W9123817R0065_Amend_0002.pdf
PDF 188 KB Posted
- Attached to
- Replace/Upgrade Pier 2 Federal contract opportunity
- Solicitation number
- W9123817R0065
About this file
W9123817R0065 Amend 0002 (please note the changes to section 00 72 00)
View the file
Other files for this federal contract opportunity
Show all 50
Replace/Upgrade Pier 2 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123817R0065 Amend 0002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. The purpose of this amendment is to make changes to the solciitation based on "bidder inquiries," and extend the solicitation due date.
B. The plans and specifications attached to this amendment (see revised table of contents in the follow ing pages) supersede their oringally-issued versions.
C. Except as noted below , all terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 62
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Oct-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123817R0065
X 9B. DATED (SEE ITEM 11)
08-Sep-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Oct-2017
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Attachment 1-MOTCO
PIER
2_SPECIFICATIONS
1847 07-SEP-2017
Attachment 02 Attachment 2 - Drawings
- Updated RTA Design Drawings
342 08-MAY-2017
Attachment 03 Attachment 3 - Wage Determination - CA29
54 08-SEP-2017
Attachment 04 MOTCO Pier 2 Final Supplemental Environmental
264 24-JAN-2017
Attachment 05 MOTCO Pier 2 Supplemental Environmental Assessment
4 06-APR-2017
Attachment 06 NMFS Biological Opinion 11_19_2014 MOTCO Pier
68 19-NOV-2014
Attachment 07 PD_Final_Environmental Impact Statement_MOTCO
854 10-FEB-2015
Attachment 08 USFWS 2014-F-0002-5 MOTCO Pier 2 Final Biological Opinion
154 04-FEB-2015
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Attachment 1-MOTCO
PIER
2_SPECIFICATIONS
1847 07-SEP-2017
Attachment 02 Attachment 2 - Drawings
- Updated RTA Design Drawings
342 08-MAY-2017
Attachment 03 Attachment 3 - Wage Determination - CA29
54 08-SEP-2017
Attachment 04 MOTCO Pier 2 Final Supplemental Environmental
264 24-JAN-2017
Attachment 05 MOTCO Pier 2
Supplemental Environmental Assessment
4 06-APR-2017
Attachment 06 NMFS Biological Opinion 11_19_2014 MOTCO Pier
68 19-NOV-2014
Attachment 07 PD_Final_Environmental Impact Statement_MOTCO
854 10-FEB-2015
Attachment 08 USFWS 2014-F-0002-5 MOTCO Pier 2 Final Biological Opinion
154 04-FEB-2015
Attachment 09 Amendment_0002_Specif ication_2026
79 04-OCT-2017
Attachment 10 Amendment_0002_Drawi ngs (Marked Delta 1)
21 04-OCT-2017
Attachment 11 SCA Wage Determination WD 15-5623 (Rev.-4)
11 01-AUG-2017
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 26-Oct-2017 12:00 PM to 07-Nov-2017 12:00 PM.
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
INSTRUCTIONS TO PROPOSERS
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
INQUIRIES:
Prospective offerors should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the QUICK ADD link. Select agency as USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click continue. Fill in all required information and click Add User.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.
4. The Solicitation Number is : W9123817R0065
The Bidder Inquiry Key is: 6HMFK6-35999A
c. The Bidder Inquiry System will be available for new inquiries shortly after the issuance of the Phase-I solicitation up until the end of day on 10 Oct 2017 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Daniel Czech Telephone: (916) 557-7012
E-MAIL: Daniel.E.Czech@usace.army.mil
DIRECTIONS FOR SUBMITTING OFFERS:
Envelopes/packages containing offers must be sealed, marked and addressed as follows:
MARK ENVELOPES/PACKAGES:
Solicitation No. W9123817R0065
ADDRESS ENVELOPES/PACKAGES TO:
Department of the Army U.S. Army Engineer District, Sacramento ATTN: Contracting Division, Daniel Czech 1325 J Street Sacramento CA 95814-2922
SPECIAL INSTRUCTION PERTAINING TO HAND-CARRIED OFFERS:
Hand-carried offers must be delivered to: The Building Lobby at 1325 J Street, Sacramento, CA.
Due to security precautions, offerors may no longer hand-carry their offers directly to Contracting Division. Offers may NOT be turned-in at the Security Desk or left unattended elsewhere in the Lobby. Additionally, you are advised that there is no public parking in the Building.
The contract specialist will be in the Building Lobby 20 minutes prior to the closing time to accept hand-carried offers.
Offerors who desire to hand-deliver their offers at an earlier time must coordinate with the contract specialist in advance in order to arrange to be met in the Building Lobby by Contracting Division personnel.
Please ensure that all courier and delivery personnel are aware of these procedures.
CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY:
In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Section 00 22 00, Preaward Survey). All offerors will complete and return the Preaward Survey as part of the Price/Cost proposal. Failure to submit the Preaward Survey in conjunction with the price proposal will not of itself render the offer unacceptable.
Determination of Contractor Responsibility will be completed in accordance with FAR 9.104-1:
If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Preaward Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in FAR 9.104-
1) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.
The Preaward Survey as a tool used by the Government in determining responsibility of the offeror is submitted as part of the Price/Cost proposal and is separate from the technical proposal's response to the technical evaluation criteria found later in this section. Some of the information required from the offeror for completion of the
Preaward Survey and the technical proposal may be duplicative but it is necessary that the information be provided in full in both places and that the Price/Cost proposal and the Technical proposal be separate documents. DO NOT state, for example, in the technical proposal, "See Price/Cost proposal for past performance information".
AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS DESCRIPTIONS:
a. The internet URL for Corps of Engineers publications is:
http://www.publications.usace.army.mil/
b. Construction Criteria Base (CCB). The Construction Criteria Base (CCB) system available through the National Institute of Building Sciences includes copies of Corps of Engineers methods and specifications. Information about the CCB can be obtained from:
http://www.wbdg.org/ccb/ccb.php
PREPARATION OF SUBCONTRACTING PLAN:
(a) See FAR 52.219-9 (DEVIATION 2016-O0009), Section 00 70 00, of this solicitation. Subcontracting Plans will be developed considering only the subcontracts actually to be awarded. Subcontracting Plans are required from other than small businesses if the contract price is over $1,500,000; they are not required from small business firms regardless of the contract price.
(b) For information on the evaluation of subcontracting plans, see Army Federal
Acquisition Regulation Supplement, Appendix DD.
(c) Contact Michelle Stratton (916)557-7641, Deputy for Small Business, with questions on the Subcontracting Plan requirements and further instructions on submission of Electronic Subcontracting Reporting System (eSRS) as required by FAR 52.219-9.
(d) Offerors are to propose their own small business goals (see the Small Business Participation Factor in Section 00 22 00, pargraph 5.3.5:
The goals are calculated as a percentage of the THE TOTAL CONTRACT AMOUNT.
FACSIMILE BIDS/OFFERS:
Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will not be accepted.
PERFORMANCE AND PAYMENT BONDS:
The bidder/offeror whose bid/offer is accepted will, within the time established in the contract, furnish performance and payment bonds in accordance with FAR 52.228-15.
INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS:
Bidders/offerors utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28 (Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an individual surety, and include these with the SF 24 (Bid Bond), and the bid itself (see clause titled "Pledges of Assets," FAR 52.228-11).
Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate.
ACCEPTANCE OF OFFERS:
A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
System for Award Management (SAM) Registration:
It is a requirement that any and all contractors that intend to do business with the government must be registered in the System for Award Management (SAM) database.
No contract may be awarded by the government to any contractor who is not registered in SAM. If your company is not registered in SAM, you must register in order to be eligible for any government award.
The following link provides access to the SAM website:
https://www.sam.gov/portal/public/SAM/
If you have difficulties with or questions regarding the SAM registration, the following link has been set up by the Defense Logistics Agency (DLA) to assist contractors registering for CAGE codes for enrollment and navigation within SAM:
https://www.logisticsinformationservice.dla.mil/CAGETier3/
—End Section—
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been modified:
SUPPLEMENTARY INSTRUCTIONS
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, BASIS OF
AWARD, AND EVALUATION CRITERIA
1. OVERVIEW.
This is a "Best Value" solicitation for the replacement/upgrade of Pier 2 at Military Ocean Terminal Concord (MOTCO), California. The Contracting Officer will award a firm fixed-price contract to that responsible offeror whom the Source Selection Authority determined conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price.
2. BASIS OF AWARD.
2.1. ELIGIBILITY FOR CONTRACT AWARD
In accordance with the requirements of Part 9 of the Federal Acquisition Regulation (FAR), no contract shall be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.
2.2. SOURCE SELECTION USING THE TRADE-OFF PROCESS
The Government will select the offer that represents the best value to the Government by using the trade-off process described in FAR Part 15. This process permits tradeoffs between price and technical (“non-price”) factors and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative analysis and an integrated assessment of proposals against all source selection criteria in the solicitation.
2.3. RELATIVE IMPORTANCE OF PRICE TO THE TECHNICAL EVALUATION FACTORS
All evaluation factors other than price, when combined, are significantly more important than price. The Government is potentially willing to pay more for a better proposed solution. The degree of importance of price could become greater depending upon the equality of the technical proposals. If competing technical proposals are determined to be essentially equal, price could become the controlling factor.
2.4. EVALUATION OF THE PRICE PROPOSAL
a. Price to the Government will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed price will be analyzed for reasonableness. Price may also be analyzed to determine whether it reflects a clear understanding of the requirements and to determine that it is consistent with the offeror’s Technical Proposal. In addition, all offers will be analyzed for unbalanced pricing.
b. Information required to be submitted in the Price Proposal volume in addition to the executed SF 1442 with acknowledgement of amendments and the completed CLIN schedule will be used to determine the offeror’s eligibility for contract award in accordance with paragraph 2.1 above (for example: the work breakdown structure, the offeror’s representations and certifications; the bid guarantee; and the offeror’s pre-award survey information). The Government may enter into exchanges with offerors about such information without it constituting discussions, subject to applicable FAR limitations, including FAR 15.306, Exchanges with offerors after receipt of proposals.
2.5. THE TECHNICAL EVALUATION FACTORS:
a. The Government will evaluate each offeror’s technical proposal based on how well the proposal addresses each of the evaluation factors, listed below, and on how well the offeror has performed on related projects through the evaluation of the past performance information provided from references or obtained from other sources. Each of the evaluation factors will be evaluated by the Government and an adjectival rating and risk rating will be determined by consensus of the Government evaluation board for all technical factors other than past performance. The Past Performance factor will be evaluated by the Government and a relevancy and confidence level will be determined by consensus of the Government evaluation board.
b. The evaluation factors correlate directly to the main organizational tabs identified in the proposal submission instructions.
Factor 1: Experience and Capability
Factor 2: Technical Approach
Factor 3: Past Performance
Factor 4: Small-Business Participation
2.6 RELATIVE WEIGHTING OF THE TECHNICAL EVALUATION FACTORS
Technical Evaluation Factor Order of Importance:
Factor 1 – Experience and Capability is the most important factor.
Factor 2 – Technical Approach is equal to Factor 1.
Factor 3 – Past Performance is less important than Factors 1 and 2.
Factor 4 – Small-Business Participation is the least important factor.
2.7. GENERAL TECHNICAL EVALUATION CRITERIA
a. The offeror’s conformance with the specified format, submission requirements, and the offeror’s attention to detail (e.g., typographical, grammatical, and reference errors) will be considered during the technical evaluation and tradeoff. Failure to comply with the formatting and/or submission requirements or a lack of attention to detail may be seen as indicative of the type of problems that could be expected during contract performance. Lack of conformance or attention to detail could therefore result in a higher risk assessment, in addition to any other impacts on the evaluation. Material omission(s) may result in a deficiency, which will cause the technical proposal to be rejected as unacceptable. However, in accordance with FAR 52.215-1, the Government may waive informalities and minor irregularities in proposals. For example, a failure by a proposed key subcontractor to submit a properly executed letter of commitment may be considered as increasing risk, but may not be considered a proposal deficiency and may not result in an unacceptable rating, in and of itself.
b. Technical proposals which do not provide the specified information in the specified location in accordance with the submission instructions may be found to have weaknesses or significant weaknesses. The Government is under no obligation to search for information that is not in the specified location.
c. Proposals which are generic, vague, or lacking in detail may found materially weak or deficient. Responses that are essentially blanket offers of compliance are not adequate substitutes for the detailed and complete technical information necessary to establish that an offeror can meet US Government needs. The proposal submission instructions are written to give prospective contractors, where feasible, an indication of the level of detail desired by the Government. The offeror’s failure to include information that the Government has indicated should be included may result in the proposal being assigned a (significant) weakness and/or being found deficient if inadequate detail is provided.
d. Any prescribed page and formatting limitations will be strictly adhered to and enforced by the Government. The Government will not evaluate any excess information resulting from the offeror’s failure to comply with the submission instructions. Examples:
If an offeror were to submit three pages in response to an item with a two page limitation, the information on the first two pages would be evaluated but the information on the third page would not be evaluated. If an offeror were to submit a fold-out sheet (e.g. 11”x 17”) in response to a one-page limitation where fold-out sheets were not authorized, only the information that could reasonably have been submitted on one 8- 1/2 x 11 inch sheet would be evaluated. If an offeror were to submit three 8-1/2 x 11 inch pages in response to a one not-to-exceed 11 x 17 inch page limitation, only the information that could reasonably have been submitted on one 11 x 17 inch sheet would be evaluated. If an offeror submitted alternates that were not requested (e.g., key personnel), the information will not be evaluated.
e. The degree of risk to the Government inherent in the offeror’s technical proposal will be a consideration under every evaluation factor, with the exception of past performance, which will be evaluated as Past Performance Confidence Assessment.
f. A “strength” is an aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. A significant strength has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
g. An “uncertainty” is any aspect of a non-cost/price factor proposal for which the intent of the offer is unclear (e.g. more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
h. A “deficiency” is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level (see FAR 15.001).
i. “Weakness” means a flaw in a proposal that increases the risk of unsuccessful contract performance (See FAR 15.001). A “significant weakness” is a proposal flaw that appreciably increases the risk of unsuccessful contract performance. The Government cannot accept an offer with a deficiency in its technical proposal. The term “acceptable” is therefore used in this context to describe a technical proposal that does not contain a deficiency and thus could be accepted by the Government, notwithstanding any weaknesses or significant weaknesses in the proposal.
j. The presence of a deficiency will automatically result in an “Unacceptable” rating in the pertinent evaluation factor. The Government cannot make award based on an unacceptable offer. Therefore, a rating of “Unacceptable” under any factor will render the offer ineligible for award, unless the Government elects to enter into discussions with that offeror and all deficiencies are remedied in a revised proposal.
k. Failure of a proposed subcontractor to furnish authorization for the Government to discuss its past performance with the offeror will not be considered a proposal deficiency. However, the Government will not be able to disclose to the offeror any details pertaining to their performance problems that may contribute to a lower overall rating.
l. Combined Technical/Risk Rating for other than past performance.
Color Rating
Adjectival Rating
Description
Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Furthermore, the Government shall use the following risk descriptions:
Risk Level Description Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which are likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
3 GENERAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS.
3.1 GENERAL INSTRUCTIONS.
3.1.1 Media, Page Size, Margins, Fonts, and Page Limitations.
Submit only the hard-copy paper documents and electronic files specifically authorized elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. Do not include links to information on websites in lieu of incorporating the information physically into the proposal. Except where another size is specifically authorized for a specific submission, use only 8 1/2” x 11” paper. Use at least 1 inch margins, which may include headers and footers. Do not justify the right margin. Ensure that all text and graphics are clearly legible. Do not use a font size smaller than 10, unusual font styles such as script, or condensed fonts. For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, a foldout sheet will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are excluded from page limitations.
3.1.2 Proposal Binding.
The preferred method for assembling proposals is a method that enables the rapid insertion or deletion of pages such as three ring binders. Ensure recommended capacity is not exceeded and that pages turn freely. Do not use spring clamps, spiral binding systems, or heat binding systems.
3.1.3 Conditioning of Offer.
Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer; see “Inquiries”, located in Section 00 21 16, for instructions. Notwithstanding the above, the offeror must clearly describe in the proposal cover sheet submitted with the price volume any exceptions, within the offer, to the contractual and/or technical terms and conditions of the solicitation.
3.1.4 Restrictions on Offeror-Provided Information.
“Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, “Instructions to Offeror – Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”. Files shall not contain classified data.
3.2 General Proposal Preparation
Each offeror must submit both a “price proposal” volume and a “technical proposal” volume. The price proposal includes the signed offer and the offeror’s proposed prices.
The technical proposal includes all required information relating to the “non-price” evaluation factors. The two volumes must be submitted as separate, physically distinct volumes. Both volumes must be received at the location shown in Block 8 of Standard Form 1442, not later than the date and time specified in Block 13 of Standard Form 1442. The information in the two volumes is evaluated separately and independently.
Therefore, all information intended by the offeror to be evaluated as part of the price proposal must be submitted as part of the price proposal. All information intended by the offeror to be evaluated as part of the technical proposal must be submitted as part of the technical proposal. Do not merely cross-reference similar material between the technical and price proposals. Information in the price proposal will not be considered in the technical evaluation, and vice versa.
3.2.1 Marking of Proposal Volumes.
Mark each volume as either the “Price Proposal” or the “Technical Proposal”. In addition, mark the outside front cover of each volume with the project title and location, solicitation number, name and address of the offeror, and volume copy number.
(Markings which identify the offeror are not required on either the back cover or on the spine/binding.)
3.2.2 Tabbing of Proposal Volumes.
Offers are to be formatted and tabbed in accordance with the instructions that follow for each proposal volume.
3.2.3 Table of Contents.
Include a table of contents for each proposal volume.
4 PRICE PROPOSAL VOLUME.
4.1 NUMBER OF SETS OF THE PRICE PROPOSAL.
Submit the original and two hardcopies of the price proposal volume and an electronic copy on a compact disk.
4.2 FORMAT, CONTENTS, AND LIST OF TABS FOR THE PRICE PROPOSAL.
Use only 8-1/2” x 11” pages, unless specified otherwise. There are no page limits for the price proposal; however, limit responses to required information. Organize your price proposal as indicated below. If a tab is not applicable to your proposal, omit that tab but do not renumber the subsequent tabs.
PRICE PROPOSAL VOLUME
TAB CONTENTS OF THE PRICE PROPOSAL
1 Proposal Cover Sheet
2 SF 1442; Acknowledgement of Amendments; Joint Venture Agreement
3 CLIN Schedule
4 Work Breakdown Structure
5 Representations and Certifications
6 Bid Guarantee
7 Pre-Award Survey Information
8 Subcontracting Plan
4.3 DETAILED SUBMISSION REQUIREMENTS FOR THE PRICE PROPOSAL.
Tab 1 of the Price Proposal: Proposal Cover Sheet.
The proposal cover sheet is required by FAR 52.215-1(c)(2). This provision, titled “Instructions to Offerors – Competitive Acquisition” is incorporated by reference in Section 00 21 00. The format and content for the proposal cover sheet follows:
PROPOSAL COVER SHEET
1. Solicitation Number:
2. The name, address, DUNS number, and telephone and facsimile numbers of the offeror.
3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the Solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item.
4. Names, titles, email addresses, and telephone and facsimile numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:
5. Name, title, and signature of person authorized to sign the proposal.
Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(End of Proposal Cover Sheet)
Tab 2 of the Price Proposal: SF 1442; Acknowledgement of Amendments; Joint Venture Agreement.
The Standard Form (SF) 1442 must be completed by the offeror and duly executed with an original signature by the official(s) identified in the proposal cover sheet as authorized to bind the offeror in accordance with FAR 4.102, which includes specific instructions pertaining to individuals, partnerships, corporations, Joint Venture participants, and agents. Include the offeror’s DUNS number in block 14 of the SF 1442, along with the offeror’s address. All amendments must be acknowledged in accordance with the instructions on the Standard Form 30, Amendment. If the offeror is a Joint Venture (JV), include a copy of the JV agreement and indicate its status. (Note: It is preferred, but not required, that you use a document protector in lieu of punching holes in the original SF 1442.)
Tab 3 of the Price Proposal: CLIN Schedule.
Submit the completed CLIN Schedule with the offeror’s proposed contract prices inserted in the appropriate spaces. Prices must be proposed for all contract line items.
Unit prices must be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off the extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission. Any qualification of pricing may render the proposal unacceptable and therefore not eligible for award. (Note: It is preferred, but not required, that you use a document protector in lieu of punching holes in the completed “original” CLIN schedule.)
Tab 4 of the Price Proposal: Work Breakdown Structure.
Submit a Work Breakdown Structure of the offeror’s proposed contract prices for each CLIN using the format below, in accordance with Unified Facilities Criteria (UFC) 3-740- 05:
01 SUBSTRUCTURE
02 SUPERSTRUCTURE
03 EXTERIOR CLOSURE
04 ROOFING
05 INTERIOR CONSTRUCTION
06 INTERIOR FINISHES
07 CONVEYING SYSTEMS
08 PLUMBING
09 HVAC M2
10 FIRE PROTECTION SYSTEMS
11 ELECTRIC POWER AND LIGHTING
12 ELECTRICAL SYSTEMS
13 EQUIPMENT
14 FURNISHINGS
15 SPECIAL CONSTRUCTION
16 SELECTIVE BUILDING
DEMOLITION
17 SITE PREPARATION
18 SITE IMPROVEMENTS
19 SITE CIVIL/MECHANICAL UTILITIES
20 SITE ELECTRICAL UTILITIES
In addition, the Contractor shall provide a separate price-breakdown structure that includes, but is not limited to, all labor categories, hours, material, equipment, transportation, travel, and per diem related to each CLIN 0024, MEC Removal and Disposal, and CLIN 0025, MEC Blast-in-place.
Tab 5 of the Price Proposal: Representations and Certifications.
The offeror must have electronically completed the annual representations and certifications on the System for Award Management (SAM) website in accordance with FAR 52.204-8.
The offeror is responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in Section 00 45 00 of the solicitation. If the offeror is a Joint Venture, all participants must separately complete annual representations and certifications and Section 00 45 00.
Tab 6 of the Price Proposal: Bid Guarantee.
All offerors must submit a bid guarantee (e.g., Standard Form 24, Bid Bond) which complies with the requirements of FAR 28.101 Bid Guarantees, and any Defense and Army supplements thereto.
Tab 7 of the Price Proposal: Pre-Award Survey Information.
a. The Contracting Officer is required to make an affirmative pre-award determination of the prospective contractor’s responsibility in accordance with the mandatory requirements of Part 9 of the Federal Acquisition Regulation (FAR) and its supplements. The Contracting Officer must have sufficient information available to determine that a prospective contractor meets these minimum standards. Therefore, the offeror is requested to provide the pre-award survey information described below with its price proposal:
(1) The completed Construction Contractor Data Form with Supplemental Schedules A- C (see format which follows). If the offeror is a large multi-segmented business concerns, the data provided on the supplemental schedules may be limited to information that directly pertains to the specific segment of the business concern (e.g., the division, group, unit, etc.) proposed to perform work under the prospective contract with its own work force. If the offer is being submitted by a Joint Venture, submit a separate form for each Joint Venture participant. The offeror may submit pre-award survey information in another format, provided that the information furnished is substantially the same as that which would be furnished on the Construction Contractor Data Form and its supplemental schedules.
(2) Current financial statements. If the financial statement is more than 60 days old, submit a certificate stating that the firm's financial condition is substantially the same, or, if not the same, state the changes that have taken place. If a Joint Venture, provide this information for each participant in the Joint Venture.
(3) Banking information. Provide letters from banks or other financial institutions with which the contractor conducts business. The letters should contain information about your firm's accounts, loans, lines of credit, etc. The Government is interested in financial stability, timely payments, the length and nature of the relationship between the firm and the financial institution, and the firm's financial ability to perform the contract. The letters should also provide the name and telephone number of the bank representative the Government may contact. If a Joint Venture, provide this information for each Joint Venture participant.
(4) The Government will treat the pre-award survey information submitted by the offeror as proprietary.
(Tab 7 of the Price Proposal: Pre-Award Survey Information)
CONSTRUCTION CONTRACTOR DATA DATE:
Firm Name and Telephone Number Main Office Address (Street, City, and State)
Branch Offices Services Rendered Construction Design Consultant
Organization Individual Joint Venture Partnership Corporation
Date Organized Date Incorporated:
State:
Names of Officers and Other Key Personnel
I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:
Officers:
Other Key:
Remainder: Subtotal Permanent:
Maximum Personnel at Any Time:
Date:
Total:
II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF
(DATE): Present Value ($)
Current Assets:
Acquisition Cost ($) Current Liabilities:
Net Worth:
IV—TOTAL VALUE OF CONSTRUCTION AND
DEMOLITION WORK IN PAST 6 YRS EXCLUSIVE OF
JOINT VENTURE (LIST MOST RECENT FIRST)
V—LARGEST JOB EVER
CONTRACTED
(If Other Than in Past Six Years)
$ LARGEST JOB IN PAST 6 YRS Contract Amount:
Date:
Description:
Owner:
$ Contract Amount:
Date:
Description:
Owner:
Avg. Annual Income
VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES
NAME AND POSITION/TITLE OF PERSON SIGNING
SIGNATURE
See attachment for explanations or detailed description of item(s) reported above.
CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS
List below the construction projects your firm currently has under way, including recent awards.
Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.
CONTRACT
NUMBER
AMOUNT
DESCRIPTION/
LOCATION
ORGANIZATION/
CONTACT PERSON/
PHONE NUMBER
PERCENT
COMPLETE
CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS
List below the principal construction projects your firm has completed within the past six years, including all DoD contracts with a total value exceeding $25,000,000.00.
NUMBER
AMOUNT
DESCRIPTION/
LOCATION
ORGANIZATION/
CONTACT PERSON/
PHONE NUMBER
PERCENT
SUBLET
CONSTRUCTION CONTRACTOR DATA – SCHEDULE C –
CONSTRUCTION AND/OR TECHNICAL EQUIPMENT
List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.
QUANTITY
DESCRIPTION
CONDITION
YEARS
OF
SERVICE
PRESENT
STATUS
Tab 8 of the Price Proposal: Subcontracting Plan
a. All offerors submitting offers with a total value (including all options) exceeding $1,500,000 that are not small businesses are required to submit a subcontracting plan. The plan must be prepared in accordance with Public Law 95-507 and the following instructions and format, which conform to FAR 52.219-9(d)(1) through (d)(11) (Deviation 2016-O0009) and include the required statutory elements as described in FAR 19.704 and the additional requirements of DFARS 219.704 and AFARS 5119.704. Evaluation of the subcontracting plan by the Government will be as prescribed in FAR 19.705 (and its supplements).
b. Do not just address the following issues in short; follow the guidance of FAR 52.219-
9 in its entirety. The plan should address all records as described in FAR 52.219- 9(d)(11)(i) through (vi).
c. In accordance with FAR 19.704 the cumulative value of the basic contract is considered in determining whether a subcontracting plan is necessary.
d. In other words, it is necessary to address planned subcontracting dollars and percentages of the total to be awarded to small business concerns, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business concerns, small disadvantaged business, and with women-owned small business concerns for the contract.
e. Offeror’s subcontracting plan must match the proposed goals for Factor 4, Small
Business Participation. A small disadvantaged business goal of less than five percent must be approved one level above the contracting officer (DFARS 219.705-
4) The subcontracting goals are to based on the total contract value.
5 TECHNICAL PROPOSAL VOLUME.
5.1 NUMBER OF SETS OF THE TECHNICAL PROPOSAL.
The Technical Proposal is to be submitted in one hard “original” and five (5) copies. In addition, submit one complete electronic copy of the technical proposal on Compact Disk (CD). The offeror may submit the electronic technical copy on the same disk as the electronic price copy; however, both electronic copies must be in separate files.
5.2 FORMAT, CONTENTS, AND LIST OF TABS FOR THE TECHNICAL PROPOSAL.
Use 8-1/2” x 11” pages for the narrative portions of the proposal. There may be page limits imposed at the tab level. Organize your technical proposal as indicated below. The tabs directly correlate to the technical evaluation factors. Although the Government may use information contained anywhere within the technical proposal in its evaluation of any technical evaluation criteria, the Government is not obligated to search for or to consider information that is not located in the specified location. Number the pages. Do not include information pertaining to your proposed pricing for this project in the technical proposal;
failure to comply with this requirement will disqualify your proposal from consideration for award. Limit your submittals to the information specified; excess information will not be evaluated.
TECHNICAL PROPOSAL
TAB CONTENTS
PREFACE
Prime Contractor/Key Subcontractor Introduction
1. FACTOR 1 – EXPERIENCE AND CAPABILITY
Prime Contractor/Key Subcontractor Example Projects Demonstrating Experience and Capability
2. FACTOR 2 – TECHNICAL APPROACH
Organization Chart and Narrative Project Schedule
3. FACTOR 3 – PAST PERFORMANCE
Prime Contractor/Key Subcontractor Example Projects Past Performance Key Subcontractor Authorization Letters
4. FACTOR 4 – SMALL-BUSINESS PARTICIPATION
Proposed Small Business Participation
5.3 DETAILED SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA FOR THE TECHNICAL
PROPOSAL
5.3.1 Preface – Prime Contractor/Key Subcontractor Introduction
a. The Offeror is required to propose a specific project team including key subcontractors for evaluation in response to this Request for Proposals. For purposes of this procurement, the terms “key subcontractors” are used to refer only to the prospective subcontractors whose qualifications, experience, and past performance will be evaluated by the Government as part of the source selection process. For reasons of efficiency, not all of the subcontractors critical to successful post-award contract performance have been included in this group. In order to streamline the proposal submission and evaluation process, please limit your submission to the information specifically requested. Information pertaining to other subcontractors not designated as “key” by the Government will be considered excess and will not be evaluated.
Should an offeror not be utilizing any subcontractor peforming 25% or more of the work (see b.i., immediately below), then indicate that no firm meets this criterion in the preface.
b. For the purposes of this procurement, a key subcontractor is defined as any subcontractor performing “key” major work elements for which capability information is required to be submitted for evaluation as part of the Offeror’s technical proposal. The Government has designated the following subcontractors as “key”:
i. Any firm that will be responsible for 25% (or greater) of the construction effort.
ii. Any firm responsible for handling the munitions and explosives of concern (MEC) and unexploded ordnance (UXO) material as it relates to the MEC/UXO underwater demolition.
iii. Any firm responsible for performing the Biological Surveys to determine presence/existence of endangered species and habitat.
iv. Any firm responsible for the pile driving effort.
v. Any firm responsible for the demolition of the existing pier.
c. The Offeror’s attention is directed to the clause in Section 00 73 00 titled “Key Personnelclause UAI 5152.236-9001 Personnel, Subcontractors, and Outside Associates or Consultants. and Subcontractors”. In accordance with this clause, any post-award changes to the key subcontractorsidentified individuals and firms in the accepted proposal will require Contracting Officer approval.
d. Provide a brief introduction narrative. Identify and provide the name, DUNS number, address, point of contact email address, and a brief description of the role and authority of each firm that will be involved in performance of this contract at the prime contractor and key subcontractor level. If the proposed prime contractor is a Joint Venture (i.e., mentor protégé Joint Venture), describe the relationship, role, and authority (to include management authority) of each firm. (Note: If a proposed firm has branch offices, provide information for each individual branch office that will perform work under the contract with its own workforce.) List the major work elements to be self-performed by the offeror’s in-house work force and by each key subcontractor. The submission is limited to two (2) 8-1/2”x11” pages for narrative.
e. The Government will not evaluate the Preface - Prime Contractor/Key Subcontractor Introduction. The purpose of this narrative is to provide a brief introduction for information purposes; however, if applicable, the Government reserves the right to consider it throughout the evaluation of the other factors.
5.3.2 Tab 1 of the Technical Proposal: Factor 1 – Experience and Capability
1. General
a. The information provided under this tab will be used to evaluate the experience and capability of the offeror and proposed key subcontractors. The resumes and example projects will provide the primary basis for the Government’s evaluation of the offeror’s qualifications and experiences.
b. The more similarities an example project has with the prospective contract, the greater the degree of relevancy. Relevant is defined as projects similar in project type/scope, physical size, complexity; dollar value, contract type, and degree of subcontract/teaming.
c. The Government is especially interested in relevant experience in projects of comparable complexity and size. Examples of these facilities can either be commercial or institutional.
The Key Elements are:
i. Previous diving experience and familiarity w/USACE guidance EM 385-1-1, Department of Defense Explosives Safety Board guidance TP-18, and all applicable references noted within the specifications package of the subject solicitation;
ii. Working within MEC/UXO and Biologically Sensitive Environments, which demonstrates the protection of both Human Health and the surrounding environment.
iii. Prior pile driving experience in ecologically sensitive areas, including the underwater monitoring of sound level and turbidity.
iv. Prior experience in marine demolition in an ecologically sensitive area.
2. Prime Contractor/Key Subcontractor Projects Demonstrating Experience and Capability
a. The offeror is required to submit…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .