Military_Ocean_Terminal_Concord_Integrated_Cultural_Resources_Management....pdf
PDF 26 MB Posted
- Attached to
- Replace/Upgrade Pier 2
- Solicitation number
- W9123817R0065
About this file
MOTCO Integrated Cultural Resources Management Plan
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Military Ocean Terminal Concord Integrated Cultural Resources
Management Plan Update
Final
U.S. Army Military Surface Deployment and Distribution Command 834th Transportation Battalion Operations at Military Ocean Terminal Concord, California
May 2011
2011-2016
[PAGE INTENTIONALLY BLANK]
Under the authority of the National Historic Preservation Act (NHPA) and the Archaeological Resources Protection Act (ARPA), this report is not for public release due to the specific site locations included.
U.S. Army Integrated Cultural Resources
Management Plan
834th Transportation Battalion Military Ocean Terminal
Concord, California
Prepared for:
U.S. Army Military Surface Deployment and Distribution Command
Contract by:
Army Corps of Engineers, Mobile District
Prepared under contract by:
TEC Inc./Louis Berger Group, Inc.
Contract No. W91278-08-D-0043 Task Order No. 0011
2011-2016
Under the authority of the National Historic Preservation Act (NHPA) and the Archaeological Resources Protection Act (ARPA), this report is not for public release due to the specific site locations included.
ACKNOWLEDGEMENTS
Contract No.: W91278-08-0043
Task Order No.: 0011
USACE Mobile District Technical Manager: Mr. Joseph Giliberti
U.S. Army Military Surface Deployment and Distribution Command: Ms. Kimberly Garber
834th Transportation Battalion Department of Public Works Director: Mr. Malcolm Charles
Compiled by: TEC Inc.
Jacksonville, Florida
Ms. Carol Wirth
Ms. Carrie Schomig
Ms. Jennifer Bryant
Under Contract to: The Louis Berger Group, Inc.
Morristown, New Jersey
Integrated Cultural Resources Management Plan v
Table of Contents
TABLE OF CONTENTS
ACKNOWLEDGEMENTS ......................................................................................................................... iii
LIST OF FIGURES .................................................................................................................................... vii
LIST OF TABLES ...................................................................................................................................... vii
LIST OF ACRONYMS ............................................................................................................................. viii
CHAPTER 1.0 EXECUTIVE SUMMARY ............................................................................................. 1-1
CHAPTER 2.0 INTRODUCTION ........................................................................................................... 2-1
2.1 OVERVIEW .............................................................................................................................. 2-1
2.2 NATURAL SETTING ............................................................................................................... 2-2
2.3 LAND USES .............................................................................................................................. 2-3
2.4 HISTORY AND MISSION OF MILITARY OCEAN TERMINAL CONCORD .................... 2-6
2.5 CULTURAL RESOURCES PROGRAM: SUMMARY AND GOALS ................................... 2-8
2.6 ICRMP AND ICRMP UPDATE ORGANIZATION ................................................................ 2-9
2.7 ICRMP PLAN DEVELOPERS AND REVIEWERS ................................................................ 2-9
2.8 ICRMP AUDIENCE .................................................................................................................. 2-9
2.9 SUMMARY OF CHANGES SINCE THE 2002-2007 ICRMP .............................................. 2-10
CHAPTER 3.0 MILITARY OCEAN TERMINAL CONCORD CULTURAL RESOURCES ............... 3-1
3.1 INTRODUCTION ..................................................................................................................... 3-1
3.2 SUMMARY OF PREVIOUS INVESTIGATIONS ................................................................. 3-1
3.3 BUILDINGS AND STRUCTURES ........................................................................................ 3-14
3.4 LANDSCAPE FEATURES ..................................................................................................... 3-20
3.5 LINEAR RESOURCES ........................................................................................................... 3-20
3.6 ARCHAEOLOGICAL SITES ................................................................................................. 3-22
3.7 UNDERWATER RESOURCES .............................................................................................. 3-35
3.8 PROPOSED FACILITIES ...................................................................................................... 3-35
CHAPTER 4.0 CURRENT PRIORITIES ................................................................................................ 4-1
4.1 PROPOSED INDIVIDUAL UNDERTAKINGS ...................................................................... 4-2
4.2 SECTION 110 SURVEY AND EVALUATION ...................................................................... 4-3
4.3 AMERICAN INDIAN TRIBAL CONSULTATION AND AGREEMENTS .......................... 4-5
4.4 AMERICAN INDIAN GROUPS WITH AN INTEREST IN ACTIVITIES AT MOTCO....... 4-5
4.5 GOALS FOR THE MOTCO CULTURAL RESOURCES MANAGEMENT PLAN .............. 4-7
CHAPTER 5.0 UPDATED LAWS AND REGULATIONS .................................................................... 5-1
5.1 CHANGES TO HISTORIC PRESERVATION LAWS ............................................................ 5-1
5.1.1 36 Code of Federal Regulations Part 800 (36 CFR § 800), ―Protection of Historic and
Cultural Properties,‖ amended August 2004 ..................................................................... 5-3
5.1.2 Executive Order 13287, ―Preserve America,‖ March 3, 2002 ........................................... 5-4
5.1.3 Executive Order 13327, ―Federal Real Property Asset Management,‖ February 4, 2004 . 5-5
5.1.4 Army Regulation (AR) 200-1, ―Environmental Protection and Enhancement,‖ revised
December 13, 2007 ............................................................................................................ 5-7
5.1.5 DoDI 2000.16, ―DoD Antiterrorism (AT) Standards‖ ....................................................... 5-7 vi Integrated Cultural Resources Management Plan
Table of Contents
CHAPTER 6.0 STANDARD OPERATING PROCEDURES (SOPs) ..................................................... 6-1
6.1 OVERVIEW ............................................................................................................................. 6-1
SOP 1: MAINTENANCE AND CARE FOR HISTORIC BUILDINGS AND STRUCTURES .. 6-2
SOP 2: DISPOSAL OR DEMOLITION OF EXCESS PROPERTY ............................................. 6-6 SOP 3: MISSION TRAINING OF MILITARY AND TENANT PERSONNEL ........................ 6-12 SOP 4: EMERGENCY ACTIONS .............................................................................................. 6-14
SOP 5: INADVERTENT DISCOVERY OF ARCHAEOLOGICAL DEPOSITS/CULTURAL
MATERIAL .................................................................................................................... 6-16 SOP 6: CURATION GUIDELINES ............................................................................................ 6-20 SOP 7: DEPARTMENT OF PUBLIC WORKS (DPW) ACTIVITIES ....................................... 6-27 SOP 8: IDENTIFYING HISTORIC PROPERTIES .................................................................... 6-29 SOP 9: EVALUATING HISTORIC PROPERTIES .................................................................... 6-37 SOP 10: SECTION 106 PROCESS ............................................................................................... 6-56
SOP 11: TRIBAL CONSULTATION PROCESS ......................................................................... 6-60
CHAPTER 7.0 ICRMP BIBLIOGRAPHY .............................................................................................. 7-1
APPENDIX A: Glossary ........................................................................................................................... A-1
APPENDIX B: MOTCO Real Property Inventory and Installation Maps................................................ B-1
APPENDIX C: Program Comment for World War II and Cold War Era (1939-1974) Ammunition
Storage Facilities ............................................................................................................. C-1
APPENDIX D: DoD Instruction, Cultural Resources Management ........................................................ D-1
APPENDIX E: Federally Recognized American Indian Tribes and Sacred Site File Search Results ...... E-1
Integrated Cultural Resources Management Plan vii
Table of Contents
LIST OF FIGURES
Figure 1-1. MOTCO Location Map ........................................................................................................... 1-2 Figure 2-1. Land Use at MOTCO .............................................................................................................. 2-4 Figure 2-2. Wetland Preserve at MOTCO ................................................................................................. 2-5 Figure 2-3. Agricultural Outleases at MOTCO.......................................................................................... 2-5 Figure 3-1. Previous Cultural Resources Surveys within MOTCO and within a One-Mile Radius of
MOTCO ............................................................................................................................... 3-11 Figure 3-2. Areas with Surface Archaeological Potential at MOTCO .................................................... 3-24 Figure 3-3. Areas with Surface Archaeological Potential at MOTCO .................................................... 3-25 Figure 3-4 Areas with Surface Archaeological Potential at MOTCO ..................................................... 3-27 Figure 3-5. Areas with Surface Archaeological Potential at MOTCO .................................................... 3-29 Figure 3-6. Previously Recorded Archaeological Sites within MOTCO and within a One-Mile Radius of
MOTCO ................................................................................................................................. 3-33 Figure 6-1. Flowchart in Event of Inadvertent Discovery of Potential Cultural Resources .................... 6-19 Figure 6-2. Section 106 Process Flowchart ............................................................................................. 6-59
LIST OF TABLES
Table 2-1. Summary of Changes Since the NWSSBD Concrod 2002-2007 ICRMP ............................. 2-10
Table 3-1. Summary of Previous Cultural Resource Investigations within MOTCO............................... 3-3 Table 3-2. Cultural Resources Surveys within One Mile of MOTCO ...................................................... 3-7 Table 3-3. MOTCO Facilities Built After 1990 Not Yet Surveyed or Evaluated for National Register
Eligibility .............................................................................................................................. 3-16
Table 3-4. Projects Likely to Be Implemented and/or Further Planned (2011-2016) and Initial
Cultural Resource Determinations ......................................................................................... 3-36
Table 4- 1. Management Activities ............................................................................................................ 4-2
Table 4-2. Buildings and Structures at MOTCO That Require Reevaluation .......................................... 4-3
Table 4-3. Buildings and Structures at MOTCO That Will Require Evaluation/Reevaluation as They
Reach 50 Years of Age ............................................................................................................ 4-4
Table 4-4. List of Federally Recognized American Indian Tribes for MOTCO ....................................... 4-6
Table 4-5. Planned Projects/Cultural Resource Priorities for MOTCO .................................................... 4-8
Table 5-1. Statutes, Laws, Regulations, and Other Guidance Applicable to the Army Integrated Cultural
Resources Management Plan ................................................................................................... 5-1
Table 5-2. DoD Real Property Historic Status Codes ............................................................................... 5-5 viii Integrated Cultural Resources Management Plan
List of Acronyms
LIST OF ACRONYMS
ACHP Advisory Council on Historic Preservation
ACSIM Assistant Chief of Staff for Installation Management
AEC Army Environmental Center
AEDB-EQ Army Environmental Database – Environmental Quality
AIRFA American Indian Religious Freedom Act
APE Area of Potential Effects
AR Army Regulation
ARPA Archaeological Resources Protection Act
BRAC Base Realignment and Closure
CFR Code of Federal Regulations
CHRIS California Historical Resources Information System
CRM Cultural Resources Management
CRP Cultural Resources Program
CX Categorical Exclusion
DENIX Defense Environmental Network and Information Exchange
DNE Determined Not Eligible for Listing
DNR NHLI/NHLC/NREI/NREC Property, Designation Rescinded
DoD Department of Defense
DoDI Department of Defense Instruction
DPW Department of Public Works
EA Environmental Assessment
ECAS Environmental Compliance Assessment System
EIS Environmental Impact Statement
ELPA Eligible for the purposes of a Program Alternative
EO Executive Order
FLETC Federal Law Enforcement Training Center
FOIA Freedom of Information Act
FONSI Finding of No Significant Impact
FPO Federal Preservation Officer
FY Fiscal Year
GIS Geographic Information System
GPS Global Positioning System
HABS/HAER Historic American Building Survey/Historic American Engineering Record
HPC Historic Properties Component
HQDA Headquarters, Department of the Army
HSC Historic Status Code
ICC Indian Claims Commission
ICRMP Integrated Cultural Resources Management Plan
IFS Integrated Facilities System
INRMP Integrated Natural Resources Management Plan
ITAM Integrated Training Area Management (program)
JRP JRP Historical Consulting Services
Integrated Cultural Resources Management Plan ix
List of Acronyms
LEA Layaway Economic Analysis
MOA Memorandum of Agreement (per 36CFR800)
MOTCO Military Ocean Terminal Concord
MOTSU Military Ocean Terminal Sunny Point
MOU Memorandum of Understanding
NAGPRA Native American Graves Protection and Repatriation Act
NCE Non-Contributing Element of NHL/NRL/NRE District
NEPA National Environmental Policy Act of 1969, as amended
NEV Not Evaluated
NHL National Historic Landmark
NHLC Contributing Element of a NHL District
NHLI Individual National Historic Landmark
NHPA National Historic Preservation Act of 1966, as amended
NPS National Park Service
NREC Contributing Element of a NRE District
NREI Individual National Register Eligible
NRHP National Register of Historic Places
NRLC Contributing Element of NRL District
NRLI Individual National Register Listed
NWS Naval Weapons Station
NWSSBD Naval Weapons Station Seal Beach Detachment
PA Programmatic Agreement (per 36 CFR 800)
PAO Public Affairs Office
POC Point of Contact
POTO Plans and Operations Training Officer
REC Record of Environmental Consideration
RFRA Religious Freedom Restoration Act
RPMP Real Property Master Plan
SDDC Surface Deployment and Distribution Command
SHPO State Historic Preservation Officer
SOP Standard Operating Procedures
TB Transportation Battalion
TBD To Be Determined
THPO Tribal Historic Preservation Officer
UFC Unified Facilities Criteria
U.S. United States
USACE U.S. Army Corps of Engineers
USACERL U.S. Army Civil Engineering Research Laboratory
U.S.C. U.S. Code
UTM Universal Transverse Mercator
UXO Unexploded Ordnance x Integrated Cultural Resources Management Plan
List of Acronyms
Integrated Cultural Resources Management Plan 1-1
Chapter 1 – Executive Summary
CHAPTER 1.0
EXECUTIVE SUMMARY
The U.S. Army Military Surface Deployment and Distribution Command’s (SDDC) 834th Transportation
Battalion (TB) operates Military Ocean Terminal Concord (MOTCO). MOTCO is a munitions transshipment facility located at a strategic site in north central Contra Costa County, California. This installation is the primary West Coast common-user ammunition terminal for the Department of Defense
(DoD).
MOTCO operated as a tenant of Naval Weapons Station Seal Beach Detachment Concord (NWSSBD
Concord) from 1 October 1999 to October 1, 2008 under the Department of the Navy. As part of Base
Realignment and Closure (BRAC) 2005, the 6,526-acre Tidal Area and 115-acre Inland Area were transferred to the Army (see Figure 1-1). From 1942, when the installation was officially commissioned as Naval Magazine, Port Chicago, through the 1990s when the installation was NWSSBD Concord, MOTCO has served as the major naval munitions transshipment port on the West Coast. SDDC’s 834th
TB’s mission is to conduct surface deployment, command and control, and distribution operations for the
DoD through terminals and facilities in California in peacetime and war. The 834th TB also is responsible for the daily management of the installation. The 834th TB is subordinate to the 596th Transportation
Group (Ammunition), located at Military Ocean Terminal Sunny Point (MOTSU) in Southport, North
Carolina. Whereas the 834th TB at MOTCO oversees West Coast Ammunition Terminal Operations, the
596th Transportation Group at MOTSU oversees East Coast Ammunition Terminal Operations. The broader Command mission is to provide global SDDC services to meet the nation's objectives. SDDC deploys and sustains more than 90 percent of the DoD’s equipment and supplies by leveraging the capability of commercial industry and other military services.
To a large degree, this document updates the Integrated Cultural Resources Management Plan (ICRMP) that was prepared for NWSSBD Concord in 2002-2007 prior to the BRAC transfer of the Tidal and
Inland Areas from NWSSBD Concord to MOTCO. Please refer to Appendix B for detailed maps of existing MOTCO facilities.
This ICRMP is designed to facilitate the implementation of historic preservation compliance actions by
MOTCO. Completed in accordance with DoD-Instruction 4715.3 and AR 200-1 revised in 2007 and issued September 18, 2008, this document reflects MOTCO’s new ownership, support for the military mission and meets the legal compliance requirements of federal historic preservation laws and regulations in a manner consistent with the sound principles of cultural resources stewardship. This ICRMP establishes priorities for the identification and evaluation of historic properties located at MOTCO, and provides a schedule designed to accomplish program objectives during a five-year period from 2011 to
2015.
This ICRMP provides new and revised information regarding cultural resources, projects planned or scheduled on the installation, and establishes priorities for cultural resource management during the five-year period in which the current ICRMP will be in effect. It also includes a set of Standard Operating
Procedures tailored specifically to the needs of MOTCO’s Environmental Coordinators.
1-2 Integrated Cultural Resources Management Plan
Figure 1-1. MOTCO Location Map
Integrated Cultural Resources Management Plan 1-3
Chapter 1 – Executive Summary
This document is an internal compliance and management plan that integrates the entirety of the Army’s
Cultural Resources Program (CRP) requirements with ongoing mission activities. It allows for ready identification of potential conflicts between MOTCO’s missions and cultural resources and it identifies compliance actions necessary to maintain the mission-essential properties and acreage. Some examples of activities which will likely require compliance action include:
additions to existing structures laying conduit/pipe in undisturbed corridors new construction sale or transfer of additional properties site preparation substructure improvements building demolition installation and repair of fences and gates installation or changes in exterior lighting archaeological/cultural resource surveys exterior closure exterior finishes repair of existing electric power, telephone, water, sewer, and natural gas lines upgrading, maintaining and improving roads, trails, parking areas, and drainages asbestos removal cleaning (interior/exterior) interior construction interior finishes roofing paint removal/disposal window/sash/frame replacement tree cutting leasing structures to both private and public entities
1-4 Integrated Cultural Resources Management Plan
Integrated Cultural Resources Management Plan 2-1
Chapter 2 - Introduction
CHAPTER 2.0
INTRODUCTION
2.1 OVERVIEW
The U.S. Army Military Surface Deployment and Distribution Command’s (SDDC) 834th Transportation
Battalion (TB) has operated Military Ocean Terminal Concord (MOTCO) as a tenant of Naval Weapons
Station Seal Beach Detachment (NWSSBD) Concord since October 1, 1999. As part of Base
Realignment and Closure (BRAC) 2005, the 6,526-acre Tidal Area and 115-acres of Inland Area (see
Figure 1) were transferred to the Army effective on October 1, 2008.
From 1942, when the installation was officially commissioned as Naval Magazine, Port Chicago, through the 1990s when the installation was NWSSBD Concord, MOTCO has served as the major naval munitions transshipment port on the West Coast. SDDC’s 834th TB’s mission is to conduct surface deployment, command and control, and distribution operations for the Department of Defense (DoD) through terminals and facilities in California in peacetime and war. The 834th TB also is responsible for the daily management of the installation. The 834th TB is subordinate to the 596th Transportation Group
(Ammunition), located at Military Ocean Terminal Sunny Point (MOTSU) in Southport, North Carolina.
Whereas the 834th TB at MOTCO oversees West Coast Ammunition Terminal Operations, the 596th
Transportation Group at MOTSU oversees East Coast Ammunition Terminal Operations. The broader
Command mission is to provide global SDDC services to meet the nation's objectives. SDDC deploys and sustains more than 90 percent of the DoD’s equipment and supplies by leveraging the capability of commercial industry and other military services.
This Integrated Cultural Resources Management Plan (ICRMP) is designed to facilitate the implementation of historic preservation compliance actions by the Army. Completed in accordance with
DoD Instruction 4715.3 and AR 200-1 issued September 18, 2008, this document reflects MOTCO’s new ownership, support for the military mission, and meets the legal compliance requirements of federal historic preservation laws and regulations in a manner consistent with the sound principles of cultural resources stewardship. This ICRMP 1) establishes priorities for the identification of and standards for the evaluation of historic properties located at MOTCO and 2) provides a schedule designed to accomplish program objectives during a five-year period from 2011 to 2016.
This ICRMP updates guidance originally provided in the 2002-2007 ICRMP that was prepared for
NWSSBD Concord prior to the BRAC transfer of the Tidal Area and the Inland Areas from NWSSBD
Concord to MOTCO. It provides new and revised information regarding cultural resources and projects planned or scheduled on the installation. Additionally, it establishes priorities for cultural resource management during the five-year period in which the current ICRMP will be in effect. This ICRMP also includes a set of Standard Operating Procedures tailored specifically to the needs of the installation’s
Environmental Coordinators.
The ICRMP provides MOTCO resource managers with a guide to ensure compliance with historic preservation laws and regulations and a means to measure progress towards achieving outlined objectives.
The Army’s decision to recognize cultural resources as an integral part of MOTCO reflects an acknowledgment of the need to develop cost-effective and integrated strategies for long-term program support of mission objectives. This ICRMP is an internal compliance and management plan that integrates the entirety of the installation’s cultural resources program requirements with ongoing mission activities. This ICRMP allows for ready identification of potential conflicts between the MOTCO
2-2 Integrated Cultural Resources Management Plan
Chapter 2 - Introduction mission and cultural resources and identifies compliance actions necessary to maintain the mission-essential properties and acreage.
This ICRMP relies on data from reports, documentation, management plans, and correspondence provided by the 834th TB’s Department of Public Works. A record search for previously documented cultural resources investigations and sites within a one-mile radius of the facility was performed at the
California Historical Resources Information System’s (CHRIS) Northwest Information Center. This information identified known sites that could impact the future planning for the 834th TB operations at
MOTCO. Real property data gathered from MOTCO was supplemented by interviews with personnel including Department of Public Works Engineer Hess Rouhafza and former Executive Officer Lieutenant
Commander Raymond Alexander of the 834th Transportation Battalion at MOTCO.
2.2 NATURAL SETTING
MOTCO’s natural environment has remained virtually unchanged since the 2002-2007 ICRMP, with the exception of the boundary change in the Inland Area that followed its transfer from Navy to Army. The following description of MOTCO’s natural setting is adapted from the previous ICRMP to reflect
MOTCO’s natural setting (Rosenthal, Milliken, and Mikesell 2002:1-5, 1-6).
The installation is located in the Coast Ranges geological province of west-central California consisting of deep alluvial materials underlain by basement rock of the Sierran Block province. It is sited at the northern terminus of the Diablo Range, where the north-south trending Coast Ranges meet Suisun Bay.
In MOTCO’s Tidal Area, the bayshore is distinguished by a relatively broad strip of salt marsh composed of a variety of plant species, including perennial grasses, pickleweed, cattails, bulrush, saltgrass, and baltic rush. A similar marsh environment occurs on the seven Army-owned islands in the bay to the north.
From the marsh edge, the hills that form the base's eastern boundary rise abruptly some 600 feet above sea level. At the base of these slopes, alluvial fan deposits interfinger with and underlie the bay mud along the margins of the salt marsh.
Since the 1800s, the marsh areas have been extensively altered as a product of diking, filling, and dumping. Most of the tidal facilities are built on fill material deposited in the marsh during construction of NWSSBD Concord. More recently, scattered portions of the Tidal Area have also been used for dumping dredge spoils cleared from inland waterways. In the Inland Area, Mt. Diablo Creek, which originates at Mt. Diablo, two miles to the south, bisects a narrow, alluvial plain as it flows through a deeply entrenched channel leading to Suisun Bay at the west side of the Tidal Area. As Mt. Diablo Creek reaches the salt marsh in the Tidal Area, its name changes to Seal Creek. High gradient alluvial fans extend from the hill slopes of the Inland Area, to meet the nearly level floodplain of Mt. Diablo Creek.
Located in a warm, dry climate, MOTCO’s soils vary depending on location and range from lowland associations to tidal flat-delta marsh lowland soils in the Tidal Area and islands and upland associations in the Inland Area. In the Inland Area and the drier upland portions of the Tidal Area, introduced seasonal grasses and forbs dominate the landscape. Riparian vegetation composed primarily of willow borders sections of the creek channel, while open grasslands and salt and freshwater marshes characterize the Tidal Area.
Integrated Cultural Resources Management Plan 2-3
2.3 LAND USES
Facility and land uses at MOTCO center on its function as an ammunition transshipment facility, and are depicted in Figure 2-1. Explosive operations remain focused on the explosive handling piers, staging areas and rail infrastructure, administrative and support functions are concentrated in a small area near the center of the Tidal Area and within the Inland Area. Regular mission functions have not included ground-disturbing activities that have the potential to impact cultural resources at MOTCO. Short- and long-range facility development plans are addressed in the Real Property Master Plan (RPMP) for MOTCO.
The Contra Costa Canal traverses the Inland Area along the northern edge of MOTCO’s Inland Area boundary and traverses the Tidal area south of the Port Chicago Highway at the base of the foothills. The
Contra Costa Canal is owned and managed by the U.S. Bureau of Reclamation.
A Wetland Preserve, established in 1984 under a Memorandum of Understanding (MOU) between the
U.S. Fish and Wildlife Service and NWSSBD Concord, is located within the Tidal Area and the whole of the seven outlying islands at MOTCO (see Figure 2-1). The Wetland Preserve consists of Roe Island, Ryer Island, Freeman Island, Snag Island, Middle Ground Island, the Seal Islands, Hastings Marsh, Pier
March, Middle Point Marsh, East Marsh, and North Area K Marsh. MOTCO is continuing to honor the
Navy agreement until a new agreement can be put into place. The Integrated Natural Resources
Management Plan (INRMP) addresses ongoing and long-term management actions for MOTCO, including the offshore islands.
MOTCO includes the Port Chicago Naval Magazine National Memorial, which was designated by
Congress in 1992 and became part the 392nd Unit of the National Park System in October 2009. The memorial commemorates an explosion and resulting fire that occurred at the site on July 17, 1944, killed
320 men, injured 390 more people, and accounted for 15 percent of all African American casualties during World War II. The incident became the largest homeland disaster during World War II. Two ships docked at Pier 1, the S.S. Quinalt Victory and the S.S. E.A. Bryant, were demolished in the explosion. In combination with the explosives on the two ships, 16 boxcars located at the dock, and
Pier 1 were also destroyed during the explosion. A total of approximately 5,000 tons of explosives were detonated in this one event. The memorial is located at the shoreline in the former location of Pier 1. The memorial site covers 0.5-acre, and consists of paved walking paths, several historical interpretive panels, including those with the names of the victims inscribed, two mounted torpedoes as a historical static display, and a flag pole. Although the Port Chicago Naval Magazine National Memorial is located within
MOTCO, it is operated and maintained by the National Park Service (NPS). Although the memorial is open to the public, two weeks notice and U.S. Army clearance is required of all visitors (NPS 2009b).
MOTCO continues to outlease large portions of the Tidal Area and a small portion of land in the Inland
Area for grazing (see Figure 2-2). The agricultural outleases in the Tidal Area are to the east and south the Port Chicago Highway, and south of the Union Pacific Railroad line.
2-4 Integrated Cultural Resources Management Plan
Figure 2-1. Land Use at MOTCO
Integrated Cultural Resources Management Plan 2-5
Figure 2-2. Agricultural Outleases at MOTCO
2-6 Integrated Cultural Resources Management Plan
2.4 HISTORY AND MISSION OF MOTCO
The following history of MOTCO is excerpted from the 2002-2007 ICRMP prepared for NWSSBD
Concord (Rosenthal, Milliken, and Mikesell 2002). It describes the history of the installation during its era as a Department of Navy installation, from its establishment during World War II to October 2008, when the Army assumed control of what is now MOTCO.
The Navy Era (1941-Present)
At the time of the attack on Pearl Harbor in December 1941, the Navy had limited munitions storage capabilities on the West Coast. The principal Naval Ammunition
Depot was in Hawthorne, Nevada, which was a safe location for storing and manufacturing munitions, but inconvenient for loading ammunition on ships from the various San Francisco Bay Navy stations. There was also an ammunition depot at Mare
Island. The utility of the Mare Island facility, however, was limited by its size and by the fact that many of the larger Navy ships could not dock there, owing to the shallowness of the waters in the Mare Island Strait.
As early as 1940, the Navy began looking for a Bay Area site for a new and larger ammunition depot to serve Naval stations in northern California. Navy planners were aware of the Port Chicago site, owing to the ship manufacturing that had been accomplished there during World War I. Navy planners judged that most of the infrastructure – railroad tracks, wharf facilities, and so forth – at the site would need to be replaced. As one observer noted, however, ―The great value of this site lies in its complete isolation from habitation and industrial activity‖ (Self 1993:11).
In January 1942, the Navy acquired 640 acres of land in what is now the Tidal Area and commenced a rapid construction of docks, barricaded railroad sidings, as well as residential and administrative buildings. In 1944 and 1945, the Navy expanded the facility by acquiring the Inland Area, which includes more than 5,000 acres. It was here that the Navy built the bulk of its munitions magazines as well as a small air facility.
During the same period, the Navy further expanded the Tidal Area in order to construct new housing and recreational and administrative structures.
The ammunition depot at Port Chicago was one of the busiest such facilities in the United
States and was described as ―the principal ammunition loading port and storage point for ammunition and high explosives on the Pacific Coast‖ (JRP 1998). The most notable event of the war era occurred on July 17, 1944, when two massive explosions ripped through the Tidal Area. Two ships, a pier, and most of the Navy’s base in the Tidal Area were destroyed, and 320 people were killed and 390 injured. Most of those killed were
―colored enlisted personnel,‖ who had been assigned the dangerous duty of loading explosives on waiting ships. The surviving personnel were subsequently relocated to
Mare Island Naval Ship Yard and ordered to load ships there. Their refusal to handle more explosives until safety precautions had been taken resulted in an incident that is commonly called the ―Port Chicago Mutiny.‖ The tragedy resulted in a major period of construction at the port, to repair damage and to provide a higher level of safety for the workers (Self 1993:13).
In the years since 1945, NWSSBD Concord has continued to function in much the same manner as it did during World War II. Its command structure, however, has changed
Integrated Cultural Resources Management Plan 2-7
Chapter 2 - Introduction repeatedly. In 1945, the facility was still a sub-installation, or annex, to the Naval
Ammunition Depot at Mare Island. In 1946, it was redesignated the ―Naval Magazine
Port Chicago,‖ and established as a separate facility, independent of Mare Island. In time, the depot at Mare Island would be designated as an annex to the Concord facility.
Naval Magazine Port Chicago experienced three periods of rapidly accelerated activity during the Cold War Era, which is defined as the period between 1946 and 1989. These three periods consist of the Korean War era of the late 1940s through the early 1950s, the
Vietnam War of the 1960s and early 1970s, and during the general military build-up of the late 1970s through the 1980s. The Concord facility was active during the Korean War by handling 75 percent of the all ammunition that was sent to the Korean Peninsula. At that time, the installation continued to utilize the existing World War II-era buildings and structures. After the end of the Korean War, the Navy consolidated Port Chicago and
Naval Ammunition Depot (NAD) Mare Island facilities on December 16, 1957. At that point, Port Chicago became the NAD Concord with the Mare Island Annex. In 1958, NAD Concord also took control of the Naval Net Depot Tiburon facility that had operated during World War II and the Korean War.
In 1963, NAD Concord became the U.S. Naval Weapons Station (NWS) Concord to reflect that facility’s shift from handling conventional ordnance to more sophisticated weaponry. During the Vietnam War years, NWS Concord continued to serve as the principal port for the transshipment of ordnance to the U.S. troops in Southeast Asia. At that time, the Navy began to replace and/or supplement the World War II-era facilities with new buildings and structures, ranging from new housing to new administrative buildings to new magazines. In 1968, the Navy condemned the buildings from the old town of Port Chicago as part of its program to provide a buffer zone around the depot. In
1969, the buildings were vacated and all of the town’s buildings and structures were demolished (JRP 1998:11-15).
A third major phase of new construction occurred during the 1980s at the end of the Cold
War, a time of accelerated military construction throughout the United States. New buildings at the installation from this period range from housing units to administrative buildings to magazines. One important addition to the installation in the 1980s was the establishment of the ―Q Area,‖ a 48-building complex in the Tidal Area for storing and maintaining special weapons (JRP 1998:52). The end of the Cold War in 1989 led a substantial reduction in transshipment and storage and in workforce personnel at NWS
Concord (JRP 2008: 21).
In the 1990s, the Tidal Area became the primary focus of new development, with the upgrade of Pier 3, the addition of eight rail and truck explosives holding yards, and construction of the new Concord Port Terminal Operations Building for use by the Army.
In 1992, the site of the 1944 Port Chicago Naval magazine explosion was dedicated as a
National Memorial (Manley 2003:25). In March 1998, NWS Concord went from operating as an independent installation to the Naval Weapons Station Seal Beach
Detachment (NWSSBD) Concord. The following year, NWSSBD Concord’s port operations in the Tidal Area were transferred to the Army, and magazine field in the
Inland Area went to a reduced operational status.
2-8 Integrated Cultural Resources Management Plan
Establishment of MOTCO
In 1995, Congress accepted a proposal under the Defense Base Closure and Realignment Commission
(―BRAC Commission‖) recommendation to close the Oakland Army Base, 27 miles southwest of
Concord. This closure caused its tenant, the 1302nd Major Port Command, to relocate from the Oakland
Army Base to Concord and become a tenant of the NWSSBD Concord in 1997. On October 1, 1997, the
Army’s 1302nd Major Port Command was relocated from the Oakland Army Base to NWSSBD Concord and became the 834th TB. MOTCO was established on 1 October 1999 as a tenant command at
NWSSBD Concord. Operating under an Indefinite Use agreement, the Army assumed responsibility for operations and maintenance of all facilities and structures in the Tidal Area.
On September 8, 2005, the BRAC Commission recommended a set of domestic realignment and closure actions (BRAC Commission 2005). These recommendations were approved by the President, forwarded to Congress, and became law in accordance with the Defense Base Closure and Realignment Act of 1990, Public Law 101-510 as amended. Accordingly, the DoD closed the majority of the Inland Area of
NWSSBD Concord. The approximately 115-acre retained Inland Area and the approximately 6,526-acre retained Tidal Area were transferred from the Department of the Navy to the Department of the Army in
October 2008. The City of Concord has been designated as the Local Reuse Authority for the approximately 5,028 acres of Navy property that was declared surplus.
SDDC’s 834th TB’s mission is to conduct surface deployment, command and control, and distribution operations for the DoD through terminals and facilities in California in peacetime and war. The 834th TB also is responsible for the daily management of the installation. The 834th TB is subordinate to the 596th
Transportation Group (Ammunition), located at MOTSU in Southport, North Carolina. Whereas the
834th TB at MOTCO oversees West Coast Ammunition Terminal Operations, the 596th Transportation
Group at MOTSU oversees East Coast Ammunition Terminal Operations. The broader Command mission is to provide global SDDC services to meet the nation's objectives. SDDC deploys and sustains more than 90 percent of the DoD’s equipment and supplies by leveraging the capability of commercial industry and other military services.
2.5 CULTURAL RESOURCES PROGRAM: SUMMARY AND GOALS
The mission of the 834th TB is to provide operational oversight at MOTCO, and to coordinate the movement of DoD cargo and ammunition through Concord. MOTCO has appointed an Environmental
Coordinator in accordance with AR 200-1 and the guidelines contained within this ICRMP. Among the primary duties of the Environmental Coordinator will be the complete documentation of all past cultural resources actions including archaeological site identification, inventory and evaluation, historical architectural inventories and evaluations, and all actions relating to the Section 106 review process and compliance with 36 Code of Federal Regulations (CFR) 800.
The MOTCO Cultural Resource Program (CRP) strives to ensure legal compliance with all applicable federal laws while emphasizing installation and command mission support as the primary program goal.
The CRP shall complete the following list of specific administrative tasks as part of the five-year plan:
1. Investigate the availability and applicability of existing local and regional predictive models to lands owned by MOTCO.
2. Initiate consultation with appropriate federally recognized American Indian groups (see Table 4-
4) and develop MOTCO and Tribal-specific Standard Operating Procedures (SOPs) and
Protocols.
Integrated Cultural Resources Management Plan 2-9
3. Update the archival data portion of the Planning Level Survey on an annual basis.
4. Update MOTCO’s Inventory of Historic Properties on an annual basis.
5. Program Facilities Annual Management Plan funds, both to conduct cultural resources investigations for programmed undertakings and to monitor progress and contractor work quality.
2.6 ICRMP AND ICRMP ORGANIZATION
This ICRMP covers all actions related to specific historic properties, including their management, treatment, and compliance procedures. This document provides a summary of the important information from the 2002 ICRMP for the NWSSBD Concord, and includes relevant new or revised information as relates to the property’s transfer in ownership from the Department of the Navy to the Department of the
Army. Specific and pertinent background information from the original ICRMP is referenced where necessary.
The ICRMP will be reevaluated after five years. Some events that may trigger a reevaluation of the
ICRMP prior to the five-year review point are:
1. Significant federal actions (e.g., change in mission, BRAC, etc);
2. Deficiencies resulting from an environmental audit (AR 200-1);
3. A significant increase in the number or percentage of completed surveys;
4. Change in Headquarters, Department of the Army (HQDA) policy;
5. New or revised federal statute, regulation, Executive Order (EO), or Presidential Memoranda;
and/or
6. Addition of new resource types or categories (e.g., historic properties are found on newly acquired land, or consultation with American Indian Tribes yields information about properties of traditional, religious, and cultural significance).
2.7 ICRMP PLAN DEVELOPERS AND REVIEWERS
The MOTCO ICRMP for the years 2011-2016 was developed under contract by the Army Corps of
Engineers Mobile District, TEC Inc., and The Louis Berger Group, Inc., in conjunction with MOTCO and
SDDC personnel.
2.8 ICRMP AUDIENCE
This ICRMP establishes procedures for addressing cultural resources within MOTCO’s planning process and serves three interrelated functions: (1) describes to the Command how Federal historic preservation laws and applicable DoD and Army instructions are being carried out; (2) instructs Facilities and other land-use planners on when and how specific undertakings fall under Section 106 review; and (3) provides guidance to the Cultural Resources Management (CRM)/Environmental Coordinator and other land-use planners on specific courses of action for completing the Section 106 process.
2-10 Integrated Cultural Resources Management Plan
Chapter 2 - Introduction
2.9 SUMMARY OF CHANGES SINCE THE 2002-2007 ICRMP
Table 2-1 lists the organization and chapter headings from the 2002-2007 NWSSBD Concord ICRMP.
Changes in each chapter are noted in the Status column.
Table 2-1. Summary of Changes Since the 2002-2007 NWSSBD Concord ICRMP
Chapter and Section Heading Status
Chapter 1: Introduction: Background and Management Issues
1.1: NWSSBD Concord and its ICRMP
1.1.1 Detachment Location, Acreage, Setting Revised per transfer from
NWSSBD Concord to Army; See
Chapters 1.0 and 2.0
1.1.2 Purpose of the ICRMP No Significant Change
1.1.3 CRM Plan Developers and Reviewers See Chapter 2.0
1.2 Legal Authority and Context
1.2.1 Department of Navy Authority Revised per transfer from
NWSSBD Concord to Army; See
Chapters 1.0 and 2.0
1.2.2 Federal Law Overview See Chapter 4.0;
EO 13327 Federal Real Property
Asset Management signed on Feb
4, 2004;
AR 200-4 replaced by revised
AR 200-1 effective 1 October
1.2.3 Important Legal Definitions No Significant Change
1.2.4 Consulting Agencies No Significant Change
1.3 NWSSBD Concord Facilities and Activities
1.3.1 Natural Setting Revised per transfer from
NWSSBD Concord to Army; See
Chapters 1.0 and 2.0
1.3.2 Station Mission Revised per transfer from
NWSSBD Concord to Army; See
Chapters 1.0 and 2.0
1.3.3 Land Uses and Facilities Revised per transfer from
NWSSBD Concord to Army; See
Chapter 2.3
1.4 Cultural Resources in and around NWSSBD Concord and Related Management Goals
1.4.1 NWSSBD Concord and Vicinity Cultural
Resources
See Chapter 3.0
1.4.2 Cultural Resource Management Goals See Chapters 2.2 and 3.0
1.5 CRM Plan Audience
1.5.1 Guidance to NWSSBD Concord Managers
and Users
Revised per transfer from
NWSSBD Concord to Army; See
Chapter 2.6
1.5.2 Documentation to Department of the Navy Revised per transfer from
NWSSBD Concord to Army; See
Chapter 6.0
Integrated Cultural Resources Management Plan 2-11
Chapter 2 - Introduction
Table 2-1. Summary of Changes Since the 2002-2007 NWSSBD Concord ICRMP
Chapter and Section Heading Status
1.5.3 Communication with Interacting Agencies
and Organizations
Revised per transfer from
NWSSBD Concord to Army; See
Chapter 6.0
1.5.4 Communication with Concerned
Organizations and Interest Groups
Revised per transfer from
NWSSBD Concord to Army; See
Chapter 6.0
1.6 How this document is organized
1.6.1 Order of Presentation See Chapter 2.6
1.6.2 Aids for Document Use See Chapter 6.0
Chapter 2.0 Known Cultural Resources: Context Survey Status, Evaluation Status
2.1 Prehistoric Archaeological Resources
2.1.1 History of Research No Significant Change
2.1.2 Cultural Chronology No Significant Change
2.1.3 Research Issues No Significant Change
2.1.4 Site Identification Status and the Buried
Site Problem
See Chapter 3.5 Archaeological
Resources
2.1.5 Areas with Archaeological Potential See Chapter 3.5 Archaeological
Resources
2.1.6 Significance Evaluation Status for
Prehistoric Sites
No Significant Change
2.2 Traditional Cultural Properties and Life
Way Values
No Significant Change
2.3 Historic Archaeological Resources
2.3.1 Historic Occupation Sequence No Significant Change
2.3.2 Historic Site Thematic Groups No Significant Change
2.3.3 Status of Historic Archaeological Site
Identification on NWSSBD Concord
Lands
Revised per transfer from
NWSSBD Concord to Army; See
Chapter 3.5 Archaeological
Resources
2.3.4 Status and Recommendations for Historic
Archaeological Site evaluations
See Chapter 3.5 Archaeological
Resources
2.4 Built Environment Historic Properties
2.4.1 1993 Pre-Cold War Study by Self &
Associates
See Chapter 3.0
2.4.2 1998 Built Environment Study by JRP See Chapter 3.0
2.4.3 Summary of National Register Status and
Recommendations for Future Evaluations
See Chapter 3.0
3.0 NWSSBD Concord Cultural Resources Management Program
3.1 Cultural Resources Coordinator No Significant Change
3.1.1 Responsibilities No Significant Change
3.2 ICRMP Data Repository No Significant Change
3.2.1 Data Management Coordination with
Northwest Information Center
No Significant Change
3.2.2 GIS-based Cultural Resources Survey and No Significant Change
2-12 Integrated Cultural Resources Management Plan
Chapter 2 - Introduction
Table 2-1. Summary of Changes Since the 2002-2007 NWSSBD Concord ICRMP
Chapter and Section Heading Status
Archaeological Site Location Maps
3.2.3 ICRMP Data Repository Contents No Significant Change
3.2.4 Confidential Information Management No Significant Change
3.3 Research Permits and Collections
Management
3.3.1 Antiquities Permits for Archaeological
Survey and Excavations
No Significant Change
3.3.2 Management of Archaeological
Collections
No Significant Change
3.4 Budget Considerations for Historic
Preservation
No Significant Change
3.5 Historic Records Management No Significant Change
3.5.1 Laws and Programs For Historic
Documents and Records Management
No Significant Change
3.5.2 Document Management at NWSSBD
Concord
No Significant Change
4.0 Project-Specific Cultural Resources Assessment
4.1 National Historic Preservation Act
(NHPA), Section 106: Cultural Resources
Under Consideration
Updated; See Chapter 5.0
4.1.1 Consideration of all Legal Undertakings
and Delineation of the Project Area of
Potential Effects (APE)
No Significant Change
4.1.2 Cultural Resources Coordinator
Determines Compliance Path
No Significant Change
4.1.3 Consultation with (State Historic
Preservation Officer) SHPO and Public
Notification
No Significant Change
4.1.4 Determining in an APE Contains Historic
Properties
No Significant Change
4.1.5 APEs with Historic Properties No Significant Change
4.2 Standard Paths to Cultural Resources
Consideration at NWSSBD Concord
No Significant Change
4.2.2 Project Planning No Significant Change
4.2.3 Minor…
This is the start of the file's text. The full file is on GovTribe.