B08 SIP (AM-04) Mix-In-Place Cutoff Wall - Butt Joint and Overlap Schematic.pdf

PDF 44 KB Posted

Attached to
Natomas Reach A Levee Repairs
Solicitation number
W9123821B0012
Issued by

About this file

This announcement is a solicitation for the Natomas Reach A Levee Repairs project. The U.S. Army Corps of Engineers, Engineering District Sacramento is seeking bids for repairs to the Natomas Reach A levee. Bids are due by August 16, 2021 at 1:00PM PST. Qualified bidders must attend a mandatory site visit on July 8, 2021 at 10:00am PST. Two large technical attachments, including the plans and geotechnical report, cannot be uploaded to SAM and must be requested from the Contract Administrator and Contracting Officer via email. The solicitation includes 18 technical attachments to detail the project requirements. Interested parties should contact the named Contract Administrator and Contracting Officer to request the oversized attachments.

View the file

Other files

File Type Posted
C04 - Bid Abstract for W9123821B0012.pdf PDF
B08 Amendment 0005.pdf PDF
B08 Amendment 0005 - updated section 31 56 14.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 Amendment 0004.pdf PDF
B08 - Pricing Schedule.Final.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 W91238-B-21-0012_AM04 Summary of Changes.pdf PDF
B08 SIP (AM-04) PP1A Outfall Grouting - Plan View.pdf PDF
B08 - Drawing C-228.pdf PDF
B08 SIP (AM-04) Kaufman_Borrow_Staging_Reach-A_20210728.pdf PDF
B08 SIP (AM-04) Gretas Pond Supplemental Info_and_Photos - Feb_2018.pdf PDF
B08 W91238-B-21-0012_AM04_2172_20210804 Specifications Updates.pdf PDF
B08 Amendment 3_Updated Plans and Specifications.pdf PDF
B08 Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 2 - Specification Changes.pdf PDF
B07 Site Visit Attendance List.pdf PDF
Amendment 0001 - Site Visit Date Change.pdf PDF
B08 Reach A IFB W9123821B0012.pdf PDF
B08 IFB Atch 9 - SIP_Plant 1A and 1B Duperon Self-Cleaning Trash Rake Manual.pdf PDF
B08 IFB Atch 10 - SIP_Plant 1B datum conversion.pdf PDF
B08 IFB Atch 15 - SIP_Pumping Plant No 1 Rockwell Automation order info.pdf PDF
B08 IFB Atch 12 - SIP_Pumping Plant 1B Drawings - As-built Markups (2003).pdf PDF
B08 IFB Atch 14 - SIP_Pumping Plant No 1 Rockwell Automation existing pump starters.pdf PDF
B08 IFB Atch 17 - SIP_USACE ARCF Executed PA 20150910.pdf PDF
B08 IFB Atch 18 - SIP_USACE ARCF GRR HPMP Final_071317.pdf PDF
B08 IFB Atch 8 - SIP_Natomas Reach A - R1 Cutoff Wall As-Builts (Complete Drawing Set).pdf PDF
B08 IFB Atch 16 - SIP_Reach I Contract 1 Stockpile Information Report.pdf PDF
B08 IFB Atch 20 - Pre-Award Survey.pdf PDF
B08 IFB Atch 11 - SIP_PP1B Cascade 20003 Pump Shop Drawing.pdf PDF
B08 IFB Atch 6 - SIP_Natomas Reach A - Borrow Site GDR - 20190321.pdf PDF
B08 IFB Atch 5 - SIP_Kaufman_Borrow_Site_Reach-A_34x22_20210607.pdf PDF
B08 IFB Atch 13 - SIP_Pumping Plant 1B Operating Elevations.docx DOCX document
B08 IFB Atch 19 - Davis Bacon Wage Determination 6.25.2021.pdf PDF
B08 IFB Atch 2 - Reach A Specifications_2172_20210616.pdf PDF
B08 IFB Atch 4 - SIP_City Sump 160 - Design Drawings (1990s).pdf PDF
B08 IFB Atch 3 - Reach A_Final Design Pricing Schedule.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Existing Heading New Heading

15 ft min

Step 1

Step 2

Step 3

Slide Number 1

File details come from the government source that posted it. Updated .