This document provides an amendment to a solicitation for the Natomas Reach A Levee Repairs project. The amendment replaces several technical specifications and drawings, updates the pricing schedule, and adds supplemental bidding documents. Key details include replacing sections of the project table of contents, specifications for various construction activities, and drawings for site plans and schematics. Additionally, the amendment updates the pricing schedule and includes supplemental information such as drawings for a borrow site and pumping plant outfall, as well as a schematic depicting butt joint and overlap designs for a mix-in-place cutoff wall. Bids for the Natomas Reach A Levee Repairs project under Solicitation Number W9123821B0012 are due on August 16, 2021. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District Sacramento.

View the file

Other files for this federal contract opportunity

Other files attached to Natomas Reach A Levee Repairs, newest first.
File Type Posted
C04 - Bid Abstract for W9123821B0012.pdf PDF
B08 Amendment 0005.pdf PDF
B08 Amendment 0005 - updated section 31 56 14.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 SIP (AM-04) PP1A Outfall Grouting - Plan View.pdf PDF
B08 SIP (AM-04) Gretas Pond Supplemental Info_and_Photos - Feb_2018.pdf PDF
B08 - Drawing C-228.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 Amendment 0004.pdf PDF
B08 W91238-B-21-0012_AM04_2172_20210804 Specifications Updates.pdf PDF
B08 - Pricing Schedule.Final.pdf PDF
B08 SIP (AM-04) Mix-In-Place Cutoff Wall - Butt Joint and Overlap Schematic.pdf PDF
B08 SIP (AM-04) Kaufman_Borrow_Staging_Reach-A_20210728.pdf PDF
B08 Amendment 3_Updated Plans and Specifications.pdf PDF
B08 Amendment 0003.pdf PDF
Amendment 2 - Specification Changes.pdf PDF
Amendment 0002.pdf PDF
B07 Site Visit Attendance List.pdf PDF
Amendment 0001 - Site Visit Date Change.pdf PDF
B08 IFB Atch 17 - SIP_USACE ARCF Executed PA 20150910.pdf PDF
B08 IFB Atch 5 - SIP_Kaufman_Borrow_Site_Reach-A_34x22_20210607.pdf PDF
B08 Reach A IFB W9123821B0012.pdf PDF
B08 IFB Atch 20 - Pre-Award Survey.pdf PDF
B08 IFB Atch 16 - SIP_Reach I Contract 1 Stockpile Information Report.pdf PDF
B08 IFB Atch 9 - SIP_Plant 1A and 1B Duperon Self-Cleaning Trash Rake Manual.pdf PDF
B08 IFB Atch 8 - SIP_Natomas Reach A - R1 Cutoff Wall As-Builts (Complete Drawing Set).pdf PDF
B08 IFB Atch 19 - Davis Bacon Wage Determination 6.25.2021.pdf PDF
B08 IFB Atch 4 - SIP_City Sump 160 - Design Drawings (1990s).pdf PDF
B08 IFB Atch 3 - Reach A_Final Design Pricing Schedule.xlsx XLSX spreadsheet
B08 IFB Atch 2 - Reach A Specifications_2172_20210616.pdf PDF
B08 IFB Atch 10 - SIP_Plant 1B datum conversion.pdf PDF
B08 IFB Atch 18 - SIP_USACE ARCF GRR HPMP Final_071317.pdf PDF
B08 IFB Atch 15 - SIP_Pumping Plant No 1 Rockwell Automation order info.pdf PDF
B08 IFB Atch 14 - SIP_Pumping Plant No 1 Rockwell Automation existing pump starters.pdf PDF
B08 IFB Atch 13 - SIP_Pumping Plant 1B Operating Elevations.docx DOCX document
B08 IFB Atch 12 - SIP_Pumping Plant 1B Drawings - As-built Markups (2003).pdf PDF
B08 IFB Atch 11 - SIP_PP1B Cascade 20003 Pump Shop Drawing.pdf PDF
B08 IFB Atch 6 - SIP_Natomas Reach A - Borrow Site GDR - 20190321.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. W91238-B-21-0012

1 of 1 Amendment 04

SACRAMENTO , CALIFORNIA

AMERICAN RIVER COMMON FEATURES

NATOMAS BASIN REACH A

AMENDMENT 04 - SUMMARY:

A) SPECIFICATION 2172

1) Replaced entire Project Table of Contents.

2) Replaced entire Section 00 73 05

3) Replaced entire Section 01 22 00

4) Replaced entire Section 02 32 00

5) Replaced entire Section 31 00 00

6) Replaced entire Section 31 56 13

7) Replaced entire Section 31 56 14

8) Replaced entire Section 31 56 15

9) Replaced entire Section 35 20 16.26

10) Replaced entire Section 35 20 18

11) Replaced entire Section 35 45 01

B) DRAWINGS

1) Replaced S-701

2) Replaced S-702

3) Added C-228

C) PRICING SCHEDULE

1) Replaced entire Pricing Schedule

D) SUPPLEMENTAL INFORMATION PACKAGE

1) Replaced Kaufman Borrow Site Drawings

2) Added Greta's Pond Supplemental Information

3) Added Mix-in-Place Cutoff Wall Butt Joint and Overlap Schematic

4) Added Pumping Plant 1A Outfall Grouting Plan View