About this file

This document package includes plans and specifications for the Natomas Reach A Levee Repairs federal contract opportunity. The solicitation seeks bids for levee repair work along Natomas Reach A as outlined in the attached drawings and specifications. Bids are due on August 16, 2021 at 1:00PM PST and a mandatory site visit is scheduled for July 8, 2021 at 10:00am PST. The scope of work involves repair of approximately 4 miles of levee and will be conducted under the oversight of the US Army Corps of Engineers Sacramento District. Oversized drawings cannot be uploaded and must be requested separately.

View the file

Other files for this federal contract opportunity

Other files attached to Natomas Reach A Levee Repairs, newest first.
File Type Posted
C04 - Bid Abstract for W9123821B0012.pdf PDF
B08 Amendment 0005 - updated section 31 56 14.pdf PDF
B08 Amendment 0005.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 W91238-B-21-0012_AM04 Summary of Changes.pdf PDF
B08 SIP (AM-04) Mix-In-Place Cutoff Wall - Butt Joint and Overlap Schematic.pdf PDF
B08 SIP (AM-04) Kaufman_Borrow_Staging_Reach-A_20210728.pdf PDF
B08 - Drawing 701 and 702.pdf PDF
B08 Amendment 0004.pdf PDF
B08 SIP (AM-04) PP1A Outfall Grouting - Plan View.pdf PDF
B08 SIP (AM-04) Gretas Pond Supplemental Info_and_Photos - Feb_2018.pdf PDF
B08 - Drawing C-228.pdf PDF
B08 W91238-B-21-0012_AM04_2172_20210804 Specifications Updates.pdf PDF
B08 - Pricing Schedule.Final.pdf PDF
B08 Amendment 0003.pdf PDF
B08 Amendment 3_Updated Plans and Specifications.pdf PDF
Amendment 2 - Specification Changes.pdf PDF
Amendment 0002.pdf PDF
B07 Site Visit Attendance List.pdf PDF
Amendment 0001 - Site Visit Date Change.pdf PDF
B08 IFB Atch 18 - SIP_USACE ARCF GRR HPMP Final_071317.pdf PDF
B08 IFB Atch 15 - SIP_Pumping Plant No 1 Rockwell Automation order info.pdf PDF
B08 IFB Atch 14 - SIP_Pumping Plant No 1 Rockwell Automation existing pump starters.pdf PDF
B08 IFB Atch 13 - SIP_Pumping Plant 1B Operating Elevations.docx DOCX document
B08 IFB Atch 12 - SIP_Pumping Plant 1B Drawings - As-built Markups (2003).pdf PDF
B08 IFB Atch 11 - SIP_PP1B Cascade 20003 Pump Shop Drawing.pdf PDF
B08 IFB Atch 6 - SIP_Natomas Reach A - Borrow Site GDR - 20190321.pdf PDF
B08 IFB Atch 20 - Pre-Award Survey.pdf PDF
B08 IFB Atch 16 - SIP_Reach I Contract 1 Stockpile Information Report.pdf PDF
B08 IFB Atch 9 - SIP_Plant 1A and 1B Duperon Self-Cleaning Trash Rake Manual.pdf PDF
B08 IFB Atch 8 - SIP_Natomas Reach A - R1 Cutoff Wall As-Builts (Complete Drawing Set).pdf PDF
B08 IFB Atch 17 - SIP_USACE ARCF Executed PA 20150910.pdf PDF
B08 Reach A IFB W9123821B0012.pdf PDF
B08 IFB Atch 19 - Davis Bacon Wage Determination 6.25.2021.pdf PDF
B08 IFB Atch 4 - SIP_City Sump 160 - Design Drawings (1990s).pdf PDF
B08 IFB Atch 3 - Reach A_Final Design Pricing Schedule.xlsx XLSX spreadsheet
B08 IFB Atch 2 - Reach A Specifications_2172_20210616.pdf PDF
B08 IFB Atch 10 - SIP_Plant 1B datum conversion.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L

C

L

L

C

L4

C

L

C

C

L

L

C

L16

L17

C

L

4:1

4:1

4:1

L8

15+00

17+50

20+00

22+50

67+50

70+00

72+50

75+00

77+50

80+00

82+50

85+00

87+50

90+00

G-801

K A

U F

M A

N

B

O R

R O

W

S

I T

E

R

E A

C H

A

E

X C

A V

A T

I O

N

S I T

E

P

L A

N

A

N D

G

R A

D I N

G

N

O T

E S

J

P

R I E

S T

J

P

R I E

S T

J

K

O R

S

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

T

O

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

A N

S I D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-801_OA-SITE_KBS-RA.dwg

Last Saved: Thu, 03 Jun 2021 - 4:51pm

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

J

T R

E E

T

S A

C R

A M

E N

I S

T R

I C

T

S A

C R

A M

E N

T O

C

A

S A

N K

Y

A

D

P

L E

A S

A N

T

G

R O

V E

C

A L

I F

O R

N I A

K A

U F

M A

N

B

O R

R O

W

S

I T

E

D

E V

E L

O P

M E

N T

95% Submittal

A N

D

R

E S

T O

R A

T I O

N

P

L A

N S

B U

I L

D I N

G

R

E L

A T

I O

N S

H I P

S

O

O

J E

M

E t

B l d g

B

T e l

S a c r a m e n t o

C

A

F a x

J U

APN 35-160-006

APN 35-150-006

APN 35-150-005

APN 35-150-007

HINTZ

VAN DYKE

SAFCA

SAFCA

APN 35-160-038

RD 1000

SCALE: 1" = 200'

200' 100' 0 200' 400'

STABILIZED

CONSTRUCTION

ENTRANCE

BORROW SITE FIELD

ACCESS RAMP

GRADING NOTES:

APN 35-170-029

JOHNSON

APN 35-220-029

ODYSSEUS FARMS

APN 35-220-027

ODYSSEUS FARMS

APN 35-170-091

SORENSON

APN 35-170-089

SORENSON

PROPERTY LINE

AND LIMIT OF WORK

LIMIT OF WORK

(MATCH (E) GROUND)

PROPERTY LINE AND

LIMIT OF WORK

(MATCH (E) GROUND)

(E) PGCC WEST

LEVEE

TOP OF REACH A

BORROW

ELEV = 32.2

TOP OF REACH A

BORROW

ELEV = 33.0-34.0

TOP OF REACH A

BORROW

ELEV 32.2-33.5

SEE LINE AND CURVE DATA THIS SHEET.

THE EXCAVATION ELEVATIONS SHOWN ARE THE FINISHED ELEVATIONS

AFTER RE-SPREADING THE STRIPPED SURFACE LAYER OF EARTHEN

MATERIALS.

CONDUCT EXCAVATION IN A PROGRESSIVE MANNER SUCH THAT BORROW

SITE IS UNIFORMLY GRADED FROM SOUTHWEST TO NORTHEAST AND

POSITIVE DRAINAGE IS MAINTAINED.

CONTRACTOR MAY OVER EXCAVATE EMBANKMENT-QUALITY BORROW

AREAS AND GRADE NON-SPEC MATERIAL INTO THE OVER-EXCAVATED

AREAS SO LONG AS THE CONTRACTOR COMPLIES WITH FINISH GRADING

PLAN.

NOTES:

CONTRACTOR TO VERIFY EARTHWORK QUANTITIES.

QUANTITIES ASSUME AVERAGE CUT OF 5' FT

AND 0.5' FT STRIPPED SURFACE.

1.

2.

R

E

A

SANKEY ROAD

N

A

T

O

M

A

D

LINE TABLE

LINE #

L1

L2

L4

L6

L8

L10

L11

L12

L14

L16

L17

LENGTH

527.67'

700.44'

1219.96'

1292.43'

180.08'

400.29'

855.47'

1267.74'

260.03'

1295.23'

1224.01'

DIRECTION

N00°37'14"W

N00°30'05"W

N88°34'38"E

N00°46'47"W

N88°31'45"E

S26°39'18"E

S26°09'13"E

S26°09'13"E

S00°46'22"E

S88°10'45"W

S88°32'38"W

CURVE TABLE

CURVE #

C1

C2

C3

C4

C5

C6

C7

LENGTH

47.56'

38.87'

15.60'

38.97'

28.28'

11.07'

38.81'

RADIUS

30.00'

25.00'

10.00'

25.00'

25.00'

25.00'

25.00'

DELTA

90°50'09"

89°04'43"

89°21'25"

89°18'31"

64°48'58"

25°22'52"

88°57'06"

ACCESS ROAD - LINE AND CURVE TABLE

PUMP STATION AND

ACCESS RAMP

OUTFALL AND

WET WELL

DISCHARGE

PIPE

(E) ROADSIDE

DITCH

KAUFMAN SITE

CONTROL LINE

TOE OF

BORROW SITE

R

E

A

T

A

G

I

E

A

TOE OF REACH A

BORROW

P

L

E

A

S

A

O

V

E

C

R

E

K

N

A

L

EARTHWORK SUMMARY:

REACH A BORROW STRIPPED SURFACE FILL NET

(C/Y) (C/Y) (C/Y)

541,917 53,534 488,383

REACH E

STAGING

REACH A

BORROW

TOE OF

REACH A

BORROW

TOE OF

REACH A

BORROW

KAUFMAN SITE

CONTROL LINE

PROPERTY LINE

KAUFMAN SITE

CONTROL LINE

PROPERTY LINE

AND LIMIT OF WORK

B

U

F

F

A

M

I

T

S

A

A

G

I

N

G

A

O

P

E

A

M

I

T

S

U

F

M

N

T

R

N

E

O

P

E

R

N

E

TOP OF REACH A

BORROW

ELEV = 33.0-34.0

TOP OF REACH A

BORROW

ELEV = 33.9-34.5

PROPERTY LINE AND

LIMIT OF WORK

(MATCH (E) GROUND)

REACH A LIMITS

MATCH (E)

GROUND

(E) POWER POLE

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE

(E) POWER POLE

PROTECT IN PLACE

ALL DISTURBED AREAS SHALL BE SHAPED BACK TO RICE FARMING

CONDITIONS.

G-802

A

U F

M A

N

B

O R

R O

W

S

I T

E

R

E A

C

A V

A T

I O

N

G R

A D

I N

G

S

E C

T I O

N S

J

P

R I E

S T

J

P

R I E

S T

J

K

O R

S

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

A N

S I D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-802_GRD_SEC-01_KBS-RA.dwg

Last Saved: Thu, 03 Jun 2021 - 5:08pm

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

T R

E E

T

S A

C R

A M

E N

S

T R

I C

T

S A

C R

A M

E N

T O

C

A

S A

N K

A

D

P

L E

A S

A N

T

G

R O

V E

C

A L

I F

O R

N I A

K A

U F

M A

N

B

O R

R O

W

S

I T

E

D

E V

E L

O P

M E

N T

95% Submittal

A N

D

R

E S

T O

R A

T I O

N

P

L A

N S

B U

I L

D I N

G

R

E L

A T

I O

N S

H I P

S

O

O

J E

M

E

B l d g

B

T e l

S a c r a m e n t o

C

A

F a x

J U

GRADING SECTION B - NORTH TO SOUTH

(E) GROUND

(P) GRADE

CONSTRUCTION NOTES:

MATCH (E) GROUND AT

TOP OF (E) DITCH

PROPERTY LINE

8'

SANKEY RD

(E) ROADSIDE DITCH

TO REMAIN

LIMIT OF WORK

LIMITS OF GRADING TO TOP OF EXISTING DITCH,

CONTRACTOR TO PROTECT IN PLACE ALL

EXISTING UTILITIES.

VARIES 1150' TO 2470'

CONTRACTOR TO EXCAVATE BORROW SITE

UNIFORMLY FROM SOUTHWEST TO NORTHEAST TO

MAINTAIN POSITIVE DRAINAGE.

VARIES

(P) TOP OF BORROW SITE

CONTROL LINE

TOP OF BORROW SITE

SEE PLAN SHEETS

PROPERTY LINE

(LIMIT OF WORK)

5'

TOP OF ACCESS ROAD

MATCH (E) GROUND

50'

TOE OF BORROW SITE

SEE SITE PLAN

TOE OF BORROW SITE

SEE SITE PLAN

50'

TOP OF BORROW SITE

SEE SITE PLAN

VARIES

(P) TOP OF BORROW SITE

CONTROL LINE

SANKEY RD

CL

VARIES

VARIES TO 125' TO 2140'

GRADING SECTION A - WEST TO EAST

SCALE: (H) 1"=40'

(E) GROUND

(P) GRADE

(E) GROUND

(P) TOP OF BORROW SITE

CONTROL LINE

TOP OF BORROW SITE

SEE SITE PLAN

PROPERTY LINE

(LIMIT OF WORK)

5'

TOP OF ACCESS ROAD

MATCH (E) GROUND

50'

TOE OF BORROW SITE

SEE SITE PLAN

TOE OF BORROW SITE

SEE SITE PLAN

50'

TOP OF BORROW SITE

SEE SITE PLAN

PROPERTY LINE

(LIMIT OF WORK)

VARIES

100' ACQUISITON EASEMENT

RD 1000 PROPERTY

(P) TOP OF BORROW SITE

CONTROL LINE

25' 25'

TOP OF ACCESS ROAD

MATCH (E) GROUND

300'

REACH E STAGING AREA BUFFERBUFFER

REACH A

LIMITS

STAGING

LIMITS

(V) 1"=4'

SCALE: (H) 1"=40'

(V) 1"=4'

G-803

A

U F

M A

N

B

O R

R O

W

S

I T

E

R

E A

C

A V

A T

I O

N

T Y

P I C

T

A I L

S

A

C

T I O

N S

J

P

R I E

S T

J

P

R I E

S T

J

K

O R

S

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

A N

S I D

Drawing Name: J:\Jobs\8295_SAFCA\8295_Kaufman_Borrow_Site\Civil\Dwg\04_USACE_Reach-A-Excavation\G-803_DET-01_KBS-RA.dwg

Last Saved: Thu, 03 Jun 2021 - 11:44pm

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

T R

E E

T

S A

C R

A M

E N

S

T R

I C

T

S A

C R

A M

E N

T O

C

A

S A

N K

A

D

P

L E

A S

A N

T

G

R O

V E

C

A L

I F

O R

N I A

K A

U F

M A

N

B

O R

R O

W

S

I T

E

D

E V

E L

O P

M E

N T

95% Submittal

A N

D

R

E S

T O

R A

T I O

N

P

L A

N S

B U

I L

D I N

G

R

E L

A T

I O

N S

H I P

S

O

O

J E

M

E

B l d g

B

T e l

S a c r a m e n t o

C

A

F a x

J U

LIMIT OF WORK

GRADE TO (E) GROUND

AT 2:1 SLOPE MINIMUM

40' WIDTH OR

AS REQUIRED

TO ACCOMMODATE

ANTICIPATED TRAFFIC

STABILIZED CONSTRUCTION ENTRANCE

SCALE: 1"=20'

SECTION B

(E) GROUND

M

I N

CRUSHED AGGREGATE GREATER

THAN 3" BUT SMALLER THAN 6"

FILTER FABRIC

R

R

MATCH (E) EP

SANKEY ROAD

OUTFALL, WET WELL AND DISCHARGE PIPE

PUMP STATION PAD AND ACCESS RAMP

SCALE: 1"=10'

SANKEY ROAD

SANKEY ROAD

PLACE AS SHOWN

NO. 2 FACING ROCK

PER CALTRANS STD

SPECIFICATION 72-2.

REGRADE (E) ROADSIDE

DITCH TO (E) CMP OPENING

ELEV= 30.81±

(E) ROADSIDE DITCH

MATCH (E) DITCH FLOW

(E)FL 32.3

(E)FL 30.8

(E) 12" CMP DRAIN PIPE

CONSTRUCT 43 LF

12" CMP STORM DRAIN PIPE

SANKEY ROAD

(E) DRAINAGE DITCH

KAUFMAN

BORROW SITE

(E) 12" CMP

PUMP STATION PAD

(P)GRADE

OUTFALL

INV=27.20

TOP OF BORROW SITE

FG=32.2

M I N

SANKEY ROAD

CENTERLINE

INV (N)= 27.20

43 LF 12" CMP @ S=0.000

DISCHARGE PIPE

AT (E) DITCH

INV=31.00

LIMIT OF WORK

LIMIT OF WORK

PROPERTY LINE

PROPERTY LINE

LIMIT OF WORK

(E) GROUND

KAUFMAN

BORROW SITE

OUTFALL

39 LF 12" CMP @ S=0.000

CONSTRUCT 20' WIDE

ACCESS RAMP

R

R

MATCH (E) EP

ACCESS RAMP

(E)12" CMP

INV=30.8

6' DIAMETER PRECAST

CONCRETE WET WELL

6' DIAMETER

WET WELL

NOTE:

CONTRACTOR SHALL RESTORE TO EXISTING

CONDITIONS UPON COMPLETION OF CONSTRUCTION.

60'

CONSTRUCT 60'X40' CL II AB PAD

PUMP STATION

PAD

INV (S)= 31.00

PROPERTY LINE

FG 34.60

FG 35.00

6' DIAMETER PRECAST

CONCRETE WET WELL

PLACE AS SHOWN

NO. 2 FACING ROCK

PER CALTRANS STD

SPECIFICATION 72-2.

(E)12"CMP

PLACE RSP TO TOP

OF (E)DITCH

CONSTRUCT 39 LF

12" CMP DISCHARGE PIPE

SANKEY ROAD

(E) DRAINAGE DITCH

10'

SECTION A

SCALE: 1"=20'

SCALE: (H) 1"=10'

(V) 1"=5'

SCALE: 1"=30'

(E) POWER POLE AND

TELEPHONE BOX

(PROTECT IN PLACE)

GRADE TO (E) GROUND

AT 2:1 SLOPE MINIMUM

2:1

(E) EP

SANKEY ROAD

ALIGNMENT

PROPERTY LINE

PROJECT LIMITS

STAGING AREA LIMITS

SANKEY ROAD

ALIGNMENT

FIELD ACCESS RAMP

SCALE: 1"=20'

TOP OF

BORROW SITE

TOE OF

BORROW SITE

SECTION C

TOE OF BORROW SITE

M

I N

CRUSHED AGGREGATE GREATER

THAN 3" BUT SMALLER THAN 6"

FILTER FABRIC

SCALE: 1"=30'

WIDTH

AS SHOWN

15'

TOP OF

BORROW SITE

G-801_OA-SITE_KBS-RA-LAYOUT
G-802_GRD_SEC-01_KBS-RA-LAYOUT
G-803_DET-01_KBS-RA-LAYOUT

File details come from the government source that posted it. Updated .