C01.13_Award_Announcement_(synopsis).pdf

PDF 62 KB Posted

Attached to
Replace/Upgrade Pier 2 Federal contract opportunity
Solicitation number
W9123817R0065
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

Award Annoucement

View the file

Other files for this federal contract opportunity

Other files attached to Replace/Upgrade Pier 2, newest first.
File Type Posted
A13.2_Bidder_Inquiries_11-6-2017_(FIO).pdf PDF
Amendment_0005_Specifications.pdf PDF
W9123817R0065_Amend_0005_Conform_Copy.pdf PDF
W9123817R0065_Amend_0005.pdf PDF
W9123817R0065_Amend_0004_Conform.pdf PDF
W9123817R0065_Amend_0004.pdf PDF
Bidder_Inquiry_Reopened.pdf PDF
Amendment_0003_Specifications.pdf PDF
Wage_Determination_-_CA_29.pdf PDF
SAV_Mitigation_Plan_081814.pdf PDF
17-R-0065_Amend_003_Conform.docx DOCX document
Military_Ocean_Terminal_Concord_Integrated_Cultural_Resources_Management....pdf PDF
MWBS.pdf PDF
NAVFAC_USACE_PPQ_Form_Sep_2011.doc DOC document
Amendment_0002_Drawings_(Marked_Delta_1).pdf PDF
Amendment_0002_Specification_2026.pdf PDF
SCA_Wage_Determination_WD_15-5623_(Rev.-4).pdf PDF
30006CM_-_May_1967_extension_1_of_2.pdf PDF
30008CM_-_May_1967_deck_repair.pdf PDF
Pier_2_&_Barge_Pier_Naval_Weapons_Sta_Concord_CA_1994.pdf PDF
30007CM_-_Marginal_pile_records_dated_13_Oct_1944.pdf PDF
30005CM_-_March_1988_repair.pdf PDF
30009CM_-_1958_rehabilitation.pdf PDF
CR-6462-OCN_MOTCO_Concord.pdf PDF
MEC_Pier_2_Low_Risk_Memo_Aug_2017-signed.pdf PDF
404_Permit_(Pier_2_NWP).pdf PDF
A2-8_HAZMAT_Phase_I_Site_Investigation_Report.pdf PDF
Cultural_Resources_Treatment_and_Discoveries_Plan_MOTCO_Pier_2.pdf PDF
MEC_-_Pier_2_MEC_RA_DD_Form_2977-signed.pdf PDF
Pier_2,_WFI-MCO-11-00128_Final_Reduced.pdf PDF
2002_Repair_Drawings_&_Fenders.pdf PDF
A2-9_HAZMAT_Phase_II_Report.pdf PDF
A7.3_MOTCO_Industry_Day_Photos_Nov_2016.pdf PDF
Pier_2_Site_Visit_Photos.pdf PDF
A2-4_Geotechnical_Data_Report.pdf PDF
Subcontracting_Goals_(FIO).pdf PDF
Attachment_5_-_MOTCO_Pier_2_Supplemental_Environmental_Assessment_Final_FNSI_signed.pdf PDF
Attachment_7_-_PD_Final_Environmental_Impact_Statement_MOTCO_Piers_2_2015-02-10.pdf PDF
W9123817R0065_Amend_0001_Conform_RFP.pdf PDF
Attachment_8_-_USFWS_2014-F-0002-5_MOTCO_Pier_2_Final_Biological_Opinion.PDF PDF
Attachment_4_-_MOTCO_Pier_2_Final_Supplemental_Environmental_Assessment.pdf PDF
W9123817R0065_Amend_0001.pdf PDF
A7.3_Site_Visit_Sign_In_Sheet.pdf PDF
Pier_2_Solicitation_Site_Visit_Slides.pdf PDF
A2.1_Attachment_3_-_Wage_Determination_-_CA29_09-08-2017.pdf PDF
Attachment_2_-_Drawings_-_Updated_RTA_Design_Drawings_(2017-05-08).pdf PDF
Attachment_1-MOTCO_PIER_2_SPECIFICATIONS_07SEP2017.pdf PDF
Forms_instructions_2.0_USACE.docx DOCX document
NCIC_CONSENT_FORM_-_DEC_2016_Fillable.pdf PDF
Industry_Day-Site_Vists_MOTCO_Pier_2_Replace_and_Update_Information.docx DOCX document
Show all 50

Replace/Upgrade Pier 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AWARD ANNOUNCEMENT

Project Title: Replace/Update Pier 2

Project Location: MOTCO, Concord, California

Acquisition Type: MILCON Construction

Acquisition Method: Unrestricted RFP (FAR 15)

Solicitation Number: W9123817R0065

Contract Number: W913818C0015

Contractor: Kiewit Manson MOTCO AJV 2200 Columbia House Blvd Vancouver, WA 98661-7753

DUNS: 080869070

CAGE: 7YMR6

Business Size: Other than Small

Solicitation Date: 09-08-2017

Award Date: 19 Jul 2018

Est: Completion Date: 24 Jul 2020

Award Amount: $89,974,550

NAICS: 237990

Description: This requirement includes the furnishing of all labor, materials, equipment, and incidental related work to complete the Replace/Upgrade Pier 2 project for container crane operations at Military Ocean Terminal Concord (MOTCO), Concord, California.

Work will involve:

a. Demolishing the existing Pier 2 Main Platform, West Trestle, Middle Trestle, and Pedestrian Trestle; miscellaneous items onshore and on the East Trestle, and removal and disposal of hazardous materials prior to demolition;

b. Remove timber piles and concrete piles;

c. Construct a new reinforced concrete West Trestle, and Main Platform to support two container cranes;

d. Construction includes installation of pre-stressed concrete piles, and appurtenant items for vessel berthing and for the container cranes, but not the cranes themselves.

e. Construct new utility services (electrical power, lighting, lightning protection, potable water, firewater, sewer, storm drainage, and communications/security);

f. Construct Operations Building on the Main Platform;

g. Strengthening and repair of the existing reinforced concrete East

Trestle;

h. Construct an electrical substation including equipment foundations;

Construct miscellaneous improvements including the landside approach to the West Trestle, raise and repave portions of existing White Road, grading for the habitat restoration plan, the shoreline protection system, and the Port Chicago National Memorial White Road Crossing.

i. Discover and remove munitions and explosives of concern (MEC) from the construction footprint.

Contract Type: Firm-Fixed Price

File details come from the government source that posted it.