MEC_Pier_2_Low_Risk_Memo_Aug_2017-signed.pdf

PDF 180 KB Posted

Attached to
Replace/Upgrade Pier 2 Federal contract opportunity
Solicitation number
W9123817R0065
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

MEC Pier 2 Low Risk Memo Aug 2017-signed

View the file

Other files for this federal contract opportunity

Other files attached to Replace/Upgrade Pier 2, newest first.
File Type Posted
C01.13_Award_Announcement_(synopsis).pdf PDF
A13.2_Bidder_Inquiries_11-6-2017_(FIO).pdf PDF
W9123817R0065_Amend_0005_Conform_Copy.pdf PDF
W9123817R0065_Amend_0005.pdf PDF
Attachment_16_Final_NMFS_Letter_signed_4Oct2016_v10042016_(clean).pdf PDF
Bidder_Inquiry_Reopened.pdf PDF
Amendment_0003_Specifications.pdf PDF
SAV_Mitigation_Plan_081814.pdf PDF
17-R-0065_Amend_003_Conform.docx DOCX document
Military_Ocean_Terminal_Concord_Integrated_Cultural_Resources_Management....pdf PDF
MWBS.pdf PDF
NAVFAC_USACE_PPQ_Form_Sep_2011.doc DOC document
Amendment_0002_Drawings_(Marked_Delta_1).pdf PDF
Amendment_0002_Specification_2026.pdf PDF
SCA_Wage_Determination_WD_15-5623_(Rev.-4).pdf PDF
W9123817R0065_Amend_0002_Conform_Copy.pdf PDF
W9123817R0065_Amend_0002.pdf PDF
30006CM_-_May_1967_extension_1_of_2.pdf PDF
30007CM_-_Marginal_pile_records_dated_13_Oct_1944.pdf PDF
30005CM_-_March_1988_repair.pdf PDF
30009CM_-_1958_rehabilitation.pdf PDF
Pier_MEC_Clearance_Completion_Report,_Rev_0.pdf PDF
30006CM_-_May_1967_extension_2_of_2.pdf PDF
CR-6462-OCN_MOTCO_Concord.pdf PDF
404_Permit_(Pier_2_NWP).pdf PDF
A2-8_HAZMAT_Phase_I_Site_Investigation_Report.pdf PDF
MEC_-_Pier_2_MEC_RA_DD_Form_2977-signed.pdf PDF
Pier_2,_WFI-MCO-11-00128_Final_Reduced.pdf PDF
2002_Repair_Drawings_&_Fenders.pdf PDF
A2-9_HAZMAT_Phase_II_Report.pdf PDF
Batymetry_Layer_71057V-HP01.dwg DWG drawing
A7.3_MOTCO_Industry_Day_Photos_Nov_2016.pdf PDF
Pier_2_Site_Visit_Photos.pdf PDF
A2-4_Geotechnical_Data_Report.pdf PDF
Subcontracting_Goals_(FIO).pdf PDF
DDESB_Approval,_Explosives_Safety_Submission,_Removal_ActionConstruction.PDF PDF
W9123817R0065_Amend_0001_Conform_RFP.pdf PDF
Attachment_8_-_USFWS_2014-F-0002-5_MOTCO_Pier_2_Final_Biological_Opinion.PDF PDF
Attachment_4_-_MOTCO_Pier_2_Final_Supplemental_Environmental_Assessment.pdf PDF
W9123817R0065_Amend_0001.pdf PDF
Attachment_6_-_NMFS_Biological_Opinion_11_19_2014_MOTCO_Piers_2.pdf PDF
A7.3_Site_Visit_Sign_In_Sheet.pdf PDF
Pier_2_Solicitation_Site_Visit_Slides.pdf PDF
A7.3_Industry_Day_Maps.pdf PDF
A2.1_Attachment_3_-_Wage_Determination_-_CA29_09-08-2017.pdf PDF
Attachment_1-MOTCO_PIER_2_SPECIFICATIONS_07SEP2017.pdf PDF
A2.1_W9123817R0065_09-08-2017.pdf PDF
Forms_instructions_2.0_USACE.docx DOCX document
Industry_Day-Site_Vists_MOTCO_Pier_2_Replace_and_Update_Information.docx DOCX document
MOTCO_190-3__JUN_2016-1_Final.xlsx XLSX spreadsheet
Show all 50

Replace/Upgrade Pier 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SDAT-CCA 29 September 2017

MEMORANDUM FOR US Army Corps of Engineers, Sacramento District, CA 95814

SUBJECT: Military Ocean Terminal Concord (MOTCO), Munitions and Explosives of Concern (MEC) Clearance Probability Assessment for Pier 2, Concord, California

1. PURPOSE. To obtain written approval prior to conducting future construction events at Pier 2 from the MOTCO Commanding Officer based off the performed MEC clearance of Pier 2 due to the 1944 explosion adjacent at Pier 1.

2. RECOMMENDATION. Recommend Safety conduct a thorough review of every aspect of the MEC Clearance After Action Report (AAR) and perform a Risk Assessment based on the MEC findings.

3. BACKGROUND AND DISCUSSION. The future construction projects at the Pier 2 site required Unexploded Ordnance (UXO) qualified personnel perform a MEC clearance assessment at the Pier 2 location. The MEC clearance was completed on 10 April 2017. On 6 February 2017 the dive crew assembled on Pier 2 and following the daily site safety brief, began setting up for current MCE operations. During the course of the clearance operations, 81 dives were completed, 11,189 anomalies were investigated, and 6 cultural items were recovered and transferred to MOTCO. No MEC or UXO’s were observed or recovered. The initial deliberate risk assessment for future construction events at the Pier 2 site were HIGH RISK. The execution of the MEC clearance has future construction events at a residual risk level as LOW RISK.

4. The point of contact in this matter is Mr. Chad A. Brown, Explosive Safety Manger,

(925) 246-4106 or by email to chad.a.brown12.civ@mail.mil.

2 Encls KEVIN M. PETERS

1. AAR MEC Findings LCDR, SC

2. Risk Assessment Deputy Commander

DEPARTMENT OF THE ARMY

Military Surface Deployment and Distribution Command

834thTransportation Battalion 410 Norman Avenue

Concord, California 94520-1142

2017-09-29T14:50:47-0700
PETERS.KEVIN.MICHAEL.1267941285

File details come from the government source that posted it. Updated .