This document outlines a federal contract opportunity for levee repairs. The U.S. Army Corps of Engineers Engineering District Sacramento is soliciting bids for the Natomas Reach A Levee Repairs project under solicitation number W9123821B0012. Bids are due on August 16, 2021 at 1:00PM PST. A mandatory site visit will be held on July 8, 2021 at 10:00am PST to review the project details outlined in Attachment 1 and the geotechnical report in Attachment 7, which contractors must request separately due to file size restrictions. The opportunity involves repairing a levee reach through separate construction contracts. No other details are provided on the scope of work or pricing terms.
Other files for this federal contract opportunity
Other files attached to Natomas Reach A Levee Repairs, newest first.
File
Type
Posted
C04 - Bid Abstract for W9123821B0012.pdf
PDF
Aug 16, 2021
B08 Amendment 0005.pdf
PDF
Aug 10, 2021
B08 Amendment 0005 - updated section 31 56 14.pdf
PDF
Aug 10, 2021
B08 - Drawing 701 and 702.pdf
PDF
Aug 9, 2021
B08 - Drawing 701 and 702.pdf
PDF
Aug 6, 2021
B08 Amendment 0004.pdf
PDF
Aug 6, 2021
B08 W91238-B-21-0012_AM04_2172_20210804 Specifications Updates.pdf
PDF
Aug 6, 2021
B08 - Pricing Schedule.Final.pdf
PDF
Aug 6, 2021
B08 SIP (AM-04) PP1A Outfall Grouting - Plan View.pdf
PDF
Aug 6, 2021
B08 SIP (AM-04) Gretas Pond Supplemental Info_and_Photos - Feb_2018.pdf
PDF
Aug 6, 2021
B08 - Drawing C-228.pdf
PDF
Aug 6, 2021
B08 W91238-B-21-0012_AM04 Summary of Changes.pdf
PDF
Aug 6, 2021
B08 SIP (AM-04) Mix-In-Place Cutoff Wall - Butt Joint and Overlap Schematic.pdf
PDF
Aug 6, 2021
B08 SIP (AM-04) Kaufman_Borrow_Staging_Reach-A_20210728.pdf
PDF
Aug 6, 2021
B08 Amendment 3_Updated Plans and Specifications.pdf
PDF
Aug 4, 2021
B08 Amendment 0003.pdf
PDF
Aug 4, 2021
Amendment 2 - Specification Changes.pdf
PDF
Jul 20, 2021
Amendment 0002.pdf
PDF
Jul 20, 2021
Amendment 0001 - Site Visit Date Change.pdf
PDF
Jul 2, 2021
B08 IFB Atch 20 - Pre-Award Survey.pdf
PDF
Jul 1, 2021
B08 IFB Atch 16 - SIP_Reach I Contract 1 Stockpile Information Report.pdf
PDF
Jul 1, 2021
B08 IFB Atch 9 - SIP_Plant 1A and 1B Duperon Self-Cleaning Trash Rake Manual.pdf
PDF
Jul 1, 2021
B08 IFB Atch 8 - SIP_Natomas Reach A - R1 Cutoff Wall As-Builts (Complete Drawing Set).pdf
PDF
Jul 1, 2021
B08 IFB Atch 19 - Davis Bacon Wage Determination 6.25.2021.pdf
PDF
Jul 1, 2021
B08 IFB Atch 4 - SIP_City Sump 160 - Design Drawings (1990s).pdf
PDF
Jul 1, 2021
B08 IFB Atch 3 - Reach A_Final Design Pricing Schedule.xlsx
XLSX spreadsheet
Jul 1, 2021
B08 IFB Atch 2 - Reach A Specifications_2172_20210616.pdf
PDF
Jul 1, 2021
B08 IFB Atch 10 - SIP_Plant 1B datum conversion.pdf
PDF
Jul 1, 2021
B08 IFB Atch 17 - SIP_USACE ARCF Executed PA 20150910.pdf
PDF
Jul 1, 2021
B08 IFB Atch 5 - SIP_Kaufman_Borrow_Site_Reach-A_34x22_20210607.pdf
PDF
Jul 1, 2021
B08 Reach A IFB W9123821B0012.pdf
PDF
Jul 1, 2021
B08 IFB Atch 18 - SIP_USACE ARCF GRR HPMP Final_071317.pdf
PDF
Jul 1, 2021
B08 IFB Atch 15 - SIP_Pumping Plant No 1 Rockwell Automation order info.pdf
PDF
Jul 1, 2021
B08 IFB Atch 14 - SIP_Pumping Plant No 1 Rockwell Automation existing pump starters.pdf
PDF
Jul 1, 2021
B08 IFB Atch 13 - SIP_Pumping Plant 1B Operating Elevations.docx
DOCX document
Jul 1, 2021
B08 IFB Atch 12 - SIP_Pumping Plant 1B Drawings - As-built Markups (2003).pdf
PDF
Jul 1, 2021
B08 IFB Atch 11 - SIP_PP1B Cascade 20003 Pump Shop Drawing.pdf
PDF
Jul 1, 2021
B08 IFB Atch 6 - SIP_Natomas Reach A - Borrow Site GDR - 20190321.pdf
PDF
Jul 1, 2021
Show all 38
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Jul 13, 2021 .