B08 SIP (AM-04) Kaufman_Borrow_Staging_Reach-A_20210728.pdf

PDF 43 MB Posted

Attached to
Natomas Reach A Levee Repairs
Solicitation number
W9123821B0012
Issued by

About this file

This document provides details on a federal solicitation for levee repairs. The Natomas Reach A Levee Repairs Invitation for Bid (IFB) W9123821B0012 seeks bids for repair work on the Natomas Reach A levee. Bids are due on August 16, 2021 at 1:00PM PST. A site visit will be held on July 8, 2021 at 10:00am PST. While most IFB attachments can be found on SAM, Attachments 1 and 7 containing plans and geotechnical data cannot be uploaded and must be requested from the Contract Administrator and Contracting Officer via email. The work is being conducted by the Department of the Army Corps of Engineers Engineering District Sacramento.

View the file

Other files

File Type Posted
C04 - Bid Abstract for W9123821B0012.pdf PDF
B08 Amendment 0005.pdf PDF
B08 Amendment 0005 - updated section 31 56 14.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 Amendment 0004.pdf PDF
B08 - Pricing Schedule.Final.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 W91238-B-21-0012_AM04 Summary of Changes.pdf PDF
B08 SIP (AM-04) PP1A Outfall Grouting - Plan View.pdf PDF
B08 SIP (AM-04) Mix-In-Place Cutoff Wall - Butt Joint and Overlap Schematic.pdf PDF
B08 - Drawing C-228.pdf PDF
B08 SIP (AM-04) Gretas Pond Supplemental Info_and_Photos - Feb_2018.pdf PDF
B08 W91238-B-21-0012_AM04_2172_20210804 Specifications Updates.pdf PDF
B08 Amendment 3_Updated Plans and Specifications.pdf PDF
B08 Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 2 - Specification Changes.pdf PDF
B07 Site Visit Attendance List.pdf PDF
Amendment 0001 - Site Visit Date Change.pdf PDF
B08 Reach A IFB W9123821B0012.pdf PDF
B08 IFB Atch 9 - SIP_Plant 1A and 1B Duperon Self-Cleaning Trash Rake Manual.pdf PDF
B08 IFB Atch 10 - SIP_Plant 1B datum conversion.pdf PDF
B08 IFB Atch 15 - SIP_Pumping Plant No 1 Rockwell Automation order info.pdf PDF
B08 IFB Atch 12 - SIP_Pumping Plant 1B Drawings - As-built Markups (2003).pdf PDF
B08 IFB Atch 14 - SIP_Pumping Plant No 1 Rockwell Automation existing pump starters.pdf PDF
B08 IFB Atch 17 - SIP_USACE ARCF Executed PA 20150910.pdf PDF
B08 IFB Atch 18 - SIP_USACE ARCF GRR HPMP Final_071317.pdf PDF
B08 IFB Atch 8 - SIP_Natomas Reach A - R1 Cutoff Wall As-Builts (Complete Drawing Set).pdf PDF
B08 IFB Atch 16 - SIP_Reach I Contract 1 Stockpile Information Report.pdf PDF
B08 IFB Atch 20 - Pre-Award Survey.pdf PDF
B08 IFB Atch 11 - SIP_PP1B Cascade 20003 Pump Shop Drawing.pdf PDF
B08 IFB Atch 6 - SIP_Natomas Reach A - Borrow Site GDR - 20190321.pdf PDF
B08 IFB Atch 5 - SIP_Kaufman_Borrow_Site_Reach-A_34x22_20210607.pdf PDF
B08 IFB Atch 13 - SIP_Pumping Plant 1B Operating Elevations.docx DOCX document
B08 IFB Atch 19 - Davis Bacon Wage Determination 6.25.2021.pdf PDF
B08 IFB Atch 2 - Reach A Specifications_2172_20210616.pdf PDF
B08 IFB Atch 4 - SIP_City Sump 160 - Design Drawings (1990s).pdf PDF
B08 IFB Atch 3 - Reach A_Final Design Pricing Schedule.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L12

C1

L1 L2

C2 L4 C3 L6

C4 C5

L10

L11

C6

L16L17

L8

4:1

4:

1 4:

4:1

4:

4:1

4:1

4:1

L1

C71+

2+

5+

7+

+0

+5

15+00 17+50 20+00 22+50 25+00

+5

+0

+5

+0

+5

40+00

42+50

45+00

47+50

50+00

52+50

55+00

57+50

60+00

62+50

+0

67+50

70+0072+5075+0077+5080+0082+5085+0087+5090+00

G-800

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

SH

EE

T

LA

YO

U

T

AN

D G

R

AD

IN

G

N O

TE

S

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

APN 35-160-006

APN 35-150-006

APN 35-150-005

APN 35-150-007

HINTZ

VAN DYKE

SAFCA

SAFCA

APN 35-160-038

RD 1000

SCALE: 1" = 200'

200' 100' 0 200' 400'

STABILIZED

CONSTRUCTION

ENTRANCE

BORROW SITE FIELD

ACCESS RAMP

PROPERTY LINE AND

LIMIT OF WORK (E) PGCC WEST

LEVEE

TOP OF BORROW

ELEV = 32.2

TOP OF BORROW

ELEV = 33.0-34.0

CONTRACTOR TO VERIFY EARTHWORK QUANTITIES.

QUANTITIES ASSUME AVERAGE CUT OF 5' FT

AND 0.5' FT STRIPPED SURFACE.

1.

2.

REACH E

NATOM

AS ROAD

LINE TABLE

LINE #

L1

L2

L4

L6

L8

L10

L11

L12

L14

L16

L17

LENGTH

527.67'

700.44'

1219.96'

1292.43'

180.08'

400.29'

855.47'

1267.74'

260.03'

1295.23'

1224.01'

DIRECTION

N00°37'14"W

N00°30'05"W

N88°34'38"E

N00°46'47"W

N88°31'45"E

S26°39'18"E

S26°09'13"E

S26°09'13"E

S00°46'22"E

S88°10'45"W

S88°32'38"W

CURVE TABLE

CURVE #

C1

C2

C3

C4

C5

C6

C7

LENGTH

47.56'

38.87'

15.60'

38.97'

28.28'

11.07'

38.81'

RADIUS

30.00'

25.00'

10.00'

25.00'

25.00'

25.00'

25.00'

DELTA

90°50'09"

89°04'43"

89°21'25"

89°18'31"

64°48'58"

25°22'52"

88°57'06"

ACCESS ROAD - LINE AND CURVE TABLE

KAUFMAN SITE

CONTROL LINE

TOE OF

BORROW SITE

300'

PLEASANT GROVE CREEK CANAL

TOE OF

BORROW SITE

KAUFMAN SITE

CONTROL LINE

PROPERTY LINE AND

LIMIT OF WORK

25'

TOP OF BORROW

ELEV = 33.0-34.0

TOP OF BORROW

ELEV = 33.9-34.5

BORROW

AREA LIMITS

APN 35-170-029

JOHNSON

APN 35-220-029

ODYSSEUS FARMS

APN 35-220-027

ODYSSEUS FARMS

APN 35-170-091

SORENSON

APN 35-170-089

SORENSON

BORROW SITE

TOP OF SLOPE

ELEV 32.2-33.5

LIMIT OF WORKSANKEY ROAD

GRADING NOTES:

ALL DISTURBED AREAS SHALL BE SHAPED BACK TO RICE FARMING

CONDITIONS.

THE EXCAVATION ELEVATIONS SHOWN ON GRADING SHEETS G-801 TO

G-807 ARE THE SITE ELEVATIONS BEFORE RE-SPREADING THE STRIPPED

SURFACE LAYER OF EARTHEN MATERIALS.

SEE TEST PIT LOGS SHEETS G-811 TO G-829 FOR DESCRIPTION OF

SUBSURFACE SOIL.

AFTER COMPLETION OF BORROW OPERATIONS, CONTRACTOR SHALL

CONSTRUCT ROADS AS SHOWN ON PLANS ADJACENT TO EXCAVATION

LIMITS. CONTRACTOR SHALL RE-GRADE FIELD TO MATCH ELEVATION OF

ADJACENT RICE FIELDS. SEE GRADING SHEETS G-801 TO G-807.

THE EXISTING RICE FIELD MUST BE DEWATERED AND ALLOWED TIME TO

DRY FOR AT LEAST 15 DAYS PRIOR TO GRADING. 15 DAY PERIOD IS THE

ESTIMATED TIME FOR GIANT GARTER SNAKES TO LEAVE AREA.

CONTRACTOR MUST OBTAIN THE CONSENT OF THE PROJECT MANAGER

PRIOR TO START OF GRADING.

DEWATERING OF SITE SHALL BE IN CONFORMANCE WITH FEDERAL,

STATE, AND LOCAL REQUIREMENTS.

THROUGHOUT THE CONTRACT PERIOD, INCLUDING THE MAINTENANCE

PERIOD, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL

ENVIRONMENTAL AVOIDANCE AND PROTECTION MEASURES

PRESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS.

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED.

CONTRACTOR SHALL SUBMIT A DETAILED BORROW UTILIZATION PLAN

TO PROJECT MANAGER FOR APPROVAL.

CONTRACTOR MAY OVER EXCAVATE EMBANKMENT-QUALITY BORROW

AREAS AND GRADE NON-SPEC MATERIAL INTO THE OVER-EXCAVATED

AREAS SO LONG AS THE CONTRACTOR COMPLIES WITH FINISH GRADING

PLAN.

STAGING

AREA

PROPERTY LINE AND

LIMIT OF WORK

TOE OF

BORROW SITE

PROPERTY LINE AND

LIMIT OF WORK

25'

50'

REACH F

KAUFMAN BORROW SITE NEEDS

(SHARED AREA)

A

USACE/ SAFCA NATOMAS BASIN PROJECT

BORROW AVAILABLE

(C/Y)

541,900

FOR USE (C/Y)

B

H

340,000 C/Y

51,000 C/Y

30,000 C/Y

30,000 C/Y

451,000 C/Y TOTAL

CONSTRUCTION START

FY22 - 24

FY22

FY22

FY21

E

REACH REACH

(NON-SHARED AREA)

VOLUME AVAILABLE

AVAILABLE BORROW IN SHARED AREA

NET0.5'FT STRIPPED SURFACE

(C/Y) (C/Y)

REACH B / REACH H TAKE

(C/Y)

53,500 81,000 407,400

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-800_SHT-LAYOUT_KBS.dwg Last Saved: Sat, 24 Jul 2021 - 6:10pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

(P) 12" DISCHARGE

PUMP RISER

(E) 12" CMP AND

ROADSDE DITCH

REACH E

STAGING AREA

REACH A

2022- 24

REACH H

REACH B

REACH E

(P) PUMP STATION

ACCESS RAMP

(P) PUMP STATION

AND WET WELL

(P) 18" INLET

WITH FES

1+

2+

3+

4+

5+

6+

7+

8+

84+00 85+00

86+0087+0088+0089+0090+00 91+00

G-801

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

G R

AD

IN

G A

N D

S

IT

E

PL

AN

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SANKEY ROAD

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-801_SP-01_KBS.dwg Last Saved: Sat, 24 Jul 2021 - 1:54pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

APN 35-150-006

APN 35-150-007

HINTZ

SAFCA

SCALE: 1" = 50'

50' 25' 0 50' 100'

KEY MAP

SCALE: 1"=500'

SHEET NOTES:

G-802

PLEASANT G

RO

VE CREEK CANAL

SANKEY ROAD

TOE OF

BORROW SITE

FOR CONTROL LINE AND CURVE TABLES, SEE DWG G-800.

M

AT

C H

L

IN

E (S

H

EE

T

G -8

MATCH LINE (SHEET )G-802

PROPERTY LINE

4:

8'

NATO

M

AS RO

AD

PROPERTY LINE

5'

4:1

(E) POWER POLE

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE

APN 35-220-029

ODYSSEUS FARMS

5'

TOE OF

BORROW SITE

TOP OF BORROW SITE

CONTROL LINE

SEE SHEET NOTE 1

STA 1+00 BEGIN TOP OF

BORROW SITE CONTROL LINE

NORTHING= 2046364.37

EASTING= 6701039.68

STA 91+99 END TOP OF

BORROW SITE CONTROL LINE

G-802

G-801 G-806

PLEASANT G

RO

VE CREEK CANAL

NATO

M

AS RO

AD

G-805

G-804

G-803

G-807

M

AT

C H

L

IN

E (S

H

-8

50'

4:

(P) 18" STORM DRAIN

INLET AND FLARED

END SECTION

INV= 27.2

FOR GRADING NOTES, SEE DWG G-800.

4:1

LIMIT OF WORK

50'

CONSTRUCTION NOTES:

CONSTRUCT 18" PVC INLET AND FLARED END SECTION PER CALTRANS

STANDARD DWG D94B, SEE DETAIL 1 SHEET G-811.

GRADE TO TOP OF EXISTING ROADSIDE DITCH, PROTECT IN PLACE ALL

EXISTING UTILITIES.

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED TO 12" INLET.

TOP OF BORROW SITE

CONTROL LINE

SEE SHEET NOTE 1

(P) PUMP STATION

ACCESS RAMP

(P) PUMP STATION

AND WET WELL

(E) ROADSIDE

DITCH

SMOOTH EXISTING GROUND ON ACCESS ROAD FROM TOP OF BORROW SITE

TO LIMIT OF WORK. MAINTAIN 2% MINIMUM SLOPE.

CONSTRUCT 6' DIAMETER WET WELL, SEE DETAIL 1 SHT G-811.

CONSTRUCT 60'X40' PUMP STATION PAD WITH 6" CL II AGGREGATE BASE,

SEE DETAIL 2 SHT G-811.

CONSTRUCT 20' WIDE PUMP STATION PAD ACCESS

WITH 6" CL II AGGREGATE BASE, SEE DETAIL 2 SHT G-811.

GRADE (E) ROADSIDE DITCH TO RSP AT ELEV 31.00.

SEE DETAIL 2 SHT G-811.

(E) ROADSIDE DITCH AND

(E) 12" CMP DRAIN PIPE

PROPERTY LINE

LIMIT OF WORK

MATCH (E) GROUND

PROPERTY LINE

LIMIT OF WORK

MATCH (E) GROUND

45'

45'

LIMIT OF WORK

8'

LIMIT OF WORK

REACH A

BORROW

REACH H

BORROW

REACH B

BORROW

THE EXCAVATION ELEVATIONS SHOWN ARE THE SITE ELEVATIONS

BEFORE RE-SPREADING THE STRIPPED SURFACE LAYER OF

EARTHEN MATERIALS.

(P) 12" DISCHARGE

PUMP RISER

CONSTRUCT 12" STEEL PIPE PUMP DISCHARGE RISER,

ENBED 24" INTO 3'x3'x3' REINFORCED CONCRETE ANCHOR BLOCK, SEE DETAIL 1 SHEET G-811.

3:1

7+

8+

9+

+0

+0

+0

13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00

3:1

G-802

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

G R

AD

IN

G A

N D

S

IT

E

PL

AN

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-802_SP-02_KBS.dwg Last Saved: Fri, 23 Jul 2021 - 4:50pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

SCALE: 1" = 50'

50' 25' 0 50' 100'

APN 35-150-005

VAN DYKE

KEY MAP

SCALE: 1"=500'

G-804

G-803 G-805

G-801 G-807 G-806

PLEASANT G

RO

VE CREEK CANAL

SANKEY ROAD

M

AT

C H

L

IN

E (S

H

-8

MATCH LINE (SHEET )G-801

NATO

M

AS RO

AD

APN 35-150-006

SAFCA

4:1

5'

4:

TOE OF

BORROW SITE

G-802

APN 35-150-007

HINTZ

4:

4:1

5'

TOE OF

BORROW SITE

50'

TOP OF BORROW SITE

CONTROL LINE

SEE SHEET NOTE 1

TOP OF BORROW SITE

CONTROL LINE

SEE SHEET NOTE 1

PROPERTY LINE

5'

50'

LIMIT OF WORK

MATCH (E) GROUND

45'

PROPERTY LINE

LIMIT OF WORK

MATCH (E) GROUND

PROPERTY LINE

LIMIT OF WORK

MATCH (E) GROUND

REACH A

BORROW

SHEET NOTES:

FOR CONTROL LINE AND CURVE TABLES, SEE DWG G-800.

FOR GRADING NOTES, SEE DWG G-800.

CONSTRUCTION NOTES:

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED TO 12" INLET.

SMOOTH EXISTING GROUND ON ACCESS ROAD FROM TOP OF BORROW SITE

TO LIMIT OF WORK. MAINTAIN 2% MINIMUM SLOPE.

THE EXCAVATION ELEVATIONS SHOWN ARE THE SITE ELEVATIONS

BEFORE RE-SPREADING THE STRIPPED SURFACE LAYER OF

EARTHEN MATERIALS.

45'

APN 35-150-006

SAFCA

APN 35-160-006

SAFCA

21+00 22+00 23+00 24+00 25+00

+0

+0

+0

+0

+0

49+00

50+00

51+00

G-803

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E -R

EA

C

H A

G R

AD

IN

G A

N D

S

IT

E

PL

AN

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-803_SP-03_KBS.dwg Last Saved: Fri, 23 Jul 2021 - 4:51pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

SCALE: 1" = 50'

50' 25' 0 50' 100'

APN 35-150-005

VAN DYKE

KEY MAP

SCALE: 1"=500'

G-804

G-805

G-802

G-801 G-807 G-806

PLEASANT G

RO

VE CREEK CANAL

SANKEY ROAD

M

AT

C H

L

IN

E (S

H

-8

MATCH LINE (SHEET )G-807

NATO

M

AS RO

AD

MATCH LINE (SHEET )G-804

M

AT

C H

L

IN

E (S

H

-8

G-803

PROPERTY

LINE

TOE OF

BORROW SITE

4:

4:1

TOP OF BORROW SITE

CONTROL LINE

SEE SHEET NOTE 1

TOP OF BORROW SITE

CONTROL LINE

SEE SHEET NOTE 1

STAGING AREA

LIMITS

300'

TOP OF

BORROW

AREA LIMITS

TOE OF

BORROW SITE

50'

KAUFMAN REACH E

STAGING AREA

25' BUFFER

25' BORROW LIMITS

ACCESS ROAD

PROPERTY LINE

5'

50'

LIMIT OF WORK

MATCH (E) GROUND

45'

5'

PROPERTY LINE

LIMIT OF WORK

MATCH (E) GROUND

REACH A

BORROW

SHEET NOTES:

FOR CONTROL LINE AND CURVE TABLES, SEE DWG G-800.

FOR GRADING NOTES, SEE DWG G-800.

CONSTRUCTION NOTES:

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED TO 12" INLET.

SMOOTH EXISTING GROUND ON ACCESS ROAD FROM TOP OF BORROW SITE

TO LIMIT OF WORK. MAINTAIN 2% MINIMUM SLOPE.

THE EXCAVATION ELEVATIONS SHOWN ARE THE SITE ELEVATIONS

BEFORE RE-SPREADING THE STRIPPED SURFACE LAYER OF

EARTHEN MATERIALS.

4:1 4:1

4:1

4:1

MATCH (E) GROUND

GRADE 25' ACCESS ROAD FROM TOP OF BORROW SITE TO BUFFER LIMIT OF

STAGING AREA. MAINTAIN 2% MINIMUM SLOPE.

25' BORROW LIMITS

ACCESS ROAD

MATCH (E) GROUND

TOE OF

BORROW SITE

+0

+0

+0

+0

+0

+0

+0

+0

+0

39+00

40+00

41+00

42+00

43+00

44+00

45+00

46+00

47+00

48+00

49+00

SANKEY ROAD

G-804

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

G R

AD

IN

G A

N D

S

IT

E

PL

AN

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-804_SP-04_KBS.dwg Last Saved: Fri, 23 Jul 2021 - 11:10pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

SCALE: 1" = 50'

50' 25' 0 50' 100'

APN 35-160-006

APN 35-150-005

VAN DYKE

SAFCA

KEY MAP

SCALE: 1"=500'

G-805

G-802

G-801 G-807 G-806

SANKEY ROAD

MATCH LINE (SHEET )G-803

NATO

M

AS RO

AD

G-803

G-804

PLEASANT G

RO

VE CREEK CANAL

ACQUISITION ESMT AND

LIMIT OF WORK

PLEASANT G

RO

VE CREEK CANAL

PROPERTY LINE

(E) PGCC WEST

LEVEE

ACQUISITION

EASEMENT

NATOMAS ROAD

ALIGNMENT

EXISTING

AGRICULTURAL

WELL

5'

50'

BORROW SITE

CONTROL LINE

SEE SHEET NOTE 1

NATOMAS ROAD

ALIGNMENT

PROPERTY LINE AND

LIMIT OF WORK

5'

4:1

4:1

REACH E

STAGING AREA

LIMITS

300'

TOP OF BORROW

AREA LIMITS

TOE OF

BORROW SITE

50'

KAUFMAN REACH E

STAGING AREA

25' BUFFER

50'

150'

NATO

M

AS RO

AD

PROPERTY LINE

5'

50'

LIMIT OF WORK

MATCH (E) GROUND

REACH A

BORROW

SHEET NOTES:

FOR CONTROL LINE AND CURVE TABLES, SEE DWG G-800.

FOR GRADING NOTES, SEE DWG G-800.

CONSTRUCTION NOTES:

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED TO 12" INLET.

SMOOTH EXISTING GROUND ON ACCESS ROAD FROM TOP OF BORROW SITE

TO LIMIT OF WORK. MAINTAIN 2% MINIMUM SLOPE.

THE EXCAVATION ELEVATIONS SHOWN ARE THE SITE ELEVATIONS

BEFORE RE-SPREADING THE STRIPPED SURFACE LAYER OF

EARTHEN MATERIALS.

MATCH (E) GROUND

GRADE 25' ACCESS ROAD FROM TOP OF BORROW SITE TO BUFFER LIMIT OF

STAGING AREA. MAINTAIN 2% MINIMUM SLOPE.

25' BORROW LIMITS

ACCESS ROAD

48+00

49+00

50+00

51+00

52+00

53+00

54+00

55+00

56+00

57+00

58+00

SANKEY ROAD

G-805

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

G R

AD

IN

G A

N D

S

IT

E

PL

AN

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-805_SP-05_KBS.dwg Last Saved: Fri, 23 Jul 2021 - 10:15pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

SCALE: 1" = 50'

50' 25' 0 50' 100'

APN 35-160-006

SAFCA

KEY MAP

SCALE: 1"=500'

G-802

G-801 G-807 G-806

SANKEY ROAD

M

AT

C H

L

IN

E (S

H

-8

MATCH LINE (SHEET )G-806

NATO

M

AS RO

AD

MATCH LINE (SHEET )G-804

G-803

G-804

PLEASANT G

RO

VE CREEK CANAL

PLEASANT G

RO

VE CREEK CANAL

PROPERTY LINE

(E) PGCC WEST

LEVEE

G-805

NATOMAS ROAD

ALIGNMENT

ACQUISITION ESMT AND

LIMIT OF WORK

4:1

4:1

ACQUISITION

EASEMENT

NATOMAS ROAD

ALIGNMENT

REACH E

STAGING AREA

LIMITS

300'

TOP OF

BORROW

AREA LIMITS

50'

25' BUFFER

150'

KAUFMAN REACH E

STAGING AREA

REACH E

BORROW

REACH A

BORROW

SHEET NOTES:

FOR CONTROL LINE AND CURVE TABLES, SEE DWG G-800.

FOR GRADING NOTES, SEE DWG G-800.

CONSTRUCTION NOTES:

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED TO 12" INLET.

THE EXCAVATION ELEVATIONS SHOWN ARE THE SITE ELEVATIONS

BEFORE RE-SPREADING THE STRIPPED SURFACE LAYER OF

EARTHEN MATERIALS.

KAUFMAN REACH E

STAGING AREA

25' BORROW LIMITS

ACCESS ROAD

GRADE 25' ACCESS ROAD FROM TOP OF BORROW SITE TO BUFFER LIMIT OF

STAGING AREA. MAINTAIN 2% MINIMUM SLOPE.

MATCH (E) GROUND

TOE OF

BORROW SITE

NATO

M

AS RO

AD

KAUFMAN SITE

CONTROL LINE

SEE SHEET NOTE 1

(E) POWER POLE

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE(E) POWER POLE

PROTECT IN PLACE(E) POWER POLE

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE

SANKEY ROAD

PROPERTY LINE

59+00

60+00

61+00

62+00

63+00

64+00

+0

+0

+0

68+0069+0070+0071+0072+0073+00

SANKEY ROAD

G-806

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

G R

AD

IN

G A

N D

S

IT

E

PL

AN

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-806_SP-06_KBS.dwg Last Saved: Sat, 24 Jul 2021 - 1:11pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

APN 35-160-038

RD 1000

SCALE: 1" = 50'

50' 25' 0 50' 100'

APN 35-160-006

SAFCA KEY MAP

SCALE: 1"=500'

G-802

G-801 G-807

SANKEY ROAD

M

AT

C H

L

IN

E (S

H

-8

NATO

M

AS RO

AD

MATCH LINE (SHEET )G-805

G-803

G-804

PLEASANT G

RO

VE CREEK CANAL

NATO

M

AS RO

AD

PLEASANT G

RO

VE CREEK CANAL

PROPERTY LINE

(E) PGCC WEST

LEVEE

ACQUISITION

EASEMENT

G-805

G-806

PROPERTY LINE

AND LIMIT OF WORK

STABILIZED

CONSTRUCTION

ENTRANCE

KAUFMAN BORROW SITE

FIELD ACCESS RAMP

LIMIT OF WORK

NATOMAS ROAD

ALIGNMENT

50'

TOE OF

BORROW SITE

150'

ACQUISITION ESMT AND

LIMIT OF WORK

50'

TOP OF BORROW SITE

CONTROL LINE

TOE OF

BORROW SITE

8'50

4:1

4:1

4:1

4:

REACH A

BORROW

REACH E

BORROW

SHEET NOTES:

FOR CONTROL LINE AND CURVE TABLES, SEE DWG G-800.

FOR GRADING NOTES, SEE DWG G-800.

CONSTRUCTION NOTES:

GRADE TO TOP OF EXISTING ROADSIDE DITCH, PROTECT IN PLACE ALL

EXISTING UTILITIES.

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED TO 12" INLET.

SMOOTH EXISTING GROUND ON ACCESS ROAD FROM TOP OF BORROW SITE

TO LIMIT OF WORK. MAINTAIN 2% MINIMUM SLOPE.

THE EXCAVATION ELEVATIONS SHOWN ARE THE SITE ELEVATIONS

BEFORE RE-SPREADING THE STRIPPED SURFACE LAYER OF

EARTHEN MATERIALS.

CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE,

SEE DETAIL 8 SHEET G-810.

CONSTRUCT 15' BORROW SITE ACCESS RAMP, SEE DETAIL 7 SHT G-810.

4:1

TOP OF BORROW

AREA LIMITS

TOE OF

BORROW SITE

25' BUFFER

MATCH (E) GROUND

GRADE 25' ACCESS ROAD FROM TOP OF BORROW SITE TO BUFFER LIMIT OF

STAGING AREA. MAINTAIN 2% MINIMUM SLOPE.

4:1

KAUFMAN SITE

CONTROL LINE

SEE SHEET NOTE 1

25' BORROW LIMITS

ACCESS ROAD

REACH E

STAGING AREA

REACH E

BORROW/ STAGING AREA

LIMITS

300'

50'

150'

74+00 75+00

76+0077+0078+0079+0080+0081+00 82+0083+00

84+00

(E) POWER POLE

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE

4+89.57 PC4+89.57 PT5+40.17 PC5+40.21 PT5+89.94 PC5+90.32 PT

12+61.01 PC

+7

6.

P T

+7

1.

P C

25+49.92 PT

38+17.65 PC

+3

3.

P T

+6

4.

P C

39+75.85 PT

64+69.96 PC

64+78.82 PT

66+93.02 PC

+2

4.

P T

+5

9.

P C

G-807

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

G R

AD

IN

G A

N D

S

IT

E

PL

AN

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SANKEY ROAD

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-807_SP-07_KBS.dwg Last Saved: Fri, 23 Jul 2021 - 10:14pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

APN 35-150-006 APN 35-160-006

SAFCASAFCA

SCALE: 1" = 50'

50' 25' 0 50' 100'

KEY MAP

SCALE: 1"=500'

G-804

G-803 G-805

G-802

G-801 G-807 G-806

PLEASANT G

RO

VE CREEK CANAL

SANKEY ROAD

M

AT

C H

L

IN

E (S

H

-8

MATCH LINE (SHEET )G-803

PROPERTY LINE

NATO

M

AS RO

AD

LIMIT OF WORK

M

AT

C H

L

IN

E (S

H

-8

(E) POWER POLE

PROTECT IN PLACE(E) 12" CMP CULVERT

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE16" CONC. PIPE

PROTECT IN PLACE

PROPERTY LINE

4:

1 4:

TOP OF BORROW SITE

CONTROL LINE

TOE OF

BORROW SITE

REACH B

BORROW

REACH A

BORROW

SHEET NOTES:

FOR CONTROL LINE AND CURVE TABLES, SEE DWG G-800.

FOR GRADING NOTES, SEE DWG G-800.

CONSTRUCTION NOTES:

GRADE TO TOP OF EXISTING ROADSIDE DITCH, PROTECT IN PLACE ALL

EXISTING UTILITIES.

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED TO 12" INLET.

SMOOTH EXISTING GROUND ON ACCESS ROAD FROM TOP OF BORROW SITE

TO LIMIT OF WORK. MAINTAIN 2% MINIMUM SLOPE.

THE EXCAVATION ELEVATIONS SHOWN ARE THE SITE ELEVATIONS

BEFORE RE-SPREADING THE STRIPPED SURFACE LAYER OF

EARTHEN MATERIALS.

8'

G-808

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

G R

AD

IN

G S

EC

TI

O N

W

ES

T

TO

E

AS

T

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-808_GRD_SEC-01_KBS.dwg Last Saved: Thu, 22 Jul 2021 - 1:06pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

GRADING SECTION A

(E) GROUND

(P) GRADE

TOP OF BORROW SITE

SEE PLAN SHEETS

2%

4:1

TOE OF BORROW SITE

SEE PLAN SHEETS

M

AT

C H

L

IN

E (S

EE

T

H

IS

S H

EE

T

BE

LO

W

M

AT

C H

L

IN

E (S

EE

T

H

IS

S H

EE

T

AB

O

VE

5'

(E) GROUND

4:

TOE OF BORROW SITE

SEE SITE PLAN

50'

TOP OF BORROW SITE

SEE SITE PLAN

PROPERTY LINE

(LIMIT OF WORK)

2%

VARIES 100' ACQUISITON EASEMENT

RD 1000 PROPERTY

5'

(P) TOP OF BORROW SITE

CONTROL LINE

25' 25'

TOP OF ACCESS ROAD

MATCH (E) GROUND

300'

REACH E STAGING AREA ACCESSBUFFER

REACH A

LIMITS

STAGING

LIMITS

SCALE: (H) 1"=40'

(V) 1"=4'

(E) GROUND

(P) GRADE

CONSTRUCTION NOTES:

CONTRACTOR TO EXCAVATE BORROW SITE

UNIFORMLY FROM SOUTHWEST TO NORTHEAST TO

MAINTAIN POSITIVE DRAINAGE.

GRADE SMOOTH EXISTING GROUND ON ACCESS

ROAD FROM TOP OF BORROW SITE TO LIMIT OF

WORK, MAINTAIN 2% MINIMUM SLOPE.

SEE SHEETS G-801 TO G-807 FOR ELEVATIONS.

VARIES VARIES TO 125' TO 2440'

5'

TOP OF ACCESS ROAD

MATCH (E) GROUND

45'

ACCESS

PROPERTY

LINE

(P) TOP OF

BORROW SITE

CONTROL LINE

50'

LIMIT OF WORK

G-809

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

G R

AD

IN

G S

EC

TI

O N

S

- N

O R

TH

T

O S

O U

TH

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-809_GRD_SEC-02_KBS.dwg Last Saved: Thu, 22 Jul 2021 - 4:22pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

(E) GROUND

(P) GRADE

(E) GROUND

(P) GRADE

CONSTRUCTION NOTES:

MATCH (E) GROUND AT

TOP OF (E) DITCH

PROPERTY

LINE

8'

SANKEY RD

(E) ROADSIDE DITCH

TO REMAIN

LIMIT OF WORK

LIMITS OF GRADING TO TOP OF EXISTING DITCH,

CONTRACTOR TO PROTECT IN PLACE ALL

EXISTING UTILITIES.

VARIES 1150' TO 2050'

CONTRACTOR TO EXCAVATE BORROW SITE

UNIFORMLY FROM SOUTHWEST TO NORTHEAST TO

MAINTAIN POSITIVE DRAINAGE.

VARIES VARIES TO 1150' TO 2050'

TOP OF BORROW SITE

SEE PLAN SHEETS

5'

TOP OF ACCESS ROAD

MATCH (E) GROUND

2%

45'

4:1

TOE OF BORROW SITE

SEE PLAN SHEETS

5'

M

AT

C H

L

IN

E

4:

TOE OF BORROW SITE

SEE PLAN SHEETS

42'

TOP OF BORROW SITE

SEE PLAN SHEETS

2%

VARIES

5'

(P) TOP OF

BORROW SITE

CONTROL LINE

SANKEY RD

CL

ACCESS

ACCESS

50'

PROPERTY

LINE

(P) TOP OF

BORROW SITE

CONTROL LINE

50'

LIMIT OF WORK

GRADE SMOOTH EXISTING GROUND ON ACCESS

ROAD FROM TOP OF BORROW SITE TO LIMIT OF

WORK, MAINTAIN 2% MINIMUM SLOPE.

SEE SHEETS G-801 TO G-807 FOR ELEVATIONS.

M

AT

C H

L

IN

E (S

EE

T

H

IS

S H

EE

T

BE

LO

W

(S

EE

T H

IS

S

H

EE

T

AB

O

VE

GRADING SECTION B

SCALE: (H) 1"=40'

(V) 1"=4'

+0

68+00

72+0073+00

G-810

KA

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

TY

PI

C

AL

D

ET

AI

LS

A N

D S

EC

TI

O N

S

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-810_DET-01_KBS.dwg Last Saved: Sat, 24 Jul 2021 - 1:05pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

LIMIT OF WORK

GRADE TO (E) GROUND

AT 2:1 SLOPE MINIMUM

40' WIDTH OR

AS REQUIRED

TO ACCOMMODATE

ANTICIPATED TRAFFIC

STABILIZED CONSTRUCTION ENTRANCE

SCALE: 1"=20' 8

SECTION C

(E) GROUND

" M

IN

CRUSHED AGGREGATE GREATER

THAN 3" BUT SMALLER THAN 6"

FILTER FABRIC

R=40'R=4 0'

MATCH (E) EP

SANKEY ROAD

SCALE: 1"=30'

(E) POWER POLE

AND TELEPHONE

BOX (PROTECT IN

PLACE)

PROPERTY LINE

LIMIT OF WORK

STAGING AREA LIMITS

SANKEY ROAD

ALIGNMENT

2:

1 2:1

FIELD ACCESS RAMP

SCALE: 1"=20' 7

TOP OF

BORROW SITE

TOE OF

BORROW SITE

4:

4:

4:

1 SECTION B

TOE OF BORROW SITE

6" M

IN

CRUSHED AGGREGATE GREATER

THAN 3" BUT SMALLER THAN 6"

FILTER FABRIC

SCALE: 1"=30'

WIDTH

AS SHOWN

15'

4:1

4:1

TOP OF

BORROW SITE28.2

28.2 28.2

28.3

R=40'R=4 0'

NOTE:

CONTRACTOR SHALL RESTORE EXISTING CONDITIONS

UPON COMPLETION OF CONSTRUCTION.

TYPICAL BORROW SITE SECTION

SCALE: 1"=20' 5

STA. 69+20 TO 91+67

4:

TOE OF

BORROW SITE

SEE PLAN

SHEETS

(E) GROUND

MATCH (E) GROUND AT

TOP OF (E) DITCH

(P) GRADE

(E) ROADSIDE DITCH

TO REMAIN

LIMIT OF

WORK

TOP OF BORROW SITE

SEE PLAN SHEETS

5'

(P) TOP OF BORROW SITE

CONTROL LINE

8'

50' SANKEY RD

CL

TYPICAL BORROW SITE SECTION

SCALE: 1"=20' 1

STA. 1+00 TO 32+00

(P) TOP OF BORROW SITE

CONTROL LINE

TOP OF BORROW SITE

SEE PLAN SHEETS

5'

TOP OF ACCESS ROAD

MATCH (E) GROUND

2% MIN

50'

4:1

TOE OF BORROW SITE

SEE PLAN SHEETS

5'

(E) GROUND

(P) GRADE

45'

ACCESS

PROPERTY

LINE

LIMIT OF WORK

42'

PROPERTY

LINE

ACCESS

NOTE:

PROTECT IN PLACE ALL EXISTING UTILITIES

ON SANKEY ROAD

2% MIN

TYPICAL BORROW SITE SECTION

SCALE: 1"=20' 2

STA. 32+00 TO 34+50

(E) GROUND

(P) TOP OF BORROW SITE

CONTROL LINE

5'

TOP OF ACCESS ROAD

MATCH (E) GROUND

50'

45'

ACCESS

PROPERTY

LINE

LIMIT OF WORK

VARIES

BORROW LIMITS ACCESS

25'

BUFFER

(P) GRADE

2% MIN

TYPICAL BORROW SITE SECTION

SCALE: 1"=20' 3

STA. 34+50 TO 39+80

(E) GROUND

(P) TOP OF BORROW SITE

CONTROL LINE

5'

TOP OF ACCESS ROAD

MATCH (E) GROUND

50'

45'

ACCESS

PROPERTY

LINE

LIMIT OF WORK

VARIES

BORROW LIMITS ACCESS

(P) GRADE

2% MIN

4:

TOE OF

BORROW SITE

SEE PLAN

SHEETS

(P) GRADE

5'

(E) GROUND

TOP OF BORROW SITE

SEE PLAN SHEETS

2% MIN

STAGING

LIMITS

25'

ACCESS

25'

BUFFER

STAGING AREA

BORROW

LIMITS

TOP OF

BORROW

TYPICAL BORROW SITE SECTION

SCALE: 1"=20' 6

BORROW LIMITS EAST SIDE

TOP OF ACCESS ROAD

MATCH (E) GROUND

TYPICAL BORROW SITE SECTION

SCALE: 1"=20' 4

STA. 39+80 TO 64+76

(E) GROUND

PROPERTY LINE

(LIMIT OF WORK)

150' ACQUISITON EASEMENT

STA. 64+76 TO 68+85

RD 1000 PROPERTY **

(P) TOP OF BORROW SITE

CONTROL LINE

50'300'

REACH E STAGING AREA

' A

C C

ES

S

R O

AD

8'

G-811

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

TY

PI

C

AL

D

ET

AI

LS

A N

D S

EC

TI

O N

S

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-811_DET-02_KBS.dwg Last Saved: Tue, 27 Jul 2021 - 10:54pm

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

SECTION B

(E) GROUND

" M

IN

CRUSHED AGGREGATE

GREATER THAN 3" BUT

SMALLER THAN 6"

FILTER FABRIC

INLET AND WET WELL 1 PUMP STATION PAD AND ACCESS RAMP

SCALE: 1"=10' 2

SANKEY ROAD

S A

N K

E Y

R O

A D

PLACE AS SHOWN

NO. 2 FACING ROCK

PER CALTRANS STD

SPECIFICATION 72-2.

REGRADE (E) ROADSIDE

DITCH TO (E) CMP OPENING

ELEV= 30.81±

(E) ROADSIDE DITCH

MATCH (E) DITCH FLOW

(E)FL 32.3±

(E)FL 30.8±

(E) 12" CMP

DRAIN PIPE

CONSTRUCT 34 LF

18" PVC STORM DRAIN PIPE

SANKEY ROAD

(E) DRAINAGE DITCH

(E) 12" CMP

4:1

PUMP STATION PAD

(P)GRADE

18" FES

INV=27.20

TOP OF BORROW SITE

FG=32.2

SANKEY ROAD

CENTERLINE

INV EL= 27.17

34 LF 18" PVC @ S=0.000

3'x3'x3' REINFORCED

CONCRETE ANCHOR BLOCK

2:1 2:1

LIMIT OF WORK

LIMIT OF WORK

PROPERTY LINE

PROPERTY LINE

LIMIT OF WORK

(E) GROUND

KAUFMAN

BORROW SITE

R=10'R=1 0'

MATCH (E) EP

ACCESS RAMP

(E)12" CMP

INV=30.8±

VERIFY

6' DIAMETER PRECAST

CONCRETE WET WELL

6' DIAMETER

WET WELL

NOTE:

CONTRACTOR SHALL RESTORE TO EXISTING

CONDITIONS UPON COMPLETION OF CONSTRUCTION.

CONSTRUCT 60'X40' PAD

WITH 6" CL II AB

PUMP STATION

PAD

EL= 23.00

PROPERTY LINE

FG 34.60 FG 35.00

6' DIAMETER PRECAST

CONCRETE WET WELL

PLACE AS SHOWN

NO. 2 FACING ROCK

PER CALTRANS STD

SPECIFICATION 72-2.

(E)12"CMP

PLACE RSP TO

TOP OF (E) DITCH

2:

(E) SANKEY ROAD

DRAINAGE DITCH

(SOUTHSIDE)

18.6''

SECTION A

SCALE: 1"=20'

SCALE: (H) 1"=10'

(V) 1"=5'

SCALE: 1"=30'

GRADE TO (E) GROUND

AT 2:1 SLOPE MINIMUM

10'

2:1

2:

(E) EP

SANKEY ROAD

ALIGNMENT

2:

1 2:1

20'

CONSTRUCT CONCRETE

FLARED END SECTION FOR

18" PVC PIPE, PER CALTRANS

STANDARD DWG D94B

6'-0"Ø PRECAST CONC WET WELL,

SEE NOTE 2,

TOC EL SEE DETAIL 1 THIS SHEET

FG EL= 23.00

4'-0" x 4'-0" CLR

ACCESS OPENING

SEE NOTE 1

SCALE: NTS

18" INLET

SEE DETAIL 1

THIS SHEET

18" INLET PIPE

INV EL= 27.17

FLEXIBLE PIPE-TO-M/H

CONNECTOR, KOR-N-SEAL

106/406 SERIES WEDGE

STYLE, OR EQ

18" PVC PIPE

1'-4"

1' -6

6"

2"

1'-0"

1. ACCESS HATCHES SHALL BE H-20 RATED AND OF ALUMINUM CONSTRUCTION, AND SHALL HAVE SIDE-BY-SIDE DOUBLE LEAF ACCESS DOORS WITH SECONDARY SAFETY GRATING. HATCH DOORS SHALL BE SPRING ASSIST OPENING, WITH STAINLESS STEEL HINGE PINS, HOLD-OPEN ARMS, EPDM DEBRIS GASKET, REMOVABLE LATCH, AND ALL HARDWARE NECESSARY FOR A COMPLETE INSTALLATION. HATCHES SHALL BE FLYGT "SAFE-HATCH", BILCO TYPE JD-xAL H20, OR

APPROVED EQUAL.

2. PROVIDE PRECAST CONCRETE WETWELL CONSISTING OF A REINFORCED CONCRETE FOUNDATION BASE AND TOP, REINFORCED PRECAST PIPE RINGS, GASKETS, AND ALL OPENINGS AND PENETRATIONS AS REQUIRED AND AS SHOWN.

PRECAST CONCRETE WET WELL FOUNDATION AND TOP SLAB PERIMETER DESIGNS MAY BE CIRCULAR OR SQUARE AS VIEWED FROM ABOVE, AT THE CONTRACTOR'S OPTION. PRECAST CONCRETE WET WELL SUPPLIER SHALL SUBMIT SHOP DRAWINGS AND STRUCTURAL CALCULATIONS, SIGNED AND STAMPED BY A REGISTERED STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA, FOR REVIEW AND APPROVAL PRIOR TO WET WELL FABRICATION. DIMENSIONS FOR THE WET WELL FOUNDATION AND TOP SLABS ARE FOR BIDDING PURPOSES ONLY. ACTUAL DIMENSIONS SHALL BE

BASED ON APPROVED STRUCTURAL CALCULATIONS AND SHOP DRAWINGS.

PUMP STATION DETAIL 3

PUMP STATION NOTES:

SANKEY ROAD

(E) DRAINAGE DITCH

FILTER FABRIC

NO. 2 FACING

ROCK

NO. 2 FACING ROCK

OVER FILTER FABRIC

CONSTRUCT 20' WIDE

ACCESS RAMP

INV EL

= 27.17

(F) TRAILER-MOUNTED

PUMP UNIT (BY OTHERS)

12" STEEL PIPE PUMP

DISCHARGE RISER, EMBED

24" INTO ANCHOR BLOCK

FG 34.0

CONSTRUCT 12" STEEL PIPE

PUMP DISCHARGE RISER,

EMBED 24" INTO 3'x3'x3'

REINFORCED CONCRETE

ANCHOR BLOCK

(E) SANKEY ROAD DITCH

NORTHSIDE

(E) FL= 31.0±

12''

(F) TRAILER-MOUNTED

PUMP UNIT (BY

OTHERS)

12" STEEL PIPE

PUMP DISCHARGE

RISER

8"

FG 33.00

G-812

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N T

ES

T

PI

T

LO

C

AT

IO

N M

AP

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-812_TESTLOG-01_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:25am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-813

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N T

ES

T

PI

T

LE

G

EN

D

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-813_TESTLOG-02_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 1:02am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-814

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-814_TESTLOG-03_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:29am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-815

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-815_TESTLOG-04_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:30am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-816

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-816_TESTLOG-05_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:34am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-817

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-817_TESTLOG-06_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:38am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-818

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-818_TESTLOG-07_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:39am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-819

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-819_TESTLOG-08_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:40am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-820

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-820_TESTLOG-09_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:41am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-821

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-821_TESTLOG-10_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:42am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-822

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-822_TESTLOG-11_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:44am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-823

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-823_TESTLOG-12_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:45am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-824

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-824_TESTLOG-13_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:50am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-825

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-825_TESTLOG-14_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:53am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-826

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-826_TESTLOG-15_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:55am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-827

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-827_TESTLOG-16_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:56am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-828

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-828_TESTLOG-17_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 12:58am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-829

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-829_TESTLOG-18_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 1:00am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-830

U

FM

AN

B O

R R

O W

A N

D S

TA

G

IN

G

S

IT

E

- R

EA

C

H A

EX

PL

O R

AT

IO

N L

O G

O F

TE

ST

P

IT

O

F

J.

P

R

IE

ST

J.

P

R

IE

ST

J.

K

O R

S

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers ®

AN

SI

-D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-830_TESTLOG-19_KBS.dwg Last Saved: Wed, 08 Jul 2020 - 1:01am

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

J S

TR

EE

T

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

SA

N

KE

Y

R O

AD

, P

LE

AS

AN

T

G R

O

VE

, C

AL

IF

O

R N

IA

KA

U

FM

AN

B

O R

R O

W S

IT

E

D

EV

EL

O

PM

EN

T

95% Submittal

AN

D

R

ES

TO

R

AT

IO

N P

LA

N

S

BU

IL

D

IN

G R

EL

AT

IO

N

SH

IP

S O

N E

PR

O

JE

C

T

AT

A T

IM

E

C S t, Bl dg . 1

-B

Te l 9

.3

.7

Sa cr am en to , C

A

Fa x

6.

1.

JU

LY

G-800_SHT-LAYOUT_KBS-LAYOUT
G-801_SP-01_KBS-LAYOUT
G-802_SP-02_KBS-LAYOUT
G-803_SP-03_KBS-LAYOUT
G-804_SP-04_KBS-LAYOUT
G-805_SP-05_KBS-LAYOUT
G-806_SP-06_KBS-LAYOUT
G-807_SP-07_KBS-LAYOUT
G-808_GRD_SEC-01_KBS-LAYOUT
G-809_GRD_SEC-02_KBS-LAYOUT
G-810_DET-01_KBS-LAYOUT
G-811_DET-02_KBS-LAYOUT
G-812_TESTLOG-01_KBS-LAYOUT
G-813_TESTLOG-02_KBS-LAYOUT
G-814_TESTLOG-03_KBS-LAYOUT
G-815_TESTLOG-04_KBS-LAYOUT
G-816_TESTLOG-05_KBS-LAYOUT
G-817_TESTLOG-06_KBS-LAYOUT
G-818_TESTLOG-07_KBS-LAYOUT
G-819_TESTLOG-08_KBS-LAYOUT
G-820_TESTLOG-09_KBS-LAYOUT
G-821_TESTLOG-10_KBS-LAYOUT
G-822_TESTLOG-11_KBS-LAYOUT
G-823_TESTLOG-12_KBS-LAYOUT
G-824_TESTLOG-13_KBS-LAYOUT
G-825_TESTLOG-14_KBS-LAYOUT
G-826_TESTLOG-15_KBS-LAYOUT
G-827_TESTLOG-16_KBS-LAYOUT
G-828_TESTLOG-17_KBS-LAYOUT
G-829_TESTLOG-18_KBS-LAYOUT
G-830_TESTLOG-19_KBS-LAYOUT

File details come from the government source that posted it. Updated .