This is Amendment 0002 to solicitation W9123625B5002 for the Craney Island Eastward Expansion (CIEE) Pre-Dredging Phase 1C project, issued by the USACE Norfolk District Office on February 7, 2025. The amendment makes several technical specification changes but does not extend the bid due date.
Key changes include: modifying the CQC System Manager requirements to require daily site presence for minimum 8-hour shifts rather than constant presence; removing the "Continuity of Work" requirements from Section 35 20 23; eliminating the requirement for contractors to modify operations when water quality monitoring shows exceeded criteria; adjusting scow travel speed requirements during placement to "1-3 knots or slowest safe navigable speed"; and revising the main channel required dredging depth from 42.0 feet to 41 feet. The amendment responds to multiple bidder inquiries (11159971, 11160094, 11163852, 11163967, and 11164237) with these clarifications that will be incorporated prior to contract award.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W9123625B5002 Craney Island Eastw ard Expansion (CIEE) Pre-Dredging Phase 1C is hereby amended as follow s:
Please see summary of changes for a full amendment breakout.
POC Luke Hedlund, Email: luke.d.hedlund@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Feb-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123625B5002
X 9B. DATED (SEE ITEM 11)
13-Jan-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Feb-2025
CODE
USACE NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123625B5002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
1. The Bid Due date has not been extended as a result of this Amendment. Please acknowledge all Amendments in your bid.
2. The purpose of this Amendment is to provide additional clarification regarding changes to the Specifications, Drawings, and Attachments resulting from the following ProjNet Bidder Inquiries and Government responses. The following changes will be incorporated prior to Contract Award:
Amendments to the Technical Specifications are as follows:
1. Corresponding Bidder Inquiry Number 11159971:
Specifications Section 01 45 00 Quality Control, Paragraph 3.4.2 CQC System Manager:
DELETE: This CQC System Manager must be on the site at all times during construction and is employed by the prime Contractor.
ADD: The CQC System Manager must be on the site daily during construction for a minimum of one full shift or 8 hours and employed by the prime Contractor.
2. Corresponding Bidder Inquiry Number 11160094:
Specifications Section 35 20 23 Dredging, Paragraph 1.17 Continuity of Work:
DELETE: Paragraph 1.17 Continuity of Work and reference to “Continuity of Work” in specification section 35 20 23, paragraph 1.5.1 Acceptance Sections.
3. Corresponding Bidder Inquiry Number 11163852:
Specifications Section 01 57 19 Temporary Environmental Controls, Paragraph 3.3.2 Mitigation Measures:
DELETE: If at any point water quality monitoring indicates that permit-specified water quality criteria are being exceeded, the Contractor must modify operations as necessary to reduce the turbidity.
4. Corresponding Bidder Inquiry Number 11163967:
Specifications Section 35 20 23 Dredging, Paragraph 3.5.1 Requirements for Use of NODS, Subparagraph 1:
DELETE: Scows must travel at a speed of 1 to 3 knots during placement.
ADD: Scows must travel at a speed of 1 to 3 knots or slowest safe navigable speed during placement.
W9123625B5002
5. Corresponding Bidder Inquiry Number 11164237:
Drawing Sheet G-105 Project Summary:
DELETE: Reference to main channel required dredging depth of 42.0 feet.
ADD: Reference to main channel required dredging depth of 41 feet.
(End of Summary of Changes)