-18-R-0002_0003.pdf PDF
FJRP159073-M-303-Amd03.pdf PDF
FJRP159073-EI-504-Amd03.pdf PDF
W91242-18-R-0002-0002.pdf PDF
Pre-Proposal_Conference_PPT_Presentation_W91242-18-R-0002_v.pptx PPTX presentation
1.3_Drawings-CIVIL_2_of_4.pdf PDF
W91242-18-R-0002_0001.pdf PDF
Exhibit_C_Past_Performance_Questionnaire_Package.pdf PDF
7_-_VISITOR_REQUEST_WORKSHEET,_2_PGS.pdf PDF
Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
1.8_Drawings-ELECTRICAL.pdf PDF
5-_SPECS_CERTIFICATION_SHEET_SEALED.pdf PDF
2-_GEOTECHNICAL_REPORT_SEALED.pdf PDF
W91242-18-R-0002.pdf PDF
Exhibit_D_Letter_of_Commitment.pdf PDF
3-_TECHNICAL_SPECIFICATION_VOLUME_1_of_2.pdf PDF
1.10_Drawings-REF_DRAWING.pdf PDF
1.4_Drawings-STRUCTURAL.pdf PDF
Show all 50

C-17 Refueling Hydrant System Ramp Expansion has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073 145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 16. 00 20 PROJECT CONSTRUCTI ON PROGRESS SCHEDULES

01 33 00 SUBMI TTAL PROCEDURES

01 33 23. 33 AVI ATI ON FUEL SYSTEM SPECI FI C SUBMI TTAL REQUI REMENTS

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 35 13 SPECI AL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 35 29. 13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMI NATED SI TES

01 45 00. 00 20 QUALI TY CONTROL

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

01 78 23. 33 OPERATI ON AND MAI NTENANCE MANUALS FOR AVI ATI ON FUEL

SYSTEMS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 61 13 EXCAVATI ON AND HANDLI NG OF CONTAMI NATED MATERI AL

02 81 00 TRANSPORTATI ON AND DI SPOSAL OF HAZARDOUS MATERI ALS

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 40 00 COLD- FORMED METAL FRAMI NG

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

05 59 10 ROLLI NG COVER FOR AVI ATI ON REFUELI NG VAULTS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 11 13 BI TUMI NOUS DAMPPROOFI NG

07 21 13 BOARD AND BLOCK I NSULATI ON

07 27 26 FLUI D- APPLI ED AI R AND VAPOR BARRI ERS

07 60 00 FLASHI NG AND SHEET METAL

07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG

07 84 00 FIRESTOPPING

PROJECT TABLE OF CONTENTS Page 1

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 51 13 ALUMI NUM WI NDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 77 20 DECORATI VE FI BERGLASS REI NFORCED WALL PANELS

09 90 00 PAI NTS AND COATI NGS

09 96 00 HI GH- PERFORMANCE COATI NGS

09 97 13. 17 THREE COAT EPOXY I NTERI OR COATI NG OF WELDED STEEL

PETROLEUM FUEL TANKS

09 97 13. 27 EXTERI OR COATI NG OF STEEL STRUCTURES

DI VI SI ON 10 - SPECI ALTI ES

10 14 00. 20 I NTERI OR/ EXTERI OR SI GNAGE

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHERS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19 METAL BUI LDI NG SYSTEMS

13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT

13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT

13 73 19 JET BLAST DEFLECTOR FENCE FOR HI GH POWER RUN- UP VELOCI TI ES

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 82 02. 00 10 UNI TARY HEATI NG AND COOLI NG EQUI PMENT

23 82 46. 00 40 ELECTRI C UNI T HEATERS

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 24 13 SWITCHBOARDS

26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON

26 32 15. 00 10 DI ESEL- GENERATOR SET STATI ONARY 100- 2500 KW, WI TH

AUXILIARIES

PROJECT TABLE OF CONTENTS Page 2

26 36 00. 00 10 AUTOMATI C TRANSFER SWI TCH AND BY- PASS/ I SOLATI ON SWI TCH

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 42 19. 00 10 CATHODI C PROTECTI ON BY I MPRESSED CURRENT

26 51 00 I NTERI OR LI GHTI NG

26 56 00 EXTERI OR LI GHTI NG

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 64. 00 10 FI RE DETECTI ON AND ALARM SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARI NG AND GRUBBI NG

31 24 00 SETTLEMENT MONI TORI NG

31 32 11 SOI L SURFACE EROSI ON CONTROL

31 36 00 WI RE MESH GABI ONS

31 63 26 DRI LLED SHAFTS

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 16. 71 COLD MI LLI NG ASPHALT PAVI NG

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

PAVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 23 GRADED- CRUSHED AGGREGATE BASE COURSE

32 12 10 BI TUMI NOUS TACK AND PRI ME COATS

32 12 15. 13 HOT- MI X ASPHALT AI RFI ELD PAVI NG

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS

32 13 11 CONCRETE PAVEMENT FOR AI RFI ELDS AND OTHER HEAVY- DUTY

PAVEMENTS

32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKI NGS

32 31 13 CHAI N LI NK FENCES AND GATES

32 32 23 MECHANI CALLY STABI LI ZED EARTH RETAI NI NG WALL

32 92 19 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 08 53 AVI ATI ON FUEL DI STRI BUTI ON SYSTEM START- UP

33 09 53 AVI ATI ON FUEL PUMP CONTROL AND ANNUNCI ATI ON SYSTEM

33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 30 00 SANI TARY SEWERS AND CONTAI NMENT DRAI NS

33 40 00 STORM DRAI NAGE UTI LI TI ES

33 52 43. 11 AVI ATI ON FUEL MECHANI CAL EQUI PMENT

33 52 43. 13 AVI ATI ON FUEL PI PI NG

33 52 43. 14 AVI ATI ON FUEL CONTROL VALVES

33 52 43. 23 AVI ATI ON FUEL PUMPS

33 52 43. 28 FI LTER SEPARATOR, AVI ATI ON FUELI NG SYSTEM

33 52 80 LI QUI D FUELS PI PELI NE COATI NG SYSTEMS

33 52 90. 00 20 WELDI NG FOR POL SERVI CE PI PI NG

33 56 10 FACTORY- FABRI CATED FUEL STORAGE TANKS

33 56 13. 13 STEEL TANKS WI TH FI XED ROOFS

33 56 19 FUEL I MPERMEABLE LI NER SYSTEM

33 65 00 CLEANI NG PETROLEUM STORAGE TANKS

33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

DI VI SI ON 34 - TRANSPORTATI ON

PROJECT TABLE OF CONTENTS Page 3

34 73 16 JET BLAST DEFLECTOR FENCE FOR HI GH POWER RUN- UP VELOCI TI ES

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

File details come from the government source that posted it.