C04 - Bid Abstract for W9123821B0012.pdf

PDF 94 KB Posted

Attached to
Natomas Reach A Levee Repairs Federal contract opportunity
Solicitation number
W9123821B0012
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This bid abstract summarizes bids received for the Natomas Reach A Levee Improvements solicitation issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The solicitation sought bids for CLIN 0001 base work ranging from $62,354,115 to $98,997,812.50, as well as option CLINs 1001-1003 for additional work. Option CLIN 1001 bids ranged from $7,700,000 to $13,200,000, option CLIN 1002 bids ranged from $24,220,386 to $36,808,166, and option CLIN 1003 bids ranged from $14,311,800 to $30,136,718. Grand total bids ranged from $113,251,301 to $164,549,938. The related federal contract opportunity notice seeks bids for the Natomas Reach A Levee Repairs project due by August 16, 2021. The Corps will provide oversized technical attachments to requesting bidders by electronic file transfer.

View the file

Other files for this federal contract opportunity

Other files attached to Natomas Reach A Levee Repairs, newest first.
File Type Posted
B08 Amendment 0005 - updated section 31 56 14.pdf PDF
B08 Amendment 0005.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 W91238-B-21-0012_AM04 Summary of Changes.pdf PDF
B08 SIP (AM-04) Mix-In-Place Cutoff Wall - Butt Joint and Overlap Schematic.pdf PDF
B08 SIP (AM-04) Kaufman_Borrow_Staging_Reach-A_20210728.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 Amendment 0004.pdf PDF
B08 W91238-B-21-0012_AM04_2172_20210804 Specifications Updates.pdf PDF
B08 - Pricing Schedule.Final.pdf PDF
B08 SIP (AM-04) PP1A Outfall Grouting - Plan View.pdf PDF
B08 SIP (AM-04) Gretas Pond Supplemental Info_and_Photos - Feb_2018.pdf PDF
B08 - Drawing C-228.pdf PDF
B08 Amendment 0003.pdf PDF
B08 Amendment 3_Updated Plans and Specifications.pdf PDF
Amendment 2 - Specification Changes.pdf PDF
Amendment 0002.pdf PDF
B07 Site Visit Attendance List.pdf PDF
Amendment 0001 - Site Visit Date Change.pdf PDF
B08 IFB Atch 18 - SIP_USACE ARCF GRR HPMP Final_071317.pdf PDF
B08 IFB Atch 15 - SIP_Pumping Plant No 1 Rockwell Automation order info.pdf PDF
B08 IFB Atch 14 - SIP_Pumping Plant No 1 Rockwell Automation existing pump starters.pdf PDF
B08 IFB Atch 13 - SIP_Pumping Plant 1B Operating Elevations.docx DOCX document
B08 IFB Atch 12 - SIP_Pumping Plant 1B Drawings - As-built Markups (2003).pdf PDF
B08 IFB Atch 11 - SIP_PP1B Cascade 20003 Pump Shop Drawing.pdf PDF
B08 IFB Atch 6 - SIP_Natomas Reach A - Borrow Site GDR - 20190321.pdf PDF
B08 IFB Atch 20 - Pre-Award Survey.pdf PDF
B08 IFB Atch 16 - SIP_Reach I Contract 1 Stockpile Information Report.pdf PDF
B08 IFB Atch 9 - SIP_Plant 1A and 1B Duperon Self-Cleaning Trash Rake Manual.pdf PDF
B08 IFB Atch 8 - SIP_Natomas Reach A - R1 Cutoff Wall As-Builts (Complete Drawing Set).pdf PDF
B08 IFB Atch 19 - Davis Bacon Wage Determination 6.25.2021.pdf PDF
B08 IFB Atch 4 - SIP_City Sump 160 - Design Drawings (1990s).pdf PDF
B08 IFB Atch 3 - Reach A_Final Design Pricing Schedule.xlsx XLSX spreadsheet
B08 IFB Atch 2 - Reach A Specifications_2172_20210616.pdf PDF
B08 IFB Atch 10 - SIP_Plant 1B datum conversion.pdf PDF
B08 IFB Atch 17 - SIP_USACE ARCF Executed PA 20150910.pdf PDF
B08 IFB Atch 5 - SIP_Kaufman_Borrow_Site_Reach-A_34x22_20210607.pdf PDF
B08 Reach A IFB W9123821B0012.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 $84,997,910.00 CLIN 0001 $98,997,812.50 CLIN 0001 $87,080,250.00

Option CLIN 1001 $8,250,000.00 Option CLIN 1001 $7,700,000.00 Option CLIN 1001 $10,524,804.00 Option CLIN 1002 $20,520,553.80 Option CLIN 1002 $26,833,321.50 Option CLIN 1002 $36,808,166.00 Option CLIN 1003 $14,157,100.00 Option CLIN 1003 $21,919,652.00 Option CLIN 1003 $30,136,718.00 GRAND TOTAL $127,925,563.80 GRAND TOTAL $155,450,786.00 GRAND TOTAL $164,549,938.00

CLIN 0001 $83,703,787.00 CLIN 0001 $62,354,115.00

Option CLIN 1001 $13,200,000.00 Option CLIN 1001 $12,365,000.00 Option CLIN 1002 $26,724,270.00 Option CLIN 1002 $24,220,386.00 Option CLIN 1003 $21,538,760.00 Option CLIN 1003 $14,311,800.00

GRAND TOTAL $145,166,817.00 GRAND TOTAL $113,251,301.00

Bid Abstract for W9123821B0012 Natomas Reach A Levee Improvements

Malcolm Nordic

Odin Ahtna‐Great Lakes JV

IGE